Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Deep Space Exploration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

Towards Crew-Centered, Mission-Oriented Space Flight Training

This poster describes a training approach that applies empirically derived principles of training to reimagining the overall design of NASA's space flight training program. The poster is focused specifically on the design of astronaut training for NASA's future deep space, exploration missions to Mars. We briefly describe NASA's space flight training practices during the Apollo and Space Shuttle eras as well as NASA's current practices for training astronauts for their missions to the International Space Station. We provide an overview of NASA's current concepts for a mission to Mars to scope our training approach. We envision a new space flight training approach which we term crew-centered, mission oriented training, inspired by the design approach offered in the context of airline pilot training by Barshi. We apply research-based training principles reviewed by Kole and his colleagues, as well as by other researchers in training science, into real-world, practical guidelines for the particular context of training astronauts for a mission to Mars.

Dempsey, Donna L.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Urine Removal from Suited Crew in Orion Vehicle Depressurization Scenario

Humankind wants to continually venture deeper into space, but there are many hazards of deep space exploration. NASA’s Orion Program seeks to incrementally identify these hazards and begin addressing the difficulties of such long-duration missions. One of the largest risks and areas of program focus is crew survival in a vehicle cabin depressurization scenario. As part of proactive mitigation efforts, contingency operations and associated hardware are being developed to sustain crew members for up to 6 days. While the Orion launch and entry suit would provide the crew a pressurized safe haven for that duration, additional systems are needed to handle crew waste while within the suit. NASA’s Orion Crew Survival Systems (OCSS) and Collins Aerospace are working together to develop and test an external suit system to aid in the evacuation of urine from pressurized suits to ensure crew health and safety. This paper describes the recent and on-going design and testing that is driving evolution of hardware and requirements towards eventual flight certification.

OCSS↗

Comparison of Space Radiation GCR Models to AMS Heavy Ion Data

Galactic cosmic rays (GCR) are a constant source of radiation that constitutes one of the major hazards during deep space exploration missions for both astronauts and hardware. In this work, GCR models commonly used by the space radiation protection community are compared with recently published high-precision, high- resolution measurements of cosmic ray lithium, beryllium, boron, carbon, nitrogen, and oxygen fluxes along with their ratios (Li/B, Li/C, Li/O, Be/B, Be/C, Be/O, B/C, B/O, C/O, N/B, N/O) from the Alpha Magnetic Spectrometer (AMS). All of the models were developed and calibrated prior to the publication of this AMS data, therefore this is an opportunity to validate the models against an independent data set. This paper is a compliment to the previously published comparison of GCR models with AMS hydrogen, helium, and the boron-to-carbon ratio.

Whitman, Kathryn↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

A High Inclination Solar Mission Enabled by Near-Term Solar Sail Propulsion

Our current understanding of the Sun, its atmosphere, and the heliosphere is severely limited by a lack of good observations of the Sun’s polar regions. A High Inclination Solar Mission (HISM) mission would go into a 0.48-AU circular solar orbit with at least a 60° inclination to conduct long-term observations of the Sun’s poles using both situ and remote-sensing instruments to study the connections between the Sun, the solar wind, and solar energetic particle events. The propulsion requirements to implement HISM are beyond the capability of conventional chemical propulsion and extremely challenging even for highly efficient solar electric propulsion. To enable HISM and a host of other propulsion-intense space science missions, NASA is actively developing solar sail propulsion, capable of continuous low thrust for the extended periods of time required to meet the delta V requirements of HISM. Upcoming solar sail missions include the Near Earth Asteroid (NEA) Scout (2021 planned launch) and Solar Cruiser (candidate for flight in 2024).Solar sails use sunlight to propel vehicles through space by reflecting solar photons from a large, highly-reflective sail. This continuous photon pressure provides propellantless thrust, allowing for very high delta V maneuvers on long-duration, deep-space exploration. Since the Sun supplies the necessary propulsive energy, solar sails require no onboard propellant, thereby potentially increasing useful payload mass. The NASA MSFC Advanced Concepts Office recently completed a detailed mission concept study of HISM based on the solar sail propulsion technologies being developed for NEA Scout and Solar Cruiser. The HISM spacecraft concept envisions carrying a Doppler & Stokes Imager, a coronagraph, magnetometer, Faraday Cup, a plasma spectrometer, and a radio and plasma wave package to meet the science objectives established for a solar polar orbiting mission in the Heliophysics Decadal Survey. This paper will describe the mission concept and its solar sail propulsion system

