Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Resilience-based Recovery Scheduling of Transportation Network in Mixed Traffic Environment: A Deep-Ensemble-Assisted Active Learning Approach

Devising effective post-hazard recovery strategies is critical in enhancing the resilience of transportation networks (TNs). However, existing work does not consider the multiclass users’ travel behavior in network functionality quantification and the metaheuristic solution procedures often suffer from extensive computational burden due to the exploration need in large solution space and the expensive functionality quantification. Here, this study develops a bilevel decision-making framework for the resilience-based recovery scheduling of the TN in a mixed traffic environment with connected and autonomous vehicles (CAVs) and human-driven vehicles (HDVs). The lower level quantifies the TN's functionality over time considering different travel behavior of CAV and HDV users arisen from their different levels of information perception. The upper level presents a novel deep-ensemble-assisted active learning approach to balance optimization performance and computational cost. This framework can help decision makers better quantify the TN's functionality to support effective recovery scheduling of TN with different mixed traffic scenarios ranging from HDV-only to future CAV-dominant traffic. The optimization approach bears the potential to be extended to solving general large-scale network recovery scheduling problems effectively and efficiently. The proposed methodology is demonstrated using a real-world traffic network in Southern California under earthquake considering deterministic and stochastic repair durations.

42 ENGINEERING↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Simultaneous personnel and vehicle shift scheduling in the waste management sector

Highlights: • We consider the problem of simultaneously schedule personnel and vehicle shifts in the waste management sector. • We propose both an optimization model and a heuristic approach. • Important monetary savings can be achieved in the waste collection operations. - Abstract: Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust optimisation-based microgrid scheduling with islanding constraints

This paper proposes a robust optimization based optimal scheduling model for microgrid operation considering constraints of islanding capability. Our objective is to minimize the total operation cost, including generation cost and spinning reserve cost of local resources as well as purchasing cost of energy from the main grid. In order to ensure the resiliency of a microgrid and improve the reliability of the local electricity supply, the microgrid is required to maintain enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation when the supply of power from the main grid is interrupted suddenly, i.e., microgrid transitions from grid-connected into islanded mode. Prevailing operational uncertainties in renewable energy resources and load are considered and captured using a robust optimization method. With proper robust level, the solution of the proposed scheduling model ensures successful islanding of the microgrid with minimum load curtailment and guarantees robustness against all possible realizations of the modeled operational uncertainties. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Q-Learning-Based Approach for Distributed Beam Scheduling in mmWave Networks

We consider the problem of distributed downlink beam scheduling and power allocation for millimeter-Wave (mmWave) cellular networks where multiple base stations (BSs) belonging to different service operators share the same unlicensed spectrum with no centralized control or explicit coordination among them. Our goal is to design efficient distributed beam scheduling and power allocation schemes such that the network-level payoff, defined as the weighted sum of the total throughput and a power penalization term, can be maximized. To this end, we propose a distributed scheduling approach to power allocation and adaptation for efficient interference management over the shared spectrum by modeling each BS as an independent Q-learning agent. As a baseline, we compare the proposed approach to the state-of-the-art non-cooperative game-based approach which was previously developed for the same problem. We conduct extensive experiments under various scenarios to verify the effect of multiple factors on the performance of both approaches. Experiment results show that the proposed approach adapts well to different interference conditions by learning from experience and thus can achieve higher payoff than the game-based approach. The proposed approach can also be integrated into our previously developed Lyapunov stochastic optimization framework for the purpose of network utility maximization with optimality guarantee. As a result, the weights in the payoff function can be automatically and optimally determined by the virtual queue values from the sub-problems derived from the Lyapunov optimization framework.

