Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Conduct of Operations and Nuclear Criticality Safety Standards

Since the beginning of the nuclear age in 1943, there have been 22 criticality accidents in process facilities worldwide in which fissionable materials were processed by hand for various purposes. Of these 22 process criticality accidents, 16 involved faulty or flawed conduct of operations. Most of these process accidents (17 of 22) occurred before 1970, mostly due to the implementation of formal conduct of operations—such as the use of operating procedures and training—and the use of consensus standards for nuclear criticality safety (NCS). Obviously, the nuclear facilities applied lessons learned from their accident history, and the rate of criticality accidents was significantly reduced as a result. Over the years, it has been emphasized in NCS training courses and other venues in the United States that the consensus standards, such as ASA N6.1-1964, were the key contributors to this reduction in accidents. The formality of operations required to implement and apply the standards at a facility is also a crucial prerequisite that must be sufficiently robust to ensure NCS. This prerequisite is crucial to success fully implement the NCS consensus and other safety standards at a site.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Observations of marine animal interactions with a small tidal turbine

The risk of collisions between animals and operating tidal turbines remains a concern in the scientific and regulatory communities. A sensor package including optical cameras was deployed to monitor animal interactions with a small-scale (1 m 2 ) cross-flow tidal turbine. The turbine was deployed in Washington State, USA for 141 days at a site with peak flow speeds of 2.5 m/s. We analyze optical camera imagery spanning 109 days of turbine operation. The analyzed images contain 1044 observations of fish, fish schools, seabirds, or seals in the vicinity of the turbine. No instances of collision with seabirds or seals were observed. Seabirds were only observed during daylight hours and while the turbine was stationary. Both seals and fish were observed during both day and night and while the turbine was stationary and rotating. Four fish were observed colliding with the moving turbine and in all but one case the animals swam away following the collision. Over the same period of time, over fifty times more fish (224 individual fish and 5 fish schools) were observed passing the moving turbine without collision. Fish encounters were likely under counted due to the difficulty in discerning small fish from plant matter in the water column. These observations represent the first optical camera imagery showing fish, bird, and marine mammal interactions with a tidal turbine in North America. In addition to quantitative and qualitative discussion of the implications of our observations for collision risk, we discuss lessons learned on sampling schemes and deployment of machine learning for detection of animals to inform future data collection strategies in future monitoring campaigns.

16 TIDAL AND WAVE POWER↗

Hard Rock Drilling Optimization Software

The main objective of the developed software is to reduce the cost per foot during drilling, in other words, optimize the drilling operational parameters in achieving optimum ROP while avoiding critical operational parameters due to either low ROP, drillstring vibration, accelerated cutter wear, or low MSE. The developed software can also be used for post-well analysis to provide insight and lessons learned for future drilling operations. Several functions are available in the software to help the user perform drilling analysis, optimization, and simulation.

15 GEOTHERMAL ENERGY↗

Steptoe Valley NV Data Compilation: Understanding a Stratigraphic Hydrothermal Resource through Geophysical Imaging

Sandia National Laboratories partnered with a multi-disciplinary group of subject matter experts to evaluate a stratigraphic geothermal resource in Steptoe Valley, Nevada using both established and novel geophysical imaging techniques. Provided here are a compilation of newly acquired data over the area and select modeling efforts. This encompasses a 3D geological model (inclusive of full Leapfrog files, Leapfrog viewer files, and XYZ data for faults and stratigraphy) with embedded geophysical modeling, controlled-source electromagnetic (CSEM) and magnetotelluric (MT) data packages, aqueous spring geochemistry data, seismic reflection interpretations, and a gravity data package. The stratigraphic reservoir in Steptoe Valley was previously discovered during oil and gas exploration. Subsequent studies, such as the Nevada Play Fairway Analysis, added data which further highlighted potential resource targets in the basin. Geophysical surveys, complimented with refined geologic mapping and geochemical sampling, were deployed to further characterize the resource. The resulting 3D geologic interpretation, conceptual model refinements, and reservoir simulations suggest that a power-capable reservoir is economically accessible in the Paleozoic carbonates of the deep/central basin. Additional geophysical characterization and exploration drilling efforts are recommended to calibrate interpretation and determine where/how to potentially develop the Steptoe resource. The geophysical tools, interpretations, lessons learned, and publicly available data generated by this study establish an exploration methodology to inform decisions for successful development of stratigraphic reservoirs.

