Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “techno”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Techno-economic feasibility of borehole thermal energy storage system connected to geothermal heat pumps for seasonal heating load of two buildings in Fairbanks, Alaska

Borehole thermal energy storage (BTES) is an effective solution for managing imbalanced heating and cooling loads in cold regions. This study evaluated the long-term feasibility of a BTES system in the Fairbanks area, Alaska, through building energy modeling, resource characterization, and numerical modeling. The system was designed to store waste heat from a nearby coal power plant during summer and provide thermal energy during winter to geothermal heat pumps supplying heating loads in two buildings. Heating load profiles were modeled for the buildings using EnergyPlus, and the results indicated the annual heating load was 5.6 times greater than the cooling load. 40 borehole heat exchangers were pre-designed approximately 100 m away from the two buildings in terms of land availability and regulatorily optimized depth. The 20-year performance of the designed BTES system under two operational scenarios—one with a 5-year preheating period and one without—was numerically modeled using subsurface temperature and properties characterized through the literature review and thermal response tests. Both scenarios demonstrated that the BTES has the capacity to fully cover the heating loads in the two buildings throughout the 20-year lifetime. Production temperatures at central wells were 33 % higher on average than at outer wells in both scenarios. The 5-year preheating period increased subsurface and extraction temperatures, and correspondingly annual average and total thermal energy production was higher for 8 years than in the scenario without the preheating period. These results highlight the long-term reliability and sustainability of the BTES system in meeting heating demands over its lifetime, with the preheating period offering potential performance improvements. Implementing the BTES system in cold regions with high heating demand, such as Fairbanks, Alaska, could provide a long-term, sustainable energy solution for managing imbalanced heating and cooling loads.

15 GEOTHERMAL ENERGY↗

SimH 2 : an integrated techno-economic modeling framework for hydrogen pipeline infrastructure and network optimization

Large-scale hydrogen (H 2 ) pipeline transport design and network optimization have seldom been reported due to the lack of a cost model accounting for the relationship between transport cost and hydrogen mass flow rate. Here, this work introduced a system-level cost model for hydrogen pipeline transport at supercritical state and integrated it with an existing CO 2 pipeline network tool, SimCCS, for hydrogen-specific pipeline design and optimization. The Intermountain West (I-West) region of the U.S., historically dependent on fossil fuel-based economies, is chosen to demonstrate the capabilities of our H 2 pipeline cost model and transport network optimization platform called SimH 2 . Two scenarios are examined: one where the pipeline is not allowed to pass through disadvantaged communities and the other where it is permitted. The results highlight that incorporating disadvantaged-community constraints lead to longer pipeline routes and increased transport costs, reflecting the trade-offs involved in equitable infrastructure development. It is demonstrated that the newly developed SimH 2 tool not only enables the efficient design of H 2 transportation pipelines but also optimizes the network by accounting for local terrain and the presence of disadvantaged areas.

08 HYDROGEN↗

Techno-economic analysis of cathode material production using flame-assisted spray pyrolysis

The cost of cathode materials contributes approximately 32.7% of the total cell construction cost of lithium-ion batteries, significantly affecting the price of battery packs. To reduce the cathode material manufacturing cost, a flame-assisted spray pyrolysis (FSP) method has been developed to utilize a sustainable solvent of glycerol to manufacture the LiNi 1/3 Mn 1/3 Co 1/3 O 2 (NMC333) cathode materials. The purpose of this study is to evaluate the minimum cathode material selling price (MCSP) of the FSP processes compared with a traditional carbonate co-precipitation pathway. Results show that the MCSP of the FSP is $\$$19.1/kg that is 17% lower than the traditional carbonate co-precipitation pathway as a result of lower fixed operating cost and variable overhead. Sensitivity analysis shows that when the new process is integrated with in-situ sintering and processing, the MCSP can be as low as $\$$15.6/kg. When all the material prices are decreased by 20%, the FSP process can synthesize NMC333 at a price of $\$$2.3/kg lower. According to the simulation result, LiNi 0·8 Mn 0·1 Co 0·1 O 2 (NMC811) has the best potential to meet the U.S. Department of Energy battery price target of $\$$125/kWh, demonstrating that the FSP process is an attractive manufacturing technology for NMC cathode powder material production.

