Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “setup”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Radiation and thermal analysis of production solenoid for Mu2e experimental setup

The Muon-to-Electron (Mu2e) experiment at Fermilab, will seek the evidence of direct muon to electron conversion at the sensitivity level where it cannot be explained by the Standard Model. An 8-GeV 25-kW proton beam will be directed onto a tilted gold target inside a large-bore superconducting Production Solenoid (PS) with the peak field on the axis of {approx}5T. The negative muons resulting from the pion decay will be captured in the PS aperture and directed by an S-shaped Transport Solenoid towards the stopping target inside the Detector Solenoid. In order for the superconducting magnets to operate reliably and with a sufficient safety margin, the peak neutron flux entering the coils must be reduced by 3 orders of magnitude that is achieved by means of a sophisticated absorber placed in the magnet aperture. The proposed absorber, consisting of W- and Cu-based alloy parts, is optimized for the performance and cost. Results of MARS15 simulations of energy deposition and radiation are reported. The results of the PS magnet thermal analysis, coordinated with the coil cooling scheme, are reported as well for the selected absorber design.

43 PARTICLE ACCELERATORS↗

MODEL AND BEAM BASED SETUP PROCEDURES FOR A HIGH POWER HADRON SUPERCONDUCTING LINAC

This presentation will review methods for experimental determination of optimal operational set points in a multi-cavity superconducting high power hadron linac. A typical tuning process is based on comparison between measured data and the results of simulations from envelope and single-particle models. Presence of significant space charge effects requires simulation and measurement of bunch dynamics in 3 dimensions to ensure low loss beam transport. This is especially difficult in a superconducting linac where use of interceptive diagnostics is usually restricted because of the risk of SRF cavity surface contamination. The procedures discussed here are based on non-interceptive diagnostics such as beam position monitors and laser wires, and conventional diagnostics devices such as wire scanners and bunch shape monitors installed outside the superconducting linac. The longitudinal Twiss analysis based on the BPM signals will be described. The superconducting SNS linac tuning experience will be used to demonstrate problems and their solution for real world linac tune-up procedures

Shishlo, Andrei P↗

The CMS online cluster: Setup, operation and maintenance of an evolving cluster

The CMS online cluster consists of more than 2700 computers running about 15000 application instances. These applications implement the necessary services to run the data acquisition of the CMS experiment. In this paper the IT solutions employed on the cluster are reviewed. Details are given on the adopted solutions which include the following topics: implementation of reduction and load balanced network and core IT services; deployment and configuration management infrastructure and its customization; a new monitoring infrastructure. Special emphasis will be put on the scalable approach allowing to increase the size of the cluster with no administration overhead. Finally, the lessons learnt from the two years of running will be presented.

Coarasa, J. A.↗

Minimizing Experimental Setup Time and Effort at APS beamline 1-ID through Instrumentation Design

Sector 1-ID at the APS accommodates a number of dif-ferent experimental techniques in the same spatial enve-lope of the E-hutch end station. These include high-energy small and wide angle X-ray scattering (SAXS and WAXS), high-energy diffraction microscopy (HEDM, both near and far field modes) and high-energy X-ray tomography. These techniques are frequently combined to allow the users to obtain multimodal data, often attaining 1 μm spatial resolution and <0.05º angular resolution. Furthermore, these techniques are utilized while the sam-ple is thermo-mechanically loaded to mimic real operat-ing conditions. The instrumentation required for each of these techniques and environments has been designed and configured in a modular way with a focus on stability and repeatability between changeovers. This approach allows the end station to be more versatile, capable of collecting multi-modal data in-situ while reducing time and effort typically required for set up and alignment, resulting in more efficient beam time use. Key instrumentation de-sign features and layout of the end station are presented.

Benda, Erika↗