At least 523 records · Page 29

Computational Fluid Dynamics Study of a Cross-Flow Marine Hydrokinetic Turbine and the Combined Influence of Struts and Helical Blades: Preprint

A computational fluid dynamics study was performed for a cross-flow marine hydro-kinetic turbine. The analysis was done in three dimensions and used the unsteady Reynolds averaged Navier-Stokes solver in the commercial code STAR-CCM+. The base turbine configuration is the RivGen® Turbine, designed by the Ocean Renewable Power Company (ORPC). A convergence and uncertainty analysis was performed for both the spatial and temporal discretization; this was done using the base configuration which features support struts and helical foils. The proposed study aims to compare the impact of the struts on both power performance and blade loading for helical and straight blades.

CFD↗

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY↗

An Integrated Approach to Predicting Ash Deposition and Heat Transfer in Coal-Fired Boilers

The overall goal of this project is to develop via measurements and simulations an advanced online technology to predict, monitor and manage fireside ash deposition in a coal-fired boiler allowing for more efficient operations under a range of load conditions and fuel property variability. With this in place fuel sorting and blending can be done upstream and operations can be optimized to compensate for load and fuel properties. In support of this objective, three experimental campaigns were undertaken during the course of the project to measure ash deposition rates within the boiler at different fuel flow rates and its ash composition variability. Simulations of the experimental conditions representing actual geometry, operational scenarios in terms of air flow rates, coal flow rates as well as coal compositions, heating values, and particle size distributions were also carried out. Deposition rates were predicted using a unique particle kinetic energy and viscosity based ash deposition methodology whose validity was ascertained by comparing against deposition rate measurements for widely varying operating conditions and ash compositions in a lab-scale furnace. With a unique end-to-end combustion modeling methodology established and different simulation scenarios carried out, the results from our computational fluid dynamic (CFD) simulations in conjunction with the plant data summarized in this report were used to refine Microbeam Technology Incorporated’s MTI CSPI-CT Tool to predict and monitor fire-side ash deposition under a range of load conditions and fuel property variability in real time.

01 COAL, LIGNITE, AND PEAT↗

Microbe-Encapsulated Silica Gel Biosorbents for Selective Extraction of Scandium from Coal Byproducts

Establishing an inexpensive and environmentally friendly scandium (Sc) supply is critical for the development of clean energy technologies. However, refining Sc from Sc-bearing sources using current technologies poses economic and environmental challenges due to its low concentration relative to base metals and chemically similar lanthanides. In this work, we developed a biosorption-based flow-through process for extraction of Sc from low-grade feedstocks. A novel biosorbent material was synthesized by encapsulating Arthrobacter nicotianae, a bacterium that selectively adsorbs Sc, within a porous silica matrix. Through the use of several complementary microscopy techniques, we demonstrated a highly porous biosorbent structure with a high cell-loading density and a homogenous cell distribution. Batch adsorption assays revealed selective Sc adsorption over lanthanides and common based metals, with the exception of Fe(III), as evidenced by separation factors greater than 50. The MESG particles were packed into fixed-bed columns to enable adsorption under flow-through conditions, which demonstrated effective Sc extraction at flow rates up to 0.08 cm/s and high stability for reuse; greater than 95% of the adsorption capacity was maintained after 10 consecutive adsorption/desorption cycles. When applied to a lignite coal leachate, whose Fe content was depleted through pH-mediated precipitation, the MESG particles yielded Sc breakthrough at 30 bed volumes, whereas all other metals broke through after only a few bed volumes. Following desorption, an eluate with a 124-fold increase in Sc purity was achieved relative to the lignite leachate with Sc constituting 96.4% of the total REEs. This study established a rapid, facile, and scalable cell immobilization approach that enables the use of microbial biomass for Sc recovery from low-grade sources.

