Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

HEPTAPOD: Orchestrating High Energy Physics Workflows Towards Autonomous Agency

Many workflows in high-energy-physics (HEP) stand to benefit from recent advances in transformer-based large language models (LLMs). While early applications of LLMs focused on text generation and code completion, modern LLMs now support orchestrated agency: the coordinated execution of complex, multi-step tasks through tool use, structured context, and iterative reasoning. We introduce the HEP Toolkit for Agentic Planning, Orchestration, and Deployment (HEPTAPOD), an orchestration framework designed to bring this emerging paradigm to HEP pipelines. The framework enables LLMs to interface with domain-specific tools, construct and manage simulation workflows, and assist in common utility and data analysis tasks through schema-validated operations and run-card-driven configuration. To demonstrate these capabilities, we consider a representative Beyond the Standard Model (BSM) Monte Carlo validation pipeline that spans model generation, event simulation, and downstream analysis within a unified, reproducible workflow. HEPTAPOD provides a structured and auditable layer between human researchers, LLMs, and computational infrastructure, establishing a foundation for transparent, human-in-the-loop systems.

Menzo, Tony [Alabama U.; Fermilab] (ORCID:00000002↗

Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Work Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.

54 ENVIRONMENTAL SCIENCES↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

NASA Advanced Space Suit Pressure Garment System Status 2023

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. ICES papers in 2022 detailed the design of the xEMU pressure garment components. This paper outlines the design updates to the xPGS since that time. More notably, this paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s transition from xEMU development and testing, to supporting the Exploration Extravehicular Activity Services (xEVAS) vendors will also be discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

spacesuit↗

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2023

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. ICES papers in 2022 detailed the design of the xEMU pressure garment components. This paper outlines the design updates to the xPGS since that time. More notably, this paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s transition from xEMU development and testing, to supporting the Exploration Extravehicular Activity Services (xEVAS) vendors will also be discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

spacesuit↗

Cost-effective retrofit technology for reducing peak power demand in small and medium commercial buildings

We describe a cost-effective retrofit technology that uses collective control of multiple rooftop air conditioning units to reduce the peak power consumption of small and medium commercial buildings. The proposed control uses a model of the building and air conditioning units to select an operating schedule for the air conditioning units that maintains a temperature set point subject to a constraint on the number of units that may operate simultaneously. A prototype of this new control system was built and deployed in a large gymnasium to coordinate four rooftop air conditioning units. Based on data collected while operating this prototype, we estimate that the cost savings achieved by reducing peak power consumption is sufficient to repay the cost of the prototype within a year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report on status of execution of SiC step document

Advanced fuel claddings made entirely or mainly of silicon carbide (SiC) ceramics and/or composites are considered very attractive elements of the accident-tolerant fuels for the light water reactors. In order to translate the promise of SiC composite materials into a reliable fuel cladding, a coordinated program of component level design and materials development must be carried out with many key feasibility issues addressed a-priori to inform the process. With the primary objective of developing a draft blueprint of a technical program that addresses the critical feasibility issues; assesses design and performance issues related with manufacturing, operating, and off-normal events; and advances the technological readiness levels in essential technology elements, a draft plan for the Systematic Technology Evaluation Program for SiC/SiC Composite Accident-Tolerant LWR Fuel Cladding and Core Structures was developed in the FY-14 Advanced Fuels Campaign of the U.S. Department of Energy’s Fuel Cycles Research and Development Program. This document summarizes the status of execution of the technical plan within the activities at the Oak Ridge National Laboratory.

