Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONITOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Eye-Tracking Analysis from a Flight-Director-Use and Pilot-Monitoring Study

Eye tracking may be a useful tool to investigate pilot monitoring and develop and conduct training. There is increased interest from airlines to use eye-tracking technologies in flight simulators. However, much is still unknown about how to best utilize eye-tracking data in pilot training. This paper presents eye-tracking results from a pilot-monitoring training study with 19 pilots. All pilots completed 15 monitoring challenges across four operational scenarios in a B737-700 full flight simulator. In addition, the study investigated the impact of having the flight director engaged or disengaged on the pilot monitoring side in the final approach. It was hypothesized that pilots would focus less on the primary flight display with the flight director off and look more around in the cockpit. To assess this, pilots performed half of the scenarios with the flight director on and half with the flight director off. However, pilots monitoring tended to look less at the primary flight display with the flight director on as indicated by lower Proportion Dwell Times, contrary to the hypothesis. Next, eye-tracking data were analyzed from two monitoring challenges involving waypoint restrictions and two involving extending the flaps at appropriate airspeeds. Pilots that successfully completed the challenges appeared to focus more on areas of interest that contained the most relevant information to successfully complete the challenge. In addition, successful pilots seemed to adapt their monitoring strategy more to the challenge at hand as observed by a distinct shift in focus on either the primary flight display or the navigation display depending on the challenge. Our findings suggest the importance of flexible gaze allocation across specific situations and raise the question whether and to what degree prespecified patterns of eye fixation can be identified and trained.

eye tracking↗

Eye-Tracking Analysis from a Flight-Director-Use and Pilot-Monitoring Study

Eye tracking may be a useful tool to investigate pilot monitoring and develop and conduct training. There is increased interest from airlines to use eye-tracking technologies in flight simulators. However, much is still unknown about how to best utilize eye-tracking data in pilot training. This paper presents eye-tracking results from a pilot-monitoring training study with 19 pilots. All pilots completed 15 monitoring challenges across four operational scenarios in a B737-700 full flight simulator. In addition, the study investigated the impact of having the flight director engaged or disengaged on the pilot monitoring side in the final approach. It was hypothesized that pilots would focus less on the primary flight display with the flight director off and look more around in the cockpit. To assess this, pilots performed half of the scenarios with the flight director on and half with the flight director off. However, pilots monitoring tended to look less at the primary flight display with the flight director on as indicated by lower Proportion Dwell Times, contrary to the hypothesis. Next, eye-tracking data were analyzed from two monitoring challenges involving waypoint restrictions and two involving extending the flaps at appropriate airspeeds. Pilots that successfully completed the challenges appeared to focus more on areas of interest that contained the most relevant information to successfully complete the challenge. In addition, successful pilots seemed to adapt their monitoring strategy more to the challenge at hand as observed by a distinct shift in focus on either the primary flight display or the navigation display depending on the challenge. Our findings suggest the importance of flexible gaze allocation across specific situations and raise the question whether and to what degree prespecified patterns of eye fixation can be identified and trained.

eye tracking↗

General Services Administration Reclamation Yard (SWMU 010) 2020-2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred from October 2020 through June 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include four field events: (1) October 2020 – Chlorinated VOC Plume groundwater sampling via Direct Push Technology (DPT) – 68 groundwater samples were collected from 14 locations at varying intervals; (2) December 2020 – Site-wide semi-annual water level measurements of 52 monitoring wells and sampling of 39 monitoring wells; (3) May 2021 – Chlorinated VOC Plume monitoring well installation – two monitoring wells were installed and screened from 10 to 20 feet below land surface (bls); and (4) May/June 2021 – Site-wide semi-annual water level measurements of 53 monitoring wells and sampling of 40 monitoring wells. Results showed substantial reduction of both plumes. Conclusions and recommendations are presented.