99 GENERAL AND MISCELLANEOUS↗

Staggered scheduling of sensor estimation and fusion for tracking over long-haul links

Networked sensing can be found in a multitude of real-world applications. Here, we focus on the communication-and computation-constrained long-haul sensor networks, where sensors are remotely deployed over a vast geographical area to perform certain tasks. Of special interest is a class of such networks where sensors take measurements of one or more dynamic targets and send their state estimates to a remote fusion center via long-haul satellite links. The severe loss and delay over such links can easily reduce the amount of sensor data received by the fusion center, thereby limiting the potential information fusion gain and resulting in suboptimal tracking performance. In this paper, starting with the temporal-domain staggered estimation for an individual sensor, we explore the impact of the so-called intra-state prediction and retrodiction on estimation errors. We then investigate the effect of such estimation scheduling across different sensors on the spatial-domain fusion performance, where the sensing time epochs across sensors are scheduled in an asynchronous and staggered manner. In particular, the impact of communication delay and loss as well as sensor bias on such scheduling is explored by means of numerical and simulation studies that demonstrate the validity of our analysis.

47 OTHER INSTRUMENTATION↗

Fault-tolerant dynamic task graph scheduling

In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

fault tolerance↗

A Vision–based Robust $\mathcal{H}$ ∞ Gain Scheduling Longitudinal and Lateral Following Controller for Autonomous Vehicles on Urban Curved Roads

Implementing advanced driver assistance systems (ADAS) in congested and intricate urban traffic scenarios poses significant challenges. To address the frequent stop–and–go motions exhibited by autonomous vehicles (AVs) navigating urban roads with changes in curvature, we propose a vision–based robust $\mathcal{H}$ ∞ adaptive cruise control system (ACC) for longitudinal control, plus a lane keeping assist system (LKAS) for lateral control. For the vision-based ACC, a weighted probability objective function for the vehicle following behavior is formulated. We incorporate $\mathcal{H}$ ∞ performance and gain scheduling techniques to mitigate the impact of uncertainty in visual sensor measurements. Furthermore, the optimal time headway is scheduled based on the velocity to ensure traffic flow efficiency and safety during the vehicle following process. For the LKAS, we introduce a road curvature estimation method that integrates lane and vehicle dynamics information to obtain the lateral and heading offsets. Next, the design criterion of the observer–based robust gain scheduling lateral motion controller is established by linear matrix inequality (LMI). Here, a series of experiments conducted within a camera–in–loop platform validate the proposed method.

33 ADVANCED PROPULSION SYSTEMS↗

A Gain Scheduling Wide-Area Damping Controller for the Efficient Integration of Photovoltaic Plant

With photovoltaic generation increasing, the wide-area oscillation has a vital influence on the long-distance power transmission of photovoltaic power. For an efficient integration of photovoltaic generation, a gain scheduling wide-area damping controller (WADC) is designed to guarantee system damping performance under a wide-area signal delay and a changing operating condition, which could be aggravated by the fluctuant and uncertain photovoltaic generation. A linear parameter-varying (LPV) model is proposed to represent all possible operating conditions within varying ranges of the photovoltaic generation and the load. Then, a tensor product (TP) model transformation is applied to transform the LPV model into a TP model. Based on the TP model, a parallel distributed compensation controller (PDC) framework is adopted to design the gain scheduling WADC, which is solved by linear matrix inequalities (LMIs) considering the accommodation to the random interval delay. In addition, a staircase basis function method is proposed to reduce the conservatism of LMIs within the PDC framework. The gain of the proposed WADC will be adjusted according to the operating condition acknowledged through the real-time scheduling and control center, once a wide-area oscillation is detected. Lastly, the performance of the proposed WADC is verified by a 2-area 4-machine system and a 68-bus 16-machine system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Enhanced Method for Scheduling Observations of Large Sky Error Regions for Finding Optical Counterparts to Transients

