Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Space Station thermal control during on-orbit assembly

This paper summarizes the Space Station program requirements for the Thermal Control System (TCS), and outlines the capabilities of the TCS for each assembly configuration. The TCS architecture for the completed assembly configuration is described, consisting of an active TCS (ATCS) and a passive TCS (PTCS). The four ATCS subsystems are described, including the two-phase ammonia central ATCS, photovoltaic power module, attached payload accommodation equipment and the single-phase water internal ATCS.

Bilardo, Vincent J., Jr.↗

Heavy lift vehicles for transportation to a low earth orbit Space Station for assembly of a Human to Mars Mission

Heavy lift vehicle configurations are proposed which will meet the requirements for transporting the elements of a Human to Mars Mission to a low earth orbit Space Station for assembly. Both near term derivative type vehiles as well as advanced technology vehicles are considered. The capability of these vehicles to accommodate the precursor missions are also examined. The implications on launch vehicle payload accommodation design and orbital operations are discussed.

Swalley, Frank E.↗

The Interplay Between Hardware and Control System Design in the Development of the Active Rack Isolation System

A primary mission of the International Space Station (ISS) is to provide a premier microgravity laboratory environment for conducting acceleration sensitive scientific research. In order to accomplish this goal, vibroacoustic disturbances caused by station activities that occur during the microgravity mode of operation, must be controlled. In addition to source isolation and other passive isolation methods, the ISS uses active isolation at the receiver, through the use of an Active Rack Isolation System (ARIS), as part of its overall vibration isolation strategy. A schematic diagram of a typical ARIS payload rack is shown. The ARIS isolation control system senses rack acceleration via three triaxial accelerometer heads and uses eight pushrod actuators to perform active vibration attenuation. Position sensors housed in the actuator assembly are used to sense the relative position between the rack and the station. Electrical power, data and other essential resources are routed through a set of umbilicals that interface with a passthrough panel at the bottom of the rack. A representative umbilical set is shown.

Fialho, Ian J.↗

A New Large Vibration Test Facility Concept for the James Webb Space Telescope

The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

test facilities↗

A New Large Vibration Test Facility Concept for the James Webb Space Telescope

The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

vibration↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Manned maneuvering unit: User's guide

The space shuttle will provide an opportunity to extend and enhance the crew's inherent capabilities in orbit by allowing them to operate effectively outside of their spacecraft by means of extravehicular activity. For this role, the shuttle crew will have a new, easier to don and operate space suit with integral life support system, and a self-contained propulsive backpack. The backpack, called the manned maneuvering unit, will allow the crew to operate beyond the confines of the Shuttle cargo bay and fly to any part of their own spacecraft or to nearby free-flying payloads or structure. This independent mobility will be used to support a wide variety of activities including free-space transfer of cargo and personnel, inspection and monitoring of orbital operations, and construction and assembly of large structures in orbit.

Lenda, J. A.↗

Manned remote work station - Safety and rescue considerations

It is noted that due to restrictions of payload and volume limitations of current and projected launch systems, space construction of ultralarge space structures is essential. The present paper discusses the concepts of a key piece of construction equipment needed to support assembly of such large structures. Attention is given to the manned remote work station (MRWS), a universal crew cabin to be used as a construction cherry picker, space crane turret, work station on a construction base rail system, or a free flyer. Concepts and safety and rescue requirements for this spacecraft are delineated for early applications in support of Shuttle operations, as well as applications in support of a mid to late 1980's space construction base. Finally, applications in support of constructing and maintaining a solar power satellite system are covered.

Nathan, C. A.↗

Space vehicle concepts

This paper presents several concepts of chemical-propulsion Space Vehicles (SVs) for manned Mars landing missions. For vehicle sizing purposes, several specific missions were chosen from opportunities in the late 1990's and early 2000's, and a vehicle "system" concept is then described which is applicable to the full range of missions and opportunities available. In general, missions utilizing planetary opposition alignments can he done with smaller vehicles than those utilizing planetary opposition alignments (reference I) The conjunction missions have a total mission time of about 3 years, including a required stay-time of about 60 days. Both types of missions might be desirable during a Mars program, the opposition type for early low-risk missions and/or for later unmanned cargo missions, and the conjunction type for more extensive science/exploration missions and/or for Mars base activities. Since the opposition missions appeared to drive the SV size more severely, there were probably more cases examined for them. Some of the concepts presented utilize all-propulsive braking, some utilize an all aerobraking approach, and some are hybrids. Weight statements are provided for various cases. The aerobraking cases have significant advantages in size and weight. Cryogenic propellants were used for the main propulsive elements in all cases, due to their significant weight advantage over storable propellants (reference 1). Extensive use is made of existing propulsive elements and other systems. Most of the work was done on O-g vehicle concepts, but partial-g and 1-g concepts are also provided and discussed. A recommendation is added that efforts be made to find ways to offset the long-term O-g effects on the crew, other than providing a g-field for the total SV or spacecraft, since this causes significant design and operations impacts. Several options for habitable elements are shown, such as large-diameter modules and Space Station (SS) types of modules. The latter were used as a reference because of their cost advantage as existing elements Several options are shown for the Mars landing vehicle, and a landing "system" is recommended which makes use of a large aeroshell to allow landing of payloads of various sizes and shapes over the course of a multi-year program. Because of the large size and weight of the SV it will be necessary to launch individual elements and assemble them in low Earth orbit (LEO). A configuration of one potential assembly concept is provided.

