Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Subjective Assessment of Initial and Mid-Term UAM Operations and the Impact on Air Traffic Controllers' Workload

The emergence of Urban Air Mobility (UAM) marks a new era of aviation that will be characterized by a shift in transportation dynamics marked by safe, efficient, and sustainable air travel within urban areas. Although UAM will provide significant advantages, increased air travel demand has the potential to impact air traffic controllers (ATCo) workload. Therefore, industry, government, and academia in the UAM ecosystem are actively working to overcome potential implementation challenges that include airspace integration and air traffic management. As part of this effort, researchers from the National Aeronautics and Space Administration (NASA) are studying the challenges associated with UAM operations’ interactions with air traffic control (ATC). The present research paper presents an analysis of subjective assessments to determine the usability and acceptability of airspace procedures under two different operating conditions – Initial and Mid-Term – and two different levels of UAM traffic. The completion of these investigations will be a steppingstone in supporting the successful implementation of UAM operations into the National Airspace System.

Urban Air Mobility, Air Traffic Control, Workload↗

Subjective Assessment of Initial and Mid-Term UAM Operations and the Impact on Air Traffic Controllers' Workload

The emergence of Urban Air Mobility (UAM) marks a new era of aviation that will be characterized by a shift in transportation dynamics marked by safe, efficient, and sustainable air travel within urban areas. Although UAM will provide significant advantages, increased air travel demand has the potential to impact air traffic controllers (ATCo) workload. Therefore, industry, government, and academia in the UAM ecosystem are actively working to overcome potential implementation challenges that include airspace integration and air traffic management. As part of this effort, researchers from the National Aeronautics and Space Administration (NASA) are studying the challenges associated with UAM operations’ interactions with air traffic control (ATC). The present research paper presents an analysis of subjective assessments to determine the usability and acceptability of airspace procedures under two different operating conditions – Initial and Mid-Term – and two different levels of UAM traffic. The completion of these investigations will be a steppingstone in supporting the successful implementation of UAM operations into the National Airspace System.

Urban Air Mobility↗

Two HSCT Mach 1.7 low sonic boom designs

The objective of this study was to provide low sonic boom concepts, geometry, and analysis to support wind tunnel model designs. Within guidelines provided by NASA, two High Speed Civil Transport (HSCT) configurations were defined with reduced sonic boom that have low drag, high payload, and good performance. To provide information for assessing the feasibility of reduced sonic boom operation, the two designs were analyzed in terms of their sonic boom characteristics, as well as aerodynamics, weight and balance, and performance characteristics. Low drag and high payload were achieved, but both of the blended arrow-wing configurations have deficiencies in high lift capability, fuel volume, wing loading, balance, and takeoff gross weight. Further refinement of the designs is needed to better determine the commercial viability of low boom operation. To help in assessing low boom design technology, the two configurations were defined as wind tunnel models with altered aft-bodies for the wind tunnel sting mounting system.

Haglund, George T.↗

Navigation Operations for the Magnetospheric Multiscale Mission

The Magnetospheric Multiscale (MMS) mission employs four identical spinning spacecraft flying in highly elliptical Earth orbits. These spacecraft will fly in a series of tetrahedral formations with separations of less than 10 km. MMS navigation operations use onboard navigation to satisfy the mission definitive orbit and time determination requirements and in addition to minimize operations cost and complexity. The onboard navigation subsystem consists of the Navigator GPS receiver with Goddard Enhanced Onboard Navigation System (GEONS) software, and an Ultra-Stable Oscillator. The four MMS spacecraft are operated from a single Mission Operations Center, which includes a Flight Dynamics Operations Area (FDOA) that supports MMS navigation operations, as well as maneuver planning, conjunction assessment and attitude ground operations. The System Manager component of the FDOA automates routine operations processes. The GEONS Ground Support System component of the FDOA provides the tools needed to support MMS navigation operations. This paper provides an overview of the MMS mission and associated navigation requirements and constraints and discusses MMS navigation operations and the associated MMS ground system components built to support navigation-related operations.

