Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “information services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Satellite provided customer premise services: A forecast of potential domestic demand through the year 2000. Volume 2: Technical report

The potential United States domestic telecommunications demand for satellite provided customer premises voice, data and video services through the year 2000 were forecast, so that this information on service demand would be available to aid in NASA program planning. To accomplish this overall purpose the following objectives were achieved: development of a forecast of the total domestic telecommunications demand, identification of that portion of the telecommunications demand suitable for transmission by satellite systems, identification of that portion of the satellite market addressable by Computer premises services systems, identification of that portion of the satellite market addressabble by Ka-band CPS system, and postulation of a Ka-band CPS network on a nationwide and local level. The approach employed included the use of a variety of forecasting models, a market distribution model and a network optimization model. Forecasts were developed for; 1980, 1990, and 2000; voice, data and video services; terrestrial and satellite delivery modes; and C, Ku and Ka-bands.

Kratochvil, D.↗

European Mobile Satellite Services (EMSS): A regional system for Europe

The European Space Agency is presently procuring two L-band payloads in order to promote a regional system for the provision of European Mobile Satellite Services (EMSS). These are the EMS payload on the Italsat I-F2 satellite and the LLM payload on the ARTEMIS satellite. Telecommunication system studies have been concentrating on mobile applications where full European geographical coverage is required. Potential applications include high priority Private Mobile Radio networks requiring national or European coverage, such as civil security, fire brigades, police and health services, as well as a dedicated system for provision of Air Traffic Services to the civil aviation community. A typical application is an intelligent road traffic management system combining a geographically selective traffic data collection service based on probe vehicles with a geographically selective traffic information broadcast service. Network architectures and bearer services have been developed both for data only and voice/data services. Vehicle mounted mobile transceivers using CDMA access techniques have been developed. The EMSS operational phase will start with the EMS payload in orbit in 1996 and continue with the LLM payload in 1997.

Loisy, C.↗

Expansion of the Real-time Sport-land Information System for NOAA/National Weather Service Situational Awareness and Local Modeling Applications

The NASA Short-term Prediction Research and Transition (SPoRT) Center has been running a real-time version of the Land Information System (LIS) since summer 2010 (hereafter, SPoRTLIS). The real-time SPoRT-LIS runs the Noah land surface model (LSM) in an offline capacity apart from a numerical weather prediction model, using input atmospheric and precipitation analyses (i.e., "forcings") to drive the Noah LSM integration at 3-km resolution. Its objectives are to (1) produce local-scale information about the soil state for NOAA/National Weather Service (NWS) situational awareness applications such as drought monitoring and assessing flood potential, and (2) provide land surface initialization fields for local modeling initiatives. The current domain extent has been limited by the input atmospheric analyses that drive the Noah LSM integration within SPoRT-LIS, specifically the National Centers for Environmental Prediction (NCEP) Stage IV precipitation analyses. Due to the nature of the geographical edges of the Stage IV precipitation grid and its limitations in the western U.S., the SPoRT-LIS was originally confined to a domain fully nested within the Stage IV grid, over the southeastern half of the Conterminous United States (CONUS). In order to expand the real-time SPoRT-LIS to a full CONUS domain, alternative precipitation forcing datasets were explored in year-long, offline comparison runs of the Noah LSM. Based on results of these comparison simulations, we chose to implement the radar/gauge-based precipitation analyses from the National Severe Storms Laboratory as a replacement to the Stage IV product. The Multi-Radar Multi-Sensor (MRMS; formerly known as the National Mosaic and multi-sensor Quantitative precipitation estimate) product has full CONUS coverage at higher-resolution, thereby providing better coverage and greater detail than that of the Stage IV product. This paper will describe the expanded/upgraded SPoRT-LIS, present comparisons between the original and upgraded SPoRT-LIS, and discuss the path forward for future collaboration opportunities with SPoRT partners in the NWS.

Case, Jonathan L.↗

Waste Management Improvement Initiatives at Atomic Energy of Canada Limited - 13091

Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories (CRL) has been in operation for over 60 years. Radioactive, mixed, hazardous and non-hazardous wastes have been and continue to be generated at CRL as a result of research and development, radioisotope production, reactor operation and facility decommissioning activities. AECL has implemented several improvement initiatives at CRL to simplify the interface between waste generators and waste receivers: - Introduction of trained Waste Officers representing their facilities or activities at CRL; - Establishment of a Waste Management Customer Support Service as a Single-Point of Contact to provide guidance to waste generators for all waste management processes; and - Implementation of a streamlined approach for waste identification with emphasis on early identification of waste types and potential disposition paths. As a result of implementing these improvement initiatives, improvements in waste management and waste transfer efficiencies have been realized at CRL. These included: 1) waste generators contacting the Customer Support Service for information or guidance instead of various waste receivers; 2) more clear and consistent guidance provided to waste generators for waste management through the Customer Support Service; 3) more consistent and correct waste information provided to waste receivers through Waste Officers, resulting in reduced time and resources required for waste management (i.e., overall cost); 4) improved waste minimization and segregation approaches, as identified by in-house Waste Officers; and 5) enhanced communication between waste generators and waste management groups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Promoting a Rapid Deployment of New Services for Remote Reference at a National Laboratory

