Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Functional redundancy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Reliability Impacts in Life Support Architecture and Technology Selection

Equivalent System Mass (ESM) and reliability estimates were performed for different life support architectures based primarily on International Space Station (ISS) technologies. The analysis was applied to a hypothetical 1-year deep-space mission. High-level fault trees were initially developed relating loss of life support functionality to the Loss of Crew (LOC) top event. System reliability was then expressed as the complement (nonoccurrence) this event and was increased through the addition of redundancy and spares, which added to the ESM. The reliability analysis assumed constant failure rates and used current projected values of the Mean Time Between Failures (MTBF) from an ISS database where available. Results were obtained showing the dependence of ESM on system reliability for each architecture. Although the analysis employed numerous simplifications and many of the input parameters are considered to have high uncertainty, the results strongly suggest that achieving necessary reliabilities for deep-space missions will add substantially to the life support system mass. As a point of reference, the reliability for a single-string architecture using the most regenerative combination of ISS technologies without unscheduled replacement spares was estimated to be less than 1%. The results also demonstrate how adding technologies in a serial manner to increase system closure forces the reliability of other life support technologies to increase in order to meet the system reliability requirement. This increase in reliability results in increased mass for multiple technologies through the need for additional spares. Alternative parallel architecture approaches and approaches with the potential to do more with less are discussed. The tall poles in life support ESM are also reexamined in light of estimated reliability impacts.

Lange, Kevin E.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Quadratic Programming for Allocating Control Effort

A computer program calculates an optimal allocation of control effort in a system that includes redundant control actuators. The program implements an iterative (but otherwise single-stage) algorithm of the quadratic-programming type. In general, in the quadratic-programming problem, one seeks the values of a set of variables that minimize a quadratic cost function, subject to a set of linear equality and inequality constraints. In this program, the cost function combines control effort (typically quantified in terms of energy or fuel consumed) and control residuals (differences between commanded and sensed values of variables to be controlled). In comparison with prior control-allocation software, this program offers approximately equal accuracy but much greater computational efficiency. In addition, this program offers flexibility, robustness to actuation failures, and a capability for selective enforcement of control requirements. The computational efficiency of this program makes it suitable for such complex, real-time applications as controlling redundant aircraft actuators or redundant spacecraft thrusters. The program is written in the C language for execution in a UNIX operating system.

Singh, Gurkirpal↗

Stochastic evaluation of fourth-order many-body perturbation energies

A scalable, stochastic algorithm evaluating the fourth-order many-body perturbation (MP4) correction to energy is proposed. Three hundred Goldstone diagrams representing the MP4 correction are computer generated and then converted into algebraic formulas expressed in terms of Green’s functions in real space and imaginary time. They are evaluated by the direct (i.e., non-Markov, non-Metropolis) Monte Carlo (MC) integration accelerated by the redundant-walker and control-variate algorithms. The resulting MC-MP4 method is efficiently parallelized and is shown to display O(n 5.3 ) size-dependence of cost, which is nearly two ranks lower than the O(n 7 ) dependence of the deterministic MP4 algorithm. Furthermore, it evaluates the MP4/aug-cc-pVDZ energy for benzene, naphthalene, phenanthrene, and corannulene with the statistical uncertainty of 10 mE h (1.1% of the total basis-set correlation energy), 38 mE h (2.6%), 110 mE h (5.5%), and 280 mE h (9.0%), respectively, after about 10 9 MC steps.

74 ATOMIC AND MOLECULAR PHYSICS↗

MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or green according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.

60 APPLIED LIFE SCIENCES↗

Improved Diffuse Foreground Subtraction with the ILC Method: CMB Map and Angular Power Spectrum Using Planck and WMAP Observations

We report an improved technique for diffuse foreground minimization from Cosmic Microwave Background (CMB) maps using a new multiphase iterative harmonic space internal-linear-combination (HILC) approach. Our method nullifies a foreground leakage that was present in the old and usual iterative HILC method. In phase 1 of the multiphase technique, we obtain an initial cleaned map using the single iteration HILC approach over the desired portion of the sky. In phase 2, we obtain a final CMB map using the iterative HILC approach; however, now, to nullify the leakage, during each iteration, some of the regions of the sky that are not being cleaned in the current iteration are replaced by the corresponding cleaned portions of the phase 1 map. We bring all input frequency maps to a common and maximum possible beam and pixel resolution at the beginning of the analysis, which significantly reduces data redundancy, memory usage, and computational cost, and avoids, during the HILC weight calculation, the deconvolution of partial sky harmonic coefficients by the azimuthally symmetric beam and pixel window functions, which in a strict mathematical sense, are not well defined. Using WMAP 9 year and Planck 2015 frequency maps, we obtain foreground-cleaned CMB maps and a CMB angular power spectrum for the multipole range 2⩽ℓ⩽2500. Our power spectrum matches the published Planck results with some differences at different multipole ranges. We validate our method by performing Monte Carlo simulations. Finally, we show that the weights for HILC foreground minimization have the intrinsic characteristic that they also tend to produce a statistically isotropic CMB map.

