Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

Data, model inputs, and analysis scripts associated with a manuscript on stream intermittency controls across spatial scales in Pacific Northwest watersheds

NOTE: The manuscript associated with this data package is currently in review. The data may be revised based on reviewer feedback. Upon manuscript acceptance, this data package will be updated with the final dataset and additional metadata. This data package is associated with the manuscript "Hydroclimatic Memory and Watershed Template Shape Stream Intermittency: Multi-scale Attribution Using Process-based Simulation and Explainable ML" by Niroula et al. (2026), submitted to Water Resources Research (WRR). The study investigates the dominant controls on stream intermittency across local, reach, and watershed scales using a coupled process-based simulation and explainable machine-learning framework. Long-term daily simulations from the Advanced Terrestrial Simulator (ATS) were used to generate wetness states and ponded-depth responses over river-corridor cells. These ATS outputs were then aggregated across scales and used to train XGBoost (eXtreme Gradient Boosting) models. SHAP (SHapley Additive exPlanations) was applied to quantify the relative importance of hydroclimatic forcings, watershed template attributes, and antecedent-memory effects in shaping intermittency behavior. The analysis is carried out for three contrasting Pacific Northwest watersheds: Oak Creek (OCW), American River Watershed (ARW), and H.J. Andrews (HJA). Across these testbeds, the package contains ATS-ready watershed inputs, ATS run configuration and selected output files, model-evaluation data products, intermittency-analysis datasets, machine-learning target-feature tables, SHAP outputs, and notebooks used to organize, analyze, and visualize results. At a high level, the package documents a workflow in which ATS provides the physically based simulation backbone and explainable machine learning is used as a post-processing attribution tool. The contents are intended to support interpretation of the manuscript figures and results, provide context for how intermittency metrics were generated at multiple scales, and preserve the key artifacts needed to understand and reuse the analysis workflow. The package contains a high-level directory summary file (`summary.txt`) and four main content folders (1) `evaluation_plots` contains evaluation figures and supporting evaluation datasets; (2) `intermittency_plots` contains intermittency-focused analysis notebook and prepared datasets; (3) `ml-training-and-shap_values_plots` contains ML training inputs, SHAP outputs, and figure-generation notebooks; and (4) `watershed_mesh_and_ats_input` contains ATS model setup materials, forcing inputs, geometry, and selected run files. More specifically, the `evaluation_plots` folder contains the notebook used for ATS evaluation plotting and site-specific evaluation datasets. These include evapotranspiration and water-balance products for three watersheds, as well as an Oak Creek field-measurement discharge file. The `intermittency_plots` folder contains the notebook used for intermittency analysis and the prepared datasets used to analyze intermittent and non-intermittent wetness behavior across the study watersheds. The `ml-training-and-shap_values_plots` folder contains notebooks and outputs for the machine-learning and explainability workflow. This includes the main XGBoost and SHAP notebook(s), a beeswarm plotting notebook, target-feature tables for machine-learning training, SHAP summary tables, and per-sample SHAP value archives. The `watershed_mesh_and_ats_input` folder contains ATS-related watershed inputs and supporting materials. This includes mesh and shape products, ATS-readable LAI and meteorological forcing inputs, selected ATS spinup and transient-run files, and a watershed workflow example notebook. Subdirectories are organized by watershed where applicable.All files are .cpg (codepage files), .csv (comma-separated values), .dbf (database files), .exo (Exodus mesh format), .h5 (HDF5 format), .ipynb (Jupyter notebooks), .pkl (Python pickle), .prj (projection files), .sh (shell scripts), .shp (shapefile geometry), .shx (shapefile index), .txt (text files), or .xml (markup data).