Dong, Ziye↗

Optimal Network Reconfiguration and Scheduling With Hardware-in-the-Loop Validation for Improved Microgrid Resilience

With the increased occurrence of various major extreme weather events, power outages and prompt power system restorations have recently drawn more attention to the resilience and recovery of power systems. From the perspective of a more resilient power delivery at the distribution grid, system restoration using network topology reconfiguration together with optimal scheduling of distributed energy resources are adopted in this paper. The proposed optimization model aims at minimizing the total load shedding cost and other operational costs, in which linearized topological constraints borrowed from graph theory and linearized DistFlow models are respectively used to maintain the radial network topology and power flow balance after system contingencies. To demonstrate the applicability of the proposed strategy, a real-world case study of a networked three-microgrid system in Adjuntas, Puerto Rico, is used with the consideration of different independent/interconnected microgrid scenarios, contingencies, and fairness settings. Furthermore, hardware-in-the-loop testing is conducted for the same three-microgrid network, where the closely matched results with the simulated ones have validated the effectiveness of the proposed restoration strategy, which is now ready to move one step forward towards field deployment. Finally, to test the proposed restoration strategy in a larger networked system, the modified IEEE-33 bus test distribution system is considered, and the results show a more resilient power delivery for critical loads under three and four line outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Data-Driven Nonparametric Approach for Probabilistic Load-Margin Assessment Considering Wind Power Penetration

A modern power system is characterized by an increasing penetration of wind power, which results in large uncertainties in its states. These uncertainties must be quantified properly; otherwise, the system security may be threatened. Facing this challenge, here we propose a cost-effective, data-driven approach to assessing a power system's load margin probabilistically. Using actual wind data, a kernel density estimator is applied to infer the nonparametric wind speed distributions, which are further merged into the framework of a vine copula. The latter enables us to simulate complex multivariate and highly dependent model inputs with a variety of bivariate copulae that precisely represent the tail dependence in the correlated samples. Furthermore, to reduce the prohibitive computational time of traditional Monte-Carlo simulations that process a large amount of samples, we propose to use a nonparametric, Gaussian-process-emulator-based reduced-order model to replace the original complicated continuation power-flow model through a Bayesian-learning framework. To accelerate the convergence rate of this Bayesian algorithm, a truncated polynomial chaos surrogate, which serves as a highly efficient, parametric Bayesian prior, is developed. This emulator allows us to execute the time-consuming continuation power-flow solver at the sampled values with a negligible computational cost. Results of simulations that are performed on several test systems reveal the impressive performance of the proposed method in the probabilistic load-margin assessment.

17 WIND ENERGY↗

2-D moving mesh modeling of lithium dryout in open surface liquid metal flow applications

Liquid lithium displays increasing promise as a replacement for solid plasma facing components (PFCs) in fusion device applications. The Liquid Metal Infused Trench (LiMIT) system, developed at the University of Illinois (UIUC), has demonstrated how thermoelectric magnetohydrodynamics (TEMHD) can be harnessed to drive liquid lithium flow in an open surface PFC. However, in the highest heat flux applications, large local acceleration is created via TEMHD, and the sudden increase in velocity can cause the liquid level to expose the underlying solid, eliminating the protective benefits of the lithium. In order to study potential mitigation strategies, a 2-D COMSOL Multiphysics model was developed using the moving mesh module to capture free surface flow. The model depicts the development of the dryout phenomenon for 2 test cases – slow (1 cm/s) and medium (10 cm/s) flow in 5 mm deep trenches – including the liquid level reduction under the high heat flux and the pileup of slower flow both upstream and downstream of the heat stripe. The effectiveness of trench shaping dryout mitigation strategies is examined. For the slow flow case, it is shown that a 1.8 mm ledge placed under the heat stripe will stop dryout, and for the medium flow case, a 2.7 mm ledge is required to mitigate the effect. This model can be used to identify strategies for increasing the viable heat load for open surface liquid lithium PFCs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

In Situ Neutron Scattering Studies on the Oxidation and Reduction of CeO 2 and Pt–CeO 2 Nanorods

The oxygen vacancy structure of ceria plays a key role in its performance as a favored material for catalysis applications. Here, in this work, we develop an understanding of the effects of Pt loading on the structural evolution of ceria nanorods under redox gas environments that mimic real automotive catalytic converters. In situ neutron scattering studies under redox flow reveal that both CeO 2 and Pt–CeO 2 nanorods share a bulk fluorite structure with the presence of surface Frenkel-type oxygen defects. However, Pt–CeO 2 nanorods are more easily reducible than CeO 2 rods as evidenced by an increased concentration of Ce 3+ , determined by NAP-XPS. Importantly, this work finds no evidence of oxygen vacancy ordered surface reconstruction which has been reported in earlier ex situ investigations. Thus, this work highlights the discrepancy between ex situ and in situ structural observations and emphasizes the need for robust in situ investigations of catalysts to develop industrially relevant materials.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Direct Processing of Lithium Chloride Based Waste Salt in a Ceramic Waste Form