VOC↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

A Robust Infrastructure Design for Gas Centrifuge Enrichment Plant Unattended Online Enrichment Monitoring

An online enrichment monitor (OLEM) is being developed to continuously measure the relative isotopic composition of UF6 in the unit header pipes of a gas centrifuge enrichment plant (GCEP). From a safeguards perspective, OLEM will provide early detection of a facility being misused for production of highly enriched uranium. OLEM may also reduce the number of samples collected for destructive assay and if coupled with load cell monitoring can provide isotope mass balance verification. The OLEM design includes power and network connections for continuous monitoring of the UF6 enrichment and state of health of the instrument. Monitoring the enrichment on all header pipes at a typical GCEP could require OLEM detectors on each of the product, tails, and feed header pipes. If there are eight process units, up to 24 detectors may be required at a modern GCEP. Distant locations, harsh industrial environments, and safeguards continuity of knowledge requirements all place certain demands on the network robustness and power reliability. This paper describes the infrastructure and architecture of an OLEM system based on OLEM collection nodes on the unit header pipes and power and network support nodes for groupings of the collection nodes. A redundant, self-healing communications network, distributed backup power, and a secure communications methodology. Two candidate technologies being considered for secure communications are the Object Linking and Embedding for Process Control Unified Architecture cross-platform, service-oriented architecture model for process control communications and the emerging IAEA Real-time And INtegrated STream-Oriented Remote Monitoring (RAINSTORM) framework to provide the common secure communication infrastructure for remote, unattended monitoring systems. The proposed infrastructure design offers modular, commercial components, plug-and-play extensibility for GCEP deployments, and is intended to meet the guidelines and requirements for unattended and remotely monitored safeguards systems.

On Line Enrichment Monitor GCEP↗

Advanced Process Monitoring Techniques for Safeguarding Reprocessing Facilities

The International Atomic Energy Agency (IAEA) has established international safeguards standards for fissionable material at spent fuel reprocessing plants to ensure that significant quantities of weapons-grade nuclear material are not diverted from these facilities. For large throughput nuclear facilities, it is difficult to satisfy the IAEA safeguards accountancy goal for detection of abrupt diversion. Currently, methods to verify material control and accountancy (MC&A) at these facilities require time-consuming and resource-intensive destructive assay (DA). Leveraging new on-line non destructive assay (NDA) process monitoring techniques in conjunction with the traditional and highly precise DA methods may provide an additional measure to nuclear material accountancy which would potentially result in a more timely, cost-effective and resource efficient means for safeguards verification at such facilities. By monitoring process control measurements (e.g. flowrates, temperatures, or concentrations of reagents, products or wastes), abnormal plant operations can be detected. Pacific Northwest National Laboratory (PNNL) is developing on-line NDA process monitoring technologies, including both the Multi-Isotope Process (MIP) Monitor and a spectroscopy-based monitoring system, to potentially reduce the time and resource burden associated with current techniques. The MIP Monitor uses gamma spectroscopy and multivariate analysis to identify off-normal conditions in process streams. The spectroscopic monitor continuously measures chemical compositions of the process streams including actinide metal ions (U, Pu, Np), selected fission products, and major cold flowsheet chemicals using UV-Vis, Near IR and Raman spectroscopy. This paper will provide an overview of our methods and report our on-going efforts to develop and demonstrate the technologies.

process monitoring↗

Getting the Biggest Bang for Your Buck: Wildlife Monitoring on Shrublands of the Nevada Test Site

The Nevada Test Site (NTS) covers 3,561 km2 and extends over portions of both the Mojave and Great Basin Deserts. The resulting diverse and complex flora and fauna exhibit elements of both deserts. There are 20 vegetation associations, composed primarily of shrubs, nested within 10 vegetation alliances. Of the more than 1,200 invertebrate and 339 vertebrate species found in these shrubland habitats, 267 are considered sensitive or protected/regulated by federal or state laws. Wildlife and wildlife habitat monitoring ensures NTS activities comply with all federal and state laws enacted for the protection of these valuable biological resources and provides ecological information that can be used to predict and evaluate the potential impacts of proposed projects and current activities on these resources. This paper describes the monitoring approach used at this large site. Monitoring strategies include conducting preactivity surveys, proactively monitoring sensitive species, monitoring long-term population trends, and collaborating with other agencies and biologists. Ways to make monitoring more efficient and examples of successful monitoring and collaborations are discussed.

