Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Resilient Operation of Networked Community Microgrids with High Solar Penetration

This project, funded by the US Department of Energy’s Solar Energy Technologies Office (SETO), focused on the operation of microgrids as a coordinated network. The primary objective, which was successfully achieved, was to develop both control strategies and hardware solutions to support the resilient and efficient operation of networked microgrids with high solar penetration. The work was structured around the following four main tasks: • Development of distributed and scalable optimization algorithms for AC-coupled networked microgrids. • Design and implementation of a novel DC interconnection hardware to enable precise power exchange between microgrids. • Laboratory operational validation of the developed technologies using 480 V testbeds and commercially available hardware. • Field operational validation of the complete solution in Adjuntas, Puerto Rico, interconnecting two kW-scale, split-phase microgrids of Casa Pueblo’s microgrids. This project addressed multiple technical challenges across the domains of optimization, control, hardware interconnection, and protection. One of its key contributions was delivering tangible, real-world solutions for networking microgrids. In contrast to purely theoretical or simulation-based work, this project included full-scale hardware operational validation both in the lab and in the field. The work conducted as part of this project—in collaboration with the University of Puerto Rico; the University of Tennessee, Knoxville; the University of Central Florida; and Casa Pueblo—has advanced the state of the art in networked microgrids. Key contributions include the development of distributed control strategies, practical solutions for real-world implementation challenges, and the introduction of a novel DC interlink approach for microgrid interconnection. The project featured both laboratory and field validation using commercial off-the-shelf components. The field deployment successfully validated that a group of microgrids can operate in a coordinated manner, enabling precise power flow between systems and mutual support during extreme events. This project resulted in 15 journal publications and 15 conference papers; 5 graduate students and 15 undergraduate students were supported. The codes of distributed optimization and forecasting were made open-source through OSTI.gov for distributed optimization and forecasting. All the publications are available in the ORNL-hosted project landing page. The DC interlink with state-of-charge balancing control was operationally validated in Adjuntas by interconnecting two real-world, 240 V split-phase microgrids. To the best knowledge of the team, this represents the first operational validation of AC microgrids interconnected via DC-interlinks. As a culmination of this project, a follow-on grant was awarded to support the technology transfer of the distributed optimization framework to a commercial microgrid controller, Stellar Edge, developed by the California-based company New Sun Road.

14 SOLAR ENERGY↗

From Modular ADMS to Plug-and-Play Ops: Distribution Grid Operations with Platform-Level Orchestration to Enable Ambitious App Hosting

The core function of the distribution grid is to provide electricity to consumers affordably, reliably, and securely. In pursuing these core objectives, distribution utilities are accountable to customers, regulators, and in some cases, shareholders. Other third parties such as aggregators and microgrids can also have a stake in the smooth operation of the grid. Each of these stakeholders has economic, business, and/or governance objectives that inform their expectations of the distribution grid. This multi-objective, multi-stakeholder environment creates tension that must be reconciled to successfully design and operate the distribution grid. Innovative companies are competing to bring high-tech solutions to electric utilities and their customers that address each of these objectives. Many developers of advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) have adopted a modular architecture that allows grid operators to select functions and features according to their individual system needs. A modular platform also allows the solution provider to develop and integrate specific new product modules; however, the need to pursue multiple objectives with a fixed set of controllable devices makes integration expensive whether it is done at the product development stage or the deployment stage. This cost creates a significant barrier to adoption and can lengthen the product to market time of new solutions. To fundamentally address the complexity of system integration for distribution grid operations, the U.S. Department of Energy Office of Electricity has funded the GridAPPS-D project at PNNL, which streamlines integration by contributing to standards development, defining system architecture, applying advanced mathematics, and developing open-source software to demonstrate the concept of an open data-integration platform for distribution operations. The open data-integration platform concept enables system operators and solution providers to deploy ambitious, best-of-breed applications (or apps) without continually reengineering for integration. Ambitious apps developed by different solution providers will inevitably attempt to achieve different control objectives with the same set of controllable devices. If the open platform itself can resolve these conflicts in a way that achieves the best available outcomes for all apps, doesn’t restrict the ambitious design of apps, and ensures safe and secure operations, apps will be able to plug-and-play with the platform at the same time as other ambitious apps. In this paper, we describe a framework called App Deconfliction that empowers a platform to assign setpoints to controllable devices based on the values preferred by different apps (and even external stakeholder entities like customers or aggregators). The App Deconfliction framework is compatible with several methods for determining setpoint values. We present two methods based on game theory that provide a subtle built-in incentive structure for developers to adapt their apps to the fact that they will be operating in a moderated multi-app environment and to favor device setpoints that have the most effect on their objectives over those that have the least effect. Our simulation-based demonstrations have shown that game-theory-based deconfliction can lead to a 7% improvement in control space utilization compared to design-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

