Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Summary of Vendor Irradiation Capsule Workshop Hosted at Oak Ridge National Laboratory, October 3-4, 2022

The Department of Energy office of Nuclear Energy, Advanced Reactor Technology office tasked Idaho National Laboratory (INL), and Oak Ridge National Laboratory (ORNL) with hosting a set of two workshops. The primary purpose of these workshops was to convince the commercial high temperature reactor community, specifically the graphite and composite experts, to collaborate with the building and operation of a graphite/ceramic composite irradiation capsule(s). The workshops were designed to first instruct the attendees on the technical and scheduling challenges in conducting such an experiment by providing information on different technical areas in scheduling, designing, building, operating, and disassembling such irradiation capsules. A secondary purpose was to determine the individual irradiation requirements (including the desired irradiated material properties) to understand what the remaining technical needs for gas-cooled and salt-cooled advanced nuclear reactors. The first workshop was held at ORNL October 3-4, 2022. This report summarizes the discussions held during this workshop. The second workshop was hosted at INL April 4-6, 2023 and will have a separate summary report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Unlocking Autonomous Telescopes through Reinforcement Learning: An Offline Framework and Insights from a Case Study

Optimizing observational astronomy campaigns is becoming a complex and expensive task for next-generation telescopes, where manual planning of observations may tend to reach suboptimal results in terms of optimization.Reinforcement Learning (RL) has been well-demonstrated as a valuable approach for training autonomous systems, and it may provide the basis for self-driving telescopes capable of scanning the sky and optimizing the scheduling for astronomy campaigns.We have developed a framework for the optimization of telescope scheduling using RL techniques, based on a dataset containing data on a discrete set of sky locations that the telescope should visit, and a reward metric. We compared several RL algorithms applied to an offline simulation dataset based at the Stone Edge Observatory, considering a discrete set of sky locations to visit and using “t-effective” as a reward metric, a measure of the quality of the data.Deep Q-Networks (DQNs), belonging to the class of value-based methods, have shown remarkable success in the optimization of astronomical observations in our dataset. In the full environment, the average reward value in each state was found to be 92%±5% of the maximum possible reward, while on the test set it resulted in 87%±9% of the maximum possible reward.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Perspectives on Potential Advanced Construction Technologies for Nuclear Energy

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, the National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

Data Steward Team Wall-To-Wall Inventory Status Update July - September 2023 [Slides]

8 Wall-to-wall inventories were completed between July 3rd – September 20th, 2023. The scheduling was broken down by FODs, and the team completed UI and IF. The team viewed 12 sites across 7 technical areas. A total of 249 containers were verified against current WCATS data. 2 containers were unable to be verified due to lack of WMC response. We worked with WMCs and Environmental Stewardship teams this quarter to schedule the wall-to-wall inventories. Discrepancies that were found were fixed by the WMCs in a timely manner. Most of the discrepancies were Labeling issues which were resolved the day of the walk down or within a week.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initiating Event Rates at U.S. Nuclear Power Plants: 2022 Update

Analyzing initiating event rates is important because it indicates trends and patterns of plant performance and provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants from calendar year 1988 through 2022, as reported in licensee event reports. Engineers with nuclear power plant experience reviewed each event report since the last update to this report to categorize and characterize reactor trips. To be included in this study, an event had to meet all of the following criteria: (1) the event included an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), (2) the sequence of events started when the reactor was critical and at or above the point of adding heat, (3) the event occurred at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and (4) the event was reported by a licensee event report. Sixteen initiating event groupings are trended and displayed. For some of the categories, relevant events are plotted separately for boiling-water reactors (BWR) and pressurized-water reactors (PWR). P-values are given for the possible presence of a trend over the most recent 10 years.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stabilizing the Grid and Reducing Utility Bills Through Price-Responsive Controls for Heat Pump Water Heaters

