Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Remote Dry Cutting Technology for Reactor Vessel Segmentation - 19176

Decommissioning of nuclear power plants is becoming a large market due to the many reactors reaching their operational lifetime limit in the near future. One of the first activities in a decommissioning project is to segment the reactor internals and the reactor vessel. These activities are also one of the more complex ones since they deal with most of the radioactivity inventory that is left in the plant after the spent fuel is gone. They are almost always on the critical path, so an improvement in execution time will be favorable for the entire decommissioning program. Westinghouse has been successful for more than 30 years in more than 40 segmentation projects globally. The traditional technology that has been used in these projects has up until now been underwater mechanical cutting of both the reactor internals and the reactor vessel. Underwater mechanical cutting is proven and very reliable, but it is slow and since there are major advantages to the decommissioning program with improvements in schedule performance, Westinghouse is developing alternative technologies both as part of current offerings but also as entire new concepts. For reactor vessel cutting, Westinghouse has developed a new concept involving thermal cutting in a dry environment. The benefit of dry cutting is the speed of the cutting and the subsequent schedule and cost improvements. A dry environment also means that the pools can be drained which means that a critical activity can be moved forward in the schedule and that there will need to be less monitoring and controlling with no pumps, cooling and recirculation system that need to be operated. Going from underwater mechanical to dry thermal cutting reduces the on-site schedule by more than 50%. The dry cutting concept development considers both PWR and BWR reactors. Some of the challenges of dry thermal cutting involve the creation of radioactive off-gases and how to ventilate these, the extreme heat generation, remote handling of the thermal equipment, cutting station arrangements and how to remove the insulation around the reactor vessel. Depending on the concept the reactor vessel might need to be lifted from the pit in one piece, which also poses some challenges due to the weight, volume and radioactivity of the vessel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engaging Canadian Indigenous Communities and Public Stakeholders Through a US Site Benchmarking Trip - 19358

Canadian Nuclear Laboratories (CNL) is proposing a new approach to decommission the WR-1 reactor at its Whiteshell site near Pinawa, Manitoba Canada. To tackle WR-1 CNL is proposing in situ decommissioning, this new approach is subject to a Canadian federal environmental assessment. As part of this CNL is engaging with Indigenous communities and public stakeholders, both regionally and across the country. Nuclear in situ decommissioning is new to Canada but has been used numerous times in the United States. Throughout the environmental assessment process CNL has considered the feedback public and Indigenous groups have provided and has tried to enhance the way information is shared and respond where possible and reasonable. Feedback from some communities has been related to a greater understanding of what the in situ method looks like, how it is monitored, will it perform, and anxiety about having it in the community. CNL sought to respond to this feedback by coordinating a benchmarking trip to an in situ reactor in Hallam, Nebraska. The visit was coordinated around an annual inspection. Several regional stakeholder and Indigenous communities joined CNL on the benchmarking trip. The group witnessed and learned what a decommissioned in situ reactor looked like, how it was performing and the effect on the surrounding communities. The group learned important lessons during the visit, key among them that the entombment is working as designed and has had zero significant detectable effects to the surrounding community. All attendees are now better informed on what CNL's proposal for WR-1 represents and are in a position to better inform their communities and the process moving forward. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Use of Ionic Liquids for the Recycling of the Contaminated Material

