Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission Study Update

NASA commissioned the study of four large mission concepts, including the Large Ultraviolet / Optical / Infrared (LUVOIR) Surveyor, to be evaluated by the 2020 Decadal Survey in Astrophysics. In response, the Science and Technology Definition Team (STDT) identified a broad range of science objectives for LUVOIR that include the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the exchange of matter between galaxies, star and planet formation, and the remote sensing of Solar System objects. To meet these objectives, the LUVOIR Study Office, located at NASA’s Goddard Space Flight Center (GSFC), completed the first design iteration of a 15-m segmented-aperture observatory that would be launched by the Space Launch System (SLS) Block 2 configuration. The observatory includes four serviceable instruments: the Extreme Coronagraph for Living Planetary Systems (ECLIPS), an optical / near-infrared coronagraph capable of delivering 10^-10contrast at inner working angles as small as 2 O/D; the LUVOIR UV Multi-object Spectrograph (LUMOS), which will provide low- and medium-resolution UV (100 – 400 nm) multi-object imaging spectroscopy in addition to far-UV imaging; the High Definition Imager (HDI), a high-resolution wide-field-of-view NUV-Optical-NIR imager; and Pollux, a high-resolution UV spectro-polarimeter being contributed by Centre National d’Etudes Spatiales (CNES).The study team has executed a second design iteration to further improve upon the 15-m concept, while simultaneously studying an 8-m concept. In these proceedings, we provide an update on these two architectures.

space telescopes↗

Volatiles Investigating Polar Exploration Rover (VIPER)

VIPER is a lunar volatiles detection and measurement mission that will be launched as a payload on the CLPS (Commercial Lunar Payload Services) provided Astrobotic's Griffin lander to the lunar south polar region. VIPER includes a suite of rover-mounted instruments that will conduct science and map volatiles (especially hydrogen-bearing volatiles). The VIPER rover is also designed to excavate volatiles such as hydrogen, oxygen, and water from the Moon. After landing the VIPER rover will travel to investigate a range of Ice Stability Regions (ISRs) across scales from 100s of meters to kilometers and conduct surface and subsurface assessment of lunar water and other volatiles. The VIPER science mission team will use the instrument data to characterize the nature of the volatiles in the area and to extrapolate these data to create global lunar water resource maps. The expected lunar surface mission duration is up to four lunar days, with active surface operations during the periods when both Sun exposure and direct to Earth (DTE) communication conditions overlap. When comm and Sun are not both available, VIPER will go into ‘Safe Haven operations’ and maintain survival temperatures until Sun and comm return. The rover is controlled in near-real time and science decisions are made both tactically (short-term) and strategically (longer-term) to achieve the mission science success criteria and objectives.

Anthony Colaprete↗

Hubble Space Telescope - First Servicing Mission

Space Shuttle mission STS-61 was the first of several planned servicing missions for HST, intended to periodically replace failed components and upgrade scientific instruments with improved versions to keep the telescope viable and productive throughout its planned 15-year lifetime. This First Servicing Mission was also intended to correct several design flaws that were detected shortly after the launch of HST. There were three overall mission objectives for the STS-61 repair mission: 1) To Restore the Planned Scientific Capabilities: One complexity of the First Servicing Mission was the necessity for adding optical elements in the light path to correct the spherical aberration. These corrective optics were required to provide the quantitative science capability to enable key scientific programs to be carried out as originally planned. The addition of the COSTAR and the installation of WFPC2 both contributed to recovering these capabilities. 2) To Restore the Reliability of Vehicle Systems: Failed or degraded components had depleted some of the original subsystem redundancy, which had to be restored to allow continued science operations until the next servicing mission in 1997. Anomalous components that required servicing included the solar arrays, gyroscope sensing units, gyroscope electronics, magnetometers, solar array drive electronics, and electrical fuses. 3) To Validate the On-Orbit Servicing Concept for HST: Validation of the concept of on-orbit servicing as the way to achieve HST's full 15-year life was required to provide a foundation for future servicing missions.

