Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Probabilistic material strength degradation model for Inconel 718 components subjected to high temperature, high-cycle and low-cycle mechanical fatigue, creep and thermal fatigue effects

This report presents the results of both the fifth and sixth year effort of a research program conducted for NASA-LeRC by The University of Texas at San Antonio (UTSA). The research included on-going development of methodology for a probabilistic material strength degradation model. The probabilistic model, in the form of a postulated randomized multifactor equation, provides for quantification of uncertainty in the lifetime material strength of aerospace propulsion system components subjected to a number of diverse random effects. This model is embodied in the computer program entitled PROMISS, which can include up to eighteen different effects. Presently, the model includes five effects that typically reduce lifetime strength: high temperature, high-cycle mechanical fatigue, low-cycle mechanical fatigue, creep and thermal fatigue. Statistical analysis was conducted on experimental Inconel 718 data obtained from the open literature. This analysis provided regression parameters for use as the model's empirical material constants, thus calibrating the model specifically for Inconel 718. Model calibration was carried out for five variables, namely, high temperature, high-cycle and low-cycle mechanical fatigue, creep and thermal fatigue. Methodology to estimate standard deviations of these material constants for input into the probabilistic material strength model was developed. Using an updated version of PROMISS, entitled PROMISS93, a sensitivity study for the combined effects of high-cycle mechanical fatigue, creep and thermal fatigue was performed. Then using the current version of PROMISS, entitled PROMISS94, a second sensitivity study including the effect of low-cycle mechanical fatigue, as well as, the three previous effects was performed. Results, in the form of cumulative distribution functions, illustrated the sensitivity of lifetime strength to any current value of an effect. In addition, verification studies comparing a combination of high-cycle mechanical fatigue and high temperature effects by model to the combination by experiment were conducted. Thus, for Inconel 718, the basic model assumption of independence between effects was evaluated. Results from this limited verification study strongly supported this assumption.

Bast, Callie C.↗

Methodology for Developing a Probabilistic Risk Assessment Model of Spacecraft Rendezvous and Dockings

In 2007 NASA was preparing to send two new visiting vehicles carrying logistics and propellant to the International Space Station (ISS). These new vehicles were the European Space Agency s (ESA) Automated Transfer Vehicle (ATV), the Jules Verne, and the Japanese Aerospace and Explorations Agency s (JAXA) H-II Transfer Vehicle (HTV). The ISS Program wanted to quantify the increased risk to the ISS from these visiting vehicles. At the time, only the Shuttle, the Soyuz, and the Progress vehicles rendezvoused and docked to the ISS. The increased risk to the ISS was from an increase in vehicle traffic, thereby, increasing the potential catastrophic collision during the rendezvous and the docking or berthing of the spacecraft to the ISS. A universal method of evaluating the risk of rendezvous and docking or berthing was created by the ISS s Risk Team to accommodate the increasing number of rendezvous and docking or berthing operations due to the increasing number of different spacecraft, as well as the future arrival of commercial spacecraft. Before the first docking attempt of ESA's ATV and JAXA's HTV to the ISS, a probabilistic risk model was developed to quantitatively calculate the risk of collision of each spacecraft with the ISS. The 5 rendezvous and docking risk models (Soyuz, Progress, Shuttle, ATV, and HTV) have been used to build and refine the modeling methodology for rendezvous and docking of spacecrafts. This risk modeling methodology will be NASA s basis for evaluating the addition of future ISS visiting spacecrafts hazards, including SpaceX s Dragon, Orbital Science s Cygnus, and NASA s own Orion spacecraft. This paper will describe the methodology used for developing a visiting vehicle risk model.

