Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

2022 National Household Travel Survey - Oahu Add-On

# 2022 National Household Travel Survey – Oahu Add-On The Oahu add-on survey supplements the 2022 National Household Travel Survey (NHTS) with additional household samples and detailed travel behavior for an assigned travel day. ## Data Collection Agency The Federal Highway Administration conducted the NHTS and corresponding add-on surveys. ## Survey Methodology The 2022 NHTS, which covered assigned travel dates from January 2022 to January 2023, collected data on the demographic and socioeconomic composition of households as well as detailed information on travel behavior nationwide. State transportation departments and metropolitan planning agencies—like the Oahu Metropolitan Planning Organization—had the opportunity to purchase extra household samples as part of the NHTS add-on program. These additional samples, along with national samples collected in the add-on areas, are compiled for use in transportation planning, forecasting, and research. ## Survey Records, Data, and Documentation Survey records include 7,397 participants from 3,170 households in Oahu, Hawaii, as well as detailed information on the travel behavior of each household for a designated 24-hour period. The survey logged over 14,868 trips totaling 165,000 vehicle miles traveled.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2022 National Household Travel Survey - Oahu Add-On

# 2022 National Household Travel Survey – Oahu Add-On The Oahu add-on survey supplements the 2022 National Household Travel Survey (NHTS) with additional household samples and detailed travel behavior for an assigned travel day. ## Data Collection Agency The Federal Highway Administration conducted the NHTS and corresponding add-on surveys. ## Survey Methodology The 2022 NHTS, which covered assigned travel dates from January 2022 to January 2023, collected data on the demographic and socioeconomic composition of households as well as detailed information on travel behavior nationwide. State transportation departments and metropolitan planning agencies—like the Oahu Metropolitan Planning Organization—had the opportunity to purchase extra household samples as part of the NHTS add-on program. These additional samples, along with national samples collected in the add-on areas, are compiled for use in transportation planning, forecasting, and research. ## Survey Records, Data, and Documentation Survey records include 7,397 participants from 3,170 households in Oahu, Hawaii, as well as detailed information on the travel behavior of each household for a designated 24-hour period. The survey logged over 14,868 trips totaling 165,000 vehicle miles traveled.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Zero Power Reactor Database (ZPRD) Development Plan

Past sodium-cooled fast reactors (SFR) were built with an active experimental program in place to support the design and development work. Most of the experimental facilities in the United States that were important for SFR design were shutdown in the 1980s and 1990s. Reactor licensing and construction requires any reactor design to be verified against existing reactor facilities or experimental measurements. With the absence of those experimental facilities, modern SFR projects must rely on historical measurements to demonstrate that the engineering modeling software and data being used for the new reactor design work are reliable. There has been a considerable push in the last 6 years by both DOE and commercial companies to obtain historical experimental measurements that are relevant for SFRs, in particular those with features that are important for the new reactor designs of interest. The zero power reactor experiments carried out at Argonne National Laboratory’s critical facilities (ZPR-3, ZPR-6, ZPR-9, and ZPPR) from the 1950s to the 1980s are some of the best reactor physics experiments on SFR technology that are available today. Of particular interest today are the ZPPR-15 measurements done at the ZPPR facility for the Integral Fast Reactor project in the 1980s as they are in line with most commercial and DOE interests today. In the past 10 years, the measurements done on ZPPR-15 have been processed into both Monte Carlo (MCNP) and deterministic models (MC2-3 and DIF3D) useable for validating the engineering modeling software for key parts of the SFR design work. To achieve this, a detailed model description must be created for the experiment and the experimental measurement that the engineering modeling software is to reproduce. Then, an assessment of the uncertainty on the measured quantity which considers all of the sources of uncertainty in defining the model must be obtained and documented. The models created for ZPPR-15 provide the best validation basis available today for neutronics modeling software. Reference 2 is a good resource to understand how these models were built and how the uncertainties on the measured quantities were derived. The intention of the Zero Power Reactor Database (ZPRD), hosted at frdb.ne.anl.gov, is to make available the experimental measurements and models that have been constructed to-date. Though ZPPR-15 measurements are the primary data requested for validation needs, other measurements on ZPPR, ZPR-6, and ZPR-9 in support of the Clinch River Breeder Reactor (CRBR) and Fast Test Reactor (FFTF) should also be considered important for future software validation needs. In this manuscript, the details of available measurements on ZPR-3, ZPR-6, ZPR-9, and ZPPR facilities are summarized, and a general organization of the web interface is displayed. Many of the documents associated with the measurements are export controlled information so access to the database will also have to be controlled.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Options for Future Fuel/Basket Modifications for DPC Disposition