Advanced Terrestrial Simulator↗

NASA's nuclear electric propulsion technology project

The National Aeronautics and Space Administration (NASA) has initiated a program to establish the readiness of nuclear electric propulsion (NEP) technology for relatively near-term applications to outer planet robotic science missions with potential future evolution to system for piloted Mars vehicles. This program was initiated in 1991 with a very modest effort identified with nuclear thermal propulsion (NTP); however, NEP is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. The NEP Program will establish the feasibility and practicality of electric propulsion for robotic and piloted solar system exploration. The performance objectives are high specific impulse (200 greater than I(sub sp) greater than 10000 s), high efficiency (over 0.50), and low specific mass. The planning for this program was initially focussed on piloted Mars missions, but has since been redirected to first focus on 100-kW class systems for relatively near-term robotic missions, with possible future evolution to megawatt- and multi-megawatt-class systems applicable to cargo vehicles supporting human missions as well as to the piloted vehicles. This paper reviews current plans and recent progress for the overall nuclear electric propulsion project and closely related activities.

Stone, James R.↗

NASA's nuclear electric propulsion technology project

The National Aeronautics and Space Administration (NASA) has initiated a program to establish the readiness of nuclear electric propulsion (NEP) technology for relatively near-term applications to outer planet robotic science missions with potential future evolution to system for piloted Mars vehicles. This program was initiated in 1991 with a very modest effort identified with nuclear thermal propulsion (NTP); however, NEP is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. The NEP Program will establish the feasibility and practicality of electric propulsion for robotic and piloted solar system exploration. The performance objectives are high specific impulse (200 greater than I(sub sp) greater than 10000 s), high efficiency (over 0.50), and low specific mass. The planning for this program was initially focussed on piloted Mars missions, but has since been redirected to first focus on 100-kW class systems for relatively near-term robotic missions, with possible future evolution to megawatt-and multi-megawatt-class systems applicable to cargo vehicles supporting human missions as well as to the piloted vehicles. This paper reviews current plans and recent progress for the overall nuclear electric propulsion project and closely related activities.

Stone, James R.↗

Ion Propulsion for Solar System Exploration

NASA's Evolutionary Xenon Thruster (NEXT) is ready for transition-to-flight. The thruster has completed all qualification-level environmental testing, and has demonstrated a xenon propellant throughput, total impulse, and total operating hours greatly in excess of anticipated planetary science mission requirements, and exceeding that achieved by any other thruster technology in the history of electric propulsion. NEXT is the next generation system, a natural progression in technology from that implemented successfully on the Deep-Space one and Dawn missions, developed at NASA's Glenn Research Center in Cleveland, Ohio. The first implementation of NEXT will be on NASA 's Double Asteroid Redirection Test (DART). DART will be the first demonstration of the kinetic impact technique to change the motion of an asteroid in space. The DART mission is in Phase C, led by Johns Hopkins University Applied Physics Laboratory. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster solar electric propulsion system as its primary in-space propulsion system. By utilizing NEXT, DART is able to gain significant flexibility to the mission timeline and launch window, as well as decrease in launch vehicle cost. This presentation will review NASA's investment strategy in electric propulsion _ in particular gridded ion thruster technology _ as it applies to solar system exploration. Results obtained from implementing this technology on Deep-Space one and Dawn will be reviewed. Mission studies which highlight the impacts of the NEXT technology will be discussed, and near-term proposed and scheduled missions including DART and CAESAR (Comet Astrobiology Exploration Sample Return) will be reviewed.