Farnham, Steven J., II↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Decision-Based Iterative Modeling Framework for Probabilistic Performance Assessments - 18441

Radiological probabilistic performance assessments (PPAs) employ highly complex computer models to simulate the release of radionuclides from wastes in an engineered disposal facility, migration of these radionuclides over time, and resulting radiological dose to potentially exposed individuals. An iterative approach to PPA modeling is described to help define the appropriate complexity of the computer model. An initial model is developed that addresses all relevant processes and media, but that employs preliminary statistical parameter distributions to minimize the initial effort expended. Where appropriate, transport and exposure submodels with simplifying assumptions are also used in the initial model. Different assumptions and boundaries may be explored with the initial model to assess their importance in constraining model results. Exploration of the results of the initial model are used to determine the benefits of model refinements, and to guide such refinements to focus on specific areas of the model that most influence the model outputs of interest. This approach promotes efficiency and model parsimony, but does not compromise defensibility when performed in a transparent manner. Key model boundaries for a PPA include the time frame of the modeling (temporal boundaries), where future human receptors may be located (spatial boundaries), and what types of land uses and activities may exist in the future (exposure scenarios). Simplified transport and exposure models can be useful in helping decision makers and stakeholders establish such boundaries by analyzing the consequences of selecting different bounds and understanding which assumptions and boundaries have the greatest influence on the magnitude and distribution of model results. Pathway analysis and parameter sensitivity analysis performed on PPA model results are key components of the iterative modeling approach. The objective of pathway analysis is to identify the critical radionuclides and pathways contributing to radiation dose during the modeling performance period. An environmental 'pathway' is described by the connections from a waste package or cell in the disposal facility to a future human exposure event. These connections are commonly visualized using graphical means. A simple example of a potentially complete pathway for radon-222 is: radium-containing waste → radon emanation → upwards diffusion in cap material → diffusion/advection into a future building → inhalation exposure to a building occupant Parameter sensitivity analysis is conducted on the results of a PPA to identify those specific model input parameters whose distribution of values contributes the most to the distribution of target model output, such as annual radiation dose. Pathway and sensitivity analyses on initial modeling results provide information for guiding subsequent model development, and possibly interim decisions, by informing questions tied to the modeling objectives and performance criteria. For example, questions related to radiological doses from existing disposals may include: 1. Is radiation dose from radiological exposures either obviously negligible or obviously unacceptable based on initial modeling results? 2. If dose is not obviously negligible or unacceptable relative to applicable performance criteria, what model refinements would reduce uncertainty in the results to better inform decisions? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Probabilistic Finite Element Model Calibration Tool Based on Uncertainty Quantification and Machine Learning

Qualification and certification of safety critical parts is a hurdle to the adoption of metallic additively manufactured components for aerospace vehicle applications. Challenges include variability in part properties due to inconsistent defect distribution and microstructure. Understanding of the process through finite element modeling (FEM), and process control through in-situ monitoring, may result in significant improvements; however, solutions useful to manufacturers will require large volumes of data and automated data utilization. Toward this end, a generalizable automated FEM calibration paradigm is developed. This paradigm leverages existing and novel tools from machine learning and uncertainty quantification to enable the automatic calibration of FEMs without requiring prior knowledge of the model performance across input parameter space, including meshing and solver settings, which can require time consuming manual model probing or cause noisy and inconsistent predictions. The result is a probabilistic distribution of calibrated and validated FEM input parameters targeting measured data.

Additive manufacturing model calibration finite el↗

Calibration of a Structural Finite Element Model for a Representative Inflatable Space Structure Utilizing Probabilistic Methods and Surrogate Models

A structural finite element model representing a novel inflatable airlock concept has been calibrated using full‐scale test data. The concept, denoted as the Non‐Axisymmetric Inflatable Pressure Structure (NAIPS), was developed under NASA’s Minimalistic Advanced Softgoods Hatch (MASH) Program. The current studies extended previous numerical efforts by incorporating the midbody section of the NAIPS to the dome section and calibrating the model with test data using a process that included surrogate models. Brief overviews of the finite element model and calibration process are provided. The completion of the calibration process provided a model that adequately replicated the test data. The successful demonstration of calibration of a finite element model representing an inflatable habitat provides confidence in the ability to use numerical simulations and associated surrogate models to support design and certification of inflatable space habitats.