79 ASTRONOMY AND ASTROPHYSICS↗

A fully redundant power hinge for LANDSAT-D appendages

The configuration and testing of a power driven hinge for deployment of the solar array and antenna boom for the LANDSAT-D spacecraft is discussed. The hinge is fully mechanically and electrically redundant and, thereby, can sustain a single point failure of any one motor (or its power supply), speed reducer, or bearing set without loss of its ability to function. This design utilizes the capability of the stepper motor drive to remove the flexibility of the drive train from the joint stiffness equation when the hinge is loaded against its stop. This feature precludes gapping of the joint under spacecraft maneuver loads even in the absence of a latching feature. Thus, retraction is easily accomplished by motor reversal without the need for a solenoid function to remove the latch.

Mamrol, F. E.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Securing against errors in an error correcting code (ECC) implemented in an automotive system

In general, data is susceptible to errors caused by faults in hardware (i.e. permanent faults), such as faults in the functioning of memory and/or communication channels. To detect errors in data caused by hardware faults, the error correcting code (ECC) was introduced, which essentially provides a sort of redundancy to the data that can be used to validate that the data is free from errors caused by hardware faults. In some cases, the ECC can also be used to correct errors in the data caused by hardware faults. However, the ECC itself is also susceptible to errors, including specifically errors caused by faults in the ECC logic. A method, computer readable medium, and system are thus provided for securing against errors in an ECC.

Saxena, Nirmal Raj↗

Functional Consequences of Subunit Diversity in RNA Polymerases II and V

Multisubunit RNA polymerases IV and V (Pol IV and Pol V) evolved as specialized forms of Pol II that mediate RNA-directed DNA methylation (RdDM) and transcriptional silencing of transposons, viruses, and endogenous repeats in plants. Among the subunits common to Arabidopsis thaliana Pols II, IV, and V are 93% identical alternative ninth subunits, NRP(B/D/E)9a and NRP(B/D/E)9b. The 9a and 9b subunit variants are incompletely redundant with respect to Pol II; whereas double mutants are embryo lethal, single mutants are viable, yet phenotypically distinct. Likewise, 9a or 9b can associate with Pols IV or V but RNA-directed DNA methylation is impaired only in 9b mutants. Based on genetic and molecular tests, we attribute the defect in RdDM to impaired Pol V function. Collectively, our results reveal a role for the ninth subunit in RNA silencing and demonstrate that subunit diversity generates functionally distinct subtypes of RNA polymerases II and V.

Environmental Molecular Sciences Laboratory↗

An estimated 5% of new protein structures solved today represent a new Pfam family

This study uses the Pfam database to show that the sequence redundancy of protein structures deposited in the PDB is increasing. The possible reasons behind this trend are discussed. High-resolution structural knowledge is key to understanding how proteins function at the molecular level. The number of entries in the Protein Data Bank (PDB), the repository of all publicly available protein structures, continues to increase, with more than 8000 structures released in 2012 alone. The authors of this article have studied how structural coverage of the protein-sequence space has changed over time by monitoring the number of Pfam families that acquired their first representative structure each year from 1976 to 2012. Twenty years ago, for every 100 new PDB entries released, an estimated 20 Pfam families acquired their first structure. By 2012, this decreased to only about five families per 100 structures. The reasons behind the slower pace at which previously uncharacterized families are being structurally covered were investigated. It was found that although more than 50% of current Pfam families are still without a structural representative, this set is enriched in families that are small, functionally uncharacterized or rich in problem features such as intrinsically disordered and transmembrane regions. While these are important constraints, the reasons why it may not yet be time to give up the pursuit of a targeted but more comprehensive structural coverage of the protein-sequence space are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Alternate avionics system study and phase B extension

Results of alternate avionics system studies for the space shuttle are presented that reduce the cost of vehicle avionics without incurring major off-setting costs on the ground. A comprehensive summary is provided of all configurations defined since the completion of the basic Phase B contract and a complete description of the optimized avionics baseline is given. In the new baseline, inflight redundancy management is performed onboard without ground support; utilization of off-the-shelf hardware reduces the cost figure substantially less than for the Phase B baseline. The only functional capability sacrificed in the new approach is automatic landing.

Source record↗

Application of neural networks to autonomous rendezvous and docking of space vehicles

NASA-Marshall has investigated the feasibility of numerous autonomous rendezvous and docking (ARD) candidate techniques. Neural networks have been studied as a viable basis for such systems' implementation, due to their intrinsic representation of such nonlinear functions as those for which analytical solutions are either difficult or nonexistent. Neural networks are also able to recognize and adapt to changes in their dynamic environment, thereby enhancing redundancy and fault tolerance. Outstanding performance has been obtained from ARD azimuth, elevation, and roll networks of this type.