Source record↗

Determining the Probability of Violating Upper-Level Wind Constraints for the Launch of Minuteman III Ballistic Missiles at Vandenberg Air Force Base

The 30th Operational Support Squadron Weather Flight (30 OSSWF) provides comprehensive weather services to the space program at Vandenberg Air Force Base (VAFB) in California. One of their responsibilities is to monitor upper-level winds to ensure safe launch operations of the Minuteman Ill ballistic missile. The 30 OSSWF tasked the Applied Meteorology Unit (AMU) to analyze VAFB sounding data with the goal of determining the probability of violating (PoV) their upper-level thresholds for wind speed and shear constraints specific to this launch vehicle, and to develop a tool that will calculate the PoV of each constraint on the day of launch. In order to calculate the probability of exceeding each constraint, the AMU collected and analyzed historical data from VAFB. The historical sounding data were retrieved from the National Oceanic and Atmospheric Administration Earth System Research Laboratory archive for the years 1994-2011 and then stratified into four sub-seasons: January-March, April-June, July-September, and October-December. The AMU determined the theoretical distributions that best fit the maximum wind speed and maximum wind shear datasets and applied this information when calculating the averages and standard deviations needed for the historical and real-time PoV calculations. In addition, the AMU included forecast sounding data from the Rapid Refresh model. This information provides further insight for the launch weather officers (LWOs) when determining if a wind constraint violation will occur over the next few hours on the day of launch. The AMU developed an interactive graphical user interface (GUI) in Microsoft Excel using Visual Basic for Applications. The GUI displays the critical sounding data easily and quickly for LWOs on day of launch. This tool will replace the existing one used by the 30 OSSWF, assist the LWOs in determining the probability of exceeding specific wind threshold values, and help to improve the overall upper winds forecast for the launch customer. This presentation will describe how the AMU calculated the historical and real-time PoV values for the specific upper-level wind launch constraints and outline the development of the interactive GUI display.

Shafer, Jaclyn A.↗

Determining the Probability of Violating Upper-Level Wind Constraints for the Launch of Minuteman Ill Ballistic Missiles At Vandenberg Air Force Base

The 30th Operational Support Squadron Weather Flight (30 OSSWF) provides comprehensive weather services to the space program at Vandenberg Air Force Base (VAFB) in California. One of their responsibilities is to monitor upper-level winds to ensure safe launch operations of the Minuteman Ill ballistic missile. The 30 OSSWF requested the Applied Meteorology Unit (AMU) analyze VAFB sounding data to determine the probability of violating (PoV) upper-level thresholds for wind speed and shear constraints specific to this launch vehicle, and to develop a graphical user interface (GUI) that will calculate the PoV of each constraint on the day of launch. The AMU suggested also including forecast sounding data from the Rapid Refresh (RAP) model. This would provide further insight for the launch weather officers (LWOs) when determining if a wind constraint violation will occur over the next few hours, and help to improve the overall upper winds forecast on launch day.

Shafer, Jaclyn A.↗

Anvil Forecast Tool in the Advanced Weather Interactive Processing System (AWIPS)

Launch Weather Officers (LWOs) from the 45th Weather Squadron (45 WS) and forecasters from the National Weather Service (NWS) Spaceflight Meteorology Group (SMG) have identified anvil forecasting as one of their most challenging tasks when predicting the probability of violating the Lightning Launch Commit Criteria (LLCC) (Krider et al. 2006; Space Shuttle Flight Rules (FR), NASA/JSC 2004)). As a result, the Applied Meteorology Unit (AMU) developed a tool that creates an anvil threat corridor graphic that can be overlaid on satellite imagery using the Meteorological Interactive Data Display System (MIDDS, Short and Wheeler, 2002). The tool helps forecasters estimate the locations of thunderstorm anvils at one, two, and three hours into the future. It has been used extensively in launch and landing operations by both the 45 WS and SMG. The Advanced Weather Interactive Processing System (AWIPS) is now used along with MIDDS for weather analysis and display at SMG. In Phase I of this task, SMG tasked the AMU to transition the tool from MIDDS to AWIPS (Barrett et aI., 2007). For Phase II, SMG requested the AMU make the Anvil Forecast Tool in AWIPS more configurable by creating the capability to read model gridded data from user-defined model files instead of hard-coded files. An NWS local AWIPS application called AGRID was used to accomplish this. In addition, SMG needed to be able to define the pressure levels for the model data, instead of hard-coding the bottom level as 300 mb and the top level as 150 mb. This paper describes the initial development of the Anvil Forecast Tool for MIDDS, followed by the migration of the tool to AWIPS in Phase I. It then gives a detailed presentation of the Phase II improvements to the AWIPS tool.