25 ENERGY STORAGE↗

Near isothermal compressed air energy storage system in residential and commercial buildings: Techno-economic analysis

Electrical energy storage systems offer a wide range of options to efficiently manage our power supply infrastructure. Energy and environmental security via renewable resources and energy storage devices will also play a critical role in addressing the supply-demand challenges. A novel energy efficient storage system based on near isothermal compressed air energy storage concept, named as Ground-Level Integrated Diverse Energy Storage (GLIDES) is analyzed for integration with residential and commercial buildings. Additionally, the influence of different configurational aspects on key performance and cost attributes is presented in this study. GLIDES modules in the range of 0.5 kWh–15 kWh configurations were considered for residential buildings whereas 25 kW h–500 kW h modules were considered for commercial buildings. Detailed cost and performance analysis of the GLIDES module proved them to be an effective resource in lowering the peak energy demand and corresponding utility bills.

25 ENERGY STORAGE↗

Techno-economic evaluation of a process for direct conversion of methane to aromatics

Natural gas is widely abundant and relatively inexpensive. As such, large quantities are flared every year. This presents an opportunity to use natural gas as a chemical feedstock. Non-oxidative dehydroaromatization of methane, the major component of natural gas is proposed as an option to monetize natural gas. This study evaluates the economics of the methane to benzene process. A catalytic membrane reactor model written in MATLAB has been directly implemented in an Aspen Plus V9 process model using CAPE-OPEN interoperability. Minimum utility requirements and heat exchanger designs were identified in Aspen Energy Analyzer, and process economics for a variety of feed and product prices were assessed using Aspen Process Economic Analyzer. The results indicate that the venture is profitable (profitability index of 1.17, IRR of 35.5%, NRR of 18.2%). The capital cost was found to be $35,500 per daily standard barrel of benzene. Additionally, the process remains economically attractive so long as either the price of benzene remains above $470/ton, or the price of hydrogen remains above $0.8/kg.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A comprehensive techno-eco-assessment of CO 2 enhanced oil recovery projects using a machine-learning assisted workflow

Carbon dioxide enhanced oil recovery (CO 2 -EOR) projects not only extract residual oil but also sequestrate CO 2 in the depleted reservoirs. Here, this study develops a machine-learning-based workflow to co-optimize the hydrocarbon recovery, CO 2 sequestration volume and project net present value (NPV) simultaneously. Considering the trade-off relationships among the objective functions, support vector regression with Gaussian kernel (Gaussian- SVR) proxies are coupled with multi-objective particle swarm optimization (PSO) protocol and generate Pareto optimal solutions. Taking advantage of the high computational efficacy of the proxy model, economic uncertainties introduced by tax credits, capital costs and oil price are investigated by this study. The results indicate that the tax incentive policy (Section 45Q) plays a vital role in enhancing the economic returns of CO 2 -EOR projects, especially under the depression of crude oil market. The proposed workflow has been successfully implemented to optimize a water alternative CO 2 (CO 2 -WAG) injection project in a depleted oil sand in the US. The optimization results yield an incremental oil production of 15.8 MM STB and 1.37 MM metric tons of CO 2 storage in a 20-year development strategy, with the highest project NPV to be 205.6 MM US dollars.

03 NATURAL GAS↗

Techno-economic analysis of conventional and advanced high-pressure tube trailer configurations for compressed hydrogen gas transportation and refueling

Transporting compressed gaseous hydrogen in tube trailers to hydrogen refueling stations (HRSs) is an attractive economic option in early fuel cell electric vehicle (FCEV) markets. This study examines conventional (Type I, steel) and advanced (Type IV, composite) high-pressure tube trailer configurations to identify those that offer maximum payload and lowest cost per unit of deliverable payload under United States Department of Transportation (DOT) size and weight constraints. The study also evaluates the impacts of various tube trailer configurations and payloads on the transportation and refueling cost of hydrogen under various transportation distance and HRS capacity scenarios. Composite tube trailers can transport large hydrogen payloads, up to 1100 kg at 7300 psi (500 bar) working pressure, while steel tube trailer configurations are limited by DOT weight regulations and may transport a maximum hydrogen payload of approximately 270 kg. Using steel pressure vessels to transport hydrogen at high pressure is counterproductive because of the rapid increase in vessel weight with wall thickness. The most economic composite tube trailer configuration includes 30-inch-diameter vessels packed in a 3 x 3 array. A linear relationship between the deliverable payload and the capital cost of a composite tube trailer has been developed for configurations with the lowest cost-per-unit payload. The capital cost is approximately $1100 per kg of deliverable hydrogen payload. Considering the entire delivery pathway (including refueling), tube trailer configurations with smaller vessels packed in greater numbers enable higher payload delivery and lower delivery cost in terms of $/kg H-2, when delivering hydrogen over longer distances to large stations. Selection of the appropriate tube trailer configuration and corresponding hydrogen payload can reduce hydrogen delivery cost by up to 16%. (C) 2018 Hydrogen Energy Publications LLC. Published by Elsevier Ltd. All rights reserved.

composite tubes↗