Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Constraint programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Proving Ground FY-2026 Program Plan (Rev.1)

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Approximate Scheduling of DERs with Discrete Complex Injections

Rapid penetration of renewable energy based Distributed Energy Resources (DER) has the potential to exacerbate the challenges inherent in grid frequency and voltage regulation. However, their real time controllability can be leveraged to not only mitigate such challenges, but improve the economics and quality of grid operations. A plethora of DER scheduling algorithms have been developed for fast and efficient scheduling of these resources. These algorithms schedule the complex - real and reactive power injected into (or drawn from) the grid by the DERs under various cost objective functions and grid constraints. However, a vast majority of such algorithms assume the feasible range of power injections to be continuous. In reality, the control options available for several DERs form a discrete space. This implies that the feasible range of power injections also forms a discrete space. This makes DER scheduling an NP-hard problem. Integer/Mixed Integer program based algorithms, which guarantee optimality in the objective value, have been developed. But these are prohibitively expensive in terms of computational time requirements. On the other hand, fast heuristic based solutions have also been developed. But as they do not provide any guarantee on the optimality of the objective, or on satisfying the constraints, they are unreliable for grid operations. Recent works have developed approximation algorithms which offer the best of both the approaches above: (near) optimality and low computational complexity, both of which are governed by a user defined accuracy parameter ϵ. In this work, we significantly improve upon such existing works by developing an approximation algorithm which schedules DERs with complex injections (as opposed to only real injection) and whose runtime is polynomial (as opposed to exponential) in 1/ϵ. We provide theoretical analysis and support them with experimental results to validate the guarantees provided by our approximation algorithm.

14 SOLAR ENERGY↗

Multi-Timescale Three-Phase Unbalanced Distribution System Operation With Variable Renewable Generations

This paper proposes a multi-timescale operational approach for a three-phase unbalanced distribution system, which contains hourly scheduling at substation level and minutes power flow operation at feeder level. In the substation scheduling model, the objective is to minimize the system cost with variable renewable generations. The given error distribution model of renewable generation is formulated as a chance constraint, and derived into a deterministic form by Gaussian mixture model (GMM) with genetic algorithm-based expectation-maximization (GAEM). In the feeder scheduling model, the system cost is further reduced with the optimal power flow (OPF) at a timescale of minutes. Considering the nonconvexity of the three-phase unbalanced OPF problem in distribution systems, the semidefinite programming (SDP) is used to relax the problem into a convex problem, and a distributed computation approach is built based on alternating direction method of multiplier (ADMM). The IEEE 123-bus distribution system, DU (University of Denver) campus distribution system, and the IEEE 8500-bus distribution system are used as the test bench for the proposed approach. And the numerical results demonstrate the effectiveness and validity of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Neutrino mass from cosmology: impact of high-accuracy measurement of the Hubble constant

Non-zero neutrino mass would affect the evolution of the Universe in observable ways, and a strong constraint on the mass can be achieved using combinations of cosmological data sets. We focus on the power spectrum of cosmic microwave background (CMB) anisotropies, the Hubble constant H{sub 0}, and the length scale for baryon acoustic oscillations (BAO) to investigate the constraint on the neutrino mass, m{sub ν}. We analyze data from multiple existing CMB studies (WMAP5, ACBAR, CBI, BOOMERANG, and QUAD), recent measurement of H{sub 0} (SHOES), with about two times lower uncertainty (5 %) than previous estimates, and recent treatments of BAO from the Sloan Digital Sky Survey (SDSS). We obtained an upper limit of m{sub ν} < 0.2eV (95 % C.L.), for a flat ΛCDM model. This is a 40 % reduction in the limit derived from previous H{sub 0} estimates and one-third lower than can be achieved with extant CMB and BAO data. We also analyze the impact of smaller uncertainty on measurements of H{sub 0} as may be anticipated in the near term, in combination with CMB data from the Planck mission, and BAO data from the SDSS/BOSS program. We demonstrate the possibility of a 5σ detection for a fiducial neutrino mass of 0.1 eV or a 95 % upper limit of 0.04 eV for a fiducial of m{sub ν} = 0 eV. These constraints are about 50 % better than those achieved without external constraint. We further investigate the impact on modeling where the dark-energy equation of state is constant but not necessarily -1, or where a non-flat universe is allowed. In these cases, the next-generation accuracies of Planck, BOSS, and 1 % measurement of H{sub 0} would all be required to obtain the limit m{sub ν} < 0.05−0.06 eV (95 % C.L.) for the fiducial of m{sub ν} = 0 eV. The independence of systematics argues for pursuit of both BAO and H{sub 0} measurements.