54 ENVIRONMENTAL SCIENCES↗

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Ignition and Injection Perturbation under Lean and Dilute GDI Engine Operation

Turbocharged gasoline direct injection (GDI) engines are quickly becoming more prominent in light-duty automotive applications because of their potential improvements in efficiency and fuel economy. While EGR dilute and lean operation serve as potential pathways to further improve efficiencies and emissions in GDI engines, they also pose challenges for stable engine operation. Tests were performed on a single-cylinder research engine that is representative of current automotive-style GDI engines. Baseline cases were performed under steady-state operating conditions where combustion phasing and dilution were varied to determine the effects on indicated efficiency and combustion stability. Sensitivity studies were then carried out by introducing binary low-high perturbation of spark timing and injection duration on a cycle-by-cycle basis under EGR dilute and lean operation to determine dominant feedback mechanisms. Ignition perturbation was phased early/late of MBT timing, and injection perturbation was set fuel rich/lean of the given air-fuel ratio. COVIMEP was used to define acceptable operation limits when comparing different perturbation cases. Overall results suggests that combustion phasing is very important for dilute operation while the impact of perturbation is reduced due to increased burn duration compared to the stoichiometric baseline without EGR. Lean operation was found to be very sensitive to injection perturbation, with the effect of perturbations amplified by next-cycle feedback. Due to the longer timescale EGR operation was shown to be less sensitive to next-cycle changes in fueling.

Wallner, Thomas↗

Determination of the Operating Envelope for a Direct Fired Fuel Cell Turbine Hybrid Using Hardware Based Simulation

The operating range of a direct fired solid oxide fuel cell gas turbine (SOFC/GT) hybrid with bypass control of cathode airflow was determined using a hardware-based simulation facility designed and built by the U.S. Department of Energy, National Energy Technology Laboratory (NETL). Three methods of cathode airflow management using bypass valves in a hybrid power system were evaluated over the maximum range of operation. The cathode air flow was varied independently over the full range of operation of each bypass valve. Each operating point was taken at a steady state condition and was matched to the thermal, pressure and flow output of a corresponding fuel cell operation condition. Turbine electric load was also varied so that the maximum range of fuel cell operation could be studied, and a preliminary operating map could be made. Results are presented to show operating envelopes in terms of cathode air flow, fuel cell and turbine load, and compressor surge margin to be substantial.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data-Parallel Halo Finder Operator in PISTON

PISTON is a portable framework which supports the development of visualization and analysis operators using a platform-independent, data-parallel programming model. Operators such as isosurface, cut-surface and threshold have been implemented in this framework, with the exact same operator code achieving good parallel performance on different architectures. An important analysis operator in cosmology is the halo finder. A halo is a cluster of particles and is considered a common feature of interest found in cosmology data. As the number of cosmological simulations carried out in the recent past has increased, the resultant data of these simulations and the required analysis tasks have increased as well. As a consequence, there is a need to develop scalable and efficient tools to carry out the needed analysis. Therefore, we are currently implementing a halo finder operator using PISTON. Researchers have developed a wide variety of techniques to identify halos in raw particle data. The most basic algorithm is the friend-of-friends (FOF) halo finder, where the particles are clustered based on two parameters: linking length and halo size. In a FOF halo finder, all particles which lie within the linking length are considered as one halo and the halos are filtered based on the halo size parameter. A naive implementation of a FOF halo finder compares each and every particle pair, requiring O(n{sup 2}) operations. Our data-parallel halo finder operator uses a balanced k-d tree to reduce this number of operations in the average case, and implements the algorithm using only the data-parallel primitives in order to achieve portability and performance.

79 ASTRONOMY AND ASTROPHYSICS↗

Using an operator training simulator in the undergraduate chemical engineering curriculim