The discovery and subsequent study of optical counterparts to transient sources is crucial for their complete astrophysical understanding. Various gamma-ray burst (GRB) detectors, and more notably the ground-based gravitational wave detectors, typically have large uncertainties in the sky positions of detected sources. Searching these large sky regions spanning hundreds of square degrees is a formidable challenge for most ground-based optical telescopes, which can usually image less than tens of square degrees of the sky in a single night. We present algorithms for better scheduling of such follow-up observations in order to maximize the probability of imaging the optical counterpart, based on the all-sky probability distribution of the source position. We incorporate realistic observing constraints such as the diurnal cycle, telescope pointing limitations, available observing time, and the rising/setting of the target at the observatory’s location. We use simulations to demonstrate that our proposed algorithms outperform the default greedy observing schedule used by many observatories. Our algorithms are applicable for follow-up of other transient sources with large positional uncertainties, such as Fermi -detected GRBs, and can easily be adapted for scheduling radio or space-based X-ray follow-up.

79 ASTRONOMY AND ASTROPHYSICS↗

Collaborative Scheduling Using JMS in a Mixed Java and .NET Environment

A viewgraph presentation to demonstrate collaborative scheduling using Java Message Service (JMS) in a mixed Java and .Net environment is given. The topics include: 1) NASA Deep Space Network scheduling; 2) Collaborative scheduling concept; 3) Distributed computing environment; 4) Platform concerns in a distributed environment; 5) Messaging and data synchronization; and 6) The prototype.

.NET↗

Deep Space Network Scheduling Using Evolutionary Computational Methods

The paper presents the specific approach taken to formulate the problem in terms of gene encoding, fitness function, and genetic operations. The genome is encoded such that a subset of the scheduling constraints is automatically satisfied. Several fitness functions are formulated to emphasize different aspects of the scheduling problem. The optimal solutions of the different fitness functions demonstrate the trade-off of the scheduling problem and provide insight into a conflict resolution process.

Deep Space Network (DSN)↗

Calculation of Flight Deck Interval Management Assigned Spacing Goals Subject to Multiple Scheduling Constraints

The Federal Aviation Administration's Next Generation Air Transportation System will combine advanced air traffic management technologies, performance-based procedures, and state-of-the-art avionics to maintain efficient operations throughout the entire arrival phase of flight. Flight deck Interval Management (FIM) operations are expected to use sophisticated airborne spacing capabilities to meet precise in-trail spacing from top-of-descent to touchdown. Recent human-in-the-loop simulations by the National Aeronautics and Space Administration have found that selection of the assigned spacing goal using the runway schedule can lead to premature interruptions of the FIM operation during periods of high traffic demand. This study compares three methods for calculating the assigned spacing goal for a FIM operation that is also subject to time-based metering constraints. The particular paradigms investigated include: one based upon the desired runway spacing interval, one based upon the desired meter fix spacing interval, and a composite method that combines both intervals. These three paradigms are evaluated for the primary arrival procedures to Phoenix Sky Harbor International Airport using the entire set of Rapid Update Cycle wind forecasts from 2011. For typical meter fix and runway spacing intervals, the runway- and meter fix-based paradigms exhibit moderate FIM interruption rates due to their inability to consider multiple metering constraints. The addition of larger separation buffers decreases the FIM interruption rate but also significantly reduces the achievable runway throughput. The composite paradigm causes no FIM interruptions, and maintains higher runway throughput more often than the other paradigms. A key implication of the results with respect to time-based metering is that FIM operations using a single assigned spacing goal will not allow reduction of the arrival schedule's excess spacing buffer. Alternative solutions for conducting the FIM operation in a manner more compatible with the arrival schedule are discussed in detail.

