Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Microgrid operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

SOLAr Critical Infrastructure Energization (SOLACE): Leveraging Distributed Energy Resources to Provide Local Power

This document is a technical report based on a large-scale DOE-funded project conducted between 2019 and 2022. The project, called SOLAr Critical infrastructure Energization (SOLACE), is aimed at leveraging distributed energy resources (DERs) to provide local power to communities, feeders, or other regions. The project included a particular focus on high-value critical loads such as municipal water supply, telecommunication hubs, and disaster shelters. The key developments of the project were: (1) A comprehensive pre-event power system analysis methodology that identifies and characterizes the viable local power options. (2) A DMS-based example control system for activating and operating the local power solution during a time of crisis. (3) Grid-forming inverter technology to enable isolated local power operation and black-starting. (4) Cyber-security considerations for isolated systems when wider-area communication may be offline. This report describes the overall process that identifies and assesses the viable DER-based local power solutions for a given facility, region, or community. The report documents the process, including the key analysis steps, tools required, data requirements, and recommended pass/fail criteria for each step. It also provides a sample implementation of this process through a test case. Finally, it provides details of how a viable pre-event plan can be selected and activated at go-time when an event has occurred.

14 SOLAR ENERGY↗

Optimal Co-Design of Integrated Thermal-Electrical Networks and Control Systems for Grid-interactive Efficient District (GED) Energy Systems

This project advances a unified, open-source framework for the optimal co-design of thermal, electrical, and control systems in grid-interactive efficient districts (GEDs). As communities integrate growing levels of distributed energy resources, traditional approaches that model thermal and electrical networks independently lead to reduced efficiency, limited flexibility, and missed opportunities for coordinated operation. To address these challenges, the research team developed a comprehensive suite of physics-based models, control algorithms, and software tools that enable holistic simulation, optimization, and demonstration of district-scale energy systems.

14 SOLAR ENERGY↗

A Novel Framework for Optimizing Ramping Capability of Hybrid Energy Storage Systems

Hybrid Energy Storage System has been widely applied in aerospace, electric vehicle, and microgrid applications. The advantages are that they include complimentary technologies with both high power and energy capabilities. HESS have the potential to be useful to the bulk power systems, for example to increase the value of energy produced by variable generation resource through enabling participation in ancillary service markets. Actualizing the benefits of HESSs requires optimizing the combined ramping capability of aggregated HESS resources. To provide quality ancillary service, source of HESSs locating at multiple sites of variable generation resource must be optimally sized and cohesively controlled. Optimizing aggregated resources can be formulated as an optimization problem. Successfully solving this problem not only requires using effective solution methods but also depends on accurately and rapidly setting the necessary parameters in the problem formula. This article proposes a novel framework with double-layer structure to solve the optimization problem of aggregating ramping capability. Program developed on the upper layer focuses on solving the optimization of aggregating ramping capability among multiple HESSs and is compatible with most existing optimization algorithms. Program on lower layer of the framework targets at optimizing the local control of a single HESS based on a thorough analytics of HESS operation strategy presented in this article. Result of local optimization is also provided to upper layer program for updating the parameters in formula of optimization problem. Real time hardware-in-the-loop test is conducted to verify the performance of the optimization framework developed. The work presented is expected to provide guidance for implementing this framework in practical operation.

Luo, Yushen↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Taming the wild edge of smart grid – Lessons from transactive energy market deployments

For two decades, the idea of using market-based approaches in field deployments that coordinate the flexible operation of electricity customer assets has occupied the efforts of transactive energy practitioners. While the purported benefits of this distributed decision-making approach have been well explored, the practical aspects of implementing such a system to address real-world problems are just beginning to emerge. This report surveyed 24 field-deployed programs and interviewed experts instrumental in these deployments. The results of the survey and interviews reveal the diversity of designs and applications. They highlight the technical promise of the approaches as well as challenges with system integration, sustainable business strategy, and regulatory policy obstacles. Insights from the survey offer considerations to direct future effort and investment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Segmented Energy Routing for a Modular AC/DC Hybrid System