Ceramic waste form materials were fabricated with a LiCl based salt mixture to demonstrate the suitability of direct processing of waste salt from an all LiCl pyroprocessing flow sheet on the formation, microstructure, and durability of ceramic waste forms. Materials were successfully synthesized by using the simplified direct processing technique with salt loadings of 5, 7.5, and 10 wt% at the laboratory scale. Materials fabricated with LiCl based salt indicated full conversion of zeolite to sodalite occurred to form products with low open porosity. This indicates that the Na 2 O content of NBS4 glass is suitable for processing salt chemistries which do not contain NaCl. Generated sodalite was microencapsulated by the glass binder, halite occlusions were detected within sodalite domains at all salt loadings, and a Cs-rich phase believed to be Cs-pollucite was detected in the material made with the lowest salt loading (5 wt%). Salt inclusions were encapsulated within the binder glass at all loadings, and found to consist primarily of NaCl with Cs present. A small amount of salt was found at the surface of the wasteform made with the highest salt loading of 10 wt%, which may indicate an upper limit to the amount of salt that can be accommodated or incomplete mechanical mixing of the reagents. Durability testing by using the ASTM C1308 method indicated that initial rapid dissolution of exposed halite inclusion phases was directly correlated to salt loading. Wasteform degradation during all tests occurred primarily due to dissolution of the sodalite phase. Durability of the binder glass was found to increase as the waste salt loading increased. Results for the release of cations from the salt indicate the changes in wasteform durability and halite inclusion chemistry are strongly influenced by ion exchange phenomena between the salt and the glass. This appears to be the result of the relatively stronger affinity for the glass phase of Li, compared to that of other cations such as Na and Cs. The effects from cation exchange were diminished at lower salt loadings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Desiccants enabling energy-efficient buildings: A review

Buildings account for about 39% of the total energy consumption in the United States. Developing highly energy-efficient and environmentally friendly systems that are either actively or passively integrated into buildings plays a crucial role in decarbonizing the building sector. Among various technologies, desiccant-based energy systems have received particular attention in recent years due to their unique advantages, such as being thermally driven using low-grade waste or solar energies and being reliable over a wide range of operating ranges. Extensive research efforts have been exerted on desiccant-enabled technologies at both material and system levels aiming to increase their performance and achieve high technological readiness levels. The present review paper comprehensively discusses research works made at the system level. It overviews desiccant-based air conditioning systems, desiccant-based humidity pumps, desiccant-based thermal energy storage systems, and desiccant-based appliances. The study identifies challenges and opportunities to accelerate the commercialization of desiccant-enabled technologies. It is found that desiccant materials offer great promise to improve energy efficiency and functionality of future buildings through decoupling the latent and sensible cooling loads in air conditioning systems, humidity pumps integrated into building facades, and next-generation appliances. However, commercial viability and widespread acceptance of desiccant-based systems have been hampered by several major obstacles, including liquid and air flow mal-distribution and inferior thermo-physical properties of desiccant materials resulting in low ab/adsorption and regeneration rates and bulky/costly systems.

25 ENERGY STORAGE↗

Digital Twin Model for Advanced Manufacture of a Rotating Detonation Engine Injector