54 ENVIRONMENTAL SCIENCES↗

Wetland Mitigation Monitoring at the Fernald Preserve - 13200

The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluated from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience on Safety Review of Liquid and Gaseous Effluent Monitoring System for Nuclear Power Plants in Korea - 16237

The liquid and gaseous effluent monitoring systems are important components in order to evaluate and minimize the radiation environmental impacts from Nuclear Power Plants (NPPs). Therefore, licensee should install liquid and gaseous effluent monitoring systems and these systems should be reviewed by regulatory body. In Korea, the criteria of liquid and gaseous effluent monitoring systems for NPPs are stipulated in Nuclear Safety Act (NSA) and subordinate statute, and it is stated in 'Regulation on Technical Standards for Nuclear Reactor Facilities, etc.' that 'Instrumentation shall be provided to monitor related variables, including the following, and systems over their anticipated ranges of normal operations, anticipated operational occurrences, and accident conditions'. RG-1.97(Rev. 3, 1983) of US Nuclear Regulatory Commission (NRC) was used as criterion for accident monitoring instrumentations for NPPs in Korea. Licensee, however, started to apply RG-1.97(Rev. 4, 2006) as new criterion for accident monitoring instrumentation of the Construction Permit (CP) of new NPPs (Shin-kori Unit 5 and 6). Licensee submitted the report for type selection criteria and this report shows selection criteria of from 'Type A variables' to 'Type E variables'. Licensee of Korea has plans to submit the validation report regarding the criteria for accident monitoring instrumentation during Operation License (OL) and regulatory body of Korea also will conduct safety review of these reports. A graded approach to establishing a sampling program is required in ANSI/HPS N13.1-1999. Because deaerator release pipe of Shin-kori unit 5, 6 was integrated into condenser vacuum system release pipe, regulatory body reviewed application of a graded approach on this integration. Output of PWR GALE shows that iodine released from turbine building is 0.12% of total iodine release amount and this value is potential impact categories (PICs) 3 in ANSI/HPS N13.1-1999. So, periodic sampler installed in condenser vacuum system release pipe in Shin-kori unit 5, 6 is suitable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimizing Long-term Monitoring of Radiation Air Dose Rates - 19169

Radiation air dose rates near the Fukushima Daiichi Nuclear Power Plant (NPP) have been steadily decreasing over the past seven years since the accident in March 2011. After seven years, the radiation monitoring program is expected to transition from short-term emergency responses to long-term monitoring. The objectives of long-term monitoring are often different from early emergency responses, since extensive data accumulation has led to an understanding of contaminant distributions and mobility. The main long-term monitoring objectives are (1) to confirm system stability and the continuing reduction of contaminant and hazard levels, (2) to provide assurance for the public, (3) to accumulate the basic datasets for scientific knowledge and future preparation, and (4) to detect changes or anomalies in contaminant mobility (if they occur), or any unexpected processes or events. In this work, we have developed a methodology for optimizing the sampling locations of radiation air dose-rate monitoring. Three steps are taken in order to determine sampling locations in a systematic manner: (1) prioritizing the critical locations, such as schools or regulatory requirement locations, (2) diversifying locations across the key environmental controls that are known to influence contaminant mobility and distributions, and (3) capturing the heterogeneity of radiation air dose rates across the domain. In the second step, we use a Gaussian mixture model to identify the representative locations in multiple environmental variables, such as elevation and land-cover types. In the third step, we use a Gaussian process model to capture and estimate the heterogeneity of air dose rates across the domain. We use the integrated dose-rate map from the Bayesian geostatistical method as the reference map and distribute the sampling in such a way as to capture the heterogeneity of the reference map. Although we assume hypothetical sets of measurement locations to evaluate the performance of the methodology and algorithms, we have demonstrated this approach using real, spatially extensive datasets, including the integrated air-dose-rate map of 2016. Our results have shown that this approach allows us to add sampling locations in a systematic manner. Increasing the number of sampling locations can better capture the heterogeneity of dose rates, although the estimation error does not decrease further after a certain number of samples. We have also found that when there are restrictions such as pre-existing monitoring locations or the ones along roads, the spatial estimation becomes poor even with the same number of monitoring locations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Monitoring in an Irradiated/Used Fuel Dry Storage Container - 19193

