Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

The fast-spectrum transmutation experimental facility FASTEF: Main design achievements (Part 1: Core and primary system) within the FP7-CDT collaborative project of the European Commission

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK CEN in replacement of its material testing reactor BR2. SCK CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest configuration of the reactor core and primary system. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1 2. If it remains a small-scale facility, the core power amounts now up to 100 MWth in critical mode. In a companion paper 3, we present the concept of the reactor building and the plant layout. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Societal-Equity-Enhancing Criteria and Facility-Host Incentives Supporting Five Key Elements in the January 2012 Blue Ribbon Commission Report - 13015

In February 2009, the Obama Administration announced it would abandon USA's only candidate SNF/HLW-disposal facility since 1987. In 2010, all related activities were stopped and the Blue Ribbon Commission on America's Nuclear Future was established 'to recommend a new strategy for managing the back end of the nuclear fuel cycle', which it did in January 2012, emphasizing eight key elements. However, Key Element 1, 'A new, consent-based approach to siting future nuclear facilities', is qualitative/indeterminate rather than quantitative/measurable. It is thus highly-susceptible to semantic permutations that could extend rather than, as intended, expedite the siting of future nuclear facilities unless it also defines: a) Whose consent is needed?; and b) What constitutes consent? The following 'generic', radiation-risk- and societal-equity-based criteria address these questions: 1. Identify areas affected by projected radiation and other health risks from: a. The proposed nuclear facility (facility stakeholders); and b. The related nuclear-materials-transportation routes (transportation stakeholders); then 2. Surround each stakeholder area with a buffer zone and use this enlarged foot print to identify: a. Stakeholder hosts; and b. Areas not hosting any stakeholder category (interested parties). 3. Define 'consent-based' as being at least 60 percent of the 'population' in the respective stakeholder category and apply this yardstick to both 'in favor' and 'against' votes. Although criteria 1 and 2 also need facility-based definitions to make Key Element 1 measurable, the described siting approach, augmented by related facility-host incentives, would expedite the schedule and reduce the cost for achieving Key Elements 4-6 and 8, politics permitting. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230

Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA comes from the diversity of facilities to be dismantled, which are predominantly research facilities and therefore have no series advantage. There is tremendous operating feedback, however. For more than twenty years in all its centres, the CEA has acquired experience and know-how through dismantling research reactors or critical models and laboratories or plants. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing from two dedicated funds, close to euro 15,000 Millions for the next thirty years, for current or projected dismantling operations, the Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2020, the dismantling of the UP1 plant at Marcoule, one of the largest dismantling works in the world, will be well advanced, with all the process equipment dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting considerations for consolidated storage of used fuel in the United States - Assessing the impact of key developments since release of the Blue Ribbon Commission Report in 2012 - 15458

This paper offers a formula for achieving success in siting a facility for the Interim Pilot Storage Facility and a Consolidated Storage Facility for Used Fuel as envisioned by the Blue Ribbon Commission Report in 2012 and by the DOE in its Strategy Recommendations issued in 2013. Particular attention is given to the potential impact of recent events (i.e., the underground fire and radioactive release incidences at WIPP in February 2014) on the proposed formula and for their potential impact on future siting efforts. Particular attention is giving to the continuation and application of the Consensus Based Approach which will now face additional challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Recommendation of Public Engagement Commission on Spent Nuclear Fuel in Korea - 16074

The Public Engagement Commission on Spent Nuclear Fuel Management was lunched and embarked on public engagement activities with an aim of presenting recommendations on the method for managing spent fuel to the government by June 2015. Therefore, a national policy, strategy and management plan for spent fuel will be presented in detail in the Basic Plan for Radioactive Waste Management where the results of public engagement activities will be incorporated. In consideration of Korea's circumstances, permanent disposal facilities should be constructed and operated with the goal of 2051. For this reason, Underground research laboratory (URL) in the same area and on-site and site conditions of disposal facilities by selecting the site and construction process in 2020 should be started and the empirical study should be initiated in 2030. This study is expected to transfer experience of and lessons from determining national policy to countries that have not established their final management policy for spent fuel, based on Korea's solutions to shortage of spent fuel pools and the formation of national consensus. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparison of the U.S. Nuclear Regulatory Commission Technical Evaluation for the Zion and La Crosse License Termination Plans with a Focus on Release Criteria