This article presents a modular ac/dc system with both distributed and centralized power ports for energy router (ER) applications. In each module of the described system, photovoltaic (PV) power generation units, battery-type energy storage (ES) units, and critical loads are connected to the cascaded H-bridge (CHB)-organized medium-voltage (MV) dc links, with fully distributed low-voltage (LV) dc power ports. Copies of modules share the centralized load bus and interact with an MV ac grid in parallel. Hybrid power port (HPO) assigns flexibility to the system but makes energy routings a necessity for stable operation. In this article, a segmented energy management strategy for the HPO-ER is proposed. In terms of the grid-side power transferring, the system ratings are intentionally designed to match significant power imbalance. Focally, a segmented energy management strategy is proposed to realize fully autonomous energy routing involving MV ac grid, distributed PV generations, distributed battery storages, and LV load. The system is proven to be stable using the derived impedance-based model considering the interaction between power blocks. The feasibility of the topology and control strategy is also verified through software simulation, laboratorial hardware prototype experiment, and hardware-in-the-loop (HIL) emulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Temperature Latent Heat Storage System using Transportable Heat Pipes for Versatile Integration with Emerging Microreactors

With the growing interest in the development of micro nuclear reactors and their application to microgrid, high-temperature thermal energy storage (TES) has also been receiving great attention as a technology to reinforce the energy utilization and profitability of this class of reactors. Given the importance and research needs of the TES technology, a research project is underway at Idaho National Laboratory (INL) to develop high-temperature TES that can be easily interfaced with emerging micro nuclear reactors. Currently under development is the Heat pipe-Integrated Thermal Battery (HITB), a novel latent heat storage design that enables flexible and robust integration with any design of currently considered micro nuclear reactors. The development of detailed design based on the proposed TES concept, HITB, requires not only development and validation of modeling and simulation capabilities, but also research that spans thermal performance analysis, component- and system-scale design optimization, and experimental demonstrations including high-temperature feasibility testing. The current research efforts (and plans) are divided into the following four areas: (i) Thermal and structural modeling and analysis at both system- and component-scales for evaluating performance and conducting design optimization, (ii) Small-scale experimental demonstrations for the key components of the proposed HITB design, (iii) Modelica-based dynamic model development for developing a control strategy under dynamic operation within integrated energy systems configuration, (iv) Integrated experimental testing and demonstration. This paper introduces the overall research efforts that have been and are being conducted to develop and demonstrate the novel design of the high-temperature latent heat storage device, HITB. The key design features, ongoing research efforts including the development of modeling and simulation capabilities, small-scale demonstrations of the HITB’s key functionalities prior to scaled-up experimental demonstration, are discussed. Then, this paper concludes with a remark on the future research plans for this project.

25 ENERGY STORAGE↗

Cybersecurity Considerations for Grid-Connected Batteries with Hardware Demonstrations

The share of renewable and distributed energy resources (DERs), like wind turbines, solar photovoltaics and grid-connected batteries, interconnected to the electric grid is rapidly increasing due to reduced costs, rising efficiency, and regulatory requirements aimed at incentivizing a lower-carbon electricity system. These distributed energy resources differ from traditional generation in many ways including the use of many smaller devices connected primarily (but not exclusively) to the distribution network, rather than few larger devices connected to the transmission network. DERs being installed today often include modern communication hardware like cellular modems and WiFi connectivity and, in addition, the inverters used to connect these resources to the grid are gaining increasingly complex capabilities, like providing voltage and frequency support or supporting microgrids. To perform these new functions safely, communications to the device and more complex controls are required. The distributed nature of DER devices combined with their network connectivity and complex controls interfaces present a larger potential attack surface for adversaries looking to create instability in power systems. To address this area of concern, the steps of a cyberattack on DERs have been studied, including the security of industrial protocols, the misuse of the DER interface, and the physical impacts. These different steps have not previously been tied together in practice and not specifically studied for grid-connected storage devices. In this work, we focus on grid-connected batteries. We explore the potential impacts of a cyberattack on a battery to power system stability, to the battery hardware, and on economics for various stakeholders. We then use real hardware to demonstrate end-to-end attack paths exist when security features are disabled or misconfigured. Our experimental focus is on control interface security and protocol security, with the initial assumption that an adversary has gained access to the network to which the device is connected. We provide real examples of the effectiveness of certain defenses. This work can be used to help utilities and other grid-connected battery owners and operators evaluate the severity of different threats and the effectiveness of defense strategies so they can effectively deploy and protect grid-connected storage devices.

