Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

Radiological contamination, Grand Junction, Colora↗

An Overview of the United States Department of Energy's Nuclear Criticality Safety Program and Future Challenges

The United States (US) Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) was formally established in January 1998 as part of the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-2 implementation plan. The NCSP was initially focused on seven NCSP tasks: Critical Experiments, Benchmarking, Analytical Methods, Nuclear Data, Training and Qualification, Information Preservation and Dissemination, and Applicable Ranges of Bounding Curves and Data. The first NCSP 5-year plan was published in August 1999. Now, more than 20 years later, NCSP continues to serve the United States and the nuclear criticality safety (NCS) community around five technical program elements (TPEs): Analytical Methods, Information Preservation and Dissemination, Integral Experiments, Nuclear Data, and Training and Education. NCSP has three chartered support groups, the Criticality Safety Support Group, the Nuclear Data Advisory Group, and the DOE Criticality Safety Coordinating Team, all of which provide technical advisement to the NCS community, to DOE, and to the NCSP manager. NCSP has a comprehensive mission and vision document that provides technical and budget priorities for TPE attributes and goals to ensure that the needs of the NCS community and DOE NCS are prioritized appropriately to meet the goals defined by the 1998 DNFSB recommendation. Like any DOE/NNSA program, NCSP faces significant challenges in the future that involves program funding, rising nuclear facility costs, aging critical assembly infrastructure, knowledge retention, and other issues. This paper discusses NCSP and provides some insights into these and other challenges moving into the future.

Bowen, Douglas G.↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R&D Program for HEP High-Power Targets at Fermilab

A high-power target system is a key beam element to complete future High Energy Physics (HEP) experiments. In the recent past, major accelerator facilities have been limited in beam power not by their accelerators, but by the beam intercepting device survivability. The target must then endure high power pulsed beam, leading to high cycle thermal stresses/pressures and thermal shocks. The increased beam power will also create significant challenges such as corrosion and radiation damage that can cause harmful effects on the material and degrade their mechanical and thermal properties during irradiation. This can eventually lead to the failure of the material and drastically reduce the lifetime of targets and beam intercepting devices. In order to operate reliable beam-intercepting devices in the framework of energy and intensity increase projects of the future, it is essential to develop a strong R&D program and have synergy with various expertise. After presenting the high power targetry challenges facing next generation multi-MW accelerators, we will give an overview of Fermilab’s R&D program in support of High Power Targetry development. The RaDIATE collaboration (Radiation Damage In Accelerator Target Environment), managed by Fermilab, also draws on existing expertise in related fields to execute a coordinated strategy for high power targetry R&D between the 14 international member institutions.

Pellemoine, Frederique [Fermilab]↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-153: Establish a Comprehensive Patient-Specific Plan QA Database for Instituitional Quality Control Program

Purpose: Since the publication of TG-119, several new treatment techniques requiring new QA devices have been implemented in the clinic. To monitor and analyze our institutional QA performance, we have created a comprehensive QA database using Research Electronic Data Capture (REDCap). The database will also assist us in creating IMRT QA Analysis practice guidelines. Methods: Since Oct. 2013, 336 patient plan QA results were entered into the database. Plan parameters such as plan ID, treatment site, technique, energy, optimization constraints, modulation factor, leaf speed, leaf opening.etc were automatically extracted from the Varian Eclipse database to allow us to refine our evaluation and analysis method. Specific QA device, LINAC-related information, and measurement and analysis results were manually entered by the QA team. IMRT plans were measured using MapCHECK2 while RapidArc plans were measured using ArcCHECK. Distance-To-Agreement 3%/3mm without global maximum normalization was used. Results: The data indicates that different treatment techniques might benefit from a different site-specific action level(AL) depending on the complexity of the plan and optimization parameter used (e.g., breast IMRT QA= 97.8% and pelvis IMRT QA=93.1%). Different QA devices may also benefit from a different AL (MapCHECK2 = 94.1% while ArcCHECK = 83.0%). The relationship between the parameters and passing rate suggests that the complexity of each plan, characterized by leaf travel, leaf opening and modulation factor, affect the passing rate significantly. The database is reviewed regularly, and any abnormal point of the QA result or a trend of lower QA passing rate on a specific LINAC is further investigated. Conclusion: Establishing a comprehensive QA database provides an overview of the quality assurance program. It not only helps in answering the question “what is a reasonable and achievable standard for each institution”, but also saves time in monitoring and investigating the daily machine and QA performance.