A corrosion monitoring system was developed to monitor the corrosion behaviour of steel components embedded in the high density concrete of a Dry Storage Container (DSC). The DSC is a free-standing reinforced concrete container, with an inner carbon-steel liner and an outer carbon-steel shell, for the storage, on-site transfer and off-site transportation of irradiated Candu fuel. Normally, uncontaminated concrete is benign with regards to embedded steel components because high alkalinity in the concrete leads to formation of a passive film on the steel surface, which prevents excessive metal loss. However, corrosion of steel in concrete may be promoted by one or more of local concentration of chloride ions or local loss of alkalinity. For the DSC, it is recognized that the above mechanism(s) are unlikely, however, if any did exist, the corrosion mechanisms that could then occur would include corrosion of carbon steel components and stress corrosion cracking of 304L stainless steel components. In order to confirm that these unlikely events are not occurring, Ontario Power Generation has undertaken a project to investigate the corrosion behaviour of metallic components embedded in the DSC's high density concrete. A corrosion monitoring system that can be installed within the concrete space of a DSC was designed and installed to monitor changes in temperature, corrosion potential, corrosion rate, and electrochemical noise. The corrosion monitoring system was commissioned in July 2012, followed by the commencement of monitoring and measurements. The corrosion data, collected for the three years from year 2012 to 2015, were analyzed. It was concluded that the corrosion rates of both carbon steel and stainless steel within the DSC are very low and consistent with the intended minimum operational life of the DSC. The monitoring system as a whole has allowed a systematic and long term judgement regarding the conditions within the DSCs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PERFORMACE OF MULTI-PROBE CORROSION MONITORING SYSTEMS AT THE HANFORD SITE

Between 2007 and 2009, several different multi-probe corrosion monitoring systems were designed and installed in high-level nuclear waste tanks at the U.S. Department of Energy's Hanford Site in WaShington State. The probe systems are being monitored to ensure waste tanks operate in regions that minimize localized corrosion (i.e., pitting) and stress corrosion cracking. The corrosion monitoring systems have been installed in wastes with different chemistry types. An ongoing effort during the same time period has generated non-radioactive simulants that are tested in the laboratory to establish baseline corrosion monitoring system performance and characterize data to allow interpretation of readings from the multiple corrosion monitoring systems. Data collection from these monitoring systems has reached the point where the results allow comparison with the laboratory testing. This paper presents analytical results from the corrosion monitoring system development program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stack Monitor Operating Experience Review

Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative “all modes” failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Acoustic Emission and Guided Wave Monitoring of Fatigue Crack Growth on a Full Pipe Specimen

Continuous on-line monitoring of active and passive systems, structures and components in nuclear power plants will be critical to extending the lifetimes of nuclear power plants in the US beyond 60 years. Acoustic emission and guided ultrasonic waves are two tools for continuously monitoring passive systems, structures and components within nuclear power plants and are the focus of this study. These tools are used to monitor fatigue damage induced in a SA 312 TP304 stainless steel pipe specimen. The results of acoustic emission monitoring indicate that crack propagation signals were not directly detected. However, acoustic emission monitoring exposed crack formation prior to visual confirmation through the detection of signals caused by crack closure friction. The results of guided ultrasonic wave monitoring indicate that this technology is sensitive to the presence and size of cracks. The sensitivity and complexity of GUW signals is observed to vary with respect to signal frequency and path traveled by the guided ultrasonic wave relative to the crack orientation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FY-2010 Process Monitoring Technology Final Report