Solar Sail↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Trends in Small Satellite Presentations from 2017-2019

As the small satellite community expands and new technologies emerge, it is important to understand and interpret these changes over time. In doing so, we observe progress and aid future development within the field. During the summer of 2020 we compiled for assessment purposes, archived presentation data for years 2017-2019 from three primary sources: the CubeSat Developers Workshop, Interplanetary Small Satellite Conference, and the Small Satellite Conference. A few examples of the information we recorded and compiled were presenter names and affiliations, presentation topic, and mission progress status. Ultimately, we reviewed roughly 600 presentations between the three conferences and the data obtained therein form the basis of our trend assessment. The paper focuses on trends interpreted through the assessment of key elements available in the content of each presentation to include: SmallSat mission developers, subsystem developments and the expanded scope for small satellite destinations. Data was generalized using various forms of analysis depending on the type of information being assessed. In the end, we achieved our goal of reducing the content to its key points and major takeaways from the conference proceedings. In this presentation, the observed trends in data and our findings will be discussed. First, we will cover changes in presentation topics by categorizing them as either: science, technology, science/technology, or other. Our next topic will be about the agencies and organizations at the forefront of small satellite research and development. The following section will explain trends in subsystem developments for telecommunications, propulsion, power, and thermal management. Further discussion will highlight how the scope of interplanetary spaceflight has expanded since 2017 as new small spacecraft missions venture beyond low-Earth orbit into deep space exploration. And finally, we will observe what information was lacking in archived presentations which included but not limited to: mission’s funding source, presentation focus area, and software used.

Small Satellite↗

Implementing distributed operations : a comparison of two Deep Space Missions

Two very different deep space exploration missions—Mars Exploration Rover and Cassini—have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a prime mission of four years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process.

Larsen, Barbara↗

Advanced RF front end technology

The ability to achieve low-mass low-cost micro/nano-spacecraft for deep space exploration requires extensive miniaturization of all subsystems.

Advanced↗

SmallSat Navigation via the Deep Space Network: Lunar Transport

Spacecraft component miniaturization, the standardized CubeSat form factor, and a corresponding increase in launch ride-share availability have led to a renewed interest in smaller, more agile spacecraft missions. Naturally, interest in SmallSat capabilities extends outside of low Earth orbit for a variety of science and technology demonstration applications. As with larger missions, near-term deep-space SmallSats will more than likely rely on telecommunications and tracking via NASA's Deep Space Network or similar facilities. Given the predicted growth in the number of deep space missions, e ective use of telecommunication resources will be more critical than ever, even with Multiple Spacecraft Per Aperture capability. In particular, SmallSat missions will likely face stricter limitations on two-way contact with the tracking stations, thus making other options like one-way data types more attractive. While all missions must eventually develop their own detailed navigation plans, a common set of references is needed to support SmallSat missions, especially in the early development phases. Our investigation provides this initial survey of expected navigation performance for standard radiometric data types, from traditional two-way Doppler and ranging capabilities to one-way equivalents, including delta-di erential one-way range. In this investigation, we examine transport within the Earth-Moon region, the rst step outward from Earth into deep space exploration.

Wood, Lincoln↗

Efficient NRHO to DRO transfers in cislunar space

There has been recently a growing interest in cislunar missions, in particular for supporting human deep space exploration. Understanding the dynamical envi-ronment between various cislunar orbits is therefore useful. The current study is focused on finding efficient transfer trajectory options between a Near-Rectilinear Halo Orbit (NRHO) and a Distant Retrograde Orbit (DRO) in the Earth-Moon system. A general methodology is introduced to design these trans-fers in a systematic way, including the use of solar perturbations and lunar fly-bys. Representative solutions are presented and compared in terms of delta-v and flight time, including a transfer requiring 56 m/s only.

Lantoine, Gregory↗