Deliverable Description: Identify and evaluate options for fuel and basket modifications, for dual-purpose canisters (DPCs) to be loaded in the future, that would substantially reduce the probability of post closure criticality after waste package breach and flooding with ground water. Planned work in FY20 will examine the feasibility of criticality control features, particularly neutron absorbing inserts or replacement channels for boiling water reactor (BWR) fuel assemblies. The expected outcome is additional engineering information that can be used to guide the R&D program, and to support future stakeholder interactions. This document will be incorporated into planned deliverable DPC Disposal Concepts of Operation (M3 SF-20SNO10305052, 18S ep20).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Responding to the US national pollinator plan: a case study in Michigan

The long‐term health of pollinators is a critical issue for the functioning of natural habitats and for agricultural production. In response to widespread public concern about the future of these ecologically and economically important animals, in 2015 the US Government released a national strategy to support pollinators, including research priorities, directives for funding, and timelines for achieving three overarching goals. Five years after this strategic plan was released, we evaluate progress toward the national targets for improved honey bee ( Apis mellifera ) overwintering survival, expanded pollinator habitat, and larger monarch butterfly ( Danaus plexippus ) populations, and find that the three goals of the plan have not yet been reached. Our research and extension programs to improve the health of honey bees, wild bees, and monarch butterflies in the US state of Michigan are described, providing opportunities to contribute to the national pollinator goals.

Bloom, Elias H.↗

Practice Summary: Improved Reliability via Optimization in Residential Microgrids

Southern Company is an electric utility that is embracing residential microgrids as a platform for distributed energy. The first residential microgrid in the southeastern United States was constructed in Hoover, Alabama, as a testbed for development. To operate the microgrid, we developed an optimization model for unit commitment and economic dispatch. We report the optimization model was implemented in a microgrid central controller and tested under various operational scenarios. Challenges also include developing a pricing algorithm to deliver price forecasts to the residential homes in the microgrid and open-source software restrictions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Play Fairway Analysis: Structurally Controlled Geothermal Systems in the Eastern Great Basin Extensional Regime, Utah