Dealing with spent nuclear fuel (SNF) and other radioactive waste management is one of the main issues of the nuclear industry. Today, there is an increased demand for lower environmental affection and higher safety assurances within all industries dealing with radioactivity. The resulting increasing costs for dealing with radioactive waste, altogether with the pressure of public opinion, are strong motivation factors for the development of recycling schemes, softening the effects on the environment, and bringing economic advantages for the nuclear industry. This problem is even multiplied as a significant wave of decommissioning of nuclear facilities can be expected in the next decades and it makes the problem even more urgent. The Organisation for Economic Co-operation and Development/Nuclear Energy Agency estimates that 400 nuclear power plants will have to be decommissioned between 2014 and 2050 and it will generate more than 5 million tons of radioactive scrap metal. If the decommissioning of other nuclear installations is taken into account, almost 30 million tons of scrap metal contaminated by radionuclides will need to be handled?1 According to an International Atomic Energy Agency report?2 during the nuclear facility decommissioning process, only 3 % of the material is considered contaminated, but costs for its disposal can make over 60 % of overall costs. In both of mentioned areas - SNF reprocessing and material decontamination - possible benefits of ionic liquids (ILs) are studied worldwide because of their interesting physical-chemical properties and chemical behavior. ILs (described as room-temperature molten salts in older literature) are commonly described as salts with organic cations associated with organic or inorganic anions that are liquid below 373 K and fully consisting of ions and offer advantages of nonaqueous processes like a safer environment because of substituting volatile and flammable organic solvents or less serious criticality issues. At the same time, ILs beat high-temperature molten salt in comparing energy costs. Also some other of ILs' unique properties are definitely attractive for areas of SNF reprocessing and solid waste decontamination. Among other major advantages of ionic liquids, negligible vapor pressure, non-flammability, chemical and mechanical stability, tunability as well as good electric conductivity or wide electrochemical window are usually being mentioned. In this contribution, the experimental verification of some principles needed for the development of the decontamination of material contaminated with uranium and europium are presented as model cases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2017 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 26)

This 2017 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 26) provides water use information for production and potable water wells at the Idaho National Laboratory (INL) Site for Calendar Year 2017. It also provides detailed information for new, modified, and decommissioned wells. Fourteen new wells were drilled and completed in Calendar Year 2017. No wells on the INL Site were decommissioned in Calendar Year 2017. However, an offsite area near Box Canyon that contained instrumented boreholes used for research was decommissioned. Detailed construction and decommissioning information and location maps for the wells are provided. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

2017 Idaho National Laboratory Water Use Report an↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

NOAA-17 Break-up Engineering Investigation

The NOAA-17 weather satellite operated in polar orbit near 800 km from 2002 until it was decommissioned in April 2013. The spacecraft broke up almost eight years later in March 2021 producing about 100 trackable objects. This follows the breakups of similar spacecraft NOAA-16, DMSP F11, and DMSP F13 which also produced between 80 and 500 trackable objects. An investigation was made into the cause of the breakup and recommend how to better operate or decommission spacecraft in the future. The NOAA-17 breakup was found to be a single, localized debris event; there is likely no catastrophic damage to the whole spacecraft. NOAA-17 debris is very much in family with NOAA-16 debris, and DMSP F11 and F13 are very much in family with each other and share similarities with NOAA-16 and 17; it is likely all four share the same breakup cause. DMSP F13 breakup occurred simultaneous with a known battery overcharge and therefore battery rupture is most likely intermediate cause of all four of the breakups. This is a low confidence assessment, however, since other debris sources cannot be definitively ruled out. No root cause was found as the NOAA-17 batteries were all confirmed to have been disconnected from the charge path as intended. Possible conditions for reconnection are all unlikely including short circuits and ground commanding. All 25 related spacecraft pose a risk of similar breakups for decades to come and are a threat to the critical 800-850 km polar orbit regime; even appropriately decommissioned spacecraft appear to be at risk. Recommendations include an update to the decommissioning procedure and consideration of further investigations and active debris removal, consistent with national policy.

Scott Hull↗

Radioactive Waste Management and Environmental Contamination Issues at the Chernobyl Site

The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near surface waste-storage and disposal facilities. Trench and landfill type facilities were created from 1986 to 1987 in the Chernobyl Exclusion Zone at distances 0.5 to 15 km from the NPP site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100-years service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste management at the reactor site and in the Exclusion Zone, and especially for high-level and long-lived waste, has not been developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of the PETRA glove box: tritium contamination and inventory assessment