During FY 2010, work under the Spectroscopy-Based Process Monitoring task included ordering and receiving four fluid flow meters and four flow visible-near infrared spectrometer cells to be instrumented within the centrifugal contactor system at Pacific Northwest National Laboratory (PNNL). Initial demonstrations of real-time spectroscopic measurements on cold-stream simulants were conducted using plutonium (Pu)/uranium (U) (PUREX) solvent extraction process conditions. The specific test case examined the extraction of neodymium nitrate (Nd(NO3)3) from an aqueous nitric acid (HNO3) feed into a tri-n-butyl phosphate (TBP)/ n-dodecane solvent. Demonstration testing of this system included diverting a sample from the aqueous feed meanwhile monitoring the process in every phase using the on-line spectroscopic process monitoring system. The purpose of this demonstration was to test whether spectroscopic monitoring is capable of determining the mass balance of metal nitrate species involved in a cross-current solvent extraction scheme while also diverting a sample from the system. The diversion scenario involved diverting a portion of the feed from a counter-current extraction system while a continuous extraction experiment was underway. A successful test would demonstrate the ability of the process monitoring system to detect and quantify the diversion of material from the system during a real-time continuous solvent extraction experiment. The system was designed to mimic a PUREX-type extraction process with a bank of four centrifugal contactors. The aqueous feed contained Nd(NO3)3 in HNO3, and the organic phase was composed of TBP/n-dodecane. The amount of sample observed to be diverted by on-line spectroscopic process monitoring was measured to be 3 mmol (3 x 10-3 mol) Nd3+. This value was in excellent agreement with the 2.9 mmol Nd3+ value based on the known mass of sample taken (i.e., diverted) directly from the system feed solution.

process monitoring, spectroscopy-based monitoring,↗

Advanced Laboratory and Field Arrays: Evaluating Sampling Techniques for MHK Biological Monitoring (Task 6)

The overall goal of the task was to identify cost effective biological sampling techniques for MHK environmental monitoring. Protected, demersal, and pelagic fish and selected nektonic invertebrates were surveyed using capture and remote sensing techniques at the PacWave sites. The performance of capture and remote sensing monitoring techniques were evaluated and generic nekton monitoring indices were developed for MHK technologies and sites. In parallel to data collections at the PacWave site, the ability of regression models to characterize, detect, and predict change in acoustic data was evaluated using acoustic data collected in Admiralty Inlet, WA, during a biological monitoring study of the proposed SnoPud tidal turbine project site. Expected outcomes of these efforts included an evaluation of instrumentation and techniques used to monitor biological variability; identification of data streams that can be used to detect and quantify change; and sampling requirements to ensure detection of change in monitored variables.

13 HYDRO ENERGY↗

Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement (Rev. 6)

This Compliance Monitoring Implementation Plan outlines monitoring activities conducted by the U.S. Department of Energy (DOE) at the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with the U.S. Environmental Protection Agency (EPA) disposal regulations at Title 40 Code of Federal Regulations (CFR) Part 191, "Environmental Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes," Subparts B and C; and the EPA criteria for certifying compliance at 40 CFR Part 194, "Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the Disposal Regulations," Certification Decision, Final Rule. This plan does not address | monitoring activities intended to demonstrate compliance with 40 CFR Part 191 Subpart A. WIPP is a mined repository designed for the permanent disposal of defense-related transuranic (TRU)waste located in the Chihuahuan Desert, 26 miles east of Carlsbad, New Mexico. The suitability of the WIPP site for TRU waste disposal is supported by more than three decades of environmental studies. Monitoring the WIPP facility is one of the DOE's top priorities. Monitoring activities are implemented in compliance with various federal and state of New Mexico regulatory and operational safety requirements. These activities are conducted to ensure environmental protection, public and worker health and safety, and proper characterization of the disposal system. Monitoring activities will continue at WIPP through the operational period and until well after closure of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operating Experience Review of Tritium-in-Water Monitors

Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