ATD-1↗

Experiments with a Parallel Multi-Objective Evolutionary Algorithm for Scheduling

Evolutionary multi-objective algorithms have great potential for scheduling in those situations where tradeoffs among competing objectives represent a key requirement. One challenge, however, is runtime performance, as a consequence of evolving not just a single schedule, but an entire population, while attempting to sample the Pareto frontier as accurately and uniformly as possible. The growing availability of multi-core processors in end user workstations, and even laptops, has raised the question of the extent to which such hardware can be used to speed up evolutionary algorithms. In this paper we report on early experiments in parallelizing a Generalized Differential Evolution (GDE) algorithm for scheduling long-range activities on NASA's Deep Space Network. Initial results show that significant speedups can be achieved, but that performance does not necessarily improve as more cores are utilized. We describe our preliminary results and some initial suggestions from parallelizing the GDE algorithm. Directions for future work are outlined.

scheduling↗

Precision Arrival Scheduling for Tactical Reconfiguration

This research adapts the concept of precision arrival scheduling to accommodate reconfiguration operations between two sets of fixed arrival routes modeled for Chicago O'Hare International Airport (ORD). Integrated fixed path routing from en-route to runways was modeled for ORD's top two peak traffic configurations, as well as transition routing between the two configurations. A first-come-first-served multi-point scheduler was adapted to the reconfiguration problem by prioritizing the rescheduling of aircraft within the terminal airspace at the time of reconfiguration notification. Arrival rescheduling was then tested for a range of arrival rates and reconfiguration notification lead-times in fasttime simulation. Reconfigurations with lead-times as short as 10 minutes at a nominal static configuration arrival rate (~25 arrivals per quarter hour) could be accommodated with little impact to throughput. However, as lead-time shortened below 25 minutes, individual aircraft efficiency quickly degraded due to extra flight time at lower altitude and speed. In general, first-come-first-served arrival scheduling on fixed routing for this sample reconfiguration problem is promising if at least 10-15 minutes lead-time is given before the reconfiguration is in effect.

airport reconfiguration↗

Alternatives for Scheduling Departures for Efficient Surface Metering in ATD-2: Exploration in a Human-in-the-Loop Simulation

A Human-in-the-Loop (HITL) simulation was conducted to explore whether Ramp Controllers at Charlotte Douglas International Airport (CLT) could both release departing aircraft at an advised time at the gate and also meet an advised time at the spot, where Air Traffic Control (ATC) takes control. Three conditions were compared: (1) Baseline, with no scheduling advisories, (2) instructions to meet advisory times at the gate only, and (3) instructions to meet advisory times at both the gate and the spot. Surprisingly, results showed increased compliance with advisories at the spot in the second condition. This was likely due to increased ramp congestion in the third condition as well as higher Ramp Controller workload and lower situation awareness. Instructing Ramp Controllers to meet scheduling times at the spots, in addition to the gates, is therefore not likely to improve surface scheduling predictability at CLT and may indeed worsen it.

airport surface scheduling↗

Capacity and Throughput of Urban Air Mobility Vertiports with a First-Come, First-Served Vertiport Scheduling Algorithm

In this paper, a first-come, first-served vertiport scheduling algorithm for Urban Air Mobility (UAM) was exercised to assess and compare the capacity and throughput of various vertiport configurations. The scheduler models each vertiport by the number of vertipads and parking spaces, and manages reservations on timelines for those vertiport resources, at a level of fidelity suitable for fast-time and system-level analyses of UAM concepts and other airspace studies. The paper defines the theoretical model that can be used to estimate the capacity of various vertiport configurations. The theoretical model provides an understanding of the conditions that can lead to either a parking space-limited or a vertipad-limited vertiport. Examples of potential throughput for some vertiport configurations are provided using both a queueing approach as well as a simulated UAM demand scenario. The study demonstrated that a first-come, first-served scheduling approach can have inefficiencies in the use of the vertiport resources. The inefficiencies can increase as the number of resources increases. Nonetheless, 80% or better peak throughput to capacity ratio was observed for most vertiport configurations.

UAM↗

Resource Scheduling for a Network of Communications Antennas

This paper describes tha Demand Access Network Scheduler (DANS) system for automatically scheduling and rescheduling resources for a network of communication antennas. DANS accepts a baseline schedule and supports rescheduling of antenna and subsystem resources to satisfy tracking goals in the event of changing track requests, equipment outages, and inclement weather.

Deep↗