Lyle, Karen H.↗

Probabilistic Material Strength Degradation Model for Inconel 718 Components Subjected to High Temperature, High-Cycle and Low-Cycle Mechanical Fatigue, Creep and Thermal Fatigue Effects

The development of methodology for a probabilistic material strength degradation is described. The probabilistic model, in the form of a postulated randomized multifactor equation, provides for quantification of uncertainty in the lifetime material strength of aerospace propulsion system components subjected to a number of diverse random effects. This model is embodied in the computer program entitled PROMISS, which can include up to eighteen different effects. Presently, the model includes five effects that typically reduce lifetime strength: high temperature, high-cycle mechanical fatigue, low-cycle mechanical fatigue, creep and thermal fatigue. Results, in the form of cumulative distribution functions, illustrated the sensitivity of lifetime strength to any current value of an effect. In addition, verification studies comparing predictions of high-cycle mechanical fatigue and high temperature effects with experiments are presented. Results from this limited verification study strongly supported that material degradation can be represented by randomized multifactor interaction models.

Bast, Callie C.↗

Estimating the Likelihood of GHG Concentration Scenarios From Probabilistic Integrated Assessment Model Simulations

The climate scenarios that form the basis for current climate risk assessments have no assigned probabilities, and this impedes the analysis of future climate risks. This paper proposes an approach to estimate the probability of carbon dioxide (CO 2 ) concentration scenarios used in key climate change modeling experiments. It computes the CO 2 emissions compatible with the concentrations prescribed by Coupled Model Intercomparison Project Phase 5 (CMIP5) and CMIP6 experiments. The distribution of these compatible cumulative emissions is interpreted as the likelihood of future emissions given a concentration pathway. Using Bayesian analysis, the probability of each pathway can be estimated from a probabilistic sample of future emissions. The approach is demonstrated with five probabilistic CO 2 emission simulation ensembles from four Integrated Assessment Models (IAM), leading to independent estimates of the likelihood of the CO 2 concentration of Representative Concentration Pathways (RCP) and Shared Socioeconomic Pathways (SSP). Results suggest that SSP5-8.5 is unlikely for the second half of the 21st century, but offer no clear consensus on which of the remaining scenarios is most likely. Estimates of likelihoods of CO 2 concentrations associated with RCP and SSP scenarios are affected by sampling errors, differences in emission sources simulated by the IAMs, and a lack of a common experimental framework for IAM simulations. These shortcomings, along with a small IAM ensemble size, limit the applicability of the results presented here. Novel joint IAM and the Earth System Model experiments are needed to deliver actionable probabilistic climate risk assessments.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Mixture Model-Based Spectral Unmixing

Spectral unmixing attempts to decompose a spectral ensemble into the constituent pure spectral signatures (called endmembers) along with the proportion of each endmember. This is essential for techniques like hyperspectral imaging (HSI) used in environment monitoring, geological exploration, etc. Several spectral unmixing approaches have been proposed, many of which are connected to hyperspectral imaging. However, most extant approaches assume highly diverse collections of mixtures and extremely low-loss spectroscopic measurements. Additionally, current non-Bayesian frameworks do not incorporate the uncertainty inherent in unmixing. We propose a probabilistic inference algorithm that explicitly incorporates noise and uncertainty, enabling us to unmix endmembers in collections of mixtures with limited diversity. We use a Bayesian mixture model to jointly extract endmember spectra and mixing parameters while explicitly modeling observation noise and the resulting inference uncertainties. We obtain approximate distributions over endmember coordinates for each set of observed spectra while remaining robust to inference biases from the lack of pure observations and the presence of non-isotropic Gaussian noise. As a direct impact of our methodology, access to reliable uncertainties on the unmixing solutions would enable robust solutions to noise, as well as informed decision-making for HSI applications and other unmixing problems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Benchmarking of Probabilistic Fracture Mechanics Models in Grizzly