The electricity grid is facing increasing challenges in cost-effectively balancing supply and demand. These challenges are exacerbated by increased penetration of photovoltaics, which causes mid-day overproduction, and electrification of gas appliances, which increases peak-period electricity demand. Decarbonization requires shifting building loads from fossil-intensive high-cost times to renewable-intensive low-cost times while maintaining quality of service to occupants. Utilities and ISO’s are investigating new ways of incentivizing this load shifting. One promising method is the use of Highly Dynamic Prices (HDPs). HDPs feature continuously changing prices that reflect real-time grid generation and distribution costs and capacity constraints, and thus incentivize consumers to shift their loads. California’s CPUC CalFUSE proposal and Hawaii’s recent changes demonstrate that electricity tariffs are moving towards this model. For this to work however, loads must have the capability to respond to these prices. Heat pump water heaters (HPWHs) are an ideal device for this purpose because their storage tanks decouple delivery of domestic hot water from electricity consumption. The storage enables control strategies that consume midday solar power to increase the energy stored in the tank, then provide evening peak domestic hot water services using the stored energy. Berkeley Lab's CalFlexHub project is pioneering price-driven load flexibility by developing and deploying cost-minimizing controls for many flexible loads - including HPWHs - in response to HDP. Control development is based on simulations using the Flexible Heat Pump Water Heater Performance Predictor which captures the control decisions of the on-board controller in a residential, integrated HPWH . The price-responsive controls a) shift load in ways that consume additional midday solar power to help stabilize the grid and reduce overall emissions, b) ensure that occupants receive equal or better hot water delivery service, and c) minimize the operating cost for each home in the fleet. On the grid level, the resulting shift will reduce utility operating costs and emissions, and can avoid expensive system capacity expansions. The control approach is customized to each home based on typical hot water consumption patterns. HPWH controllers, whether on the device or remotely, will receive a schedule of CTA-2045-B signals or set temperature adjustments customized to the current HDP price schedule and home. Simulation results for a fleet of 148 HPWHs on a summer day in Berkeley, California show cost savings of 29% and high price electricity consumption reductions of 80%, while maintaining full quality of service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EJFAT: Towards Intelligent Compute Destination Load Balancing

To handle increased data flow, Jefferson Lab (JLab) is partnering with ESnet for development of an AI/ML directed compute work Load Balancer (LB) of UDP streamed data. The LB is FPGA based featuring dynamically configurable, low latency and high throughput destination address switching. The LB provides integration of edge and core computing to support JLab experimental programs, the Electron-Ion Collider, as well as data centers of the future. In the ESnet/JLab FPGA Accelerated Transport (EJFAT) initiative, the function of the LB Data Plane (DP) is to redirect data streams to selectable (but unknown to sender) destination hosts based on current worload and within that host to destination ports as a function of sub- stream id. This effects hierarchical scaling, first across compute machines for processing over a series of events and second, across ports so different data source sub-streams may be assigned to different processors for further parallelization. The LB Control Plane (CP) programs the DP using compute farm telemetry to direct and balance workloads across a compute cluster as the operating conditions require. While Proportional/Integrative/Derivative (PID) controllers are often seen in similar applications, here we investigate the feasibility of a Reinforcement Learning (RL) based schedule manager running in the CP to provide dynamic updates to the DP scheduling policy.

Lawrence, David↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters’ use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as we are currently keeping credentials active for approximately 15 experiments, each with 1-3 different credentials, and distributing those credentials to 2-20 submit points per experiment, with those numbers steadily increasing. To address these issues, we created and deployed a Managed Tokens service. The service is written in Go, taking advantage of that language’s native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points. When experimenters schedule jobs to be submitted, these distributed vault tokens are used to access a Hashicorp Vault instance (run separately from the Managed Tokens service), and previously-stored refresh tokens there are used to obtain the bearer token that is submitted with the job. We will discuss here the design of the Managed Tokens service, including elaborating on certain choices we made with regards to concurrent operations, configuration, monitoring, and deployment.

Bhat, Shreyas↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Best of Both Worlds: Integrating Slurm with Kubernetes in a Kubernetes Native Way

We present K-Foundry, a framework that enables the integration of Simple Linux Utility for Resource Management (SLURM) with Kubernetes (K8s) via a Kubernetes-like Control Plane (KCP). Our implementation seamlessly enables a unified communication and scheduling layer for a fleet of multiple diverse computing platforms. While SLURM and K8s traditionally support distinct scheduling models, they have recently started aligning their objectives by moving towards a more converged execution environment.