Zion Nuclear Power Station (ZNPS) and the La Crosse Boiling Water Reactor (LACBWR) sites are both undergoing decommissioning. Although these two sites are different in terms of size, design, and operational history, the approach for defining release criteria for decommissioning at each site is similar. ZNPS consists of two (Units 1 and 2) Pressurized Water Reactors (PWR), each approximately 1100 MWe. ZNPS is located near the city of Zion in northeast Illinois on the west shore of Lake Michigan. The two units were operated from 1973 to 1998. LACBWR was an AEC Demonstration Reactor (50 MWe) which operated from 1967 to 1987. The LACBWR site is in Vernon County, Wisconsin and is shared with an operational fossil plant. EnergySolutions is managing the decommissioning of both these sites under the separate entities ZionSolutions and LaCrosseSolutions. The U.S. Nuclear Regulatory Commission (NRC) transferred the Zion Facility Operating License from Exelon Generation Company, LLC (Exelon) to ZionSolutions on September 1, 2010. A similar license transfer from Dairyland Power Cooperative to LaCrosseSolutions is planned for the second quarter of 2016. On December 19, 2014, ZionSolutions submitted the ZNPS License Termination Plan (LTP). It is expected that the LTP for the La Crosse BWR will be submitted to the NRC in early 2016. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Facilitator's Perspective on Government Public Meetings on the Environmental and Energy Issues: The U.S. Nuclear Regulatory Commission Example - 20428

Many Federal, and State agencies, are required by policy or regulation, to hold a public meeting on a proposed regulatory action. These may be on a specific licensing issue or they may be to obtain public advice on generic issues, such as a proposed rulemaking or policy issue. Environmental or energy issues may often involve emotional behavior on the part of the public, and sometimes anger or protests. Consequently, trained facilitators are often used to 'facilitate' the meeting to reduce the tension and to help the meeting run smoothly. The United States Nuclear Regulatory Commission ('NRC') has had considerable experience with public meetings, emotional behavior by the public, and the use of facilitators. This paper will describe the history of the NRC with public meetings and public engagement, the issues that raise concerns by certain segments of the public, and how a facilitator will attempt to reduce the concern and anxiety at the meeting and to run a fair and constructive meeting. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Post-Transient Examination Results of RIA Commissioning Teats at the Transient Reactor Test Facility

Six reactivity-initiated-accident (RIA) commissioning tests have been performed at Idaho National Laboratory’s (INL) Transient Reactor Test Facility. Five of these tests were performed using fresh fuel rodlets, and the sixth test was performed using a previously irradiated rodlet from the ATF-2 irradiation experiment. These experiments demonstrate the ability to perform RIA testing including the ability to perform experiments using previously irradiated materials. Post-transient examinations revealed pellet cladding interactions and cladding ballooning depending on the initial boundary conditions of the test. Increased thickness of both zirconium oxide and alpha-zirconium were found in the cladding with tests performed at higher levels of total energy deposition. No oxide or alpha-zirconium was found in the test with the greatest amount of ballooning, which was also the test with the highest initial rod internal pressure. The highest energy deposition test (1110 J/g) resulted in failure of the rodlet. Fragmentation of the fuel pellets occurred in this test with the size of the fragments decreasing inversely to the pellet radius.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 60,000-liter tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels will be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, J. [Fermilab] (ORCID:0009000185837576)↗

Design and Commissioning of a Deuterium-Tritium Gas Delivery System for Muon Catalyzed Fusion in a Diamond Anvil Cell

We report the design, commissioning, and operation of deuterium-deuterium (DD) and deuterium-tritium (DT) gas delivery systems developed to load a diamond anvil cell (DAC) beam target for muon-catalyzed fusion (muCF). The DAC approach enables DT fuel to be compressed to GPa pressures at more than twice the liquid density and heated from cryogenic temperatures through 500 K, opening access to a substantially expanded parameter range for muCF kinetics and yield measurements. In this approach, DT is cryo-condensed to a liquid in a minichamber and then compressed in the DAC using a helium-driven pneumatic membrane, achieving high pressures in a millimeter-scale DT sample volume. A DD gas delivery system was designed and used to validate the experimental apparatus, measure the gas quantities needed for filling, develop operational experience, and collect kinetics and yield data with DD targets. The DT gas delivery system adds tritium-specific capabilities for inventory minimization, secondary containment, and activity monitoring. The DT system integrates depleted uranium storage beds and a liquid helium cryogenic condenser used for pressure building and cryopumping. High-purity delivery is provided by a rapid-response palladium permeator. The system is housed in a helium-atmosphere glovebox held at negative pressure with continuous cleanup. We present the process and instrumentation design, a failure modes and effects analysis (FMEA), and data from the experiment's in situ Raman spectrometer, which provides direct confirmation of target loading and composition through the optically clear diamond anvils. The 2024 and 2025 DT campaigns achieved repeatable target fills and operation with no measurable tritium releases to the stack, demonstrating safe, high-purity DT loading at novel density-temperature conditions for muCF studies.