Barrett, Joe H., III↗

NASA Space Exploration Logistics Workshop Proceedings

As NASA has embarked on a new Vision for Space Exploration, there is new energy and focus around the area of manned space exploration. These activities encompass the design of new vehicles such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV) and the identification of commercial opportunities for space transportation services, as well as continued operations of the Space Shuttle and the International Space Station. Reaching the Moon and eventually Mars with a mix of both robotic and human explorers for short term missions is a formidable challenge in itself. How to achieve this in a safe, efficient and long-term sustainable way is yet another question. The challenge is not only one of vehicle design, launch, and operations but also one of space logistics. Oftentimes, logistical issues are not given enough consideration upfront, in relation to the large share of operating budgets they consume. In this context, a group of 54 experts in space logistics met for a two-day workshop to discuss the following key questions: 1. What is the current state-of the art in space logistics, in terms of architectures, concepts, technologies as well as enabling processes? 2. What are the main challenges for space logistics for future human exploration of the Moon and Mars, at the intersection of engineering and space operations? 3. What lessons can be drawn from past successes and failures in human space flight logistics? 4. What lessons and connections do we see from terrestrial analogies as well as activities in other areas, such as U.S. military logistics? 5. What key advances are required to enable long-term success in the context of a future interplanetary supply chain? These proceedings summarize the outcomes of the workshop, reference particular presentations, panels and breakout sessions, and record specific observations that should help guide future efforts.

deWeek, Oliver↗

Human Space Flight and Future Major Space Astrophysics Missions: Servicing and Assembly

Some concepts for candidate future "flagship" space observatories approach the payload limits of the largest launch vehicles planned for the next few decades, specifically in the available volume in the vehicle fairing. This indicates that an alternative to autonomous self-deployment similar to that of the James Webb Space Telescope will eventually be required. Moreover, even before this size limit is reached, there will be significant motivation to service, repair, and upgrade in-space missions of all sizes, whether to extend the life of expensive facilities or to replace outworn or obsolete onboard systems as was demonstrated so effectively by the Hubble Space Telescope program. In parallel with these challenges to future major space astronomy missions, the capabilities of in-space robotic systems and the goals for human space flight in the 2020s and 2030s offer opportunities for achieving the most exciting science goals of the early 21st Century. In this paper, we summarize the history of concepts for human operations beyond the immediate vicinity of the Earth, the importance of very large apertures for scientific discovery, and current capabilities and future developments in robot- and astronaut-enabled servicing and assembly.

Hubble Space Telescope↗

A Concept of Operations (ConOps) of an In-time Aviation Safety Management System (IASMS) for Advanced Air Mobility (AAM)

