Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Report on the DANCE/FP14 Beam Profile and plans for the CY23 LANSCE run cycle

During the beam outage at the beginning of calendar year 2022, the Lujan Center Spallation Target was replaced with the Mark-IV design. Most notably, this included a rotated tungsten disk (for neutron production) in the direct line of sight of the upper tier flight-paths (FPs 12-15), which include DANCE, DICER, and the general-purpose flight path 12, all focused on nuclear physics measurements. This change was made in order to significantly improve both the neutron flux and the time-of-flight resolution for neutrons above 1 keV. Details of the design and motivation can be found in Zavorka et al. 2018. Due to the changes in the spallation target, significant work was required to provide new shutters and shielding for the upper tier flight paths. While the planned beam deliver was for September of 2022, because of delays in the installation process, first beam to DANCE was received the afternoon of 22 Nov 2022. Due to accelerator reliability issues, a total of only 18 days of beam were available for the run cycle. Approximately 90 days of development were planned for understanding the neutronic proper<es of the new spallation target. Most of this work could not be completed. Two measurements were completed, of which one will be discussed here.

43 PARTICLE ACCELERATORS↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Gas Community of the Future (Final Report)

Nicor Gas, a subsidiary of Southern Company Gas and its parent company Southern Company, is developing the concept of the Carbon-neutral, Affordable, Resilient, and Equitable Community ("CARE Community") to address the challenges of accessibility and affordability of grid-interactive efficient buildings in historically disadvantaged communities. The CARE Community is a new construction net-zero energy and carbon neutral residential neighborhood consisting of 50 homes with electricity and natural gas services in South Suburban Chicago, built as low-income affordable housing. The National Renewable Energy Laboratory (NREL) is assisting Southern Company to explore how energy efficiency, renewable technologies, and the reliability and resilience of natural gas can be combined and optimized in an islandable energy system as part of a broader effort to understand the role natural gas plays in future communities integrated with renewable energy and improved energy efficiency. The CARE Community will demonstrate how energy efficiency, distributed energy resources (DERs), and advanced controls can be combined with existing natural gas infrastructure to serve historically disadvantaged communities in a cold climate with low energy cost for affordable housing programs and enhanced resilience to withstand extreme weather. Homes will be a part of an islandable energy system, integrating multiple DER technologies such as solar panels, natural gas fuel cells, reciprocating natural gas engines, and battery storage. The CARE Community will provide a replicable template that affordable housing developers and energy companies can adopt throughout the United States. In this report, we present the design and modeling of the community and potential approaches for integrating DERs. We analyze and discuss annual simulations under normal operating conditions and week-long simulations under electric power grid outage conditions.

03 NATURAL GAS↗

Using Current Data to Detect Hardware Faults at Solar Plants

Monitoring amperage data is an effective means of detecting faults in PV plant data. Utilizing amperage data collected at the combiner box gives plant operators an up-to-date list of faulted equipment, allowing them to coordinate maintenance needs at much shorter intervals than previously. Shorter maintenance intervals will increase PV plant production levels, narrowing the gap between expected and actual PV plant performance. The amperage monitoring method performs at a high level, with a string-outage related fault detection True Positive Rate of 46% and False Positive Rate of 8%.