The PETRA facility is the first installation in which experiments with tritium were carried out at the Tritium Laboratory Karlsruhe. After completion of two main experimental programs, the decommissioning of PETRA was initiated with the aim to reuse the glove box and its main still valuable components. A decommissioning plan was engaged to: -) identify the source of tritium release in the glove box, -) clarify the status of the main components, -) assess residual tritium inventories, and -) de-tritiate the components to be disposed of as waste. Several analytical techniques - calorimetry on small solid samples, wipe test followed by liquid scintillation counting for surface contamination assessment, gas chromatography on gaseous samples - were deployed and cross-checked to assess the remaining tritium inventories and initiate the decommissioning process. The methodology and the main outcomes of the numerous different tritium measurements are presented and discussed. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Circular Economy for Lithium-Ion Batteries Used in Mobile and Stationary Energy Storage: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As large-format battery energy storage (BES) capacity increases in the United States, so will the volume of spent lithium-ion batteries (LiBs) (Bade 2019). Estimates based on a 10-year lifetime assumption found that the volume of LiBs that have reached the end of their utility for electric vehicle (EV) applications could total two million units (four million metric tons) annually by 2040 in the United States (Richa et al. 2014; Ai and Borucki 2018). Although there is currently no publicly available decommissioning or end-of-life (EoL) projection for stationary BES systems, the U.S. energy storage market is expected to grow from an annual deployment of 523 megawatts in 2013 to 7.3 gigawatts in 2025 (Wood MacKenzie and ESA 2020; Wesoff 2020). Despite potential secondary market opportunities and the potential benefits associated with the reuse/recovery of LiB material, anecdotal evidence suggests that in the United States most decommissioned LiBs from EVs are landfilled or otherwise disposed of (Steward et al. 2019; Salim et al. 2019; CPUC 2019; DTSC 2019d; NREL 2019b; Jacoby 2019; DOE 2019). The reuse of large-format LiBs is not at commercial scale and to date consists of only a handful of U.S.-led pilot projects. Similarly, less than 5% of LiBs from EVs are sent to recycling facilities in the United States (Steward et al. 2019; Jacoby 2019; America Made 2019; Patel 2017). As awareness of current practices grows, and the demand for critical LiB materials increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for LiBs (Figure 1). Circular economy principles (Figure 1) attempt to transition from a “take-make-consume-dispose” linear economic system to a circular system that allows for the long life, high performance, and the reuse/recovery of products and materials (Ellen MacArthur Foundation 2016). We begin this report by summarizing drivers, barriers, and enablers to a circular economy for LiBs used in mobile and stationary BES systems in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the reuse/recovery and disposal of LiBs, and potential civil and criminal liabilities associated with noncompliance. We conclude by highlighting state policies and initiatives in the United States that expressly address reuse/recovery and disposal of large-format LiBs. Our results are based on legal and literature-based research and interviews with mobile and stationary BES industry stakeholders, regulators, and policymakers. While this report addresses stationary BES, as well as mobile BES, much of the information and experience with LiB decommissioning and EoL material management is derived from the increasing management of spent EV LiBs in the United States.

25 ENERGY STORAGE↗

A Systematic Review and Integrated Approach to Modeling of Aging Utility Scale PV Systems

The growing deployment of utility-scale photovoltaic (PV) systems has increased the importance of techno-economic modeling operational photovoltaic (PV) systems for predicting energy yield, optimizing asset management, and informing financial decisions. Through a systematic review of literature and current industry practices, we review the different common modeling practices of a system's configuration and age, performance and degradation, operation and maintenance (O&M), while also focusing on specific considerations for repowering, revamping, and decommissioning. Building on the synthesis, we develop a structured framework for techno-economic modeling of operating PV systems that integrate performance and degradation analysis, a decommissioning and repowering cost model that estimates the system's end-of-life costs to reduce uncertainty quantifications and improve consistency across the sector. This research contributes to improved modeling methodologies and potentially to reduced financial performance requirements by providing practitioners with input resources and practical approaches to estimate performance, degradation, and costs associated with continued operation, revamping, repowering, or decommissioning decisions.

14 SOLAR ENERGY↗

Development of a security-by-design handbook.