In 2020, as part of contract/task order 31310019N0006/31310020F0060, the Nuclear Regulatory Commission tasked Idaho National Laboratory (INL) with benchmarking the MOOSE/GRIZZLY code against the NRC’s Fracture Analysis of Vessels - Oak Ridge (FAVOR), version 16.1 code. Both codes can predict large light-water reactor vessel integrity deterministically and probabilistically. In fact, such predictions are the primary purpose of the FAVOR code, and are a main focus of the GRIZZLY code, although GRIZZLY is capable of modeling a wider range of geometries and problems. The vessel integrity modeling capabilities of the GRIZZLY code are still under development and being gradually expanded, and the capability to model vessel fracture by crack growth has not yet been integrated into GRIZZLY (although it does exist in pre-release versions). Thus, the present benchmark study focused on comparing predictions for the conditional probability of crack growth initiation (CPI) between GRIZZLY and FAVOR v16.1. The present benchmarking study expands on a previous study completed in 2020, which focused on single plate regions, various flaw types, and full vessel studies. The previous study was limited in scope and revealed some relatively large discrepancies, particularly in the case of weld regions. In the present study, detailed investigations into the sources of discrepancies between GRIZZLY and FAVOR were performed, with a focus on weld regions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 19295

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The reprocessing wastes include high-level waste (HLW), so U.S. Department of Energy (DOE) was compelled to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980, including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the contamination at the West Valley Site and its potential implications for human health and the environment. The West Valley PPA Model (the Model), developed using the GoldSim modeling software, is a tool intended to provide support for decision making with uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-organized contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of HLW resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife are exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion in subsurface air and water, and erosion of the Site. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes that contribute most to overall uncertainty. With this information, the Supplemental Environmental Impact Statement (SEIS) can inform defensible decisions regarding remediation of the Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Active learning using hybrid surrogate tool life modeling for machining process optimization

Here, this paper describes an active learning approach for part-to-part iterative machining process optimization using a hybrid surrogate tool life model. A probabilistic interpolating tool life model is developed by combining the empirical Taylor-type tool life equation and the model fit error. The probabilistic tool life model is then used to calculate the machining cost per part distribution. The optimal machining parameters are selected using an expected improvement in machining cost per part criterion. The method is validated numerically using experimental results; the results show a median convergence error of 2.2% after three tests over 400 simulations. The method is validated experimentally on two industrial applications for Ti-6Al-4V roughing resulting in a cost per part reduction greater than 23% after two tests. The described method is a robust solution for rapid convergence to optimal machining parameters in an industrial production environment.

Active learning↗

Probabilistic Discrete‐Time Models for Spreading Processes in Complex Networks: A Review

Abstract Research into network dynamics of spreading processes typically employs both discrete and continuous time methodologies. Although each approach offers distinct insights, integrating them can be challenging, particularly when maintaining coherence across different time scales. This review focuses on the Microscopic Markov Chain Approach (MMCA), a probabilistic f ramework originally designed for epidemic modeling. MMCA uses discrete dynamics to compute the probabilities of individuals transitioning between epidemiological states. By treating each time step—usually a day—as a discrete event, the approach captures multiple concurrent changes within this time frame. The approach allows to estimate the likelihood of individuals or populations being in specific states, which correspond to distinct epidemiological compartments. This review synthesizes key findings from the application of this approach, providing a comprehensive overview of its utility in understanding epidemic spread.