Libraries around the world use Springshare library products to expand their reference and information literacy services. The scholarly literature primarily addresses the use of Springshare’s LibGuides and LibChat in academic libraries. During the COVID-19 pandemic, virtual reference became the norm at all types of libraries, many turning to new tools to serve their patrons. This article describes the implementation and marketing of LibGuides and LibChat applications at the Los Alamos National Laboratory Research Library at the Los Alamos National Laboratory (LANL). These Springshare tools helped the LANL Research Library close service gaps during the COVID-19 work from home initiative at LANL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Standard formatted data units-control authority procedures

The purpose of this document is to establish a set of minimum and optional requirements for the implementation of Control Authority (CA) organizations within and among the Agencies participating in the Consultative Committee for Space Data Systems (CCSDS). By satisfying these requirements, the resultant cooperating set of CA organizations will produce a global CA service supporting information transfer with digital data under the Standard Formatted Data Unit (SFDU) concept. This service is primarily accomplished through the registration, permanent archiving, and dissemination of metadata in the form of Metadata Objects (MDO) that assist in the interpretation of data objects received in SFDU form. This Recommendation addresses the responsibilities, services, and interface protocols for a hierarchy of CA organizations. The top level, consisting of the CCSDS Secretariat and its operational agent, is unique and primarily provides a global coordination function. The lower levels are Agency CA organizations that have primary responsibility for the registration, archiving, and dissemination of MDOs. As experience is gained and technology evolves, the CA Procedures will be extended to include enhanced services and their supporting protocols. In particular, it is anticipated that eventually CA organizations will be linked via networks on a global basis, and will provide requestors with online automated access to CA services. While this Recommendation does not preclude such operations, it also does not recommend the specific protocols to be used to ensure global compatibility of these services. These recommendations will be generated as experience is gained.

Source record↗

Mission Operations and Information Management Area Spacecraft Monitoring and Control Working Group

Working group goals for this year are: Goal 1. Due to many review comments the green books will be updated and available for re-review by CCSDS. Submission of green books to CCSDS for approval. Goal 2.Initial set of 4 new drafts of the red books as following: SM&C protocol: update with received comments. SM&C common services: update with received comments and expand the service specification. SM&C core services: update with received comments and expand the service the information model. SM&C time services: (target objective): produce initial draft following template of core services.

Lokerson, Donald C.↗

Airport Analyses Informing New Mobility Shifts: Opportunities to Adapt Energy-Efficient Mobility Services and Infrastructure: Preprint

An airport is one of the most important assets for a region's economic development and connectivity with the rest of the nation and world. Key aspects for investigation of energy efficient mobility at airports is ground transportation including factors ranging from the infrastructure, mobility services, and associated revenues. Data is critical to understand the maturity of new mobility services that can inform both cities and airports on how to respond, approach, manage, and adapt to the challenges, opportunities, and uncertainties associated with shifts in new mobility that influence human behavior, energy-efficiency and sustainability strategies. One key question identified in this article is how quickly we are adapting to new mobility options - such as app-based ride-hailing and 'pooling' services - that may provide an opportunity to influence energy efficiency of ground transportation to and from airports. By starting with airports in the regions of four smart city finalists in the U.S. DOT Smart City Challenge, this paper focuses on key observability aspects of new modes and the rate of shifts in mobility patterns across San Francisco, Portland, Denver, and Kansas City. With the emerging megatrend of rising urbanization and rising air travel demand (a predicted doubling in demand by 2035), airports are expected to increasingly be on the front lines of adaptation to new transportation technology and services in terms of infrastructure investments, policies, and revenues. As airports have demonstrated the most potential and capability of any public institution to implement fees for new ride-hailing services, they are also a prime resource for collecting important data to help understand smart mobility transitions. Results focused on the shifts in revenues for ground transportation at airports offer one vantage point into the pace of transitions and adaptations in the new emerging mobility landscape, and present an opportunity to analyze how future adaptations could support more energy-efficient scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Global Change Data Center: Mission, Organization, Major Activities, and 2001 Highlights

Rapid efficient access to Earth sciences data is fundamental to the Nation's efforts to understand the effects of global environmental changes and their implications for public policy. It becomes a bigger challenge in the future when data volumes increase further and missions with constellations of satellites start to appear. Demands on data storage, data access, network throughput, processing power, and database and information management are increased by orders of magnitude, while budgets remain constant and even shrink. The Global Change Data Center's (GCDC) mission is to provide systems, data products, and information management services to maximize the availability and utility of NASA's Earth science data. The specific objectives are (1) support Earth science missions be developing and operating systems to generate, archive, and distribute data products and information; (2) develop innovative information systems for processing, archiving, accessing, visualizing, and communicating Earth science data; and (3) develop value-added products and services to promote broader utilization of NASA Earth Sciences Enterprise (ESE) data and information. The ultimate product of GCDC activities is access to data and information to support research, education, and public policy.