A digital twin material model (DTMM) of an additive manufacturing (AM) process was created to advance the state of the art in rotating detonation engine (RDE) injector design. Current RDE injectors are designed with large pressure drops, enabling a stable and repeatable combustion process. However, this comes at the cost of system efficiency. For the technology to transition to commercial fossil-based power generation, it is important to develop injectors with reduced flow losses. Low-loss injectors are difficult to design and manufacture with conventional manufacturing techniques. AM enables new design options, but the AM manufacturing process must be thoroughly understood to result in a robust design. A DTMM provides the necessary insight by defining the cause-effect relationships between process parameters, microstructure features, and properties. Therefore, a DTMM to support the design and manufacturing process was developed and applied to the design of a new additively manufactured low-loss injector. The injector combustion behavior was characterized through hot-fire tests, and mechanical performance was compared to the DTMM predictions. The two project goals were the successful development of the DTMM and the demonstration of an improved RDE injector design. The RDE injector design and DTMM developments occurred on parallel but dependent paths. The injector was designed to reduce pressure drop by increasing the cross-sectional flow area ratio between the injector air passages and the combustor annulus. This resulted in less structural material, raising the concern that thin members would be susceptible to high-cycle fatigue (HCF) under the periodic loading inherent to an RDE. It was most important for the DTMM to predict behavior in these features; therefore, the injector design concept guided the material thicknesses used in fatigue tests. The DTMM development started by manufacturing a series of coupons over the range of possible AM process variations. A design-of-experiment approach was used to select which process variable combinations gave the most efficient coverage relevant to the injector design space. The microstructure in each of these coupons was characterized, and then computational methods were used to create a numerical model of the correlation between process variables and microstructure. Next, a set of HCF samples were tested to calibrate existing models that map microstructure to HCF performance. Together, these two links formed the DTMM that calculates HCF behavior from AM process variables. Two injector prototypes were additively manufactured. The first injector design strategy aggressively pursued low-loss performance by substantially increasing the oxidizer flow area. The combination of manufacturing lead times and the fatigue testing schedule meant that the DTMM was not available when building this first prototype. Therefore, its process parameters were chosen based on a manual review of the available coupon data. This prototype was built successfully and evaluated in 58 combustion tests. Sustained detonation was achieved with remarkably reduced pressure loss, and some tests even displayed pressure loss characteristics similar to conventional gas turbine combustors. This achieved the project goal of improving RDE injector design. The second injector was manufactured according to the optimized parameters predicted by the DTMM. The flow area modifications of this injector were less aggressive than the first injector since demonstrating low pressure loss was not an objective of the second hot-fire test series. Rather, the test objective was to cause high cycle fatigue failure in the part due to periodic loading from the rotating detonation wave. The observed number of cycles to failure was to be compared to the number predicted by the DTMM and thereby assess the utility of the DTMM in component design. However, the required level of vibration was not obtained during combustion. Therefore, high cycle fatigue was not experienced in the hot-fire tests of the second injector. Fatigue data was obtained by further testing the second injector in a conventional HCF test apparatus. The injector demonstrated HCF strength above the DTMM prediction. In fact, it did not fail and testing was only discontinued due to reaching the end of the period of performance. This points to some success in the project’s primary goal of successfully developing and applying the DTMM to a component design. Implementing the DTMM recommendations for optimal processing parameters led to a part with acceptable properties. The DTMM was also shown to be an efficient correlator of data and to provide insight into the relationship between process settings, microstructure, and property performance. However, the failure of the DTMM prediction to match the experimental result of the injector fatigue test also points to the need to include significantly more data in the model development. In this project, coupons made with identical processing parameters exhibited drastically different properties from each other and from the injector part, which clearly influences the accuracy of a model that predicts performance based on parameters. Uncertainties in the build process must be quantified to develop more robust models. A denser and broader matrix of coupon process and geometry variations, several repeated builds of every point, more in-situ build process measurements, and direct observation of tensile and HCF sample microstructure (as opposed to separate microstructure specimens) are recommendations to improve future AM modeling efforts.

20 FOSSIL-FUELED POWER PLANTS↗

Enhancing power grid resilience to winter storms via generator winterization with equity considerations

Here we develop two-stage stochastic programming models for generator winterization that enhance power grid resilience while incorporating social equity. The first stage in our models captures the investment decisions for generator winterization, and the second stage captures the operation of a degraded power grid, with the objective of minimizing load shed and social inequity. To incorporate equity into our models, we propose a concept called adverse effect probability that captures the disproportionate effects of power outages on communities with varying vulnerability levels. Grid operations are modeled using DC power flow, and equity is captured through mean or maximum adverse effects experienced by communities. We apply our models to a synthetic Texas power grid, using winter storm scenarios created from the generator outage data from the 2021 Texas winter storm. Our extensive numerical experiments show that more equitable outcomes, in the sense of reducing adverse effects experienced by vulnerable communities during power outages, are achievable with no impact on total load shed through investing in winterization of generators in different locations and capacities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of Multi-Gamma Based Sensor Technology for As-Fired Coal Property Measurement

This project demonstrated the application of the use of an advanced multigamma attenuation (MGA) sensor to accurately and precisely measure coal properties at the point of injection into burners. Accurate and precise coal property information at the burner provides the opportunity to adjust burner parameters to better follow changing load condition, optimize flame stability, and decrease nitrogen oxide formation at each burner. In addition, coal property information at the burner will assist in managing slag flow behavior, fireside ash related deposition, corrosion, and erosion issues. The advantage of having multiple gamma emitters is that the atomic/elemental interaction with the gamma energy takes place at several energies and the resulting attenuation is dependent upon the atomic number of the atom/element encountered in the coal.