Electric Propulsion↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2019 Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory's (ORNL's) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high performance computing (HPC) needs; and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2019 was a big year as OLCF staff ran five world-class resources (the leadershipclass computers Titan and Summit, the large analysis cluster called Eos, and the massive parallel filesystems called Atlas and Alpine)) and also began power and cooling upgrades for a 2021 exascale system called Frontier. While continuing exceptional operation of Titan, Eos, and Rhea, the OLCF released the Summit supercomputer for production on January 1, 2019. Summit debuted as the most capable and efficient system in its class and has been recognized as the most powerful system in the world for its performance on both the high performance linpack (HPL) and conjugate gradient (HPCG) benchmark applications since June 2018 according to TOP500. Summit represents the culmination of a multiyear effort between the OLCF, IBM, NVIDIA, and Mellanox to deliver a system that is unmatched for modeling, simulation, data analysis, and learning. To hit the ground running with science-ready applications on day one, application teams worked closely with the OLCF through the Center for Accelerated Application Readiness (CAAR) program for years in advance of the Summit deployment. CY 2019 was filled with outstanding results and accomplishments: a very high rating from users on overall satisfaction for the sixth year in a row; a tremendous amount of core-hours delivered to researchers from two leadership-class systems; and success in delivering on the allocation split of roughly 60%, 30%, and 10% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director's Discretionary (DD) programs, respectively (see Operational Performance section). These accomplishments, coupled with the high utilization rates (overall and capability usage), represent the fulfillment of the promise of both leadership-class machines: efficient facilitation of leadership-class computational applications. Table ES.1 presents a summary of the 2019 OLCF metric targets and the associated results. More information can be found in the Operational Performance section for each OLCF resource. The scientific accomplishments of OLCF users are a strong indication of long-term operational success, with publications this year in such notable journals and publications as Nature, Nature Physics, Nature Plants, Physical Review X, Journal of the American Physical Society, Cell, Nano Letters, and Trends in Biotechnology. Crucial domain-specific discoveries facilitated by resources at the OLCF are described in the High Performance Computing Facility Operational Assessment 2019 Oak Ridge Leadership Computing Facility (OAR) Strategic Results section. For example, researchers used Summit to pinpoint and understand the production of proteins from genetic information, including mutations and the functional expression of disease (Section 8.2).

97 MATHEMATICS AND COMPUTING↗

A reinvestigation into Munson’s model for room closure in bedded rock salt

Accurate predictions of room closure are important for hazardous waste repositories in rock salt formations, such as the Waste Isolation Pilot Plant (WIPP). When Munson and co-workers simulated several room closure experiments conducted at the WIPP during the 1980’s and 1990’s, their simulated closure curves closely agreed with the closure measurements. A careful review of their work, however, raised concerns and prompted the reinvestigation in this paper. Here, to begin the reinvestigation, Munson’s legacy Room D closure simulation was reasonably recreated in a current-day finite element code. Next, special care was taken to obtain numerically converged results, re-introduce the anhydrite strata intermittently ignored by Munson, and calibrate the Munson–Dawson (M–D) constitutive model for salt as much as possible from laboratory test measurements. When this new model was used to simulate Room D’s closure, it under-predicted the horizontal and vertical closure rates by 2.34x and 3.10x, respectively, at 5.7 years after room excavation. As a result, the M–D model was extended to capture the newly established creep behavior at low equivalent stresses (<8 MPa) and replace the Tresca with the Hosford equivalent stress. Simulations using the new M–D model over-predicted the horizontal closure rate by 1.15x and under-predicted the vertical closure rate by 1.08x at 5.7 years, averaged over three room closure experiments. Although further improvements could be made, the new model has a stronger scientific foundation than Munson’s legacy model and appears ready for careful engineering use.

58 GEOSCIENCES↗

An Overview Of NASA's Solar Sail Propulsion Project

Research conducted by the In-Space Propulsion (ISP) Technologies Projects is at the forefront of NASA's efforts to mature propulsion technologies that will enable or enhance a variety of space science missions. The ISP Program is developing technologies from a Technology Readiness Level (TRL) of 3 through TRL 6. Activities under the different technology areas are selected through the NASA Research Announcement (NRA) process. The ISP Program goal is to mature a suite of reliable advanced propulsion technologies that will promote more cost efficient missions through the reduction of interplanetary mission trip time, increased scientific payload mass fraction, and allowing for longer on-station operations. These propulsion technologies will also enable missions with previously inaccessible orbits (e.g., non-Keplerian, high solar latitudes). The ISP Program technology suite has been prioritized by an agency wide study. Solar Sail propulsion is one of ISP's three high-priority technology areas. Solar sail propulsion systems will be required to meet the challenge of monitoring and predicting space weather by the Office of Space Science s (OSS) Living with a Star (LWS) program. Near-to-mid-term mission needs include monitoring of solar activity and observations at high solar latitudes. Near-term work funded by the ISP solar sail propulsion project is centered around the quantitative demonstration of scalability of present solar sail subsystem designs and concepts to future mission requirements through ground testing, computer modeling and analytical simulations. This talk will review the solar sail technology roadmap, current funded technology development work, future funding opportunities, and mission applications.