A research team with membership from the University of Utah/Energy & Geoscience Institute, the University of Utah/Dept. of Geology & Geophysics, and the Utah Geological Survey, undertook a play fairway analysis (PFA) for geothermal resources in the Eastern Great Basin (EGB) extensional tectonic regime of western Utah. This is a high-priority region for geothermal exploration because active Basin and Range (B&R) extension with volcanism having a N-S strike is superimposed upon pre-existing E-W belts of plutonic rocks and large-scale structural lineaments. Cumulative heat flow along the N-S strike of the state totals approximately 5 GWt above background stable interior. Three electricity producing power plants currently exist with substantial potential for increase. Succinctly, our PFA approach aims to resolve potential sources of heat and permeability in the region, which are the two principal criteria for establishing a geothermal resource. An initial Phase 1 was carried out using only existing geoscientific data in the area. Criteria selected for focusing heat potential include direct heat flow measurements in boreholes, magnetotelluric (MT) low resistivity anomalies, fluid/gas geochemistry, and proximity to recent volcanic eruptions. Permeability is established through geological structures (fault density, critically stressed areas, seismicity, gravity), and MT low resistivity anomalies. In Phase II of this PFA project, additional geological, geophysical and geochemical data were acquired and analysis carried out primarily over promising composite common risk (CCR) areas initially identified in Phase I in order to focus prospectivity and prepare for drilling recommendations. These prospects are near the Twin Peaks rhyolite field, high heat flow areas north of the producing Cove Fort system, and geophysical structure beneath the Crater Knoll area off the northeast flank of the Mineral Mountains. Additional data included MT site fill-in, structural mapping and analysis using high-resolution imagery, gravity and on-ground mapping, Nodal 3C passive seismic collection, and passive 3He surveying. Heat source and permeability potential are again expressed in terms of their individual common risk segment (CRS) maps, with a color scheme using green for most favorable (low risk) and red for least favorable (high risk). Diverse data types are united through the technique of probability kriging, which establishes prospectivity thresholds for each data type and then computes probability of exceeding that threshold over the PFA area. Modified CRS and CCRS maps are compared to those of Phase I to highlight tighter prospectivity focus. In doing so, the prospectivity threshold for heat was increased significantly to narrow the targeting. In the final Phase III of this project where a recommended deep thermal gradient hole was sited, additional geophysical, geochemical and geological field collection and analysis was carried out to refine drill hole targeting. This includes prospect-scale MT, gravity, structure, passive seismic deployment (Cove Fort area), and detailed 3He isotope profiling. It was the recommendation of the DOE Technical Monitoring Team (TMT) that one or more holes be sited in the north-ern Cove Fort area where legacy TG gradient holes showed high cumulative heat flow. These were to be of moderate depth, 2000-3000 feet, to reach the geothermal fluid table expected to start in excess of 1000 feet depth. The drilling organization stipulated by the DOE/GTO was that of the USGS Research Drilling Program (RDP) centered in Las Vegas, NV. A detailed well plan, appended to this report, was developed principally by Dr. Ben Barker consulting to University of Utah, Dr. Steve Pye on the DOE TMT, Mr. Steven Crawford of the USGS-RDP, and the project PI Phil Wannamaker. However, temperature and possible H 2 S at the systems lead to cancellation of the drilling last-minute as this appeared outside the experience base of the USGS-RDP. We hope to have the opportunity to revisit the test drilling and expand the Play Fairway Analysis of this region at some point in the future.

15 GEOTHERMAL ENERGY↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compact 1-4 and 10-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011 and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These two goals were combined in the AGR-3/4 irradiation, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a “fuel body”, in which the outer graphite ring included a floor and cap that fully enclosed the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U.S. Offshore Wind Workforce Assessment

As the U.S. offshore wind market prepares for rapid growth, our understanding of specific workforce requirements and pathways to meet those requirements is not keeping pace. Without this deeper understanding, there is a risk that the workforce will not develop as efficiently or robustly as is needed to fully realize the benefits of offshore wind. The "U.S. Offshore Wind Workforce Assessment" provides a more detailed assessment of the workforce demand, supply, and pathways to support key stakeholders including industry, state and local governments, educational organizations, and unions in their efforts to attract, educate, train, and retain a domestic workforce to support this burgeoning industry.

17 WIND ENERGY↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Determination of Average Burnup in AGR-3/4 Compacts 1-4 and 7-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011, and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and post-irradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite. These two goals were combined in the AGR-3/4 irradiation, which consisted of 12 independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. Two capsule types were used: a standard capsule and a so-called fuel body, in which the outer graphite ring included a floor and cap that fully enclosed the fuel. The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from the matrix and graphite at accident temperatures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Production of NBL PO plutonium isotopic standards CRM 136A, CRM 137A, and CRM 138A

Lawrence Livermore National Laboratory (LLNL) produced approximately 1 mg units of purified Pu from the parent New Brunswick Laboratory (NBL) certified reference materials (CRM) 137, 136 and 138 isotopic standards for the NBL Program Office (NBL PO) as detailed in the revised project plan. As stated in the plan, three representative units of each material were dispensed at the same time to be characterized at LLNL and provide informational values for the quantity of Pu and progeny nuclides in each unit. NBL PO intends to collect and evaluate isotopic measurement data from multiple laboratories and certify these materials as new isotopic standards C137A, C136A, and C138A, respectively. Soon after production eleven units of each analytical standard were shipped to other analytical laboratories for the certification effort, and 121, 119, and 119 units of C137A, C136A and C138A, respectively were shipped to Mickey Finch at Y12 NBL distribution center in November 2024 (30-gallon drum, TID 003777 PRL 7000005043). Residual purified Pu from the effort is being stored indefinitely in B332 at LLNL. Detailed methods can be found in the production plan, and this report describes and documents aspects of the production effort that are not in or were modified from the original production plan.