36 MATERIALS SCIENCE↗

Analysis of Benefits of an Energy Imbalance Market in the NWPP

The Northwest Power Pool (NWPP) Market Assessment Committee (MC) Initiative, which was officially launched on March 19, 2012, set out to explore a range of alternatives that could help the Balancing Authorities and scheduling utilities in the NWPP area address growing operational and commercial challenges affecting the regional power system. The MC formed an Analytical Team with technical representatives from each of the member Balancing Areas in the NWPP and with staff of Pacific Northwest National Laboratory (PNNL). This Analytical Team was instructed to conduct extensive studies of intra-hour operation of the NWPP system in the year 2020 and of the NWPP region with 14,671 MW of wind penetration. The effort utilized a sub-hourly production cost model (the PLEXOS® computer model) that inputs data from the Western Electricity Coordinating Council (WECC)-wide Production Cost Model (PCM) to evaluate potential production cost savings. The Analytical Team was given two general options to evaluate: •Energy Imbalance Market (EIM): establishment of an automated, organized NWPP area market for economically supplying energy imbalance within the hour. •Enhanced Market-Operational Tools (EMT) that might augment or replace an EIM. The Analytical The Analytical Team built on the WECC-wide PCM data from prior work done in the WECC and carried forward the evolution of the original WECC Transmission Expansion Planning Policy Committee (TEPPC) 2020 PC0 data base. A large number of modifications and improvements were made to this case and the data were subjected to extensive review by the team members to improve the model representation of the Northwest (NW). MC meetings that were open to the public were held for interested parties to review and provide input to the study. Results for the test, base, and sensitivity case studies performed by the MC Initiative Analytical Team indicate that there are a wide range of benefits that could be obtained from the operation of an EIM in the NWPP depending on what assumptions are made. The instructions from the MC were to determine a "minimum high confidence" range of potential benefits. The results for the Base Case indicate that the EIM benefits ranged from approximately $40 million to $70 million in annual savings from the operation of an EIM in the NWPP footprint. A number of additional relevant sensitivity cases were performed, including low and high water conditions, low and high natural gas prices, and various flex reserve requirements, resource operations, and amounts of resource capability held back during the preschedule period. Along with the results for the Base Case, the results for these studies yielded EIM benefits that clustered within the range of $70 to $80 million dollars per year with potential benefits ranging from approximately $125 million to as little as $17 million per year. Because the design and operation of an EIM could enable participating Balancing Authorities (BAs) to collectively lower the quantity of resources they must carry to meet within-hour balancing needs, a sensitivity case was also performed to analyze the impact that such reductions might have on the benefits from an EIM. The results for this sensitivity case indicate that such reductions could increase the benefits from the operation of an EIM in the NWPP into the range of approximately $130 million to $160 million per year. Also, a sensitivity case for a WECC-wide EIM was performed with the results indicating that the potential benefits to the NWPP could increase into the range of $197 million to $233 million per year. While there may be potential reliability benefits from the coordinated dispatch process underlying the operation of an EIM, reliability benefits from an EIM were out of the scope of this study. The EIM benefit analyses that were performed by the Analytical Team are provided in this report.

Power markets, NWPP, Energy Imbalance, EIM, Renewa↗

Representation and Impact of Water Head on Power System Planning and Operation

Representing water head information in power system model files, can provide a more realistic model of the system and thereby inform operation and planning personnel in the decision-making process. This article describes a procedure for modifying the power system model files (steady-state and dynamic) to represent water head information. Additionally, the impact of representing the water head on power system reliability studies including contingency analysis, cascading failure analysis and dynamic frequency response analysis has been investigated, using the modified power system models. This paper considers the detailed Western Electricity Coordination Council model during summer and winter conditions as the test system for the impact analysis. Results show that under reduced water head: 1) the number of critical voltage and branch flow violations increases; 2) chances of cascading failure and island formation increases; and 3) frequency nadir decreases as compared to those of the base cases where the water head information is not represented.

13 - HYDRO ENERGY↗

DNDO Analysis Cell Concept

The Domestic Nuclear Detection Office (DNDO) has a mission of implementing rad/nuc interdiction capabilities for a managed and coordinated response to threats, integration of federal nuclear forensics programs, and coordinating the development of the global nuclear detection and reporting architecture. In the process of executing this mission, DNDO has generated substantial information, data, technical results, operational workflows and analytical tools. The effective utilization of these resources is an overarching goal of the organization. After nearly a decade of performing work, DNDO faces a challenge in capitalizing on the large amount of data, reports, processes, tools, and people. As new work is being planned, managers and researchers need to have an understating of what information has been collected, what tools are available, the collaborations which can be utilized to propel the work forward, processes to plan and execute, and how to present conclusions and results that can assist the government in making decisions. This type of challenge can be met through the use of a series of organized and connected elements which form a broader structure (cell) that promotes cross utilization of elements such that they can be tailored (analyzed) to fit the context of the problem to be solved. The development of an analysis cell for DNDO will address the challenges of utilizing existing elements, identifying gaps, annually reporting the performance of rad/nuc interdiction instrumentation, and planning the execution of future work.