Koukina, Elena [Acceleron Fusion]↗

The LINAC Coherent Light Source and Radiological Issues During the Commissioning

The Linac Coherent Light Source (LCLS) at SLAC National Accelerator Laboratory is the world's first X-ray free electron laser (XFEL). Pulses of x-ray laser light from LCLS will be many orders of magnitude brighter and several orders of magnitude shorter than what can be produced by other x-ray sources available in the world. These characteristics will enable frontier new science in many areas. This paper describes the LCLS beam parameters and lay-out. The general radiological issues during commissioning are presented, such as radiation dose rates and integrated doses outside the enclosure. Also, specific radiological issues related to X-ray free electron lasers are discussed. XFEL with high peak power will burn through high-Z materials. The X-ray beam needs to be blocked by stoppers when the downstream areas are occupied. LCLS stoppers feature a piece of boron carbide (B{sub 4}C), 10 mm thick. B{sub 4}C is one of the best materials since it has a low absorption coefficient for X-rays and a high melting temperature. Theoretical calculations indicate that the unfocused fluence of the LCLS XFEL beam should be about one order of magnitude below the damage threshold for bulk B{sub 4}C, for 830 eV FEL radiation. However, these calculations have not been tested experimentally and cannot be validated until LCLS begins providing 830 eV XFEL pulses. This paper describes the test plan for using the initial LCLS radiation to evaluate the survivability of B{sub 4}C and reports the preliminary results. Another major issue for LCLS is the potential radiation damage to the LCLS undulator magnets during operation. TLD dosimeters were installed along the LCLS undulators for each period of two or three weeks. This paper reports the integrated doses along the undulators with and without XFEL generation.

SAFETY, XFEL↗

Design, installation, commissioning and operation of a beamlet monitor in the negative ion beam test stand at NIFS

In the framework of the accompanying activity for the development of the two neutral beam injectors for the ITER fusion experiment, an instrumented beam calorimeter is being designed at Consorzio RFX, to be used in the SPIDER test facility (particle energy 100keV; beam current 50A), with the aim of testing beam characteristics and to verify the source proper operation. The main components of the instrumented calorimeter are one-directional carbon-fibre-carbon composite tiles. Some prototype tiles have been used as a small-scale version of the entire calorimeter in the test stand of the neutral beam injectors of the LHD experiment, with the aim of characterising the beam features in various operating conditions. The extraction system of the NIFS test stand source was modified, by applying a mask to the first gridded electrode, in order to isolate only a subset of the beamlets, arranged in two 3×5 matrices, resembling the beamlet groups of the ITER beam sources. The present contribution gives a description of the design of the diagnostic system, including the numerical simulations of the expected thermal pattern. Moreover the dedicated thermocouple measurement system is presented. The beamlet monitor was successfully used for a full experimental campaign, during which the main parameters of the source, mainly the arc power and the grid voltages, were varied. This contribution describes the methods of fitting and data analysis applied to the infrared images of the camera to recover the beamlet optics characteristics, in order to quantify the response of the system to different operational conditions. Some results concerning the beamlet features are presented as a function of the source parameters.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the soft x-ray undulator beamline at the Siam Photon Laboratory

The synchrotron radiation from the first undulator at the Siam Photon Laboratory was characterized with the photon beam position monitors (BPMs) and grating monochromator. The soft x-ray undulator beamline employs a varied line-spacing plane grating monochromator with three interchangeable gratings. Since 2010, the beamline has delivered photons with energy of 40-160 and 220-1040 eV at the resolving power of 10,000 for user services at the two end- stations that utilize the photoemission electron spectroscopy and microscopy techniques. The undulator power-density distributions measured by the 0.05-mm wire-scan BPM were in good agreement with those in simulation. The flux-density distributions were evaluated in the red-shift measurements, which identify the central cone of radiation and its distribution. Since 2014, the operation of the other insertion devices in the storage ring has started, and consequently bought about the increases in the emittance from 41 to 61 nm·rad and the coupling constant from 4 to 11%. The local electron-orbit correction greatly improved the alignment of the electron beam in the undulator section resulting in the improvements of the photon flux and harmonics peaks of the undulator radiation.

43 PARTICLE ACCELERATORS↗