Michael Tucker↗

An overview of the program to place advanced automation and robotics on the Space Station

The preliminary design phase of the Space Station has uncovered a large number of potential uses of automation and robotics, most of which deal with the assembly and operation of the Station. If NASA were to vigorously push automation and robotics concepts in the design, the Station crew would probably be free to spend a substantial portion of time on payload activities. However, at this point NASA has taken a conservative attitude toward automation and robotics. For example, the belief is that robotics should evolve through telerobotics and that uses of artificial intelligence should be initially used in an advisory capacity. This conservativeness is in part due to the new and untested nature of automation and robotics; but, it is also due to emphases plased on designing the Station to the so-called upfront cost without thoroughly understanding the life cycle cost. Presumably automation and robotics has a tendency to increase the initial cost of the Space Station but could substantially reduce the life cycle cost. To insure that NASA will include some form of robotic capability, Congress directed to set aside funding. While this stimulates the development of robotics, it does not necessarily stimulate uses of artificial intelligence. However, since the initial development costs of some forms of artificial intelligence, such as expert systems, are in general lower than they are for robotics one is likely to see several expert systems being used on the Station.

Heydorn, Richard P.↗

Dexterous Orbital Servicing System (DOSS)

The Dexterous Orbiter Servicing System (DOSS) is a dexterous robotic spaceflight system that is based on the manipulator designed as part of the Flight Telerobotics Servicer program for the Space Station Freedom and built during a 'technology capture' effort that was commissioned when the FTS was cancelled from the Space Station Freedom program. The FTS technology capture effort yielded one flight manipulator and the 1 g hydraulic simulator that had been designed as an integrated test tool and crew trainer. The DOSS concept was developed to satisfy needs of the telerobotics research community, the space shuttle, and the space station. As a flight testbed, DOSS would serve as a baseline reference for testing the performance of advanced telerobotics and intelligent robotics components. For shuttle, the DOSS, configured as a movable dexterous tool, would be used to provide operational flexibility for payload operations and contingency operations. As a risk mitigation flight demonstration, the DOSS would serve the International Space Station to characterize the end to end system performance of the Special Purpose Dexterous Manipulator performing assembly and maintenance tasks with actual ISSA orbital replacement units. Currently, the most likely entrance of the DOSS into spaceflight is a risk mitigation flight experiment for the International Space Station.

Price, Charles R.↗

Thermal Modeling Method Improvements for SAGE III on ISS

The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument is the fifth in a series of instruments developed for monitoring aerosols and gaseous constituents in the stratosphere and troposphere. SAGE III will be delivered to the International Space Station (ISS) via the SpaceX Dragon vehicle. A detailed thermal model of the SAGE III payload, which consists of multiple subsystems, has been developed in Thermal Desktop (TD). Many innovative analysis methods have been used in developing this model; these will be described in the paper. This paper builds on a paper presented at TFAWS 2013, which described some of the initial developments of efficient methods for SAGE III. The current paper describes additional improvements that have been made since that time. To expedite the correlation of the model to thermal vacuum (TVAC) testing, the chambers and GSE for both TVAC chambers at Langley used to test the payload were incorporated within the thermal model. This allowed the runs of TVAC predictions and correlations to be run within the flight model, thus eliminating the need for separate models for TVAC. In one TVAC test, radiant lamps were used which necessitated shooting rays from the lamps, and running in both solar and IR wavebands. A new Dragon model was incorporated which entailed a change in orientation; that change was made using an assembly, so that any potential additional new Dragon orbits could be added in the future without modification of the model. The Earth orbit parameters such as albedo and Earth infrared flux were incorporated as time-varying values that change over the course of the orbit; despite being required in one of the ISS documents, this had not been done before by any previous payload. All parameters such as initial temperature, heater voltage, and location of the payload are defined based on the case definition. For one component, testing was performed in both air and vacuum; incorporating the air convection in a submodel that was only built for the in-air cases allowed correlation of all testing to be done in a single model. These modeling improvements and more will be described and illustrated in the paper.