Navigation↗

Development and Assessment of Deployed Sensors and Technologies Supporting Molten Salt Loop Operations

During FY24, Argonne conducted a variety of activities to develop and assess new monitoring and control technologies towards enabling long-duration operations of molten salt reactor systems. The first objective of the work completed this year was to deploy technologies capable of reliably and rapidly monitoring the operational health of a molten salt loop. To achieve this, the project focused on specific tasks, including: (1) electroanalytical technique development for use in deployed sensors, and (2) operations of sensors on the Facility to Alleviate Salt Technology Risks (FASTR) loop at Oak Ridge National Laboratory. The second objective of the work this year focused on creating a pumped actinide flow loop to enable long-duration salt chemistry and corrosion studies using uranium-bearing fuel salts. Toward that end, we designed and procured a loop capable of being installed into a radiological glovebox at Argonne. A corrosion control system was also designed for integration into this loop. These combined systems will enable the feasibility of corrosion control and management systems to be investigated with complex chloride fuel salt mixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Designing for a new era of launch vehicle operational efficiency

It is pointed out that early recognition of operational requirements and assessment of their effects provides the best chance of designing an economically viable future space transportation system (FSTS). Operational factors which may influence configuration design include fleet size, operation mode, refurbishment, and the resource requirements. FTST has a simplified operational role compared to the Space Shuttle, which, in addition to transportation, must perform experiments, support payloads, and stay long on orbit. In the future a space station will perform many of these tasks. The FSTS comprises a two-stage fully reusable launch vehicle designed to carry 150,000 lb to a space station, off-load, and return. It would always be launched fully loaded, and its cargo would be processed and redistributed at the space station. Attention is given to ground servicing, flight operations, rendezvous-compatible orbits, launch windows, standard trajectories, entry windows, operational costs, the mission model, and resource requirements.

Talay, T. A.↗

Total Probability of Collision as a Metric for Finite Conjunction Assessment and Collision Risk Management

On-orbit collision risk is becoming an increasing mission risk to all operational satellites in Earth orbit. Managing this risk can be disruptive to mission and operations, present challenges for decision-makers, and is time-consuming for all parties involved. With the planned capability improvements to detecting and tracking smaller orbital debris and capacity improvements to routinely predict on-orbit conjunctions, this mission risk will continue to grow in terms of likelihood and effort. It is very real possibility that the future space environment will not allow collision risk management and mission operations to be conducted in the same manner as it is today. This paper presents the concept of a finite conjunction assessment-one where each discrete conjunction is not treated separately but, rather, as a continuous event that must be managed concurrently. The paper also introduces the Total Probability of Collision as an analogous metric for finite conjunction assessment operations and provides several options for its usage in a Concept of Operations.

Conjunction Assessment↗

Cyber Threat Assessment of Uplink and Commanding System for Mission Operation

Most of today's Mission Operations Systems (MOS) rely on Ground Data System (GDS) segment to mitigate cyber security risks. Unfortunately, IT security design is done separately from the design of GDS' mission operational capabilities. This incoherent practice leaves many security vulnerabilities in the system without any notice. This paper describes a new way to system engineering MOS, to include cyber threat risk assessments throughout the MOS development cycle, without this, it is impossible to design a dependable and reliable MOS to meet today's rapid changing cyber threat environment.

ground data↗

A Comparison of Pre‐Construction and Operational Wake Loss Estimates for Land‐Based Wind Plants

The overall bias between pre‐construction energy yield assessment (EYA) estimates of wind plant energy production and the achieved operational production is improving in the wind industry, but uncertainty remains high for individual wind plants. Wake effects within wind plants are one of the largest sources of energy loss considered in the EYA process, and previous work shows wake loss estimates to be a major source of disagreement among wind energy consultants who perform EYAs. To better understand the accuracy of wake loss predictions, we compare overall operational wake loss estimates based on supervisory control and data acquisition data to pre‐construction estimates provided by six wind energy consultants for five land‐based wind plants in North America. By augmenting existing approaches for quantifying operational wake losses, we estimate wake losses during the period of record for which operational data are available as well as the expected long‐term wake losses, based on historical reanalysis weather data, to which the EYA estimates are compared. To account for power variations at different turbine locations caused by terrain‐induced wind resource heterogeneity, we correct the operational wake loss estimates using predicted freestream wind speed variations from the Wind Systems Engineering Reynolds‐averaged Navier–Stokes (RANS) tool. We identify long‐term corrected operational wake losses between 1.9% and 6.4% for the five plants, with a mean loss of 4%. For the project deemed most acceptable for operational wake loss assessment, which is located in the simplest terrain and isolated from neighboring plants, the mean EYA wake loss estimate is within 0.7 percentage points of the operational value of 6.4%. For most of the remaining plants, results suggest that wake losses are generally overpredicted by 2.6–6.3 percentage points. However, operational wake losses may be underestimated for many of these projects because of spatial wind resource variations not captured by the RANS model, external wake effects that are unaccounted for in the estimation process, and wind plant blockage effects. To better understand factors that contribute to the observed wake losses, we investigate operational wake losses as a function of wind direction and wind speed. As expected, wake losses are generally concentrated near wind directions that are aligned with rows of closely spaced turbines and at below‐rated wind speeds; however, for some projects, the energy produced by the wind plant exceeds the estimated potential energy of the plant without wake interactions for certain wind directions and wind speeds, suggesting inaccurate assumptions in the wake loss estimation method for those plants. Lastly, we compare predicted and operational wake losses for individual wind turbines, finding that even when overall wake losses are predicted accurately, large uncertainty exists at the turbine level.