An operator training simulator (OTS) is to the chemical engineer what a flight simulator is to the aerospace engineer. The basis of an OTS is a high-fidelity dynamic model of a chemical process that allows an engineer to simulate start-up, shut-down, and normal operation. It can also be used to test the skill and ability of an engineer or operator to respond and control some unforeseen situation(s) through the use of programmed malfunctions. West Virginia University (WVU) is a member of the National Energy Technology Laboratory’s Regional University Alliance (NETL-RUA). Working through the NETL-RUA, the authors have spent the last four years collaborating on the development of a high-fidelity OTS for an Integrated Gasification Combined Cycle (IGCC) power plant with CO{sub 2} capture that is the cornerstone of the AVESTARTM (Advanced Virtual Energy Simulation Training And Research) Center with sister facilities at NETL and WVU in Morgantown, WV. This OTS is capable of real-time dynamic simulation of IGCC plant operation, including start-up, shut-down, and power demand load following. The dynamic simulator and its human machine interfaces (HMIs) are based on the DYNSIM and InTouch software, respectively, from Invensys Operations Management. The purpose of this presentation is to discuss the authors’ experiences in using this sophisticated dynamic simulation-based OTS as a hands-on teaching tool in the undergraduate chemical engineering curriculum. At present, the OTS has been used in two separate courses: a new process simulation course and a traditional process control course. In the process simulation course, concepts of steady-state and dynamic simulations were covered prior to exposing the students to the OTS. Moreover, digital logic and the concept of equipment requiring one or more permissive states to be enabled prior to successful operation were also covered. Students were briefed about start-up procedures and the importance of following a predetermined sequence of actions in order to start-up the plant successfully. Student experience with the dynamic simulator consisted of a six-hour training session in which the Claus sulfur capture unit of the IGCC plant was started up. The students were able to operate the simulator through the InTouch-based HMI displays and study and understand the underlying dynamic modeling approach used in the DYNSIM-based simulator. The concepts learned during the training sessions were further reinforced when students developed their own DYNSIM models for a chemical process and wrote a detailed start-up procedure. In the process control course, students learned how the plant responds dynamically to changes in the manipulated inputs, as well as how the control system impacts plant performance, stability, robustness and disturbance rejection characteristics. The OTS provided the opportunity to study the dynamics of complicated, “real-life” process plants consisting of hundreds of pieces of equipment. Students implemented ideal forcing functions, tracked the time-delay through the entire plant, studied the response of open-loop unstable systems, and learned “good practices” in control system design by taking into account the real-world events where significant deviations from the “ideal” or “expected” response can occur. The theory of closed-loop stability was reinforced by implementing limiting proportional gain for stability limits of real plants. Finally, students were divided into several groups where each group was tasked to control a section of the plant within a set of operating limits in the face of disturbances and simulated process faults. At the end of this test, they suggested ways to improve the control system performance based on the theory they learned in class and the hands-on experience they earned while working on the OTS.

97 MATHEMATICS AND COMPUTING↗

Optimizing Blocking and Nonblocking Reduction Operations for Multicore Systems: Hierarchical Design and Implementation

Many scientific simulations, using the Message Passing Interface (MPI) programming model, are sensitive to the performance and scalability of reduction collective operations such as MPI Allreduce and MPI Reduce. These operations are the most widely used abstractions to perform mathematical operations over all processes that are part of the simulation. In this work, we propose a hierarchical design to implement the reduction operations on multicore systems. This design aims to improve the efficiency of reductions by 1) tailoring the algorithms and customizing the implementations for various communication mechanisms in the system 2) providing the ability to configure the depth of hierarchy to match the system architecture, and 3) providing the ability to independently progress each of this hierarchy. Using this design, we implement MPI Allreduce and MPI Reduce operations (and its nonblocking variants MPI Iallreduce and MPI Ireduce) for all message sizes, and evaluate on multiple architectures including InfiniBand and Cray XT5. We leverage and enhance our existing infrastructure, Cheetah, which is a framework for implementing hierarchical collective operations to implement these reductions. The experimental results show that the Cheetah reduction operations outperform the production-grade MPI implementations such as Open MPI default, Cray MPI, and MVAPICH2, demonstrating its efficiency, flexibility and portability. On Infini- Band systems, with a microbenchmark, a 512-process Cheetah nonblocking Allreduce and Reduce achieves a speedup of 23x and 10x, respectively, compared to the default Open MPI reductions. The blocking variants of the reduction operations also show similar performance benefits. A 512-process nonblocking Cheetah Allreduce achieves a speedup of 3x, compared to the default MVAPICH2 Allreduce implementation. On a Cray XT5 system, a 6144-process Cheetah Allreduce outperforms the Cray MPI by 145%. The evaluation with an application kernel, Conjugate Gradient solver, shows that the Cheetah reductions speeds up total time to solution by 195%, demonstrating the potential benefits for scientific simulations.

Gorentla Venkata, Manjunath↗

Matrix multiplication operations with data pre-conditioning in a high performance computing architecture

Mechanisms for performing matrix multiplication operations with data pre-conditioning in a high performance computing architecture are provided. A vector load operation is performed to load a first vector operand of the matrix multiplication operation to a first target vector register. A load and splat operation is performed to load an element of a second vector operand and replicating the element to each of a plurality of elements of a second target vector register. A multiply add operation is performed on elements of the first target vector register and elements of the second target vector register to generate a partial product of the matrix multiplication operation. The partial product of the matrix multiplication operation is accumulated with other partial products of the matrix multiplication operation.