Wharton, Stephen W.↗

Advanced information processing system: Inter-computer communication services

The purpose is to document the functional requirements and detailed specifications for the Inter-Computer Communications Services (ICCS) of the Advanced Information Processing System (AIPS). An introductory section is provided to outline the overall architecture and functional requirements of the AIPS and to present an overview of the ICCS. An overview of the AIPS architecture as well as a brief description of the AIPS software is given. The guarantees of the ICCS are provided, and the ICCS is described as a seven-layered International Standards Organization (ISO) Model. The ICCS functional requirements, functional design, and detailed specifications as well as each layer of the ICCS are also described. A summary of results and suggestions for future work are presented.

Burkhardt, Laura↗

State Technical Assistance - New Mexico Energy and Conservation Management Division Report [Slides]

The New Mexico Energy and Conservation Management Division (ECMD) sought technical assistance to enhance their ability to evaluate program impacts using the Low-Income Energy Affordability Data (LEAD) tool. NLR assisted ECMD in leveraging the LEAD tool to calculate and analyze energy burden across electric utility service areas, enabling them to assess program outcomes more effectively. To meet ECMD's goals, NLR developed a customized methodology to calculate utility-specific energy burden metrics using census tract data and available utility service area information from the Energy Information Administration (EIA). While acknowledging some limitations in the EIA dataset, NLR estimated the percentage of households within each service territory and incorporated relevant filters such as income, housing characteristics, and other demographics from the LEAD tool. The analysis provided ECMD with a new capability to evaluate program success based on energy savings, reductions in energy burden, and other performance indicators. The data and methodology also support discussions with utilities to improve the accuracy of service territory datasets. ECMD can use the outputs to track program effectiveness and plan future initiatives. NLR offered the possibility of follow-on work, including capacity-building for ECMD to repeat the analysis independently and the option to refine the analysis with updated service.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Gamma greenhouse: A chronic facility for crops improvement and agrobiotechnology

Gamma irradiation is one of the most common procedures in plant mutagenesis and agrobiotechnology activities. The procedures consist of chronic and acute gamma radiation. Generally, {sup 60}Co and {sup 137}Cs are gamma radiation sources for radiation processing with relatively high energy (half-life 5.27 years for {sup 60}Co and 30.1 years for {sup 137}Cs). The energy associated with gamma radiation is high enough to break the molecular bonds and ionize atoms without affecting structure of the atomic nucleus (avoiding induction of radioactivity). The Gamma Green House (GGH) is the only chronic irradiation facility in Malaysia, located at Malaysian Nuclear Agency (Nuclear Malaysia). GGH is used for induction of mutation in plants and other biological samples at low dose radiation over period of time depending on the nature and sensitivity of the plant species. The GGH consist of circular green house with 30 meters radius, control room and irradiator with interlock system. The irradiator produces low dose gamma radiation derived from Caesium-137 radioactive source. The biological samples can be exposed to low dose radiation in days, weeks, months or years. The current irradiation rate for GGH is 2.67 Gy/hr at 1 meter from the source. Chronic gamma irradiation produces a wider mutation spectrum and useful for minimizing radiation damages towards obtaining new improved traits for research and commercial values. The prospect of the gamma greenhouse is its uses in research, educations and services on induced mutation techniques for the improvement of plant varieties and microbes. In generating awareness and attract users to the facility, Nuclear Malaysia provides wide range of irradiation services for plant species and mutagenesis consultancies to academicians, students scientists, and plant breeders, from local universities, other research institutes, and growers. Charges for irradiation and consultancy services are at nominal rates. The utilization activities of the gamma greenhouse mainly cover Research and Development, Research Collaboration, Exchange of Information, Irradiation Services, Training Programs, Education, Exchange of Scientists and Seminars/ Conferences.

60 APPLIED LIFE SCIENCES↗

Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV using Temperature and Pressure Acceleration

Composite Overwrapped Pressure Vessel (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Sometimes lifetime testing is performed on an actual COPV in service in an effort to validate the reliability model that is the basis for certifying the continued flight worthiness of its sisters. Currently, testing of such a Kevlar49(registered TradeMark)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the data base and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one nine , that is, reducing the probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several would be necessary.

Phoenix, S. Leigh↗

Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV Using Temperature and Pressure Acceleration

Composite Overwrapped Pressure Vessels (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Flight certification is dependent on the reliability analysis to quantify the risk of stress rupture failure in existing flight vessels. Full certification of this reliability model would require a statistically significant number of lifetime tests to be performed and is impractical given the cost and limited flight hardware for certification testing purposes. One approach to confirm the reliability model is to perform a stress rupture test on a flight COPV. Currently, testing of such a Kevlar49 (Dupont)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the database and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio model is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one "nine," that is, reducing the predicted probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several vessels would be necessary.

Phoenix, S. Leigh↗