Garbe, Gregory↗

Lunar base thermoelectric power station study

Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology needs in all areas to support the development, deployment, operation and disposal of the unit.

space power↗

Integration and Testing of the Lunar Reconnaissance Orbiter Attitude Control System

Throughout the Lunar Reconnaissance Orbiter (LRO) Integration and Testing (I&T) phase of the project, the Attitude Control System (ACS) team completed numerous tests on each hardware component in ever more flight like environments. The ACS utilizes a select group of attitude sensors and actuators. This paper chronicles the evolutionary steps taken to verify each component was constantly ready for flight as well as providing invaluable trending experience with the actual hardware. The paper includes a discussion of each ACS hardware component, lessons learned of the various stages of I&T, a discussion of the challenges that are unique to the LRO project, as well as a discussion of work for future missions to consider as part of their I&T plan. LRO ACS sensors were carefully installed, tested, and maintained over the 18 month I&T and prelaunch timeline. Care was taken with the optics of the Adcole Coarse Sun Sensors (CSS) to ensure their critical role in the Safe Hold mode was fulfilled. The use of new CSS stimulators provided the means of testing each CSS sensor independently, in ambient and vacuum conditions as well as over a wide range of thermal temperatures. Extreme bright light sources were also used to test the CSS in ambient conditions. The integration of the two SELEX Galileo Star Trackers was carefully planned and executed. Optical ground support equipment was designed and used often to check the performance of the star trackers throughout I&T in ambient and thermal/vacuum conditions. A late discovery of potential contamination of the star tracker light shades is discussed in this paper. This paper reviews how each time the spacecraft was at a new location and orientation, the Honeywell Miniature Inertial Measurement Unit (MIMU) was checked for data output validity. This gyro compassing test was performed at several key testing points in the timeline as well as several times while LRO was on the launch pad. Sensor alignment tests were completed several times to ensure that hardware remained on a rigid platform.

Simpson, Jim↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗

Improved Compaction Experiments and Modeling of Waste Isolation Pilot Plant Standard, Non-degraded, Waste Containers