There is an increasing awareness that efficient and effective nuclear facility design is best achieved when requirements from the 3S disciplines Safety, Safeguards, and Security - are balanced and intrinsic to the facility design. This can be achieved when policy, processes, methods, and technologies are understood and applied in these areas during all phases of the design process. For the purposes of this paper, Security-by-design will be defined as the system level incorporation of the physical protection system (PPS) into a new or retrofitted nuclear power plant (NPP) or nuclear facility (NF) resulting in intrinsic security. Security-by-design can also be viewed as a framework to achieve robust and durable security systems. This paper reports on work performed to date to create a Security-by-Design Handbook, under a bilateral agreement between the United States and Japan, specifically, a review of physical protection principles and best practices, and a decommissioning to better understand where these principles and practices can be applied. This paper describes physical protection principles and best practices to achieve security-by- design that were gathered from International, Japanese, and U.S. sources. Principles are included for achieving security early in the design process where security requirements are typically less costly and easier to incorporate. The paper then describes a generic design process that covers the entire facility lifecycle from scoping and planning of the project to decommissioning and decontamination. Early design process phases, such as conceptual design, offer opportunities to add security features intrinsic to the facility design itself. Later phases, including design engineering and construction, are important for properly integrating security features into a coherent design and for planning for and assuring the proper performance of the security system during the operation and decommissioning of the facility. The paper also describes some future activities on this bilateral project to create a Security-by-Design Handbook. When completed, the Handbook is intended to assist countries with less experience in nuclear power programs to apply principles and best practices in an effective and efficient manner as early in the design as possible to achieve robust and durable security.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Making the Optimal Decision in Selecting Protective Clothing

Protective Clothing plays a major role in the decommissioning and operation of nuclear facilities. Literally thousands of dress-outs occur over the life of a decommissioning project and during outages at operational plants. In order to make the optimal decision on which type of protective clothing is best suited for the decommissioning or maintenance and repair work on radioactive systems, a number of interrelating factors must be considered. This article discusses these factors as well as surveys of plants regarding their level of usage of single use protective clothing and should help individuals making decisions about protective clothing as it applies to their application. Individuals considering using SUPC should not jump to conclusions. The survey conducted clearly indicates that plants have different drivers. An evaluation should be performed to understand the facility's true drivers for selecting clothing. It is recommended that an interdisciplinary team be formed including representatives from budgets and cost, safety, radwaste, health physics, and key user groups to perform the analysis. The right questions need to be asked and answered by the company providing the clothing to formulate a proper perspective and conclusion. The conclusions and recommendations need to be shared with senior management so that the drivers, expected results, and associated costs are understood and endorsed. In the end, the individual making the recommendation should ask himself/herself: 'Is my decision emotional, or logical and economical?' 'Have I reached the optimal decision for my plant?'.

42 ENGINEERING↗

Lessons From Love Canal: Considerations for the Effective Use of Institutional Controls

The purpose of this paper is to provide background on a well-known failure of an institutional control (IC), an overview of the types and potential shortcomings of individual ICs, provide some considerations for more effectively selecting and maintaining appropriate ICs in the context of a decommissioning project (including those that may be subject to various federal and state requirements). In light of these considerations, it should be clear that the potential liabilities arising from the failure to comply with ICs may be very significant, even if such failure is not directly caused by the party responsible for the pre-existing conditions. A number of options exist to help manage risk at sites where impacts will remain in place following the completion of active decommissioning efforts. It is important to involve all appropriate professionals early on and throughout the process and to consult with other relevant parties (e.g., regulatory agencies, the community, and potential site owners and occupants) to evaluate the most appropriate ICs available. This is particularly critical in the context of a long-term decommissioning project involving a large number of contractors, personnel turnover or departure, potential isolation of individuals with focused technical or regulatory expertise, or other factors that may affect more ideal communication. Mechanisms for ensuring long-term compliance with ICs, as well as reliable approaches for enforcing their terms, also warrant early and on-going attention. However, even with a detailed and thoughtful approach, it must be recognized under certain circumstances that a more realistic goal may be to continue to reasonably minimize potential risks rather than absolutely avoid all risks for all time.

99 GENERAL AND MISCELLANEOUS↗