79 ASTRONOMY AND ASTROPHYSICS↗

A novel matching formulation for startup costs in unit commitment

Here we present a novel formulation for startup cost computation in the unit commitment problem (UC). Both our proposed formulation and existing formulations in the literature are placed in a formal, theoretical dominance hierarchy based on their respective linear programming relaxations. Our proposed formulation is tested empirically against existing formulations on large-scale UC instances drawn from real-world data. While requiring more variables than the current state-of-the-art formulation, our proposed formulation requires fewer constraints, and is empirically demonstrated to be as tight as a perfect formulation for startup costs. This tightening can reduce the computational burden in comparison to existing formulations, especially for UC instances with large reserve margins and high penetration levels of renewables.

97 MATHEMATICS AND COMPUTING↗

PASER: Options and Perspectives

We briefly review the PASER concept and early experiments as well as ongoing programs. Due to relatively weak single particle interaction, for collective effects to become dominant long interaction regions are required--similar to SASE. In order to overcome this stringent constraint the Active Penning Trap concept was suggested. In the absence of the active medium, this trap confines the electrons in an equivalent mode to the way a cavity confines radiation. As an active medium is incorporated in the trap, its effect is similar to that of inserting it in a cavity - it obviously amplifies the energy of the stored electrons. In case of the trap, electrons get bunched and due to the efficient interaction they gain energy from the medium, therefore, they may escape the trap. This paradigm has the potential of being a very compact optical injector. A promising configuration has been recently proposed (pending approval) and it will be briefly discussed. Its advantage is twofold: the photon energy is almost two orders of magnitude higher than the one employed in the past and the medium is gaseous. A solid-state (Nd:YAG) active Penning trap configuration is in its early testing stages. Preliminary results whereby during one-pass (no trapping) up to 30% increase of dc current was measured is indicative that there is enough energy-transfer in one pass to facilitate a reasonable energy transfer over many round trips. The difficulty associated with the necessity of having the electrons in close proximity to the medium's surface for many round trips is yet to be confronted. With this regard, the former configuration has the significant advantage of not having to confront this obstacle. Future perspectives relying on Penning trap with either gaseous or solid-state active medium are elaborated.

43 PARTICLE ACCELERATORS↗

ACCOUNTING FOR COSMIC VARIANCE IN STUDIES OF GRAVITATIONALLY LENSED HIGH-REDSHIFT GALAXIES IN THE HUBBLE FRONTIER FIELD CLUSTERS

Strong gravitational lensing provides a powerful means for studying faint galaxies in the distant universe. By magnifying the apparent brightness of background sources, massive clusters enable the detection of galaxies fainter than the usual sensitivity limit for blank fields. However, this gain in effective sensitivity comes at the cost of a reduced survey volume and, in this Letter, we demonstrate that there is an associated increase in the cosmic variance uncertainty. As an example, we show that the cosmic variance uncertainty of the high-redshift population viewed through the Hubble Space Telescope Frontier Field cluster Abell 2744 increases from ∼35% at redshift z ∼ 7 to ≳ 65% at z ∼ 10. Previous studies of high-redshift galaxies identified in the Frontier Fields have underestimated the cosmic variance uncertainty that will affect the ultimate constraints on both the faint-end slope of the high-redshift luminosity function and the cosmic star formation rate density, key goals of the Frontier Field program.