and nuclear chemistry↗

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Neutrino Physics and Astrophysics at Colliders

Nonzero neutrino masses guarantee new physics and neutrinos are excellent probes of extreme environments in the Universe. The recent collider neutrino experimental program, including FASER$ν$ and SND@LHC, along with the planned Forward Physics Facility at the High-Luminosity Large Hadron Collider, is opening a new window into neutrino physics and astrophysics. In this article, we review recent achievements and prospects of collider neutrino experiments, including key achievements such as the first measurements of collider neutrino interactions at unprecedented energies and the exploration of new physics scenarios, like dark matter candidates, sterile neutrinos, and non-standard neutrino interactions. For concreteness, we will focus on the significant scientific opportunities presented by the Forward Physics Facility, which will enable precision measurements of neutrino cross sections and proton structure at low parton momentum fraction. Furthermore, collider neutrino studies will substantially reduce systematic uncertainties in calculating atmospheric neutrino fluxes, thereby improving astrophysical neutrino observations as well as advancing our understanding of cosmic-ray interactions.

Machado, Pedro [Fermilab] (ORCID:0000000291187354)↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approach to Quality Assurance for Complex Environmental Modeling - 20407

A strong Quality Assurance (QA) program for complex environmental modeling is essential for regulatory and public acceptance and trust, but it does not have to be onerous. Neptune and Company, Inc. (Neptune) has developed a strong QA program that improves transparency, traceability, reproducibility, and therefore, defensibility and trust. Neptune's QA program has evolved over the past 27 years, transitioning from an ad hoc QA program, to a program that is currently Nuclear Quality Assurance-1 (NQA-1) compliant, and will soon be NQA-1/DOE approved for DOE EM modeling work. In addition, Neptune is a qualified laboratory assessor and qualified auditor for reference materials, a proficiency testing provider, and fully complies with the Environmental Protection Agency (EPA) QA program. Neptune's President and CEO, Kelly Black, was recently named the Chairperson of the International Organization for Standardization (ISO) Technical Committee 69, Application of Statistical Methods. A strong QA program has been developed for Neptune's radiological performance assessment (PA) program. Although pieces of their QA program are currently in development, their current program includes document control using Subversion, issue tracking and work flow tracking using JIRA, and transparency and traceability via a system of 'calc sheets' for documentation of all data analysis and modeling combined with 'check print' documentation of QA checking, and rigorous model testing and configuration control. All work is reviewed by an independent subject matter expert who is not associated with the collection and assembly of information, for an internal peer review. The program is enforced with a handful of Standard Operation Procedures (SOPs), Work Instructions, QA Project Plans (QAPPs), and Quality Management Plans (QMPs) that are updated frequently, with required annual training and acknowledgment. In addition, effective communication of modeling approaches and results to clients and stakeholders are integral to their QA program. Many of their models are built using the GoldSim modeling platform, for which their models are well-known for their level of transparency, documentation, and QA traceability. This level of QA is also applied to their process-level models. Neptune has taken some lessons learned from the extremely rigorous QA program required for the Yucca Mountain Project (YMP), and imposed the YMP requirements of complete traceability, transparency, and reproducibility, but avoided the inflexibility of a QA program that likely contributed to the suspect e-mails in 2005 that resulted in loss of trust in the YMP, and in nuclear waste disposal (and nuclear power) in general. There are far too many examples of loss of public trust due to poor QA that could have been easily avoided with a simple and straight-forward QA program combined with stakeholder engagement. The purpose of this paper is to share features of Neptune's Radiological Performance Assessment program QA program, and some of their QA related lessons learned over the past 27 years of QA for complex environmental modeling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