17 WIND ENERGY↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Analytical evaluation of ILM sensors, volume 1

The functional requirements and operating environment constraints are defined for an independent landing monitor ILM which provides the flight crew with an independent assessment of the operation of the primary automatic landing system. The capabilities of radars, TV, forward looking infrared radiometers, multilateration, microwave radiometers, interferometers, and nuclear sensing concepts to meet the ILM conditions are analyzed. The most critical need for the ILM appears in the landing sequence from 1000 to 2000 meters from threshold through rollout. Of the sensing concepts analyzed, the following show potential of becoming feasible ILM's: redundant microwave landings systems, precision approach radar, airborne triangulation radar, multilateration with radar altimetry, and nuclear sensing.

Kirk, R. J.↗

Inter-Satellite Communications Considerations and Requirements for Distributed Spacecraft and Formation Flying Systems

In order to avoid selecting inadequate inter-spacecraft cross-link communications standards for Distributed Spacecraft System (DSS) missions, it is first necessary to identify cross-link communications strategies and requirements common to a cross-section of proposed missions. This paper addresses the cross-link communication strategies and requirements derived from a survey of 39 DSS mission descriptions that are projected for potential launch within the next 20 years. The inter-spacecraft communications strategies presented are derived from the topological and communications constraints from the DSS missions surveyed. Basic functional requirements are derived from an analysis of the fundamental activities that must be undertaken to establish and maintain a cross-link between two DSS spacecraft. Cross-link bandwidth requirements are derived from high-level assessments of mission science objectives and operations concepts. Finally, a preliminary assessment of possible cross-link standards is presented within the context of the basic operational and interoperability requirements.

Kwadrat, Carl F.↗

Quantum-Inspired Power System Reliability Assessment

To enable an in-depth study of power system operation and planning, the assessment of standard reliability indices is inevitable. The Monte Carlo Simulation (MCS) approach is a broadly used method in replacing the analytical methods in reliability indices assessment. The accuracy of MCS, however, highly depends on the sampling size, and hence, a complicated system with large number of components requires a large sampling size and daunting computational effort. To address this shortcoming, we, in this paper attempt to take advantage of potentials of the quantum computing (QC) for power system reliability assessment by realizing the following contributions: 1) an innovative quantum model designed for reliability assessment; 2) a quantum circuit that achieves the quadratic speed up compared to the classical MCS method; 3) an efficient quantum amplitude estimation (QAE) algorithm to accurately evaluate the reliability indices. The accuracy and efficacy of the quantum reliability method are extensively verified and demonstrated on both radial and mesh distribution systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lunar Surface Habitat Configuration Assessment: Methodology and Observations

The Lunar Habitat Configuration Assessment evaluated the major habitat approaches that were conceptually developed during the Lunar Architecture Team II Study. The objective of the configuration assessment was to identify desired features, operational considerations, and risks to derive habitat requirements. This assessment only considered operations pertaining to the lunar surface and did not consider all habitat conceptual designs developed. To examine multiple architectures, the Habitation Focus Element Team defined several adequate concepts which warranted the need for a method to assess the various configurations. The fundamental requirement designed into each concept included the functional and operational capability to support a crew of four on a six-month lunar surface mission; however, other conceptual aspects were diverse in comparison. The methodology utilized for this assessment consisted of defining figure of merits, providing relevant information, and establishing a scoring system. In summary, the assessment considered the geometric configuration of each concept to determine the complexity of unloading, handling, mobility, leveling, aligning, mating to other elements, and the accessibility to the lunar surface. In theory, the assessment was designed to derive habitat requirements, potential technology development needs and identify risks associated with living and working on the lunar surface. Although the results were more subjective opposed to objective, the assessment provided insightful observations for further assessments and trade studies of lunar surface habitats. This overall methodology and resulting observations will be describe in detail and illustrative examples will be discussed.

