Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Flight Test Evaluation of the ATD-1 Interval Management Application

Interval Management (IM) is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. Both government and industry have been working together to develop the IM concept and standards for both ground automation and supporting avionics. NASA contracted with Boeing, Honeywell, and United Airlines to build and flight test an avionics prototype based on NASA's spacing algorithm and conduct a flight test. The flight test investigated four different types of IM operations over the course of nineteen days, and included en route, arrival, and final approach phases of flight. This paper examines the spacing accuracy achieved during the flight test and the rate of speed commands provided to the flight crew. Many of the time-based IM operations met or exceeded the operational design goals set out in the standards for the maintain operations and a subset of the achieve operations. Those operations which did not meet the goals were due to issues that are identified and will be further analyzed.

Swieringa, Kurt A.↗

Recommended Changes to Interval Management to Achieve Operational Implementation

A 19-day flight test of an Interval Management (IM) avionics prototype was conducted in Washington State using three aircraft to precisely achieve and maintain a spacing interval behind the preceding aircraft. NASA contracted with Boeing, Honeywell, and United Airlines to build this prototype, and then worked closely with them, the FAA, and other industry partners to test this prototype in flight. Four different IM operation types were investigated during this test in the en route, arrival, and final approach phases of flight. Many of the IM operations met or exceeded the design goals established prior to the test. However, there were issues discovered throughout the flight test, including the rate and magnitude of IM commanded speed changes and the difference between expected and actual aircraft deceleration rates.

Baxley, Brian↗

TPSAS-NF1676L-21094-DND

Advanced knowledge in atmospheric CO 2 distributions is critical in predicting the Earth's future climate. Large uncertainties in the prediction persist due to limited observations. This study focuses on the development and demonstration of the Intensity-Modulated Continuous-Wave (IM-CW) lidar for atmospheric CO 2 measurements. Simulations show that IM-CW lidar systems operating at 1.57 um will provide precise atmospheric column CO 2 measurements from space. Airborne systems have demonstrated the feasibility of the technology and instrumentation for space active atmospheric CO 2 missions. In this presentation, the atmospheric CO 2 column measurements from airborne flight campaigns and lidar system simulations for space missions will be discussed. Data analysis shows that airborne lidar CO 2 column measurements over desert and vegetated surfaces agree well with in-situ measurements. A measurement precision of 0.08% or ~0.3 ppmv for a 10-s average over these surfaces has also been achieved. Generally, airborne flight campaigns have demonstrated that the column CO 2 measurements of the current IM-CW lidar systems meet the accuracy and precision requirements of atmospheric CO 2 measurements. Furthermore, analyses of space CO 2 measurements shows that the current IM-CW lidar technology and approach will enable space missions to achieve their science goals.

Bing Lin↗

NESC GN&C TDT Workshop on 2D Image Motion Optical Transfer Functions, Pointing Performance Analysis, and Requirements

What You Will Learn: The focus is on payload imaging performance due to pointing motion. Some historical background on pointing performance analysis is given. The Optical Transfer Function (OTF) and Modulation Transfer Function (MTF) are defined. The imaging performance due to pointing motion is measured by image motion optical transfer functions (IM OTF). IM OTFs are defined for displacement, smear, and jitter motions, which are all rigorously defined. Deterministic and Statistical IM OTFs are briefly derived and graphically illustrated and compared. The IM OTFs are parameterized by pointing error metrics(PEM), which are means and covariances of displacement, smear, and jitter. Emphasis is on procedures and algorithms to evaluate the image motion optical transfer functions and pointing error metrics. Three procedures are covered, which depend on whether the pointing error data is from time-domain simulation, frequency-domain analysis, or stochastic modeling. A method to evaluate the relative contribution of disturbance sources and to identify the most significant contributors is presented. The presentation includes pertinent discussion of flexible structures and control-structure interaction. No single book can adequately cover this subject, so a book is not required for the course. A list of selected articles, reports, documents, and books is provided for reference and further study. Mathis kept to the minimum necessary to convey principles; lengthy derivations are left to the reference material. Graphics are used to illustrate concepts. As with any such learning endeavor, the knowledge gained will be retained and strengthened through actual practice.c©2019–2021 Mark E. Pittelkau— 5