15 GEOTHERMAL ENERGY↗

The Imperial Valley Dark Fiber Project: Toward Seismic Studies Using DAS and Telecom Infrastructure for Geothermal Applications

We report that the Imperial Valley is a seismically active basin occupying the southern end of the Salton trough, an area of rapid extension, high heat flow, and abundant geothermal resources. This report describes an ongoing large-scale distributed acoustic sensing (DAS) recording study acquiring high-density seismic data on an array between Calipatria and Imperial, California. This 27 km array, operating on dark fiber since 9 November 2020, has recorded a wealth of local seismic events as well as ambient noise. The goal of the broader Imperial Valley Dark Fiber project is to evaluate passive DAS as a tool for geothermal exploration and monitoring. This report is intended to provide installation information, noise characteristics, and metadata for future studies utilizing the data set. Because of the relatively small number of basin-scale DAS studies that have been conducted to date, we also provide a range of lessons learned during the deployment to assist future researchers exploring this acquisition strategy.

15 GEOTHERMAL ENERGY↗

Monitoring, Reporting, and Verification Plan (MRV)- Meeting EPA Guidelines for GHGRP and Subpart RR

This report summarizes the process and work completed to develop and successfully submit an MRV plan to EPA. This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the Niagaran reefs, successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan currently encompasses 10 reefs and also provides a reporting plan for future reef development.

accounting↗

International Offshore Geologic Carbon Storage Story Map

The International Offshore Geologic Carbon Storage Story Map provides an overview of offshore geologic carbon storage (GCS) project maturity on a global scale. This story map reviews the history of CO2 storage in offshore sedimentary basins, basic geologic requirements, project timelines and lessons learned through defined project stage progression, areas previously studied for potential future domestic offshore GCS development, and regulatory considerations within different global regions. This resource is a distillation of information collected and recorded in the Offshore Geologic Carbon Storage Inventory Version 1.0 (https://edx.netl.doe.gov/dataset/offshore-gcs-data-inventory).

Assessment↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable. Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems. To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

43 PARTICLE ACCELERATORS↗

EPICS Deployment at Fermilab

Fermilab has traditionally not been an EPICS house, as such expertise in EPICS is limited and scattered. However, PIP-II will be using EPICS for its control system. Furthermore, when PIP-II is operating, it must to interface with the existing, though modernized (see ACORN) legacy control system. We have developed and deployed a software pipeline that addresses these needs and presents to developers a tested and robust software framework, including template IOCs from which new developers can quickly gain experience. In this presentation, we will discuss the motivation for this work, the implementation of a continuous integration/continuous deployment pipeline, testing, template IOCs, and the deployment of user applications. We will also discuss how this is used with the current PIP-II teststand and lessons learned.

43 PARTICLE ACCELERATORS↗

Evaluating Function-as-a-Service (FaaS) frameworks for the Accelerator Control System

As particle accelerator control systems evolve in complexity and scale, the need for responsive, scalable, and cost-effective computational infrastructure becomes increasingly critical. Function-as-a-Service (FaaS) offers an alternative to traditional monolithic architecture by enabling event-driven execution, automatic scaling, and fine-grained resource utilization. This paper explores the applicability and performance of FaaS frameworks in the context of a modern particle accelerator control system, with the objective of evaluating their suitability for short lived and triggered workloads. In this paper, we evaluate prominent open-source FaaS platforms in executing functional logic, triggers, and diagnostics routines. Evaluation metrics consist of cold-start latency, scalability, performance, integration with other open-source tools like Kafka. Experimental workloads were designed to simulate real-world control tasks when implemented as stateless FaaS functions. These workloads were benchmarked under various invocation loads and network conditions. Self-hosted FaaS platforms, when deployed within accelerator networks, offer greater control over execution environment, better integration with legacy systems, and support for real-time guarantees when paired with message queues. Based on lessons learned and evaluation metrics, this paper describes reliability of the FaaS framework for the Accelerator Control Systems (ACS).

Jaikar, A. [Fermilab] (ORCID:0000000332046217)↗

Evolution of the high-power spallation neutron mercury target at the SNS

The Spallation Neutron Source (SNS) began operation in 2006 and first operated at its full 1.4 MW power in 2013. Targets, which receive the pulsed proton beam, were a limiting factor for reliable full power operation for several years. Reaching reliable target operation at 1.4 MW required not only changes to the target design but also support and coordination across the entire SNS enterprise. The history and some key lessons learned are presented.