79 ASTRONOMY AND ASTROPHYSICS↗

GPU-accelerated multitiered iterative phasing algorithm for fluctuation X-ray scattering

The multitiered iterative phasing (MTIP) algorithm is used to determine the biological structures of macromolecules from fluctuation scattering data. It is an iterative algorithm that reconstructs the electron density of the sample by matching the computed fluctuation X-ray scattering data to the external observations, and by simultaneously enforcing constraints in real and Fourier space. This paper presents the first ever MTIP algorithm acceleration efforts on contemporary graphics processing units (GPUs). The Compute Unified Device Architecture (CUDA) programming model is used to accelerate the MTIP algorithm on NVIDIA GPUs. The computational performance of the CUDA-based MTIP algorithm implementation outperforms the CPU-based version by an order of magnitude. Furthermore, the Heterogeneous-Compute Interface for Portability (HIP) runtime APIs are used to demonstrate portability by accelerating the MTIP algorithm across NVIDIA and AMD GPUs.

97 MATHEMATICS AND COMPUTING↗

Scalable Replay with Partial-Order Dependencies for Message-Logging Fault Tolerance

Deterministic replay of a parallel application is commonly used for discovering bugs or to recover from a hard fault with message-logging fault tolerance. For message passing programs, a major source of overhead during forward execution is recording the order in which messages are sent and received. During replay, this ordering must be used to deterministically reproduce the execution. Previous work in replay algorithms often makes minimal assumptions about the programming model and application in order to maintain generality. However, in many cases, only a partial order must be recorded due to determinism intrinsic in the code, ordering constraints imposed by the execution model, and events that are commutative (their relative execution order during replay does not need to be reproduced exactly). In this paper, we present a novel algebraic framework for reasoning about the minimum dependencies required to represent the partial order for different concurrent orderings and interleavings. By exploiting this theory, we improve on an existing scalable message-logging fault tolerance scheme. The improved scheme scales to 131,072 cores on an IBM BlueGene/P with up to 2x lower overhead than one that records a total order.

fault tolerance↗

Matrix Completion Using Alternating Minimization for Distribution System State Estimation

This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Optimal Power Flow in DC Networks with Robust Feasibility and Stability Guarantees

With high penetrations of renewable generation and variable loads, there is significant uncertainty associated with power flows in DC networks such that stability and operational constraint satisfaction are of concern. Most existing DC network optimal power flow (DN-OPF) formulations assume exact knowledge of loading conditions and do not provide stability guarantees. Here, in contrast, this paper studies a DN-OPF formulation which considers both stability and operational constraint satisfaction under uncertainty. The need to account for a range of uncertainty realizations in this paper's robust optimization formulation results in a challenging semi-infinite program (SIP). The proposed solution algorithm reformulates this SIP into a computationally tractable problem by constructing a tight convex inner approximation of the stability set using sufficient conditions for the existence of a feasible and stable power flow solution. Optimal generator set-points are obtained by optimizing over the proposed convex stability set. The validity and effectiveness of the propose algorithm is demonstrated through various DC networks adapted from IEEE test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICARUS at the Fermilab Short-Baseline Neutrino program: initial operation

The ICARUS collaboration employed the 760-ton T600 detector in a successful 3-year physics run at the underground LNGS laboratory, performing a sensitive search for LSND-like anomalous $\nu _e$ appearance in the CERN Neutrino to Gran Sasso beam, which contributed to the constraints on the allowed neutrino oscillation parameters to a narrow region around 1 eV$^2$. After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 the cryogenic commissioning began with detector cool down, liquid argon filling and recirculation. ICARUS then started its operations collecting the first neutrino events from the booster neutrino beam (BNB) and the Neutrinos at the Main Injector (NuMI) beam off-axis, which were used to test the ICARUS event selection, reconstruction and analysis algorithms. ICARUS successfully completed its commissioning phase in June 2022. The first goal of the ICARUS data taking will be a study to either confirm or refute the claim by Neutrino-4 short-baseline reactor experiment. ICARUS will also perform measurement of neutrino cross sections with the NuMI beam and several Beyond Standard Model searches. After the first year of operations, ICARUS will search for evidence of sterile neutrinos jointly with the Short-Baseline Near Detector, within the Short-Baseline Neutrino program. In this paper, the main activities carried out during the overhauling and installation phases are highlighted. Preliminary technical results from the ICARUS commissioning data with the BNB and NuMI beams are presented both in terms of performance of all ICARUS subsystems and of capability to select and reconstruct neutrino events.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Matrix Completion Using Alternating Minimization for Distribution System State Estimation: Preprint