Carpenter, Amanda↗

Productivity Analysis of Public and Private Airports: A Causal Investigation

Around the world, airports are being viewed as enterprises, rather than public services, which are expected to be managed efficiently and provide passengers with courteous customer services. Governments are, increasingly, turning to the private sectors for their efficiency in managing the operation, financing, and development, as well as providing security for airports. Operational and financial performance evaluation has become increasingly important to airport operators due to recent trends in airport privatization. Assessing performance allows the airport operators to plan for human resources and capital investment as efficiently as possible. Productivity measurements may be used as comparisons and guidelines in strategic planning, in the internal analysis of operational efficiency and effectiveness, and in assessing the competitive position of an airport in transportation industry. The primary purpose of this paper is to investigate the operational and financial efficiencies of 22 major airports in the United States and Europe. These airports are divided into three groups based on private ownership (7 British Airport Authority airports), public ownership (8 major United States airports), and a mix of private and public ownership (7 major European Union airports. The detail ownership structures of these airports are presented in Appendix A. Total factor productivity (TFP) model was utilized to measure airport performance in terms of financial and operational efficiencies and to develop a benchmarking tool to identify the areas of strength and weakness. A regression model was then employed to measure the relationship between TFP and ownership structure. Finally a Granger causality test was performed to determine whether ownership structure is a Granger cause of TFP. The results of the analysis presented in this paper demonstrate that there is not a significant relationship between airport TFP and ownership structure. Airport productivity and efficiency is, however dependent upon the level of competition, choice of the market, and regulatory control.

Vasigh, Bijan↗

Model Calibration Efforts for the International Space Station's Solar Array Mast

The International Space Station (ISS) relies on sixteen solar-voltaic blankets to provide electrical power to the station. Each pair of blankets is supported by a deployable boom called the Folding Articulated Square Truss Mast (FAST Mast). At certain ISS attitudes, the solar arrays can be positioned in such a way that shadowing of either one or three longerons causes an unexpected asymmetric thermal loading that if unchecked can exceed the operational stability limits of the mast. Work in this paper documents part of an independent NASA Engineering and Safety Center effort to assess the existing operational limits. Because of the complexity of the system, the problem is being worked using a building-block progression from components (longerons), to units (single or multiple bays), to assembly (full mast). The paper presents results from efforts to calibrate the longeron components. The work includes experimental testing of two types of longerons (straight and tapered), development of Finite Element (FE) models, development of parameter uncertainty models, and the establishment of a calibration and validation process to demonstrate adequacy of the models. Models in the context of this paper refer to both FE model and probabilistic parameter models. Results from model calibration of the straight longerons show that the model is capable of predicting the mean load, axial strain, and bending strain. For validation, parameter values obtained from calibration of straight longerons are used to validate experimental results for the tapered longerons.

Elliott, Kenny B.↗

Operational Implementation of a Pc Uncertainty Construct for Conjunction Assessment Risk Analysis

Earlier this year the NASA Conjunction Assessment and Risk Analysis (CARA) project presented the theoretical and algorithmic aspects of a method to include the uncertainties in the calculation inputs when computing the probability of collision (Pc) between two space objects, principally uncertainties in the covariances and the hard-body radius. The output of this calculation approach is to produce rather than a single Pc value an entire probability density function that will represent the range of possible Pc values given the uncertainties in the inputs and bring CA risk analysis methodologies more in line with modern risk management theory. The present study provides results from the exercise of this method against an extended dataset of satellite conjunctions in order to determine the effect of its use on the evaluation of conjunction assessment (CA) event risk posture. The effects are found to be considerable: a good number of events are downgraded from or upgraded to a serious risk designation on the basis of consideration of the Pc uncertainty. The findings counsel the integration of the developed methods into NASA CA operations.

assessment↗

Current Level of Mission Control Automation at NASA/Goddard Space Flight Center

NASA is particularly concerned with reducing mission operations costs through increased automation. This paper examines the operations procedures within NASA Mission Control Centers in order to uncover the level of automation that currently exists within them. Based on an assessment of mission operations procedures within three representative control centers, this paper recommends specific areas where there is potential for mission cost reduction through increased automation.

Maks, Lori↗