A credible simulation of disposal room porosity at the Waste Isolation Pilot Plant (WIPP) requires a tenable compaction model for the 55-gallon waste containers within the room. A review of the legacy waste material model, however, revealed several out-of-date and untested assumptions that could affect the model’s compaction behavior. For example, the legacy model predicted non-physical tensile out-of-plane stresses under plane strain compression. (Plane strain compression is similar to waste compaction in the middle of a long drift.) Consequently, a suite of new compaction experiments were performed on containers filled with surrogate, non-degraded, waste. The new experiments involved uniaxial, triaxial, and hydrostatic compaction tests on quarter-scale and full-scale containers. Special effort was made to measure the volume strain during uniaxial and triaxial tests, so that the lateral strain could be inferred from the axial and volume strain. These experimental measurements were then used to calibrate a pressure dependent, viscoplastic, constitutive model for the homogenized compaction behavior of the waste containers. This new waste material model’s predictions agreed far better with the experimental measurements than the legacy model’s predictions, especially under triaxial and hydrostatic conditions. Under plane strain compression, the new model predicted reasonable compressive out-of-plane stresses, instead of tensile stresses. Moreover, the new model’s plane strain behavior was substantially weaker for the same strain, yet substantially stronger for the same porosity, than the legacy model’s behavior. Although room for improvement exists, the new model appears ready for prudent engineering use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODS). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODS. Previously, a technique entitled "SRMS assisted docking" for installation of a payload to the ODS had been developed and was utilized for the Russian provided Docking Module on STS-74 during Shuttle-Mir missions and both the Node 1 and FGB elements on STS-88/Flight 2A. This procedure consisted of the SRMS grappling the respective payload, maneuvering it to a pre-install position inches above the ODS Androgynous Peripheral Attachment System (APAS) ring, commanding the SRMS into Test mode (which allows brakes-off motion of the joints), and then down-firing Primary Reaction Control System (PRCS) jets in order to effect a capture of the APAS latches. Once a successful capture had been achieved, then the AP AS was operated through its nominal retraction sequence to complete the mating sequence. While this technique can once again be used for the tail end docking portion of the ORM, the initial undocking of the orbiter and ISS vehicles with the assistance of the SRMS has yet to be attempted on orbit. The objective here is to determine the most efficient means to separate or extract the vehicles. Two techniques were analyzed in support of RTF: (1) the 'nominal' demating from the mated interface, and (2) the SRMS performing the operation (either in an active or passive fashion). In the first operation, the demating process would replicate standard undocking operations, with the exception that the SRMS is allowed to arrest the resulting motion. The second operation would be to extend the APAS ring to a ready to dock position, open the capture latches, and then detach the vehicles using the SRMS either actively or passively. In the active case, the APAS ring is extended and latched, and the SRMS is commanded to pull the two interfaces apart (assuming that the effective pull force of the SRMS can overcome the spec values of the combined latch resistance). In the passive case, the SRMS brakes are engaged and the AP AS mechanism is commanded to retract, pulling the two interfaces apart. Since the emphasis of both STS-74 and STS-88 had solely been on the installation operation, as opposed to the separation operation, two new models required development and incorporation within simulation tools designed to analyze those scenarios. These enhancements included: (1) a detailed demating dynamics model to characterize the pusher spring characteristics during undocking, and (2) contact and mechanical system modeling of the back side of the latches to represent unlatching dynamics. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

Space Station Remote Manipulator System↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Second Generation RLV Program

During the time period covered by this report, SAIC: 1) Continued to develop and assess processes and approaches that can be applied to Second Generation Reuseable Launch Vehicles (RLV) technologies prioritization. An approach based on the use of analytic Saaty scale functions has been defined and is being investigated. 2) Planned and facilitated technologies prioritization workshops, supported development of systems program algorithms based on the concept of influence diagramming, and assessment of analogies between aircraft and space systems developments. 3) Video interviews held with X-37 personnel at Dryden. The CD-ROM is being concluded and a near-final review disc is expected soon. 4) CD-ROMS were produced by Engineered Multimedia, Inc. (EMI) under subcontract to SAIC. These two CD-ROM products, "Microgravity" and "New Horizons", were delivered to MSFS technical representatives at a briefing at SAID on January 18, 2001. 5) Presentation brochure, "Aviation/Space Analog Team Interim Report" was provided to Space Propulsion Synergy Team (SPST) members and to NASA personnel. Wrap-up of effort will be a mid-April briefing to both MSFC and the full SPST membership. Support to Phase 2 of CCPD ends 3/31/01. Phase 3 continuation effort planned with emphasis on technical info content. 6) Recommended that eliminating the B-52 flights of the X-37 in favor of alternate approached be evaluated. Discovered that a required change to the thruster valves of the X-37 had not been made. Repair work continues on the lower fuselage section of the X-37, in the areas that experienced core collapse. The currently catalogued potential weight increases and decreases are about equal, but this does not include the impact of the cable weight underestimate reported earlier. The CFD for RCS testing correlates well with the wind tunnel data. 7) The Level IV CCB approved SCN-4 to the MC-1 Engine SPecification. Approved changes have been incorporated into the specification, and Revision D has been released to the Repository. Billy Gonterman, SAIC, traveled to SSC to perform a five-day readiness assessment on the progress of facilities activation. Implemented modifications to the MC-1 Engine TPA Component Database. 8) Replaced 25 Combined-Cycle Propulsion Database (CCPD) documents; modified the low-on screen to include a direct email link for user contact; prepared a summary presentation of current and proposed tasks.