The growth of new emerging operations involving Advanced Air Mobility (AAM) necessitates developing a perspective for an In-time Aviation Safety Management System (IASMS). This perspective advances from the National Academies report on IASMS and its recommendation for developing a Concept of Operations (ConOps) for IASMS. A ConOps has been developed for In-time System-Wide Safety Assurance (ISSA) from which the IASMS ConOps pivots to provide a robust scope commensurate with the broad vision defined by the National Academies. The IASMS ConOps focuses on emerging operations and spans innovations in Unmanned Aircraft System (UAS) and an increasingly complex ecosystem comprised of a widening mix of vehicles and technologies, Urban Air Mobility (UAM) with industry-federated services, traditional operations, as well as new supersonic aircraft and space launch systems.The challenge for the IASMS ConOps is to be broad to encompass innovations in the coming years and decades while agile to ensure levels of safety compatible with operational and certification requirements of the National Airspace System (NAS). The IASMS ConOps interweaves increasing complexity of operational safety capabilities and unlocking UAS Maturity Levels (UMLs). The relationships between increased complexity of automation and automated systems, fewer operators who are not as traditionally higher skilled, more complex operational environments, and aviation operations management with mixed aircraft and equipage pose a multi-dimensional space for IASMS capabilities essential for safety assurance and risk management. Instantiating IASMS capabilities and how they would be integral to AAM operations and increasing maturity of UAM could be accomplished through a series of Safety Demonstrators. These Safety Demonstrators could provide increased understanding and insight into use of controls for risk mitigation, means of compliance for certification, and operational experience with safety services such as in relation to contingency management. The IASMS capabilities can be viewed as initially residing with the vehicle, airspace, and Supplemental Data Service Provider (SDSP). For example, vehicle capabilities include communications including the command and control link, Remote Identification (ID), conflict advisory/alerting, and UAS system monitoring. These capabilities monitor and assess data such as battery health, aircraft state, and human performance. Complexity of ISAMS capabilities depends on a number of factors. These factors are intendedonly as a notional categorization with the purpose being to reflect the complexity of the AAM ecosystem that would drive up the complexity of ISSA capabilities including systems, sensors, models, standards, and controls. Factors could include the Vehicle Flight Management, Environment, Airspace, and Contingency Management. Each of these factors can be comprised of multiple sub-factors that contribute to increasing complexity. For example, Airspace at a lower level of complexity could be dedicated to UTM operations that are unmonitored, and at a higher level of complexity could involve mixed UTM and ATM operations. The IASMS concept includes safety services that provide data and information to different participants in AAM. The roles and responsibilities of participants can be defined using the Responsible-Accountable-Consulted-Informed (RACI) analysis. For example, for the safety service involving the Remote ID, the Operator would be accountable for providing the data, the Vehicle would be responsible for transmitting it, and the USS, SDSP, Vertiports, FIMS (FAA), and Public Entities such as safety services would be informed by receiving the data. The IASMS ConOps identifies the capabilities needed for risk mitigation and safety assurance in the increasingly complex national airspace. The ConOps serves as a pathway for engaging with industry to gain operational experience including through the Safety Demonstrator series, the RACI analysis, and operational complexity factors. The ConOps serves to integrate these different perspectives to build a cohesive and cogent approach to an AAM safety management system.

In-Time Aviation Safety Management System↗

SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

Shoemaker, Marc D.↗

MSL Project Update

Mars Science Lab (MSL) Project activities over the last 3-4 months focused on: a) Payload accommodation; b) Flight system architecture definitization; c) Program architecture support. Baseline project concept is to develop and fly two identical vehicles with launches in 2009 and 2011: a) Significant programmatic uncertainty remains due to NASA strategic issues (Shuttle Return to flight, Hubble servicing, CEV, etc.); b) Final "decisions" on future program not likely for 3-4 months; c) To maintain viability for a 2009 launch, the project must rapidly move into implementation mode despite this uncertainty. Near term activities: a) Converge baseline flight system architecture & instrument accommodation - June; b) Instrument accomodation reviews (IARs) are completed for DAN, MSSS instruments; c) Develop project-wide implementation plan & integrated schedule - June; d) Conduct grassroots cost exercise - July/August; e) Hold Preliminary Mission System Review - September.

Mars↗

Evolution of International Space Station GN&C System Across ISS Assembly Stages

The Guidance Navigation and Control (GN&C) system for the International Space Station is initially implemented by the Functional Cargo Block (FGB) which was built by the Khrunichev Space Center under direct contract to Boeing. This element (Stage 1A/R) was launched on 20 November 1998 and is currently operating on-orbit. The components and capabilities of the FGB Motion Control System (MCS) are described. The next ISS element, which has GN&C functionality will be the Service Module (SM) built by Rocket Space Corporation-Energia. This module is scheduled for launch (Stage 1R) in early 2000. Following activation of the SM GN&C system, the FGB MCS is deactivated and no longer used. The components and capabilities of the SM GN&C system are described. When a Progress vehicle is attached to the ISS it can be used for reboost operations, based on commands provided by the Mission Control Center-Moscow. When a data connection is implemented between the SM and the Progress, the SM can command the Progress thrusters for attitude control and reboosts. On Stage 5A, the U.S. GN&C system will become activated when the U.S. Laboratory is de loyed and installed (launch schedule is currently TBD). The U.S. GN&C system provides non-propulsive control capabilities to support micro-gravity operations and minimize the use of propellant for attitude control, and an independent capability for determining the ISS state vector, attitude, attitude rate. and time.. The components and capabilities of the U.S. GN&C system are described and the interactions between the U.S. and Russian Segment GN&C systems are also described.