Granell, Clara↗

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Resource Adequacy Suite (PRAS) v0.8 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system's risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.8 of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Waste Inventory for Probabilistic Performance Assessment Modeling - 19361

Estimation of radioactive waste inventory is a key initial step in the development of an environmental fate and transport model for performance assessment (PA) of radioactive waste sites. PA model output is often sensitive to parameters that represent inventory as a source term, yet estimation is a difficult problem. Inventory estimation for a probabilistic performance assessment (PPA) is related to, but distinct from, that performed for waste excavation, characterization, and offsite disposal. The latter appropriately focuses on obtaining the most detailed information possible on specific hazards and locations; however, these questions cannot be fully answered without intrusive site characterization efforts. This type of characterization is often not feasible when assembling information regarding a source term in a PPA model. Development of waste inventory for a PPA is one piece of a larger hierarchical model. The physical process model represented by Goldsim computer code represents one level of the hierarchy, and the second level of the hierarchy involves estimation of inputs such as inventory, transport, and risk parameters. The estimation of inputs is not a straightforward problem. The parameters of a computer model often do not have an equivalence to the physical quantities they describe, and estimation of the physical quantities themselves can be difficult due to limitations of available information. Inventory information for the West Valley Site in upstate New York is based on data from historical shipping and disposal forms. In the 1990's, the West Valley Demonstration Project (WVDP) compiled information from existing databases and historical waste records into one complete modern database. A conceptual model was then applied and used with recorded information to characterize the waste mass and radionuclide composition for each waste burial. Information was ultimately aggregated over all waste records to estimate the mass of each radionuclide within each trench, hole, or caisson. Three decades later, we revisit the master database, make updates with newly-identified information, and incorporate the conceptual model previously used for inventory estimation in the hierarchical modeling framework. We characterize uncertainty using probability distributions for waste mass and radionuclide composition at the individual shipment or individual burial level. Uncertainty incorporated at the lowest level of the hierarchy is ultimately carried through to uncertainty in PPA model endpoints. Sensitivity analysis of early model results is then applied to identify influential inputs and guide subsequent efforts towards parameters that drive risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting carcinogenicity of diverse chemicals using probabilistic neural network modeling approaches

Robust global models capable of discriminating positive and non-positive carcinogens; and predicting carcinogenic potency of chemicals in rodents were developed. The dataset of 834 structurally diverse chemicals extracted from Carcinogenic Potency Database (CPDB) was used which contained 466 positive and 368 non-positive carcinogens. Twelve non-quantum mechanical molecular descriptors were derived. Structural diversity of the chemicals and nonlinearity in the data were evaluated using Tanimoto similarity index and Brock–Dechert–Scheinkman statistics. Probabilistic neural network (PNN) and generalized regression neural network (GRNN) models were constructed for classification and function optimization problems using the carcinogenicity end point in rat. Validation of the models was performed using the internal and external procedures employing a wide series of statistical checks. PNN constructed using five descriptors rendered classification accuracy of 92.09% in complete rat data. The PNN model rendered classification accuracies of 91.77%, 80.70% and 92.08% in mouse, hamster and pesticide data, respectively. The GRNN constructed with nine descriptors yielded correlation coefficient of 0.896 between the measured and predicted carcinogenic potency with mean squared error (MSE) of 0.44 in complete rat data. The rat carcinogenicity model (GRNN) applied to the mouse and hamster data yielded correlation coefficient and MSE of 0.758, 0.71 and 0.760, 0.46, respectively. The results suggest for wide applicability of the inter-species models in predicting carcinogenic potency of chemicals. Both the PNN and GRNN (inter-species) models constructed here can be useful tools in predicting the carcinogenicity of new chemicals for regulatory purposes. - Graphical abstract: Figure (a) shows classification accuracies (positive and non-positive carcinogens) in rat, mouse, hamster, and pesticide data yielded by optimal PNN model. Figure (b) shows generalization and predictive abilities of the interspecies GRNN model to predict the carcinogenic potency of diverse chemicals. - Highlights: • Global robust models constructed for carcinogenicity prediction of diverse chemicals. • Tanimoto/BDS test revealed structural diversity of chemicals and nonlinearity in data. • PNN/GRNN successfully predicted carcinogenicity/carcinogenic potency of chemicals. • Developed interspecies PNN/GRNN models for carcinogenicity prediction. • Proposed models can be used as tool to predict carcinogenicity of new chemicals.

60 APPLIED LIFE SCIENCES↗