Beltre, Angel Manuel↗

Laser Powder Bed Fusion Additive Manufacture Nb1Zr Development

Next generation fission and fusion nuclear reactors require materials that can withstand operating temperatures greater than 500 °C, neutron irradiation doses of up to 200 displacements per atom (dpa), and potentially corrosive coolants such as the alkali liquid metals sodium, lithium, and NaK (Na33K eutectic alloy). Refractory alloys, such as Nb1Zr (Nb-1wt%Zr) and Molybdenum alloy TZM (Mo-0.5wt%Ti-0.08wt%Zr) have been traditionally considered viable candidates for advanced fission and fusion reactor concepts. However, it is relatively difficult to generate complex geometries of interest from these alloys using traditional manufacturing methods. In addition, there needs to be a concentrated effort to address refractory metal challenges at elevated temperature operation. In order to generate complex geometries of interest, modern manufacturing techniques are considered to increase the technological readiness level (TRL), cost-effectiveness, and schedule savings. This work focused on the continued development of laser powder bed fusion (L-PBF) additive manufacturing (AM) to improve both design flexibility, evaluate microstructure and properties, and ultimately accelerate the TRL and qualification of these processes and alloys for components to potentially be put into service. Niobium alloy Nb1Zr was identified through a down-selection process outlined in previous reports as a candidate to develop in L-PBF AM. Historically, Nb1Zr had been explored for high temperature fast spectrum fission reactors for both terrestrial and space applications. Molybdenum alloy TZM has also been considered for these reactor concepts due to exceptional high-temperature strength, creep resistance, and stability under irradiation. L-PBF AM of TZM has previously been investigated at LANL under the Microreactor program, NASA, ORNL, and in academia. However, due to the crack prone nature of TZM, L-PBF AM of TZM resulted in significant microcracking and additional development is required to pursue viable maturation. Other AM methods have been found to be more successful in printing TZM, and those alternatives approaches are discussed in this effort. The efforts detailed in this report focused on continued development of Nb1Zr through L-PBF and development of TZM via L-PBF and electron powder bed fusion (E-PBF). The objective of this work was to further the development of these AM techniques for the chosen refractory alloys, elucidating and addressing associated challenges through characterization of several demonstration builds. At LANL, Nb1Zr builds were completed using an EOS M290 and M400 machines, and a refractory alloy-dedicated L-PBF system, the Xact Metal XM200G, was installed. The XM200G primary purpose was to do the Nb1Zr parameter development process; however, due to difficulties associated with the machine installation and qualification process, it was decided to pivot development to the larger M400 and M290 machines. Although the supply of Nb1Zr powder was limited, it was sufficient to generate sub-scale metallographic specimens for the purpose of parameter development. This was first accomplished on the EOS M400 then the M290 due to machine schedule availability. Further development of TZM has been initiated at the University of Texas El Paso (UTEP) under contract with LANL to use both a heated build envelope L-PBF machine and E-PBF machine that have been found in the literature to mitigate microcracking. UTEP was provided with TZM powder and build plates to support parallel TZM parameter development across both machines. As part of the contract, UTEP will also be conducting microstructural characterization once optimized process parameters have been identified. The optimized process parameters for each machine will be used to generate a series of metallographic, mechanical, and surface finish specimens for subsequent characterization and testing. In the next section, we provide a detailed discussion of the methodology used for investigating the feasibility of leveraging these alloys for use in advanced reactor applications.

36 MATERIALS SCIENCE↗

Stakeholder Questionnaire on Fish Passage Facilities at U.S. Hydropower Developments

To mitigate the environmental impacts of hydropower dams on fish populations in rivers, fish passage infrastructure may be required by regulatory authorities or recommended by state or federal agencies to allow migratory fish to pass hydropower barriers and complete their life histories. However, information on the location, types, and characteristics of fish passage infrastructure is incomplete at the national scale. This lack of information limits understanding of current fish passage capabilities and hinders efforts to anticipate future passage requirements during project licensing or relicensing. To address this knowledge gap, researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. As part of this effort, a stakeholder questionnaire was created and deployed to solicit information on fish passage infrastructure, including engineering characteristics, operational schedules, targeted species, and costs. This online questionnaire was designed to allow respondents to provide highly detailed information regarding fish passage capabilities at U.S. hydropower developments as efficiently as possible. The questionnaire improved database coverage and accuracy by providing valuable development- or passage-specific stakeholder knowledge that is not otherwise publicly available. However, questionnaire response rates were low, and stakeholders showed a preference for providing data via the spreadsheet template. This is likely because most stakeholders had high-level knowledge about fish passage existence and type at many features, and few stakeholders had highly detailed, feature-specific knowledge of fish passage infrastructure, cost, operational scheduling, and capabilities. Nonetheless, the development and deployment of the stakeholder questionnaire advanced the project in several fundamental ways, and a similar questionnaire may be valuable for future database expansion via targeted dissemination to stakeholders with confirmed knowledge of detailed fish passage information at specific hydropower projects.

13 HYDRO ENERGY↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