Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Atmospheric Mining in the Outer Solar System: Aerial Vehicle Mission and Design Issues

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. With these two additional gases, the potential for fueling small and large fleets of additional exploration and exploitation vehicles exists. The mining aerospacecraft (ASC) could fly through the outer planet atmospheres, for global weather observations, localized storm or other disturbance investigations, wind speed measurements, polar observations, etc. Analyses of orbital transfer vehicles (OTVs), landers, and in-situ resource utilization (ISRU) mining factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points.

orbital mechanics↗

Ballistic trajectory options for manned Mars Missions

Mars Mission profile options and mission requirements data are presented for earth-Mars opposition and conjunction class round-trip flyby and stopover mission opportunities. The opposition-class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition-class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition-class mission. The conjunction-class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low earth orbit to one mission profile option and mission opportunity to another.

Young, Archie C.↗

Vehicle Design for Mars Landing and Return to Mars Orbit

This paper briefly describes three modes for accomplishing the Mars landing mission and compares them on a gross basis to indicate their probable order of merit and to identify design requirements placed on the Mars-excursion module (MEM) by the choice of mode. The paper shows that a flyby-rendezvous mode requiring low weight in earth orbit requires the MEM to enter the Mars atmosphere at velocities ranging from 20,000 to 30,000 ft/sec. The MEM for the flyby-rendezvous mode is not covered in this paper but merits further study. The MEM for the other modes of mission accomplishment begins its active operational sequence in Mars orbit and need not be greatly influenced by the method of delivery to Mars orbit. Parametric studies of the entry problem for two vehicles typifying a ballistic-type and a lifting-body-type were conducted to identify the problems associated with design of a MEM to accommodate the extremes of Mars atmospheric density presently predicted. This brief study indicates that: (a) the presently predicted density extremes of the Mars atmosphere present no serious design problems for a MEM which can operate across the entire band of predicted densities; (b) details of operational requirements and mission objectives will control the choice of configuration rather than entry requirements; and (c) the ballistic-type MEM is lighter and simpler but has less operational flexibility than a high L/D MEM.

Hammock, D. M.↗

Apollo 17: At Taurus Littrow

A summation, with color illustrations, is presented on the Apollo 17 mission. The height, weight, and thrust specifications are given on the launch vehicle. Presentations are given on: the night launch; earth to moon ascent; separation and descent; EVA, the sixth lunar surface expedition; ascent from Taurus-Littrow; the America to Challenger rendezvous; return, reentry, and recovery; the scientific results of the mission; background information on the astronauts; and the future projects.

Anderton, D. A.↗

From Lindbergh to Columbia - The Space Shuttle

An effort to gage the level of maturation of space transportation development signalled by the advent of the Shuttle is attempted. Analogy is drawn to the successful crossing of the Atlantic Ocean by Charles Lindbergh, an event which established the feasibility of routine air transport over long distances. A positive shift in public confidence is expected to arrive by recalling the favorable news coverage which resulted after two or three flights by the Wright brothers at Kitty Hawk in 1908. The evolution of modern airports is taken as an indication of the kind of growth in facilities which may shortly be required due to operational space transportation systems. The arrival of normal operations of humans-to-space and return in reuseable vehicles is seen as a benchmark for a time when certain global assessments of social and technical requirements for the continued existence and progress of human civilization on earth and into space must be made.

Lovelace, A.↗

Biconic cargo return vehicle with an advanced recovery system

The current space exploration initiative is focused around the development of the Space Station Freedom (SSF). Regular resupply missions must support a full crew on the station. The present mission capability of the shuttle is insufficient, making it necessary to find an alternative. One alternative is a reusable Cargo Return Vehicle (CRV). The suggested design is a biconic shaped, dry land recovery CRV with an advance recovery system (ARC). A liquid rocket booster will insert the CRV into a low Earth orbit. Three onboard liquid hydrogen/liquid oxygen engines are used to reach the orbit of the station. The CRV will dock to the station and cargo exchange will take place. Within the command and control zone (CCZ), the CRV will be controlled by a gaseous nitrogen reaction control system (RCS). The CRV will have the capability to exchange the payload with the Orbital Maneuvering Vehicle (OMV). The bent biconic shape will give the CRV sufficient crossrange to reach Edwards Air Force Base and several alternative sites. Near the landing site, a parafoil-shaped ARS is deployed. The CRV is designed to carry a payload of 40 klb, and has an unloaded weight of 35 klb.