NASA Engineering and Safety Center (NESC)↗

Useful Life of Tantalum Capacitors

Currently, the major reliability characteristic of tantalum capacitors is the failure rate, which is a constant used to characterize random failures of electronic components. However, contemporary MnO2 and polymer tantalum capacitors have both infant mortality (IM) and wear-out (WO) failures. This requires assessments of the useful life of the parts that is limited by the time of inception of WO failures that can be determined using an adequate reliability model and results of highly accelerated life testing (HALT). In this presentation, a modified time dependent dielectric breakdown (TDDB) model is used to describe both IM and WO failures during HALT. Specifics of physical processes resulting in degradation and failures in polymer and MnO2 tantalum capacitors are discussed, and the increase of IM failures with the level of stress is explained. The model justifies exponential dependence of the acceleration factors on voltage and predicts higher values of the voltage acceleration constant for IM compared to WO failures.

tantalum capacitors↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Microchip and wedge ion funnels and planar ion beam analyzers using same

Electrodynamic ion funnels confine, guide, or focus ions in gases using the Dehmelt potential of oscillatory electric field. New funnel designs operating at or close to atmospheric gas pressure are described. Effective ion focusing at such pressures is enabled by fields of extreme amplitude and frequency, allowed in microscopic gaps that have much higher electrical breakdown thresholds in any gas than the macroscopic gaps of present funnels. The new microscopic-gap funnels are useful for interfacing atmospheric-pressure ionization sources to mass spectrometry (MS) and ion mobility separation (IMS) stages including differential IMS or FAIMS, as well as IMS and MS stages in various configurations. In particular, "wedge" funnels comprising two planar surfaces positioned at an angle and wedge funnel traps derived therefrom can compress ion beams in one dimension, producing narrow belt-shaped beams and laterally elongated cuboid packets. This beam profile reduces the ion density and thus space-charge effects, mitigating the adverse impact thereof on the resolving power, measurement accuracy, and dynamic range of MS and IMS analyzers, while a greater overlap with coplanar light or particle beams can benefit spectroscopic methods.

47 OTHER INSTRUMENTATION↗

Innovative Data Management System in Support of Remedial Actions for Legacy Radioactive Contamination - 17280

The Port Hope Area Initiative (PHAI) is a project mandated and funded by the Government of Canada to remove contamination from properties with legacy low-level radioactive waste (LLRW) contamination arising from a crown-owned radium and, later, uranium refinery in the Town of Port Hope, Ontario. From 1976 to 1981, a community clean-up project was undertaken, with the specific purpose to decrease the level of historic LLRW contamination within Port Hope. Since then, residual LLRW has been managed by the Low Level Radioactive Waste Management Office (LLRWMO) (and its predecessors). The PHAI and the Port Hope Project (PHP) were initiated in 2001 with a formal agreement between affected municipalities and the federal government to develop a safe, long-term management solution for the historic LLRW remaining within Port Hope. An important activity of the PHP is the survey of about 4,800 'small scale sites' (SSS) throughout the community to confirm the presence or absence of LLRW. This involves surveys of properties based on the measurement of exterior gamma, contaminated objects and surfaces, soil concentrations and indoor radon and classification to Port Hope project specific criteria. A very large amount of information is involved in the project including; scheduling individual field visits to the properties, capture of field data and comments, laboratory sample tracking, QA/QC, report generation and internal and client project reporting at regular schedules. Field data collection of exterior gamma radiation surveys includes direct (real time) and interactive loading of data into the Information Management (IM) system to support initial QA/QC and reporting back to the field on radiation levels. Screening soil measurements including X-ray fluorescence (XRF) and gamma radiation are collected from all 20 cm increments in each borehole in addition to down-hole gamma radiation measurements and logging of soil characteristics which are used in documentation and interpretation of the property condition. The IM system outlined in this paper was developed to respond to the requirements for radiological surveys in Port Hope. The IM system continues to evolve as a part of continuing review and improvement. The IM system incorporates Web-enabled field tools and cloud hosted data and applications, provides increased field efficiency, timeliness in reporting, real time QA/QC analysis, and consistency in tracking project advances and changes made to the data for decision-making and reporting on an ongoing basis. Examples of specific applications are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative: Information Management for A Very Large Radiation Survey - 19567