Laue, Jay↗

On the Development and Application of High Data Rate Architecture (HiDRA) in Future Space Networks

Historically, space missions have been severely constrained by their ability to downlink the data they have collected. These constraints are a result of relatively low link rates on the spacecraft as well as limitations on the time during which data can be sent. As part of a coherent strategy to address existing limitations and get more data to the ground more quickly, the Space Communications and Navigation (SCaN) program has been developing an architecture for a future solar system Internet. The High Data Rate Architecture (HiDRA) project is designed to fit into such a future SCaN network. HiDRA's goal is to describe a general packet-based networking capability which can be used to provide assets with efficient networking capabilities while simultaneously reducing the capital costs and operational costs of developing and flying future space systems.Along these lines, this paper begins by reviewing various characteristics of modern satellite design as well as relevant characteristics of emerging technologies (such as free-space optical links capable of working at 100+ Gbps). Next, the paper describes HiDRA's design, and how the system is able to both integrate and support the operation of not only today's high-rate systems, but also the high-rate systems likely to be found in the future. This section also explores both existing and future networking technologies, such as Delay Tolerant Networking (DTN) protocol (RFC4838 citeRFC:1, RFC5050citeRFC:2), and explains how HiDRA supports them. Additionally, this section explores how HiDRA is used for scheduling data movement through both proactive and reactive link management. After this, the paper moves on to explore a reference implementation of HiDRA. This implementation is currently being realized based on a Field Programmable Gate Array (FPGA) memory and interface controller that is itself controlled by a local computer running DTN software. Next, this paper explores HiDRA's natural evolution, which includes an integration path for software-defined networking (SDN) switches. This section also describes considerations for both near-Earth and deep-space instantiations of HiDRA, describing how differences in latencies between the environments will necessarily influence how the system is configured and the networks operate. Finally, this paper describes future work. This section includes a description of a potential ISS implementation which will allow rapid advancement through the technology readiness levels (TRL). This section also explores work being done to support HiDRA's successful implementation and operation in a heterogeneous network: such a network could include communications equipment spanning many vintages and capabilities, and one significant aspect of HiDRA's future development involves balancing compatibility with capability.

DTN↗

STS-96 Mission Highlights

In this third part of a three-part video mission-highlights set, spacecrew operations between the STS-96 Space Shuttle Orbiter Discovery and the International Space Station, as well as STS reentry and landing is reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This third part of the three part series includes footage from Flight Days 8-11 (FD 8-11) of the mission. FD 8 includes the crew members moving the last items from Discovery into the International Space Station (ISS), closing the final hatch on the orbiting outpost and commanding a series of 17 pulses of Discovery's reaction control system jets to boost the station's orbit. Discovery undocks from the station, performs a 2 1/2 lap flyaround of the station, before Husband fires Discovery's jets in a final burst to move Discovery away from the station, concluding six days of docked operations. After the flyaround, Husband fires Discovery's jets to depart the station's vicinity. Beginning FD 9, as Discovery departs from the station, Mission Specialists Tammy Jernigan and Dan Barry pack away the space suit gear they used during their spacewalk early in the mission, while Commander Kent Rominger and Pilot Rick Husband practice landings on a laptop computer program. Mission Specialists Julie Payette and Valery Tokarev help to stow gear and repressurize the shuttle's cabin to its standard 14.7 pounds per square inch. The crew also readies to deploy a small, student-built payload called STARSHINE (Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment). In and around landing preparations and the STARSHINE deploy, the crew stowe all equipment used throughout the mission. The STARSHINE satellite ejects from a canister in Discovery's payload bay on FD 10. FD 11 is completed as Discovery swoops out of the darkness as Commander Kent Rominger sets the shuttle and his crewmates down on Runway 15 at the Shuttle Landing Facility in Florida to successfully complete the first shuttle mission of the year. Several different views of the landing are highlighted in the video.

Source record↗