25 ENERGY STORAGE↗

Distributed Renewables for Arctic Energy: A Case Study

Alaska is a vast state that stretches into the Arctic Circle. Roughly 140,000 people in the state are dependent on isolated electric grids, traditionally burning expensive fossil fuels. This has negative impacts on air quality and climate. As the climate warms, fuel supply chains and traditional ways of life are threatened. Renewable electric sources offer a clean, resilient alternative with less volatile costs, but there are a variety of technical, social, economic, and political challenges to developing renewable energy systems in remote Arctic communities. Examples include harsh operating conditions, lack of local technical and managerial capacity, complex funding mechanisms, and glacial permitting processes. In this study, we interview one group of communities that are interested in adding renewable energy to their systems to understand the needs and challenges they face, and then another group that has successfully installed renewable energy, to understand how they overcame such challenges and the lessons they learned. Notable results include the importance of local buy-in, education, and technical involvement, procuring external funding sources, inter-community collaboration, installing bespoke systems, and working with reliable equipment suppliers. The goal of this report is to orient and inspire Arctic communities that want to begin their renewable transition, by providing helpful examples and points of contact.

17 WIND ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Comprehensive Feasibility Study

The Marpi Landfill (“Marpi” or “the landfill”), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by a single on-site diesel generator that only operates when the landfill is open and staffed. The project team, composed of representatives of the Department of Public Works and the Office of Planning and Development (OPD), aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location to increase the use of sustainable energy and to ensure environmentally compliant landfill operations. This is consistent with the sustainable development goals documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021), including Goal #12 (ensure environmentally compliant waste management facilities) and Goal #7 (renewable energy deployment). Further, the CNMI has a 20% target for renewable energy consumption by 2030, as documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (Public Law 18-62). To accomplish these goals, the Federal Emergency Management Agency, through its Interagency Reimbursable Work Agreement with the U.S. Department of Energy, funded a feasibility study and follow-up study in 2023–2024 to assess and prioritize power supply options for the landfill. This report combines the results from both feasibility studies.

14 SOLAR ENERGY↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation: Preprint

Existing real-world projects of GFM inverters that operate in parallel to power grids typically are sized between dozens and a few hundreds Megawatt (MW) scale according to a recent NERC GFM inverter white paper. These large systems are often difficult to evaluate prior to deployments because of their large size. The performance of smaller GFM inverters (dozens to a few hundreds MW) that operate parallel with power grids (distribution systems) is even less understood. There is an opportunity to better understand these systems through hardware testing under controlled laboratory conditions. Therefore, this paper presents the functional performance evaluation tests of multiple (three) commercial GFM inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore the GFM inverters' functionalities and dynamic response when in parallel with power grids to eventually develop universal specifications for GFM inverters. Both steady state (changing the inverter's frequency and voltage droop) and transient (adding step change in grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The experimental results indicate the bench-marked performance that: 1) the GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power when paralleled to the grid; 2) the GFM inverters automatically respond to system frequency and voltage events to output the needed power, however, the GFM inverters all show stability issues when absorbing reactive power from the grid.