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities - Port Hope. The PHAI is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. The PHAI is being implemented by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. The waste is the result of radium and uranium processing in Port Hope by the former federal crown corporation Eldorado Nuclear Limited between 1933 and 1988. The waste has been distributed in the Municipality of Port Hope through placement of contaminated materials (e.g. fill), reuse of contaminated objects (e.g. tailings use in concrete, steel posts, structural wood) and air-borne deposition. Signature contaminants of potential concern (COPCs) are Ra-226, Th-230, uranium and arsenic; however, there are an additional 17 COPCs that also need to be considered. A very large amount of information has been collected during the survey and effectively managing and analyzing this information is critical to the success for the property owners, CNL's implementation of the PHAI, and Arcadis. Data collected during the survey includes information pertaining to long-term interior radon gas measurements, interior gamma radiation surveys, contaminated objects and surfaces, exterior gamma radiation and subsurface investigations. exterior gamma radiation surveys. The information management (IM) is structured with SharePoint as a focal point supported by an EQuIS database, mobile data collection and GIS support. The IM process for this project is being advanced using recent software developments to assist with internal activities (e.g. QA) and interactions with CNL including notifications and scheduling and status of property completion. Different applications have been developed to help automate, visualize, actively track, and QA different processes using recent software developments by Microsoft. We have used SharePoint to organize and track our data. Power BI has been used to actively track and visualize our data from Interior gamma surveying to exterior drilling. The creation of dynamic/advanced visualizations in Power BI gathers data daily from our multiple sources and analyzes it for anomalous data and trends. Microsoft Flow syncs with Power BI and has been implemented to automate many processes including the QA of surveys and soil results for identification of LLRW. To tie everything together, our GIS and EQuIS systems are our primary data compilation source that makes our advanced analytics/visualization and automation/tracking our data possible. Specific examples will be discussed, as will challenges encountered during the continuing development of the IM system. The incorporation of software advancements to the existing IM system for Port Hope characterization has improved the quality of the surveys, the tracking of completion, meeting schedule requirements and providing the required data for tracking, report preparation and supporting remediation of contamination on the properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of Bulk Chemical Composition on Relative Sensitivity Factors for 55Mn/52Cr by SIMS: Implications for the 53Mn-53Cr Chronometer

The {sup 53}Mn-{sup 53}Cr systematics of meteorite samples provide an important high resolution chronometer for early solar system events. Accurate determination of the initial abundance of {sup 53}Mn ({tau}{sub 1/2} = 3.7 Ma) by secondary ion mass spectrometry (SIMS) is dependent on properly correcting for differing ion yields between Mn and Cr by use of a relative sensitivity factor (RSF). Ideal standards for SIMS analysis should be compositionally and structurally similar to the sample of interest. However, previously published Mn-Cr studies rely on few standards (e.g., San Carlos olivine, NIST 610 glass) despite significant variations in chemical composition. We investigate a potential correlation between RSF and bulk chemical composition by determining RSFs for {sup 55}Mn/{sup 52}Cr in 11 silicate glass and mineral standards (San Carlos olivine, Mainz glasses KL2-G, ML3B-G, StHs6/80-G, GOR128-G, BM90/21-G, and T1-G, NIST 610 glass, and three LLNL pyroxene-composition glasses). All standards were measured on the Cameca ims-3f ion microprobe at LLNL, and a subset were also measured on the Cameca ims-1270 ion microprobe at the Geological Survey of Japan. The standards cover a range of bulk chemical compositions with SiO{sub 2} contents of 40-71 wt.%, FeO contents of 0.05-20 wt.% and Mn/Cr ratios between 0.4 and 58. We obtained RSF values ranging from 0.83 to 1.15. The data obtained on the ims-1270 ion microprobe are within {approx}10% of the RSF values obtained on the ims-3f ion microprobe, and the RSF determined for San Carlos olivine (0.86) is in good agreement with previously published data. The typical approach to calculating an RSF from multiple standard measurements involves making a linear fit to measured {sup 55}Mn/{sup 52}Cr versus true {sup 55}Mn/{sup 52}Cr. This approach may be satisfactory for materials of similar composition, but fails when compositions vary significantly. This is best illustrated by the {approx}30% change in RSF we see between glasses with similar Mn/Cr ratios but variable Fe and Na content. We are developing an approach that uses multivariate analysis to evaluate the importance of different chemical components in controlling the RSF and predict the RSF of unknowns when standards of appropriate composition are not available. Our analysis suggests that Fe, Si, and Na are key compositional factors in these silicate standards. The RSF is positively correlated with Fe and Si and negatively correlated with Na. Work is currently underway to extend this analysis to a wider range of chemical compositions and to evaluate the variability of RSF on measurements obtained by NanoSIMS.

58 GEOSCIENCES↗

Alternative treaty monitoring approaches using ultra-low background measurement technology

The International Monitoring System (IMS) of the Comprehensive Test Ban Treaty includes a network of stations and laboratories for collection and analysis of radioactive aerosols. Alternative approaches to IMS operations are considered as a method of enhancing treaty verification. Ultra-low background (ULB) detection promises the possibility of improvements to IMS minimum detectable activities (MDAs) well below the current approach, requiring MDAp30 mBq/m3 of air for 140Ba, or about 106 fissions per daily sample.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