Pagh, Richard T.↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

Resource Prospector (RP) - Early Prototyping and Development

The Resource Prospector (RP) is an In-Situ Resource Utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorate's (HEOMD) Advanced Exploration Systems (AES) Division. The mission, currently planned to launch in 2020, will demonstrate extraction of oxygen from lunar regolith to validate ISRU capability. The mission will address key Strategic Knowledge Gaps (SKGs) for robotic and human exploration to the Moon, Near Earth Asteroids (NEAs), and ultimately Mars, as well as meet the strategic goals of the Global Exploration Roadmap (GER), offered by the International Space Exploration Coordination Group (ISECG). In this roadmap, the use of local resources is specifically addressed relating to human exploration. RP will provide knowledge to inform the selection of future mission destinations, support the development of exploration systems, and reduce the risk associated with human exploration. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources. The moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. Lunar regolith contains useful resources such as oxygen, water, silicon, and light metals, like aluminum and titanium. Oxygen can be separated from the regolith for life support (breathable air), or used to create rocket propellant (oxidizer). Regolith can be used to protect against radiation exposure, be processed into solar cells, or used to manufacture construction materials such as bricks and glass. RP will characterize the constituents and distribution of water and other volatiles at the poles of the Moon, enabling innovative uses of local resources, in addition to validating ISRU capabilities. This capability, as well as a deeper understanding of regolith, will be valuable in the exploration of near-Earth asteroids (NEAs) and Mars. In order to reduce risk and explore system designs, the RP project is attempting two-fold approaches to development as it looks towards flight. We continue to explore flight planning, requirements, and interfaces definition by using Engineering Test Units (ETUs), looking towards lunar deployment, while also using fiscal year 2015 to develop, build and test an earth-terrestrial prototype rover and payload system. This terrestrial prototype, called "RP15", is built to both inform the system design, and to be a partnership advocacy tool for this unique mission. RP15 must be affordable within the resource and time constraints of fiscal year 2015, while working to the following Needs, Goals, and Objectives provided by HEOMD/AES: 1. Demonstrate rover mobility in a 1g environment 2. The Surface Segment (prototype rover + payload system) shall represent the flight system concept with as much fidelity as affordable (limited by cost and schedule) - Surface Segment shall be the approximate size/dimension/footprint -Surface Segment shall package all the expected devices (instruments, systems, etc.), even if some facets are mocked-up due to time/cost constraints -Overall Surface Segment fidelity negotiable to make achievable 3. Priority should be given to illustrating mission functionality over support functionality, which exists solely to support mission functionality This paper will provide an overview of RP project developments, including the design and build, capturing the development and initial integrated testing of RP15 in relevant environments.

Lunar↗

Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

99 GENERAL AND MISCELLANEOUS↗

Manned Space-laboratories Control Center (MSCC) operations concept

The initiation of the (German-) nationally funded control center for manned spaceflight operations triggered by the invitation of President Reagan to ESA, Japan, and Canada in 1984 to join the International Space Station Freedom Program is recalled. The requirements for a Manned Space-Laboratories Control Center (MSCC) as defined at the beginning of the planning and construction process in 1987 and the resulting modifications during the various programmatic scenario changes on NASA and ESA side between 1987 and now are presented. The validity of the original requirements with respect to the current scenario, which asks for a logical evolution from the execution of the D-2 mission in January 1993 via the European Columbus Precursor flights (in particular the E-1 mission) towards Columbus Attached Laboratory (APM)-operations by the end of this century are discussed. The resulting tasks of the MSCC for the various missions, the current configuration, and the ensuing operations concept leading from a more centralized concept for D-2 towards a decentralized payload operations concept for the APM and the implications with respect to European and International interfaces are presented. The planned Columbus MSCC facility architecture and its expected modifications introduced by the ESA Ministerial Conference in Munich (Nov. 1991) and follow-on discussions are briefly addressed. The last chapter outlines the planned services to be provided by the MSCC to the decentralized User (experimenter) community. Issues like decentralized mission planning on executional level, command validation, data flow coordination, archiving services, and telescience capabilities are highlighted from a MSCC point of view.

Kehr, Joachim↗

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Onboard planning for geological investigations using a rover team

This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The Multi-Rover Integrated Science Understanding System (MISUS) combines techniques from planning and scheduling with machine learning to perform autonomous scientific exploration with cooperating rovers.

scheduling↗

Demand Assignment in the ACTS LBR System

On the Advanced Communications Technology Satellite (ACTS) being developed at NASA Lewis, low-burst-rate (LBR) traffic stations will access the ACTS multibeam package via two hopping beams that can be directed at certain areas in the continental U.S. An onboard baseband processor (BBP) demodulates uplink traffic, switches it between uplink and downlink beams at baseband, and then remodulates it for retransmission at 20 GHz. This study describes the demand-assigned operation of the ACTS LBR system, where the onboard switch is remote from both traffic stations and master control station (MCS). Network control uses inbound and outbound orderwire channels and a BBP control channel, allowing the MCS to coordinate assignment of individual 64-kb/s spacecraft channels. Models are developed to simulate the dynamics of the assignment process and verify the call blocking behavior, to predict control channel loads, and to evaluate algorithms for burst time plan rearrangement.

White, Lawrence W.↗

Transitioning NASA Space Operations to Commercial Services

Major considerations associated with "Transitioning NASA Space Operations to Commercial Services" are presented in viewgraph form. Specific topics include: 1) Government use of commercial frequencies vs. commercial use of commercial frequencies for government use; 2) Commercial use of government frequencies; 3) Government vs commercial: Access techniques, data formats, and modulation and coding; 4) Government need for multiple sources: backup and competition; 5) Government in perceived competition with commercial service providers if TDRSS is used for commercial purposes; and 6) Coordination required among plans for CSOC, NSCP, and satellite industry.

Gilbert, Charlene E.↗