Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “prepare”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Adventures in Lunar Core Processing: Timeline of and Preparation for Opening of Core Sample 73002 for the ANGSA Program

The Apollo mission returned 382 kg of rocks, soil and core samples, which have helped to advance our knowledge of lunar science. Studies of these lunar samples are crucial for our understanding of the Moon’s geological evolution. Here, we present the meticulous process that involves preparing for, and ultimately opening, the unopened Apollo 17 drive tube: 73002,0, so that the next generation of lunar scientists can further our insight into the Moon’s history.

Krysher, C. H.↗

Standard Operating Procedure (SOP) for Preparation of an Operation & Configuration Control Plan (OCCP) of "Category B" Pressure Vessels/Systems

This Standard Operating Procedure (SOP) describes the requirements and methodology for preparation of an Operation & Configuration Control Plan (OCCP) as required by JPR 1710.13 to assure safe ground pressurization and pressurization during aircraft operations of “Category B” Pressure Vessels/Systems (PV/S) at Johnson Space Center (JSC), Ellington Field (EFD) and associated NASA spaceflight/aircraft operations facilities. An OCCP is a written assessment showing that a “Category B” PV/S is safe for ground pressurization and pressurization during aircraft operations, within the bounds established by the OCCP.

Nathanael J Greene↗

Galileo Preparing for Jupiter Arrival

The most critical events of the Galileo mission occur on Jupiter arrival day, December 7, 1995. In chronological order, these one-time events are: a 1000 km flyby of the innermost Galilean satellite Io, the 75-minute Atmospheric Entry Probe mission, and the Orbiter's Jupiter Orbit Insertion (JOI) maneuver. In addition, extensive, unique Orbiter science observations are planned because this is the only time Galileo will encounter Io, fly through the Io torus, and will be so close to Jupiter -- three times closer than at any of the perijove passes in the orbital mission. All of these events occur in what will be by far the most intense radiation environment Galileo will ever see. The focus of this paper is the extraordinary preparations being made to maximize the reliability of the most critical events in order to ensure a successful probe mission and Orbiter Insertion while also gathering unique arrival day Orbiter science. The paper also provides a mission status report including the return of the asteroid Ida data and the Galileo direct line-of-sight observations of Comet Shoemaker-Levy fragments impacting Jupiter in July 1994.

Galileo↗

Preparing to Assure Mission Success

Space flight missions are inherently risky. The mission operations assurance discipline grew out of strategies to control error and evolved into what today is an independent technical authority dedicated to achieving mission success. After the Mars Climate Orbiter loss, NASA made a set of recommendations for missions. Two of those recommendations led to the creation of today’s Mission Operations Assurance Manager role: (1) require an independent Mission Assurance representative during the operational phase of every flight project, and (2) require all flight projects to report and track post-launch anomalies. Since then, the MOAM role has been continually refined by lessons learned from its practice on more than 20 concurrent missions. The MOAM role requires significant operations experience as well as an additional set of skills. In the interests of developing a cadre of potential MOAMs, the MOAM training program was developed. It is a 14-unit set of presentations/discussions covering the 11 categories of MOAM tasks. It is offered to new MOAMs and interested systems engineers with an eye to preparing both types of personnel for present and future assignments, as well as building relationships among personnel of different organizations. MOAM training sessions include presentations on the various tools and processes employed by MOAMs, interspersed with mindset lessons illustrated via “war story” discussions of previous missions.

Bryant, Larry↗

Work Function Matching Passive Lunar Dust Mitigation Coating Preparation for Lunar Flight Opportunity

With the Artemis program, NASA isplanning longer stays on the surface, with more activities that have the potential to put the astronauts and equipment in contact with greater quantities of lunar dust. The success of these missions will depend on our understanding of material interactions with lunar dust and the development of ways to mitigate dust effects. This is particularly truein cases where exposure to dust will lead to failure of components, unacceptable loss of power or thermal control, unacceptable loss of visibility, or health issues.Optically transparent, sputter deposited,work function matching coatings are being developed at NASA Glenn Research Center to reduce adhesion of dust to windows, lenses and display panels by matching the minimum energy to remove an electron from the surface to that oflunar dust in order to reduce adhesion due to charge transfer. One of these work function matching coatings will be tested as part of Aegis Aerospace Inc.’s Regolith Adherence Characterization experiment going to the lunar surface on a Commercial Lunar Payload Services (CLPS) lander in 2023. Preparation of the work function matching coating and initial characterization prior to delivery for flight integration will be discussed.