01 COAL, LIGNITE, AND PEAT↗

Modeling Exhaust-Generated Aerodynamic Pressure Loads on Airfield Matting Repair Systems

Airfield matting systems are commonly used for rapid repair of damaged runways to facilitate continuity of critical operations. Under normal service conditions, matting repair systems are subject not only to wheel loads exerted by airfield traffic but also to aerodynamic pressure loads resulting from high-speed, turbulent exhaust plumes produced by jets during taxi and take-off. Matting systems employed by the U.S. Air Force have been tested with respect to wheel loads, but probabilities of failure because of pressure loads produced by jet exhaust have not yet been established. This study presents a numerical approach for preliminary estimation of worst-case matting anchor forces resulting from exhaust-generated pressure loads. Using a two-dimensional computational fluid dynamics model, system behavior is evaluated by means of a parametric study of six system variables, of which the most significant are: (1) distance between engine and matting, (2) depth of cavity openings at matting edges, and (3) engine exhaust velocity. The results demonstrate that matting systems are likely to experience net uplift in typical service scenarios, driven by the combined effects of flow separation and cavity pressurization. Worst-case anchor pull-out forces, computed according to a tributary-area approach, are estimated to fall in the range of 130 lb (581 N) to 979 lb (4,350 N), depending on assumed load-sharing behavior among anchors and the size of the repair site. Field testing of instrumented matting systems during jet taxi and take-off sequences is recommended as the best next step toward understanding system behavior.

Engineering↗

Techno-economic feasibility of geothermal energy production using inactive oil and gas wells for district heating and cooling systems in Tuttle, Oklahoma

Oil and gas wells have been drilled in the United States and often encounter hot co-produced water possibly suitable for geothermal direct-use applications. Here this study evaluated geothermal resources, heating and cooling demand, and techno-economic potential of four oil and gas wells repurposed for geothermal energy production to serve two public schools and 250 nearby houses in Tuttle, Oklahoma, USA. Subsurface geology in the study area primarily consists of Permian to Mississippian sandstone and limestone formations approximately from 2 km to 3.5 km depth. With a geothermal gradient of 25.3 °C/km, the temperature of geothermal energy production was estimated as 68.2 °C at 2.1 km. The potential of calcite scaling within boreholes and pipes was minimal. Using the characterized reservoir properties, techno-economic analyses were conducted for evaluating levelized costs of geothermal energy production for direct-use heating and cooling and district heating systems with five different production scenarios. Heating and cooling demand in two schools and 250 houses and additional 0.3 MW and 0.6 MW base heating loads for potential geothermal direct-use applications in the study area were also incorporated in the modeling. Results indicated that the levelized cost of heating of geothermal district heating systems utilizing existing wells were significantly lower than those of conventional geothermal energy systems that include well drillings. The geothermal energy production with doublet and quartet configurations was generally sufficient to supply total annual heating demand in the district, while a peaking boiler was used to supply peak loads. Doublet configurations showed higher production temperature with a lower thermal drawdown than the quartet configurations. The doublet system at 2.1 km production depth with 9.3 kg/s flow rate represented the optimal levelized cost of $71/MWh and 91.2% utilization factor. These results imply that the Tuttle geothermal district heating system is techno-economically feasible and comparable to geothermal district heating systems in the United States and the regional natural gas rate for residentials by recycling inactive oil and gas wells with no drillings.

15 GEOTHERMAL ENERGY↗

Surface Impedance of Nb$_3$Sn and YBa$_2$Cu$_3$O$_{7-\sigma}$ in High Magnetic Fields

New potential rf applications of superconductors emerged with the need to operate in high dc magnetic fields (up to 16 T) where vortex motion dictates the response: the beam screen coating of the Future Circular Collider (FCC) [1] and haloscopes, i.e. rf cavities for the axions detection [2]. However, very few data are available in the required regimes. We present in this work measurements of the surface impedance Z up to 12 T on bulk Nb₃Sn and YBCO thin films grown by different techniques. The measurements are performed with a dielectric loaded resonator operating at 15 GHz. We obtained the vortex motion resistivity and extracted the high frequency vortex motion parameters [3]: the depinning frequency, the flux-flow resistivity and the pinning constant, as well as their temperature and field dependences. Substantial differences are highlighted in the high frequency pinning properties of the studied materials, providing useful information on possible improvements in view of applications. A comparison with the results obtained in the microwave frequency range at lower fields (up to 1 T) is given.

43 PARTICLE ACCELERATORS↗