grid-forming inverters↗

Clean Energy Technology Applications on US Mine Land: Technical Analysis

As the United States transitions toward a clean energy economy, an opportunity exists for redeveloping the more than 17,000 mine land sites located across the nation with clean energy technologies, which have a combined potential for generating more than 85 GW of clean electricity. This report provides an overview of the potential of demonstrating and deploying clean energy projects on current and former mine land. Clean energy project refers to a project that demonstrates one or more of the following technologies: solar; microgrids; geothermal; direct air capture; fossil-fueled electricity generation with carbon capture, utilization, and sequestration; energy storage, including pumped storage hydropower and compressed air energy storage; and advanced nuclear technologies. The report discusses the following technologies and their potential for creating jobs and generating tax revenue that would result in direct and indirect benefits to the local economy: Solar photovoltaics (PV) is being developed on current and former mine land in various parts of the world, including the United States. This approach is attractive because it requires limited infrastructure investment and would utilize the bare surfaces of mines and tailing ponds. Solar resource availability may be greater in the southern regions, including the Interior and Appalachian Basins and the southwestern United States. However, since some mine land sites include areas of significant change in elevation, the deployment of PV on mine land may require sophisticated planning to account for shading and irradiance, or may require regrading of the areas. PV does not create significant environmental risks and generally does not face public resistance; Geothermal systems are often spatially and genetically associated with ore deposits, and in some cases, they have been discovered while in search for epithermal mineral resources. Numerous diverse geothermal applications have been employed at mine land around the world, including power generation, mineral extraction from geothermal brines, process heating, direct use for other mining operations, and direct use for non-mining operations and subsurface energy storage, including geothermal heat pumps. Case studies highlighting these applications provide key lessons relating to identifying drivers and barriers to geothermal resource deployment and can be used to create screening tools for identifying the types and locations of mine land most amenable to utilizing geothermal resources; Carbon capture, utilization, and sequestration technologies include direct air capture (DAC) and enhanced weathering. DAC technologies include air contactors, regeneration systems, and CO 2 compression systems. Captured CO 2 can be converted to valuable feedstocks or possibly injected into abandoned subsurface mines where it would be absorbed by alkaline rock waste and mine tailings or by the porous minerals along the walls of the mine. DAC systems can be coupled with energy sources such as wind, solar, grid, or geothermal. Many DAC systems require a source of water or steam; however, some are expected to be net producers of water. Local impacts of DAC systems are expected to be low, and are related to land footprint, material disposal, and upstream impacts of energy and material production; Compressed air energy storage is an established energy storage technology in salt caverns. It has the potential for implementation in underground mines by pressurizing and storing a large amount of air using electrical compressors when excess electricity is available. When a need for discharge emerges, the air is used to spin turbines and produce the necessary volume of electricity. Abandoned or unused mine openings, including shafts, adits, access tunnels, and mined workings of any orientation, offer potential for vast amounts of compressed air energy storage if the site characteristics meet operational requirements; Pumped hydropower storage can be implemented in surface and subsurface mines. In surface mine applications, both reservoirs may be located in a mine pit or artificial reservoirs made of excavated materials. In subsurface mines, the lower reservoir may be implemented by waterproofing and flooding mine shafts and tunnels. The water is then pumped from the lower reservoir to the upper reservoir during periods of low load and high production, and it is discharged through the turbines during periods of peak demand. The potential environmental damages associated with acidity of mine water or the presence of toxic chemicals incentivizes the development of closed-loop technologies, in which water circulates inside the pumped hydropower facility without being discharged into the external water basins; Advanced nuclear energy technologies include small modular reactors, which can be deployed locally to produce electricity and heat. Such units require seismic stability and a supply of cooling water, but population constraints may exist in some areas. Therefore, remote mine land could represent an optimal location for siting advanced nuclear energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Occupant Preference-Aware Load Scheduling for Resilient Communities

The load scheduling of resilient communities in the islanded mode is subject to many uncertainties such as weather forecast errors and occupant behavior stochasticity. To date, it remains unclear how occupant preferences affect the effectiveness of the load scheduling of resilient communities. This paper proposes an occupant thermal preference-aware load scheduler for resilient communities operating in the islanded mode. First, key resilience indicators are selected to quantify its impacts on the load scheduling of a resilient community. A deterministic model predictive control-based load scheduling framework is adopted as the baseline. Then, a chance-constrained controller is proposed to address the occupant-induced uncertainty in room temperature setpoints. Finally, the chance-constrained controller is compared with the deterministic controller on a virtual community testbed based on a real-world net-zero energy community in Florida, U.S. Results have shown that the proposed chance-constrained controller performs better in terms of serving occupants’ thermal preference and the required battery sizes compared to the deterministic controller with the presence of the assumed stochastic occupant behavior. This work indicates that it is necessary to consider the stochasticity of the occupant behavior when designing optimal load schedulers for resilient communities.

Wang, Jing↗

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