Lee, Roscoe↗

Just in Time in Space or Space Based JIT

Our satellite systems are mega-buck items. In today's cost conscious world, we need to reduce the overall costs of satellites if our space program is to survive. One way to accomplish this would be through on-orbit maintenance of parts on the orbiting craft. In order to accomplish maintenance at a low cost I advance the hypothesis of having parts and pieces (spares) waiting. Waiting in the sense of having something when you need it, or just-in-time. The JIT concept can actually be applied to space processes. Its definition has to be changed just enough to encompass the needs of space. Our space engineers tell us which parts and pieces the satellite systems might be needing once in orbit. These items are stored in space for the time of need and can be ready when they are needed -- or Space Based JIT. When a system has a problem, the repair facility is near by and through human or robotics intervention, it can be brought back into service. Through a JIT process, overall system costs could be reduced as standardization of parts is built into satellite systems to facilitate reduced numbers of parts being stored. Launch costs will be contained as fewer spare pieces need to be included in the launch vehicle and the space program will continue to thrive even in this era of reduced budgets. The concept of using an orbiting parts servicer and human or robotics maintenance/repair capabilities would extend satellite life-cycle and reduce system replacement launches. Reductions of this nature throughout the satellite program result in cost savings.

VanOrsdel, Kathleen G.↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Rendezvous Fiducial Implementation in A Space Vehicle Life Cycle

Rendezvous and capture of legacy satellites is significantly more challenging than rendezvous and capture of satellites prepared with servicing inter-faces. Rendezvous fiducial markers (or fiducials) are a low cost, low mass, simple but effective tool to bridge the gap between legacy and prepared satellites. This paper presents the motivation for rendezvous fiducials as well as analysis demonstrating the improvement in state estimation accuracy with fiducials on the client satellite or space object. Included herein is a review of the life cycle of rendezvous fiducials such as the incorporation into a space vehicle design and photo documentation of the pre-launch installation. Answers to key implementation questions are answered: How many fiducials? Where should they be placed? What does the eventual servicer need to know? NASA case studies from the recently launched James Webb Space Telescope and in-design Nancy Grace Roman Space Telescope are included for illustration.

Fiducial↗

Mechanical properties of Skylab thermal shield materials after prolonged ultraviolet irradiation

In response to an emergency request, the mechanical properties of two complex laminate materials, used as thermal shields on the Skylab spacecraft, were investigated. Concern over the prolonged use of these materials in the space environment prompted this investigation. Shields made of both of these materials, popularly called the parasol and the sail types, were taken to the Skylab spacecraft by the original Skylab astronauts. Both were used to restore thermal control after the original control surfaces were damaged during launch. During the tests the tensile properties were measured at anticipated service temperature and after prolonged exposure to increasing degrees of ultraviolet radiation at intensities approaching two solar constants. Some samples received exposures equivalent to 2,350 hours. The performance and degradation of the two materials are presented in terms of orientation, vacuum, and degree of irradiation. In general, the 75-micron (3-mil) parasol laminate showed a decrease in tensile properties as a function of exposure time, while the 200-micron (8-mil) sail laminate was little affected by exposure to the ultraviolet radiation.

Haehner, C. L.↗

Canadian Space Station program

Information on the Canadian Space Station Program is given in viewgraph form. Topics covered include the Mobile Servicing Center (MSC), Space Station Freedom assembly milestones, the MB-3 launch configuration, a new workstation configuration, strategic technology development, the User Development Program, the Space Station Program budget, and Canada's future space activities.

Doetsch, K. H.↗