Lunar dust, passive mitigation, CLPS demonstration↗

Preparing the JWST Observatory for Science Observations

The James Webb Space Telescope (JWST) is a large (6.5 m) near-and mid-infrared telescope scheduled for launch in 2021. JWST will be used to explore fundamental questions in astrophysics and planetary science, including the evolution of galaxies, the first light of stars, the formation of stars and planets as well as the characterization of exoplanets. To achieve these scientific goals, NASA and its international partners, the Canadian Space Agency (CSA) and the European Space Agency (ESA), have developed four science instruments for JWST and have prepared detailed commissioning plans for each. The NASA Project Science team has also outlined activities to characterize the performance of the Observatory as a whole. These activities include: 1) monitoring of the instrument and telescope cooldown for contamination mitigation; 2) measurements of straylight and other backgrounds for validation of the JWST stray light models as well as instrument background subtraction algorithms; 3) characterization of optical thermal distortion between its hot and cold telescope pointings within the observable field of regard and 4) trending of observatory performance parameters. Each of these activities has been planned in close collaboration with the observatory wavefront, commissioning planning, and science instrument teams. Here we present the plans for these activities, the expected results and how they will impact future guest observer (GO) proposals and JWST science community

Erin C Smith↗

Central America Disasters: Using Earth Observations to Map Flooding for Disaster Monitoring, Inform Potential Risk, and Prepare for Possible Response

In November 2020, Hurricanes Eta and Iota hit Central America within weeks of each other, causing severe flooding, landslides, and widespread damage. NASA DEVELOP partnered with Comité Regional de Recursos Hidráulicos (CRRH), Centro de Coordinación para la Prevención de los Desastres en América Central y República Dominicana (CEPREDENAC), and Sistema de la Integración Centroamericana (SICA) to better understand how flooding throughout Central America has impacted and will continue to affect communities, focusing on sites in Guatemala, Honduras, El Salvador, Belize, Nicaragua, western Panama, and eastern Costa Rica from January 2015 to October 2021. The team utilized surface reflectance data from Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Sentinel-2 MultiSpectral Instrument (MSI), Suomi National Polar-orbiting Partnership (NPP) Visible Infrared Imaging Radiometer Suite (VIIRS), and Terra Moderate Resolution Imaging Spectroradiometer (MODIS). This project also utilized backscatter data from Sentinel-1 C-band Synthetic Aperture Radar (C-SAR) and elevation data from the Shuttle Radar Topography Mission (SRTM). Incorporating these Earth observations in NASA SERVIR’s Hydrologic Remote Sensing Analysis for Floods (HYDRAFloods) tool run on Google Earth Engine (GEE), the team produced historical surface water maps, a case study analysis of the two hurricanes, and a code tutorial. These results indicated that surface water increased in priority sites from 2015 to 2021, optical and SAR imagery detected similar flood patterns and extent after the hurricanes, and rainfall was concentrated on the east coast of the region. These products allow partners to make informed decisions around flooding preparation and disaster mitigation.

Caroline Williams↗

Preparing for Mars 2020 and Future Space Missions: Technology Advancements Driving Contamination Control Requirements and Cleanroom Protocols

Future space exploration missions will force contamination control requirements to become more strict to support increasingly sensitive instrumentation and search for life missions. Driving issues for these extremely clean requirements include increased instrument sensitivity, return sample science, and protecting ambitious mission science objectives. Preparing to meet these requirements mandates that contamination control provide new guidelines and more involved support for the cleanrooms during flight hardware assembly, including establishing better methods for setting cleanroom personnel limits to reduce particle fall out in cleanrooms. Limited literature exists for universal methods of determining cleanroom personnel limits, and what does exist includes mostly theory and assumptions on determining the limit. In this work, published method will be assessed against particle fall out data collected from the ISO 5 cleanrooms of the Mars 2020 Perseverance Rover assembly. Additional evaluations will assess contamination control required cleanroom protocols and the overall success of meeting strict cleanliness requirements of the Adaptive Caching Assembly (ACA) and sample tubes to safeguard future scientific endeavors.