Liles, Kaitlin↗

SEASAT study documentation

The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.

Source record↗

Spacelab Mission 2 pallet-only mode verification flight

The first two flights of Spacelab are intended to verify the utility and flexibility of all elements of the Spacelab inventory, incorporating an array of interchangeable components including pressurized manned laboratories, unpressurized platforms, and related support systems, which can be assembled in several different configurations of pallets and pressurized modules depending on the specific requirements of the mission. System performance will be monitored by flight instrumentation. Attention is given to Mission 2's unique payload-integration equipment and the general problem of mission planning.

Lester, R. C.↗

Mechanism synthesis and 2-D control designs of an active three cable crane

A Lunar Crane with a suspension system based on a three cable mechanism is investigated to provide a stable end-effector for hoisting, positioning, and assembling large components during construction and servicing of a Lunar Base. The three cable suspension mechanism consists of a structural framework of three cables pointing to a common point that closely coincides with the suspended payload's center of gravity. The vibrational characteristics of this three cable suspension system are investigated by comparing a simple 2-D symmetric suspension model and a swinging pendulum in terms of their analytical natural frequency equations. A study is also made of actively controlling the dynamics of the crane using two different actuator concepts. Also, Lyapunov-based control algorithms are developed to determine two regulator-type control laws performing the system vibrational suppression for both system dynamics. Simulations including initial-valued dynamic responses as well as control performances for two different system dynamics are also presented.

Yang, Li-Farn↗

Design and performance of the telescope and detector covers on the Extreme Ultraviolet Explorer satellite

Two cover mechanisms were designed and developed for the Extreme Ultraviolet Explorer (EUVE) science payload to keep the EUVE telescope mirrors and detectors sealed from the atmospheric environment until the spacecraft was placed into orbit. There were four telescope front covers and seven motorized detector covers on the EUVE science payload. The EUVE satellite was launched into orbit in June 1992 and all the covers operated successfully after launch. This success can be attributed to high design margins and extensive testing at each level of assembly. This paper described the design of the telescope front covers and the motorized detector covers. This paper also discusses some of the many design considerations and modifications made as performance and reliability problems became apparent from each phase of testing.

Tom, James L.↗

A New Direction for the NASA Materials Science Research Using the International Space Station

In 2001 NASA created a fifth Strategic Enterprise, the Office of Biological and Physical Research (OBPR), to bring together physics, chemistry, biology, and engineering to foster interdisciplinary research. The Materials Science Program is one of five Microgravity Research disciplines within this new Enterprise's Division of Physical Sciences Research. The Materials Science Program will participate within this new enterprise structure in order to facilitate effective use of ISS facilities, target scientific and technology questions and transfer results for Earth benefits. The Materials Science research will use a low gravity environment for flight and ground-based research in crystallization, fundamental processing, properties characterization, and biomaterials in order to obtain fundamental understanding of various phenomena effects and relationships to the structures, processing, and properties of materials. Completion of the International Space Station's (ISS) first major assembly, during the past year, provides new opportunities for on-orbit research and scientific utilization. The Enterprise has recently completed an assessment of the science prioritization from which the future materials science ISS type payloads will be implemented. Science accommodations will support a variety of Materials Science payload hardware both in the US and international partner modules with emphasis on early use of Express Rack and Glovebox facilities. This paper addresses the current scope of the flight and ground investigator program. These investigators will use the various capabilities of the ISS lab facilities to achieve their research objectives. The type of research and classification of materials being studied will be addressed. This includes the recent emphasis being placed on radiation shielding, nanomaterials, propulsion materials, and biomaterials type research. The Materials Science Program will pursue a new, interdisciplinary approach, which contributes, to Human Space Flight Exploration research. The Materials Science Research Facility (MSRF) and other related American and International experiment modules will serve as the foundation for the flight research environment. A summary will explain the concept for materials science research processing capabilities aboard the ISS along with the various ground facilities necessary to support the program.

Schlagheck, Ronald A.↗

Research Progress and Accomplishments on ISS

The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks. The first research payloads arrived at ISS more than two years ago, and continuous science has been ongoing for more than one and a half years. During this time, the research capabilities have been tremendously increased, even as assembly of the overall platform continues. Despite significant challenges along the way, ISS continues to successfully support a large number of investigations in a variety of research disciplines. The results of some of the early investigations are reaching the publication stage. The near future looms with new challenges, but experience to date and dedicated efforts give reason to be optimistic that the challenges will be overcome and that new and greater successes will be added to past ones.

Roe, Lesa B.↗