14 SOLAR ENERGY↗

Blockchain for Fault-Tolerant Grid Operations

Radial topology and vast geographic coverage make distribution systems prone to widespread power outages upon the failure of a single (or multiple) upstream component. Fault-handling algorithms depend heavily on correct estimations of the system’s state to effectively isolate the affected area and reduce the number of affected customers while maintaining operational safety. The work described here leverages the core features of distributed, consensus-based decision-making processes and the immutability of blockchain, and demonstrates their value in improving fault-tolerant grid operations. In this work, blockchain was used to create a trusted data-sharing platform that enables independent actors to reconstruct the system state; this enables distributed resources to make intelligent decisions with limited knowledge. Although the process requires data sharing, its algorithms have been designed to limit the amount of private information that is exchanged, which helps preserve business-sensitive data and maintain customer privacy. In addition, by reducing the information that must be shared, the communication requirements are also reduced; (however, an in-depth analysis of the communication requirements is beyond the scope of this project). The proposed use cases are intended to represent a foundational basis for third parties to develop functional solutions that can eventually be deployed in the field. To further provide guidance, the envisioned use cases have incorporated design requirements that consider the blockchain characteristics and a need to limit information from surrounding resources, which preserve the assumption and the possibility that such resources could belong to different entities. This report presents a detailed design of the three use cases with the tools needed to enable the analysis being tested. The implemented gross error detection method can detect mismatches when the error exceeds 3.8 times the sensor’s rated accuracy. Detection of the circuit breaker state successfully identified the correct states across all simulation tests. A distribution-system power-flow solution in the simulator OpenDSS generally possesses a convergency tolerance of 0.01% on the voltage magnitude. The evaluation of possible reconnection using voltage magnitude—preserving the data ownership—has a voltage magnitude difference smaller than 0.001% from the OpenDSS result. The results preserving data ownership have a difference within the expected power flow tolerance with full knowledge of the system, which surpasses expectations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Coupled Decay Heat and Thermal Hydraulic Capability for Loss-of-Coolant Accident Simulations

As the nuclear energy industry considers ways to achieve improved economics in the current fleet of light-water reactors (LWRs), one possible approach is to operate each cycle for longer durations. This causes a greater portion of the fuel to be burned and reduces the frequency of outages, which ultimately reduces the cost to operate the reactor. However, this also leads to higher burnup fuels than has traditionally been allowed in these reactors. Thus, there are concerns about integrity of high-burnup (HBu) fuel, especially during accident conditions such as loss-of-coolant accidents (LOCAs), as shown by Capps et al.. To investigate these concerns, advanced modeling and simulation capabilities are being leveraged to determine the susceptibility of HBu fuel to fuel fragmentation, relocation, and dispersion (FFRD). Improvements have previously been made to fuel performance capabilities to more accurately model these phenomena; multiphysics simulations have also been conducted to determine the power and burnup histories of the HBu fuel, which are needed as inputs for the fuel performance calculations. Most recently, new statistical approaches have been developed to identify a subset of fuel rods that have greater FFRD susceptibility, reducing the total number of fuel performance simulations required. Prior LOCA simulations have relied on the TRACE systems code, which can model the core and primary loop during accident conditions. TRACE includes many models for various aspects of the primary loop, but two sets of models are important for this report. First, TRACE uses a lumped-fuel approach for modeling the core. This approximates the ~50,000 fuel rods in the core with a much smaller number of rods. The rods can be lumped in various ways as determined by the user. For example, one lumped rod may be used to represent all rods in an assembly, sometimes with an additional rod representing the hottest fuel rod. However, due to runtime constraints and complexity of modeling, a more common approach is to group several assemblies or larger regions of the core into single lumped rods. These lumping schemes apply not only to fuel rods but to flow channels as well. Second, TRACE has several different models for treating decay heat, ranging from pregenerated decay heat curves based on an ANSI/ANS-5.1 standard (hereinafter abbreviated simply as ANSI) to explicit time-dependent heat inputs from the user. None of these models account for differences in isotopics between different rods, which is an approximation the work in this report seeks to eliminate. This report focuses on the implementation of coupled decay heat capabilities in the Virtual Environment for Reactor Applications (VERA) code suite to address a gap identified in previous LOCA simulations. This constitutes an improvement for both the lumped-fuel and decay heat models in TRACE. VERA has been developed to perform high-fidelity, whole-core multiphysics simulations for LWRs. Previously, during the Consortium for Advanced Simulation of LWRs (CASL) program, the emphasis was on providing accurate steady-state analysis—with a secondary focus on reactivity insertion accident (RIA) analysis—to address operational challenges in the nuclear energy industry. Under the Department of Energy (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, these capabilities are being extended to a broader range of transient analyses with the goal of quantifying the risk of fuel failures such as FFRD. To properly model such conditions with VERA, decay heat calculations have been integrated with the multiphysics to enable rod-by-rod thermal hydraulic (TH) conditions to be driven by the decay heat in long-running accidents such as LOCAs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

