Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

The Economics of Energy Savings Performance Contracts

Energy Savings Performance Contracts (ESPCs) allow governments to tap private capital to finance energy efficiency improvements; the debt service on the financing is paid from the energy and energy-related cost savings generated by the efficiency projects themselves. Since 1998 about 43% of the funding for energy efficiency upgrades in US federal buildings has come from ESPC and other similar programs. This paper describes the balance sheet for an ESPC project as currently implemented by US federal agencies, and shows how parameters such as the cost of the project, the interest rate for financing, level of savings, energy escalation rates, and others combine to determine the project cash flow. The paper also examines the sensitivity of project economics to changes in each of these parameters.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LLNL Chronic Beryllium Disease Prevention Program (CBDPP): Implementation of 10 CFR 850, Revision 7

This document describes how Lawrence Livermore National Laboratory (LLNL) meets the requirements and management practices of federal regulation 10 CFR 850, 'Chronic Beryllium Disease Prevention Program (CBDPP).' This revision of the LLNL CBDPP incorporates clarification and editorial changes based on lessons learned from employee discussions, observations and reviews of Department of Energy (DOE) Complex and commercial industry beryllium (Be) safety programs. The information is used to strengthen beryllium safety practices at LLNL, particularly in the areas of: (1) Management of small parts and components; and (2) Communication of program status to employees. Future changes to LLNL beryllium activities and on-going operating experience will be incorporated into the program as described in Section S, 'Performance Feedback.'

99 GENERAL AND MISCELLANEOUS↗

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study #11: Commercial Kitchen Equipment (Brochure)

The Exchange, formerly the Army and Air Force Exchange Service (AAFES), is a joint military activity and the U.S. Department of Defense's (DOD) oldest and largest retailer. The Exchange is taking a leadership role in water efficiency improvements in their commercial kitchens by integrating water efficiency concepts into the organizations overall sustainability plan and objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Water Heating with Low-Cost Plastic Systems (Brochure)

Newly developed solar water heating technology can help Federal agencies cost effectively meet the EISA requirements for solar water heating in new construction and major renovations. This document provides design considerations, application, economics, and maintenance information and resources.

14 SOLAR ENERGY↗

Aspinall Courthouse: GSA's Historic Preservation and Net-Zero Renovation Case Study

The federal government is mandated with improving efficiency of buildings, incorporating renewable energy, and achieving net-zero energy operations where possible. These challenges led GSA to consider aligning historic preservation renovations with net-zero energy goals. The Wayne N. Aspinall Federal Building and U.S. Courthouse (Aspinall Courthouse), in Grand Junction, Colorado, is an example of a renovation project that aimed to accomplish both historic preservation and net-zero energy goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning Guidance for ESPCs

Guidance for facility managers describing the commissioning process in Super ESPC contracts and how these contracts can achieve the objective of meeting facility performance requirements.

99 GENERAL AND MISCELLANEOUS↗

Biennial Report to Congress on the Progress of the Federal Government in Meeting the Renewable Energy Goals of the Energy Policy Act of 2005

As a whole the Federal government met its statutory goal to consume renewable electricity to meet not less than 3 percent of total facility electricity use. However, overall Federal renewable electricity use declined 32% from 2007 to 2008, dropping from 2.8 terawatthours (TWh) (4.9%) to 1.9 TWh (3.4%). Of the 22 agencies reporting, 13 increased renewable energy use, but 7 agencies reported significant declines that more than offset the increases, while deployment was stagnant in 2 others. Higher prices for renewable energy certificates (RECs) and reduced incentives to purchase renewable energy because of the phase out of old rules that allowed counting renewable energy purchases towards energy efficiency goals were major reasons cited for the decline. In addition, there was a steep reduction of 73% in self-generated or on-site renewable energy. Although self-generated renewable energy declined, some facilities demonstrated a new approach to developing projects by selling high-value RECs to help finance projects, and then used some of the savings to purchase lower-cost replacement RECs. This approach, exemplified by the National Renewable Energy Laboratory’s (NREL) Mesa Top PV project, reduces the cost of meeting the goal, and allows the project to count as on-site energy production. EPAct 2005 only allows agencies, including the Department of Defense (DoD), to count renewable energy the agency consumes toward the EPAct goal and it only allows agencies to count electricity from renewable resources, not thermal energy. Under EPAct, ground-source heat pumps which provide thermal energy are not allowed. DoD has a separate statutory goal that counts production and consumption of both electricity and thermal energy from renewable sources, but DOD is also required to meet EPAct 2005 goals. The reduction in self-generated or on-site renewable energy is of particular concern. Given this trend, meeting the goal in 2009 may be difficult; increasing renewable energy use to 5 percent of facility electricity use in 2010 will be unlikely without a much greater effort. Agencies urgently need to increase attention to the renewable energy goal and take action to meet the goal. Removing barriers to these projects is also critically important.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at future federal resource assessments and hydropower reform legislation.

13 HYDRO ENERGY↗

Highlights and Lessons Learned from Army Re-tuning™ Pilot Demonstrations

The Army has aggressively pursued policy and energy efficiency projects and programs in recent years to meet Federal mandates and reduction goals organizationally (EISA 2007, AR 420-1, 42 U.S.C. § 8253), resulting in a 9.6% reduction in energy use intensity (EUI) from FY2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017. Many of the low-cost/no-cost conservation measures have been deployed, so finding additional savings and projects that either (a) are cost effective or (b) can be bundled with more costly capital improvement projects to improve life cycle cost effectiveness, is imperative for the Army. Leveraging building control systems (BCS) and optimizing building performance through re-tuning represents a great opportunity for the Army. In 2016, the Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment), i.e. ASA (IEE), was tasked in 2016 with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning efforts for the Army.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Best Practices: Core Principles of Sustainable Fleet Management

This report helps agency fleet managers understand and implement optimal petroleum reduction strategies for fleet locations by evaluating the most appropriate combination of the four core principles of sustainable fleet management: right-sizing the fleet to agency mission by implementing a vehicle allocation methodology study; minimizing vehicle miles traveled; increasing fleet fuel efficiency by replacing inefficient vehicles with more fuel-efficient vehicles, maintaining vehicles, driving more efficiently, and avoiding excessive idling; and optimizing cost-effective alternative fuel use, including maximizing utilization of existing alternative fuel infrastructure, installing alternative fuel infrastructure where practical (including electric vehicle charging stations), and aligning deployment of alternative fuel vehicles with fueling infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