Chen, Nicole↗

Preparations for Tomographic Background-Oriented Schlieren at the 31-Inch Mach 10 Wind Tunnel

This paper details effort by researchers at NASA Langley Research Center to prepare for an upcoming high-speed tomographic background-oriented schlieren test entry in the 31-Inch Mach 10 wind tunnel. In order to troubleshoot potential problems that will arise when setting up the experiment in the actual test facility, a full-scale mock-up of the 31-Inch Mach 10 wind tunnel test section was constructed in the laboratory to provide equivalent characteristic optical access and mounting options. A 3D-printed model that replicates the scale of the forebody of a supersonic retropropulsion (SRP) model that will be used in the final test entry has been fabricated with a central nozzle that can be connected to a high-pressure gas supply to approximate the nozzle flow that will occur. Six high-speed imaging systems consisting of a high-speed camera with a fiber illuminator module have been assembled and mounted on the test section mock-up to provide six unique perspective views of the nozzle flow from the model. Tests with one of the imaging systems using a pulsed laser light source showed that sufficient signal intensity and illumination uniformity was achieved, as demonstrated by the 2D BOS data obtained with the system. Additional work to show that retroreflective material would survive inside of the test section of the 31-Inch Mach 10 tunnel was also performed. Finally, a remotely-controlled tomographic BOS calibration system is discussed.

Brett F Bathel↗

Lunar Regolith: Small Scale Robotic Site Preparation and Geotechnical Experiments with Scoops

- NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. - The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. - In addition, the use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameters. - The Jet Propulsion Lab is preparing to fly the COLDarm payload on a CLPS lunar mission with a geotechnical measurement scoop

Regolith↗

Investigating Waste Preparation Methods for Trash-to-Gas Technologies

Trash-to-Gas technologies show promise in addressing the need for a proper waste management system onboard a long-duration space mission. However, there is a clear need to better understand how the initial waste preparation can affect the overall conversion efficiency. Factors such as the waste size, moisture content, and packing density can have significant impacts on the reactor performance. This paper will focus on the effects of various pre-processing steps on the overall solid-to-gas conversion on the state of the art Trash-to-Gas system developed at NASA Kennedy Space Center. These results will help inform future Trash-to-Gas technologies on what types of supporting subsystems will be necessary to operate effectively for exploration missions.

Trash to Gas↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

Optics↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

Preparing for Lunar Exploration: Geology and Field Training for Astronauts

NASA astronauts will soon return to the Moon, this time to the lunar south pole. Astronauts will perform traverses, make geologic observations, and collect samples to return to Earth. Lessons from Apollo show that science returns were optimized because crews were well-trained in both spacewalk operations and field geology. In that spirit, our team of geologists introduced a revised geologic training program for in-coming NASA astronauts that includes classroom activities and fieldwork and is split over 2 years. Year 1 focuses on an introduction to geologic concepts capped by a field exercise. Year two focuses on climate change, the Moon, other planets, and additional fieldwork. Our geology curriculum supports astronaut observations from the ISS and is the foundation for future Artemis geology training, which will include lunar science and increasingly complex field training in planetary-relevant locations. A final piece of our training program provides geology and field mapping experiences for NASA engineers, flight controllers, and managers, to help them understand the principles of fieldwork and relevance to lunar exploration. The Year 1 geology training must be an effective introduction for astronauts who have little or no background in geology. We focus the training around a narrowly defined field problem and use a week of classroom training to prepare the astronauts with the specific skills and background they need to carry out a field exercise on volcanic features, structures, and landforms of the Taos Plateau, New Mexico. Classroom modules are hands-on, using satellite imagery, maps, analog models, and samples, and provide the astronauts with specific and relevant experience in how to make observations and describe what they see, recognize, and interpret patterns, infer processes from products, and analyze relationships to build a story based on evidence from a variety of data sources. At the end of each classroom day, astronauts work in teams to build a preliminary geologic map of the field area, adding new observations and interpretations as they learn about topics in the classroom. Each team’s bucket list of target areas to visit helps shape their investigations during their week in the field. On the final day in the field, each astronaut team presents a geologic map, cross section, and geologic interpretation

Geology↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗

Investigating Waste Preparation Methods for Trash-to-Gas Technologies

Trash-to-Gas technologies show promise in addressing the need for a proper waste management system onboard a long-duration space mission. However, there is a clear need to better understand how the initial waste preparation can affect the overall conversion efficiency. Factors such as the waste size, moisture content, and packing density can have significant impacts on the reactor performance. This paper will focus on the effects of various pre-processing steps on the overall solid-to-gas conversion on the state of the art Trash-to-Gas system developed at NASA Kennedy Space Center. These results will help inform future Trash-to-Gas technologies on what types of supporting subsystems will be necessary to operate effectively for exploration missions.

Trash to Gas↗