This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Stochastic Unit Commitment: Model Reduction via Learning

As weather-dependent renewable generation increases its share in the generation mix of most electric energy systems, a stochastic unit commitment becomes the natural day-ahead scheduling tool. However, such a tool is generally computationally intractable if a detailed uncertainty description is considered. Taking this into account, we proposed a learning method to make the stochastic unit commitment problem tractable. Here, recent advances in statistical learning and machine learning to address optimization problems can be advantageously applied to the rather intractable stochastic unit commitment problem. Considering these advances, we explore simple learning techniques to drastically reduce the size of a stochastic unit commitment problem without significantly altering its optimal solution. The considered stochastic unit commitment problem is formulated as a two-stage stochastic programming problem. The first stage represents commitment decisions, while the second one represents the operation conditions under different scenarios. Taking into account historical solved instances (or proxies for them), we reduce the size (measured by numbers of constraints and variables) of the stochastic unit commitment problem by (i) fixing unchanged binary variables and by (ii) eliminating inactive inequality constraints. Our numerical results show that the reduced problem generally requires significantly less time to solve while obtaining high-quality solutions, which are very close to or indistinguishable from the one obtained by solving the original problem. We use an Illinois 200-bus system to illustrate and characterize the performance of the proposed problem-reduction method.

42 ENGINEERING↗

A Novel Matching Formulation for Startup Costs in Unit Commitment

We present a novel formulation for startup cost computation in the unit commitment problem (UC). Both the proposed formulation and existing formulations in the literature are placed in a formal, theoretical dominance hierarchy based on their respective linear programming relaxations. The proposed formulation is tested empirically against existing formulations on large-scale unit commitment instances drawn from real-world data. While requiring more variables than the current state-of-the-art formulation, our proposed formulation requires fewer constraints, and is empirically demonstrated to be as tight as a perfect formulation for startup costs. This tightening reduces the computational burden in comparison to existing formulations, especially for UC instances with large variability in net-load due to renewables production.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ICARUS at the Short-Baseline Neutrino program: first results

The ICARUS collaboration employed the 760-ton T600 detector in a successful three-year physics run at the underground LNGS laboratory, performing a sensitive search for LSND-like anomalous $\nu_e$ appearance in the CERN Neutrino to Gran Sasso beam, which contributed to the constraints on the allowed neutrino oscillation parameters to a narrow region around 1 $eV^2$. After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 the cryogenic commissioning began with detector cool down, liquid argon filling and recirculation. ICARUS then started its operation collecting the first neutrino events from the Booster Neutrino Beam (BNB) and the Neutrinos at the Main Injector (NuMI) beam off-axis, which were used to test the ICARUS event selection, reconstruction and analysis algorithms. ICARUS successfully completed its commissioning phase in June 2022, moving then to data taking for neutrino oscillation physics, aiming at first to either confirm or refute the claim by Neutrino-4 short-baseline reactor experiment. ICARUS will also perform measurement of neutrino cross sections in LAr with the NuMI beam and several Beyond Standard Model studies. After the first year of operations, ICARUS will search for evidence of sterile neutrinos jointly with the Short-Baseline Near Detector, within the Short-Baseline Neutrino program. In this presentation, preliminary results from the ICARUS data with the BNB and NuMI beams are presented both in terms of performance of all ICARUS subsystems and of capability to select and reconstruct neutrino events.

Artero Pons, Maria↗