97 MATHEMATICS AND COMPUTING↗

Store-operate-coherence-on-value

A system, method and computer program product for performing various store-operate instructions in a parallel computing environment that includes a plurality of processors and at least one cache memory device. A queue in the system receives, from a processor, a store-operate instruction that specifies under which condition a cache coherence operation is to be invoked. A hardware unit in the system runs the received store-operate instruction. The hardware unit evaluates whether a result of the running the received store-operate instruction satisfies the condition. The hardware unit invokes a cache coherence operation on a cache memory address associated with the received store-operate instruction if the result satisfies the condition. Otherwise, the hardware unit does not invoke the cache coherence operation on the cache memory device.

97 MATHEMATICS AND COMPUTING↗

Restoring Flow Regimes after Dam Construction and Operation: Evidence from Dynamic Systems Theory

Dams provide a variety of benefits to society, including hydropower generation, flood control, recreation, and water supply for municipal, industrial, and agricultural customers. However, constructing and operating dams for these purposes can negatively impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests has put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from eight rivers in the US to determine the dimensionality of each operating period and to analyze trends based on the primary purpose of dam operation. Hydropower dams operated without flow restrictions exhibit high dimensional, stochastic behavior. However, the system dimensionality is reduced to approximately three variables when ramping restrictions are implemented, or in cases where an afterbay is present to reregulate flows. This low dimensional behavior is more similar to natural flow regimes. For dams operated primarily for flood control or water supply, the flow regimes are typically low dimensional and more deterministic.

13 HYDRO ENERGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Compressing micro-operations in scheduler entries in a processor

An electronic device includes a processor having a micro-operation queue, multiple scheduler entries, and scheduler compression logic. When a pair of micro-operations in the micro-operation queue is compressible in accordance with one or more compressibility rules, the scheduler compression logic acquires the pair of micro-operations from the micro-operation queue and stores information from both micro-operations of the pair of micro-operations into different portions in a single scheduler entry. In this way, the scheduler compression logic compresses the pair of micro-operations into the single scheduler entry.

Boyer, Michael W.↗

EnergySolution's Clive Disposal Facility Operational Research Model - 13475

EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying processing bottlenecks and unused equipment and/or labor, improvements to operating efficiency could be determined and appropriate cost saving measures implemented. Model runs forecasting various scenarios helped illustrate potential impacts of certain conditions (e.g. 20% decrease in shipments arrived), variables (e.g. 20% decrease in labor), or other possible situations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Improvement of Measurement Instrumentation to Supervise Nuclear Operations and to Contribute Input Data to 3D Simulation Code - 13289

The CEA has developed many compact characterization tools to follow sensitive operations in a nuclear environment. Usually, these devices are made to carry out radiological inventories, to prepare nuclear interventions or to supervise some special operations. These in situ measurement techniques mainly take place at different stages of clean-up operations and decommissioning projects, but they are also in use to supervise sensitive operations when the nuclear plant is still operating. In addition to this, such tools are often associated with robots to access very highly radioactive areas, and thus can be used in accident situations. Last but not least, the radiological data collected can be entered in 3D calculation codes used to simulate the doses absorbed by workers in real time during operations in a nuclear environment. Faced with these ever-greater needs, nuclear measurement instrumentation always has to involve on-going improvement processes. Firstly, this paper will describe the latest developments and results obtained in both gamma and alpha imaging techniques. The gamma camera has been used by the CEA since the 1990's and several changes have made this device more sensitive, more compact and more competitive for nuclear plant operations. It is used to quickly identify hot spots, locating irradiating sources from 50 keV to 1500 keV. Several examples from a wide field of applications will be presented, together with the very latest developments. The alpha camera is a new camera used to see invisible alpha contamination on several kinds of surfaces. The latest results obtained allow real time supervision of a glove box cleaning operation (for {sup 241}Am contamination). The detection principle as well as the main trials and results obtained will be presented. Secondly, this paper will focus on in situ gamma spectrometry methods developed by the CEA with compact gamma spectrometry probes (CdZnTe, LaBr{sub 3}, NaI, etc.). The radiological data collected is used to quantify the activity of hot spots and can also then be entered in 3D models of nuclear plants to simulate intervention scenarios. Recent developments and results will be presented regarding this. Finally, thanks to a large amount of feedback, the interest of using complementary measurements will be discussed. In fact, the recent use of 3D simulation codes requires very accurate knowledge of nuclear plant radiological data. The use of coupled devices such as imaging devices, (gamma and alpha cameras), gamma spectrometry, dose rate mapping, collimated / un-collimated measurements and many other physical values gives an approach to the radiological knowledge of a process or plant with the lowest possible uncertainty. In line with this, the paper will conclude with the future developments and trials that could be assessed in that field of application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