On-the-Fly Energy Condensation for Whole-Core Multiphysics Simulations

As the nuclear energy industry considers ways to achieve improved economics in the current fleet of light-water reactors (LWRs), one possible approach is to operate each cycle longer. This causes a greater portion of the fuel to be burned and reduces the frequency of outages, which ultimately reduces the cost to operate the reactor. However, this also leads to higher burnup fuels than have traditionally been allowed in these reactors. There are concerns about integrity of high-burnup (HBu) fuel, especially during accident conditions such as loss-of-coolant accidents (LOCAs), as shown by Capps et al. To investigate these concerns, advanced modeling and simulation capabilities are under development to determine the susceptibility of HBu fuel to fuel fragmentation, relocation, and dispersion (FFRD). Improvements have previously been made to fuel performance capabilities to model these phenomena more accurately; multiphysics simulations have also been conducted to determine the power and burnup histories of the HBu fuel, which are needed as inputs to the fuel performance calculations. Most recently, new statistical approaches have been developed to identify a subset of fuel rods that have greater FFRD susceptibility, reducing the total number of fuel performance simulations required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Software Contribution to the L-CAPE project

The L-CAPE project utilizes asynchronous data from thousands of Linear Accelerator devices and applies data science techniques to detect anomaly of accelerator failure before the incident, as well as automatic labels of accelerator outages. The author describes her contribution progress for the L-CAPE project this summer, as well as suggestions for future interns working on the project.

Tang, Jasmine↗

Implementing a Terrestrial Timing Solution: Best Practices

This document is an overview and guide on the concept of precision time and how an alternative terrestrial timing solution to the Global Positioning System (GPS) can be implemented. What follows is a set of recommendations and best practices, derived from research at Oak Ridge National Laboratory (ORNL), across industry, and within the U.S. government, to implement a system of precision timing synchronization to support resilient operations for the U.S. grid. Precision time is a fundamental necessity for operating the grid today, and it becomes even more important as the grid modernizes with clean energy sources, microgrids, and precision sensors placed throughout the grid system to ensure failureresistant operations. The Global Navigation Satellite System (GNSS), which includes (GPS), is currently the primary provider of precision timing today. A terrestrial-based system for time delivery and synchronization to augment GPS is outlined below and it would provide secure time, synchronized with Coordinated Universal Time (UTC), in the event of outages or other interruptions associated with time delivery.

47 OTHER INSTRUMENTATION↗

Emerging Technologies Review: Water Microgrid

Project 69643 Task 10 - The Air Force Civil Engineer Center has tasked Pacific Northwest National Laboratory with investigating emerging technologies to inform the Air Force’s understanding of the technology and to guide key considerations for implementing technologies that are resilient and alternative sources to the traditional methods used in the Air Force today. This report explores the concept of a water microgrid for deployment at Air Force installations. A water microgrid is a local water system that supplies, treats, and distributes water, with the primary objective to meet mission critical water demand during a disruption of the primary supply. A water microgrid can advance an Air Force installation’s water infrastructure and water resilience by being at the ready for meeting critical missions during a utility outage.

42 ENGINEERING↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantification of 238U Holdup using Iterative, Point-Cloud-Based Compton Imaging

U holdup has impacts on several aspects of operation: Worker dose, Criticality safety, Safeguards, Outage planning. Generalized Geometry Holdup (GGH) currently estimates U mass within a high uncertainty band (± 50%). This method seeks to improve this uncertainty via quantitative Compton imaging.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Enhanced Long-Duration Energy Storage Modeling [Slides]

As our power grid evolves toward a more renewable future, energy storage is poised to take a larger role in meeting growing energy needs. Energy storage could help keep the power system reliable even through potential outages, periods of extreme weather, and when generation from variable renewable technologies like wind and solar is low. Given the different durations of these stressors, grid analysts at the National Renewable Energy Laboratory (NREL) are working to better understand the role and benefits of long-duration energy storage - or storage technologies with 8-24 hours of storage capacity - in high variable renewable energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