Winder, Drew E↗

In-Kind Contributions: The PIP-II Project at Fermilab

The Proton Improvement Plan II (PIP-II) Project is the first U.S. accelerator project that has significant contributions from international partners. A project management framework was created to fully integrate and make consistent across all partners the design, development, and delivery of In-Kind Contributions (IKC) into PIP-II. This framework consists of planning documentation, procedures, and communication and assessment processes to control schedule, risk, quality, and technical integration over the lifetime of the project. The purpose of this paper is to present the PIP-II IKC model put in place to properly integrate the IKC deliverables into the PIP-II Linac and share experience and lessons learned from its early implementation.

43 PARTICLE ACCELERATORS↗

HE Production Update at JLab - Introducing an Enhanced Nitrogen Purge for Clean String Assembly

A major limitation to cryomodule performance is field emission caused by particulates within the superconducting cavities. To reduce contamination of the inner surfaces during assembly in a cleanroom, the whole string can be connected to a purge system, which maintains a constant overpressure of dry, clean nitrogen gas. Following successes of similar systems at XFEL and Fermilab, Jefferson Lab followed this example for the production of LCLS-II HE cryomodules. Implementing this system required new procedures, infrastructure, and hardware, as well as significant testing of the system before production began. This paper will summarize the implemented controls and procedures, including lessons learned from Fermilab, as well as the results of mock-up tests. Based on the latter, the system was used to assemble the first article string in April 2022, and was also used during a rework required due to issues with cold FPC ceramics two months later. The benefits of using a purge system with regards to procedure, time savings, and added flexibility for potential rework have already proven to provide a significant improvement for the production of LCLS-II-HE cryomodules at Jefferson Lab.

Owen, P. D.↗

Manufacturing the Harmonic Kicker Cavity Prototype for the Electron-Ion Collider

High-bunch-frequency beam-separation schemes, such as the injection scheme proposed for the Rapid Cycling Synchrotron at the Electron-Ion Collider, demand rise and fall times an order of magnitude below what can realistically be accomplished with a stripline kicker. Nanosecond-time-scale kick waveforms can instead be obtained by Fourier synthesis in a harmonically resonant quarter-wave radio-frequency cavity which is optimized for high shunt impedance. Originally developed for the Jefferson Lab Electron-Ion Collider (JLEIC) Circulator Cooler Ring, a hypothetical 11-pass ring driven by an energy-recovery linac at Jefferson Lab, our high-power prototype of such a harmonic kicker cavity, which operates at five modes at the same time, will demonstrate the viability of this concept with a beam test at Jefferson Lab. As the geometry of the cavity, tight mechanical tolerances, and number of ports complicate the design and manufacturing process, special care must be given to the order of the manufacturing steps. We present our experiences with the manufacturability of the present design, lessons learned, and first RF test results from the prototype.

Overstreet, S. A.↗

Analysis of vapor diffusion Nb$^{3}$Sn coating at Fermilab: Minimizing impurities using TOF-SIMS

Nb₃Sn demonstrates steady advancements nowadays offering reduced power cost in superconducting radio-frequency cavities due to its high critical temperature, quality factor, and achieved accelerating gradient. However, theoretical estimates of its radio-frequency parameters have not been achieved due to several potentially limiting mechanisms: tin spots, patchy regions, defects, thermal impedance, and impurities. While some of these limitations have been intensively studied, impurity analysis in Nb$_3$Sn coatings have received less attention. We report an investigation of impurities in several vapor-diffused Nb₃Sn coated samples using time-of-flight secondary ion mass spectroscopy (TOF-SIMS) and show allowable impurity levels in view of superconducting cavity performance. Challenges and lessons learned in maintaining clean Nb$_3$Sn coatings are also discussed.

Tagdulang, Nikki [Fermilab]↗

LCLS-II-HE Vertical Acceptance Testing Plans

LCLS-II-HE has performance requirements similar to but generally more demanding than those of LCLS-II, with an operating gradient of 21 MV/m (up from 16 MV/m in LCLS-II) and tighter restrictions on field emission and multipacting. In this paper, we outline the requirements for the 1.3 GHz cavities and the plans for qualification of these cavities by vertical test. We discuss lessons learned from LCLS-II and highlight the changes implemented in the vertical test procedure for the new project.

43 PARTICLE ACCELERATORS↗

LCSL-II Cryomodule Testing at Fermilab

Cold powered testing of all LCLS-II production cryomodules at Fermilab is complete as of February 2021. A total of twenty-five tests on both 1.3 GHz and 3.9 GHz cryomodules were conducted over a nearly five year time span beginning in the summer of 2016. During the course of this campaign cutting-edge results for cavity Q₀ and gradient in continuous wave operation were achieved. A summary of all test results will be presented, with a comparison to established acceptance criteria, as well as overall test stand statistics and lessons learned.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