Source record↗

Heliospheric Physics and NASA's Vision for Space Exploration

The Vision for Space Exploration outlines NASA's development of a new generation of human-rated launch vehicles to replace the Space Shuttle and an architecture for exploring the Moon and Mars. The system--developed by the Constellation Program--includes a near term (approx. 2014) capability to provide crew and cargo service to the International Space Station after the Shuttle is retired in 2010 and a human return to the Moon no later than 2020. Constellation vehicles and systems will necessarily be required to operate efficiently, safely, and reliably in the space plasma and radiation environments of low Earth orbit, the Earth's magnetosphere, interplanetary space, and on the lunar surface. This presentation will provide an overview of the characteristics of space radiation and plasma environments relevant to lunar programs including the trans-lunar injection and trans-Earth injection trajectories through the Earth's radiation belts, solar wind surface dose and plasma wake charging environments in near lunar space, energetic solar particle events, and galactic cosmic rays and discusses the design and operational environments being developed for lunar program requirements to assure that systems operate successfully in the space environment.

Minow, Joseph I.↗

Solar Electric Propulsion for Primitive Body Science Missions

This paper describes work that assesses the performance of solar electric propulsion (SEP) for three different primitive body science missions: 1) Comet Rendezvous 2) Comet Surface Sample Return (CSSR), and 3) a Trojan asteroid/Centaur object Reconnaissance Flyby. Each of these missions launches from Earth between 2010 and 2016. Beginning-of-life (BOL) solar array power (referenced at 1 A.U.) varies from 10 to 18 kW. Launch vehicle selections range from a Delta II to a Delta IV medium-class. The primary figure of merit (FOM) is net delivered mass (NDM). This analysis considers the effects of imposing various mission constraints on the Comet Rendezvous and CSSR missions. Specifically, the Comet Rendezvous mission analysis examines an arrival date constraint with a launch year variation, whereas the CSSR mission analysis investigates an Earth entry velocity constraint commensurate with past and current missions. Additionally, the CSSR mission analysis establishes NASA's New Frontiers (NF) Design Reference Mission (DRM) in order to evaluate current and future SEP technologies. The results show that transfer times range from 5 to 9 years (depending on the mission). More importantly, the spacecraft's primary propulsion system performs an average 5-degree plane change on the return leg of the CSSR mission to meet the previously mentioned Earth entry velocity constraint. Consequently, these analyses show that SEP technologies that have higher thrust-to-power ratios can: 1) reduce flight time, and 2) change planes more efficiently.

Witzberger, Kevin E.↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars.

exploration↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

Dormancy Should Be Avoided for Mars and Deep Space Recycling Life Support

Mars is the crucial goal of human exploration beyond the Earth-moon system. The Mars round trip transit vehicle has been expected to use a regenerative Life Support System (LSS) similar to the one on the International Space Station (ISS). It often assumed that the Mars transit LSS will be operated on the outward trip to Mars, placed in dormancy while the full crew explores the surface, and then restored to operation for the return trip to Earth. The major difference between Mars missions and operations in the Earth-moon system is the need for much higher reliability for Mars missions, since rapid resupply of parts and materials or a quick crew return to Earth are not possible. Mars systems must achieve intrinsic high reliability by design, test, failure analysis, and redesign and then increase operational robustness by providing spare parts and redundant systems. Further requiring the LSS to be capable of dormancy and restoration to operation greatly increases the difficulty of design, test, and verification. The process of implementing dormancy and then restoring operation would add significant risk to the mission. Dormancy should be avoided for Mars and can be avoided several ways. First and most obvious, some crew can remain continually on board. If no crew can remain onboard, dormancy can still be avoided if an unused spare LSS is activated for the return trip, rather than restarting the used out bound system. Systems similar to the ISS LSS would have a significant probability of failure on a Mars trip and therefore would require two or three spares. Another full spare LSS could be provided as the return trip system, rather than refurbishing a used LSS.

dormancy↗

Atmospheric Mining in the Outer Solar System: Interplanetary Transfer Vehicles, In-Situ Resource Utilization, and Moon Mining Issues

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. With these two additional gases, the potential for fueling small and large fleets of additional exploration and exploitation vehicles exists. Analyses of orbital transfer vehicles (OTVs), landers, and in-situ resource utilization (ISRU) mining factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points. Aerospacecraft with closed cycle gas core propulsion are used to capture the 3He and deuterium from the outer planet atmospheres. Water ice on the outer planet moons has been identified as critical resources for refueling the moon landers and the nuclear electric OTVs. The numbers of interplanetary transfer vehicles (ITVs) and the launch vehicles will be presented. Preliminary design parameters for the ITVs and their payload limits will be assessed. The number of mining machines and their associated issues are addressed.