Dabney, Richard W.↗

A statistical note on the redundancy of nine standard baroreflex parameters

An accepted method for measuring the responsiveness of the carotid-cardiac baroreflex to arterial pressure changes is to artificially stimulate the baroreceptors in the neck with a pressurized neck chamber. Nine physiological responses to this type of stimulation are quantified and used as indicators of the baroreflex response function. Thirty male humans between the ages of 27 and 46 underwent the carotid-cardiac baroreflex test. The data for the nine response parameters were analyzed by principle component factor analysis. The results indicated that 92.5 percent of the total variance across all nine parameters could be explained in four dimensions. The first two dimensions reflected location points for R-R interval and carotid distending pressure, respectively. The third factor was composed of measures reflecting the gain (responsiveness) of the reflex. The fourth dimension was the ratio of baseline R-R interval to the maximal R-R interval response during simulated hypertension. The data suggest that the analysis of all nine baroreflex parameters is likely to be redundant and researchers should account for these redundancies either in their analyses or conclusions.

Ludwig, David A.↗

Culling of redundant data

The inversion of a large data set, with it errors, is demonstrated and the tradeoff curve, or resolving power calculations, are discussed. Consideration is given to inverse problems of the earth, represented in the idealized form of a single scaler function of a single coordinate. The difference between the functional for the real earth and the functional for some model is formulated. A procedure is given for using the linear relationships between the differences in the data and the differences in the model as side conditions. Through a process of diagonalization a model is created that fits the data. The data are culled by accepting only those relative standard errors that are less than 100 percent.

Gilbert, F.↗

Adaptive Data-Driven Deep-Learning Surrogate Model for Frontal Polymerization in Dicyclopentadiene

Frontal polymerization (FP) is a self-sustaining curing process that enables rapid and energy-efficient manufacturing of thermoset polymers and composites. Computational methods conventionally used to simulate the FP process are time-consuming, and repeating simulations are required for sensitivity analysis, uncertainty quantification, or optimization of the manufacturing process. Here, in this work, we develop an adaptive surrogate deep-learning model for FP of dicyclopentadiene (DCPD), which predicts the evolution of temperature and degree of cure orders of magnitude faster than the finite-element method (FEM). The adaptive algorithm provides a strategy to select training samples efficiently and save computational costs by reducing the redundancy of FEM-based training samples. The adaptive algorithm calculates the residual error of the FP governing equations using automatic differentiation of the deep neural network. A probability density function expressed in terms of the residual error is used to select training samples from the Sobol sequence space. The temperature and degree of cure evolution of each training sample are obtained by a 2D FEM simulation. The adaptive method is more efficient and has a better prediction accuracy than the random sampling method. With the well-trained surrogate neural network, the FP characteristics (front speed, shape, and temperature) can be extracted quickly from the predicted temperature and degree-of-cure fields.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Unique nucleotide sequence-guided assembly of repetitive DNA parts for synthetic biology applications

Recombination-based DNA construction methods, such as Gibson assembly, have made it possible to easily and simultaneously assemble multiple DNA parts, and they hold promise for the development and optimization of metabolic pathways and functional genetic circuits. Over time, however, these pathways and circuits have become more complex, and the increasing need for standardization and insulation of genetic parts has resulted in sequence redundancies-for example, repeated terminator and insulator sequences-that complicate recombination-based assembly. We and others have recently developed DNA assembly methods, which we refer to collectively as unique nucleotide sequence (UNS)-guided assembly, in which individual DNA parts are flanked with UNSs to facilitate the ordered, recombination-based assembly of repetitive sequences. Here we present a detailed protocol for UNS-guided assembly that enables researchers to convert multiple DNA parts into sequenced, correctly assembled constructs, or into high-quality combinatorial libraries in only 2-3 d. If the DNA parts must be generated from scratch, an additional 2-5 d are necessary. This protocol requires no specialized equipment and can easily be implemented by a student with experience in basic cloning techniques.

Torella, JP↗

Joint Actinide Shock Physics Experimental Research (JASPER): System Design Requirements: Trigger Unit

One of the key systems required for the Joint Actinide Shock Physics Experimental Research (JASPER) facility is the timely triggering of the Prompt System (PS). The Trigger Unit (TU) is the critical component that determines when the PS is to be triggered. There are two redundant TUs within the JASPER system, and each TU creates three redundant triggers for the PS. In this fashion, the Prompt Trigger System (PTS) can suffer the loss of one sensor, as well as the loss of one TU, and still function correctly. The TU is designed to receive signals from five separate sensors along the flight of the projectile on its way to the target. The TU uses three pairs of these detectors to create a trigger pulse at the appropriate time, based on the actual velocity of the projectile as it passes between the two sensors.

42 ENGINEERING↗