07 ISOTOPE AND RADIATION SOURCES↗

TA-IV Sub-Area Plan: Overview & Summary

The Plan seeks to: Sustain programs and activities, and safeguard opportunities to grow mission through redevelopment and infill; Maintain existing land use designations; Construct a multi-modal corridor that connects TA-I, TA-II, and TA-IV; Implement minor adjustments to the site’s security boundaries; Implement an incremental development strategy that enhances the many positive features of the area; Replace temporary buildings with permanent (GPP-size) structures.

99 GENERAL AND MISCELLANEOUS↗

Emergency Management Overview [Slides]

Introdution: LANL's Emergency Management Program is designed and managed in accordance with standards and requirements mandated by the DOE. LANL's primary driver and foundation of this course is DOE O 151.1D, Comprehensive Emergency Management System ; Established the requirements for emergency preparedness, response, and recovery for DOE facilities; Implemented by Emergency Management Division (EMD) on behalf of the Laboratory.

99 GENERAL AND MISCELLANEOUS↗

NREL's International Programs: Highlights

This fact sheet provides an overview of four international projects at NREL: the Net Zero World Initiative, the Global Climate Action Partnership (GCAP), the USAID-NREL Partnership, and the Global Power System Transformation Consortium (G-PST).

ENERGY PLANNING, POLICY, AND ECONOMY,ENVIRONMENTAL↗

How the U.S. DOE's Environmental Management Program Engages the Public on Complex Issues - 16532

This paper provides an overview of how the U.S. Department of Energy (DOE) Environmental Management (EM) program engages the public on complex cleanup issues. EM has made public participation a fundamental component of its cleanup mission and has found that the EM Site-Specific Advisory Board (EM SSAB) has contributed greatly to bringing community input regarding values and priorities to the cleanup decision-making processes. As such, the EM SSAB has a unique mandate to provide input regarding the cleanup of nuclear legacy sites in the United States. Public participation that involves ongoing community engagement has inherent challenges, including explaining technically complex cleanup issues and receiving input and advice on the community from a board of non-experts. This paper highlights ways that DOE works with the various local boards across the country to communicate these issues through new member orientations. DOE can use these tools to gain insight on how best to solicit input from the local community despite complex technical issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE HIGH-TEMPERATURE ELECTROLYSIS PROGRAM AT THE IDAHO NATIONAL LABORATORY: OBSERVATIONS ON PERFORMANCE DEGRADATION

This paper presents an overview of the high-temperature electrolysis research and development program at the Idaho National Laboratory, with selected observations of electrolysis cell degradation at the single-cell, small stack and large facility scales. The objective of the INL program is to address the technical and scale-up issues associated with the implementation of solid-oxide electrolysis cell technology for hydrogen production from steam. In the envisioned application, high-temperature electrolysis would be coupled to an advanced nuclear reactor for efficient large-scale non-fossil non-greenhouse-gas hydrogen production. The program supports a broad range of activities including small bench-scale experiments, larger scale technology demonstrations, detailed computational fluid dynamic modeling, and system modeling. A summary of the current status of these activities and future plans will be provided, with a focus on the problem of cell and stack degradation.

08 HYDROGEN↗

Full-Scale Vessel Testing of the Standard High-Solids Vessel for the Hanford Waste Treatment Plant Pretreatment Facility - 17282

Concerns over the mixing performance of the planned pulse-jet mixed (PJM) vessels for high solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels, ultrafiltration feed preparation vessels, and plant wash vessels. The SHSV design concept uses multiple smaller vessels (60 500 to 79 500 liters nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than earlier multiple vessel designs. Qualification of the SHSV design for mixing will be achieved through full-scale vessel testing (FSVT) with a prototypic SHSV under a set of most adverse design conditions in conjunction with additional engineering analyses. An Integrated Technical Team consisting of the U.S. Department of Energy (DOE), Bechtel National, Inc. (BNI), and independent experts was established to accelerate and provide oversight and direction to the test program and SHSV qualification. This paper will present an overview of the SHSV, full-scale vessel test and qualification program, and the management program to achieve closure of technical issues associated with PJM vessel mixing and control systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2017 Electrification Annual Progress Report

During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance Electric Motors and Power Electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance Grid Modernization and Electric Vehicle Charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Each of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2017.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrification 2018 Annual Progress Report

During fiscal year 2018 (FY 2018), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address batteries and electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance electric motors and power electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance grid modernization and electric vehicle charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Each of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2018.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrification Annual Progress Report (FY2019)

During fiscal year 2019 (FY 2019), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance electric motors and power electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance grid modernization and electric vehicle charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Each of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2019.

25 ENERGY STORAGE↗