chemical propulsion↗

HERRO: A Science-Oriented Strategy for Crewed Missions Beyond LEO

This paper presents an exploration strategy for human missions beyond Low Earth Orbit (LEO) and the Moon that combines the best features of human and robotic spaceflight. This "Human Exploration using Real-time Robotic Operations" (HERRO) strategy refrains from placing humans on the surfaces of the Moon and Mars in the near-term. Rather, it focuses on sending piloted spacecraft and crews into orbit around exploration targets of interest, such as Mars, and conducting astronaut exploration of the surfaces using telerobots and remotely controlled systems. By eliminating the significant communications delay with Earth due to the speed of light limit, teleoperation provides scientists real-time control of rovers and other sophisticated instruments, in effect giving them a "virtual presence" on planetary surfaces, and thus expanding the scientific return at these destinations. It also eliminates development of the numerous man-rated landers, ascent vehicles and surface systems that are required to land humans on planetary surfaces. The propulsive requirements to travel from LEO to many destinations with shallow gravity-wells in the inner solar system are quite similar. Thus, a single spacecraft design could perform a variety of missions, including orbit-based surface exploration of the Moon, Mars and Venus, and rendezvous with Near Earth Asteroids (NEAs), as well as Phobos and Deimos. Although HERRO bypasses many of the initial steps that have been historically associated with human space exploration, it opens the door to many new destinations that are candidates for future resource utilization and settlement. HERRO is a first step that takes humans to exciting destinations beyond LEO, while expanding the ability to conduct science within the inner solar system.

Schmidt, George R.↗

Humans to Mars in 1999

A set of vehicle designs and a mission architecture that was developed to send humans to Mars in the 1990's are discussed. Launching, landing, a 500 day stay on Mars, and a return to Earth are discussed. The plan is not merely a one shot expedition, but puts into place immediately an economical method of Earth-Mars transportation, real surface exploratory mobility, and significant base capabilities that can rapidly evolve into a mostly self-sufficient Mars colony. Since the plans call for the use of a combination of off the shelf technology and new technology that can be easily developed, the authors argue that there is no reason to postpone the exploration of Mars until several decades after a lunar base build-up.

Zubrin, Robert↗

The importance of operations, risk, and cost assessment to space transfer systems design

This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

Ball, J. M.↗

Space Communications and Navigation (SCaN) Network Simulation Tool Development and Its Use Cases

In this work, we focus on the development of a simulation tool to assist in analysis of current and future (proposed) network architectures for NASA. Specifically, the Space Communications and Navigation (SCaN) Network is being architected as an integrated set of new assets and a federation of upgraded legacy systems. The SCaN architecture for the initial missions for returning humans to the moon and beyond will include the Space Network (SN) and the Near-Earth Network (NEN). In addition to SCaN, the initial mission scenario involves a Crew Exploration Vehicle (CEV), the International Space Station (ISS) and NASA Integrated Services Network (NISN). We call the tool being developed the SCaN Network Integration and Engineering (SCaN NI&E) Simulator. The intended uses of such a simulator are: (1) to characterize performance of particular protocols and configurations in mission planning phases; (2) to optimize system configurations by testing a larger parameter space than may be feasible in either production networks or an emulated environment; (3) to test solutions in order to find issues/risks before committing more significant resources needed to produce real hardware or flight software systems. We describe two use cases of the tool: (1) standalone simulation of CEV to ISS baseline scenario to determine network performance, (2) participation in Distributed Simulation Integration Laboratory (DSIL) tests to perform function testing and verify interface and interoperability of geographically dispersed simulations/emulations.

Jennings, Esther↗

Challenges and Opportunities of International Cooperation for Safety & Mission Assurance (SMA) on the European Service Module (ESM) of the Orion Program

ESA is providing the ESM to NASA for the Orion Program in accordance with the Implementing Arrangement (IA) established between the two Agencies in 2012. This IA is a barter agreement, in which ESA provides Service Module vehicles for the first two flights of Orion in exchange for two servicing missions to the ISS. This arrangement has provided opportunities and challenges to both communities. It represents an important opportunity for ESA to build on its experience in the development and operations of ATV and play an active role in the development and flight of a manned space vehicle. This paper will explore some of the unique aspects of this arrangement as it affects Safety & Mission Assurance (SMA).The assessment of ESM compliance with applicable safety requirements is the responsibility of the Joint Safety and Engineering Review Panel (JSERP). The JSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering and SMA organizations co-chair this Panel. Previously, Safety has chaired, with Engineering as a member of the Panel. Inclusion of Engineering as a co-chair has offered greater leverage within the technical community. Second, the JSERP includes a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety (PA/S) organizations. This recognizes the international arrangement as one of partnership.Another source of both opportunity and challenge is the differing experience base of ESA and NASA. NASA has decades of experience in manned spaceflight, dating back to the Mercury program and following through Gemini, Apollo, Apollo-Soyuz, Skylab, Shuttle and the International Space Station. The risk posture for manned missions is much more rigorous than for unmanned missions. ESA brings a wealth of knowledge as well, with their flights of Ariane and Automated Transfer Vehicle (ATV), development and operation of the Columbus module on ISS, and satellite programs. The result is that both parties have developed paradigms related to risk and failure that contribute to ESM discussions.Orion represents humanity's first venture beyond Low-Earth Orbit (LEO) in over fifty years. Much of that experience is captured in program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous spacecraft with attendant safety-related issues.This paper will explore these and other challenges as we approach the flight of the first Orion vehicle.

Ciancone, Michael L.↗

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