Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Digital Twin-Enabled Adaptive Control for Hydroelectric Systems: Turbine Governor and Voltage Regulation

This paper presents a comprehensive digital twin (DT) framework for hydroelectric systems that enables adaptive control of turbine governors and excitation systems without requiring detailed manufacturer specifications. The proposed framework integrates neural network-based system identification with stabilizing adaptive control laws for the installed turbine controller and middle-branch adaptive tuning for the installed voltage regulator. Using real operational data from Unit C-8 at Rocky Reach Dam (1,349 MW capacity), highfidelity neural network models are developed to capture turbine and generator dynamics without requiring detailed manufacturer specifications. The DT enables safe controller synthesis and validation in simulation before deployment. For turbine control, the proposed method achieves a 79.9% mean square error (MSE) reduction compared with that of an optimal controller. For voltage regulation, the adaptive excitation controller achieves approximately 42.6% MSE reduction while preserving installed protection logic. The results demonstrate that DT technology provides a practical pathway for modernizing hydropower control systems with minimal operational disruption.

Gui, Yonghao [ORNL] (ORCID:0000000250435534)↗

Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.

13 HYDRO ENERGY↗

Development and application of a standardized flow measurement uncertainty analysis framework to various low-head short-converging intake types across the United States federal hydropower fleet

Turbine discharges at low-head short converging intakes are difficult to measure accurately. The proximity of the measurement section to the intake entrance admits large uncertainties related to asymmetry of the velocity profile, swirl, and turbulence. Existing turbine performance codes [10, 24] do not address this special case and published literature is largely silent on rigorous evaluation of uncertainties associated with this measurement context. The American Society of Mechanical Engineers (ASME) Committee investigated the use of Acoustic transit time (ATT), Acoustic scintillation (AS), and Current meter (CM) in a short converging intake at the Kootenay Canal Generating Station in 2009. Based on their findings, a standardized uncertainty analysis (UA) framework for velocity-area method (specifically for CM measurements) is presented in this paper given the fact that CM is still the most fundamental and common type of measurement system. Typical sources of systematic and random errors associated with CM measurements are investigated, and the major sources of uncertainties associated with turbulence and velocity fluctuations, numerical velocity integration technique (bi-cubic spline), and the number and placement of current meters are being considered for an evaluation. Since the velocity measurements in a short converging intake are associated with complex nonlinear and time varying uncertainties (e.g., Reynolds stress in fluid dynamics), simply applying the law of propagation of uncertainty is known to overestimate the measurement variance while the Monte Carlo method does not. Therefore, a pseudo-Monte Carlo simulation method (random flow generation technique [8]) which was initially developed for the purpose of establishing upstream or initial conditions in the Large-Eddy Simulation (LES) and the Direct Numerical Simulation (DNS) is used to statistically determine uncertainties associated with turbulence and velocity fluctuations. This technique is then combined with a bi-cubic spline interpolation method which converts point velocities into a continuous velocity distribution over the measurement domain. Subsequently the number and placement of current meters are simulated to investigate the accuracy of the estimated flow rates using the numerical velocity-area integration method outlined in ISO 3354 [12]. The authors herein consider that statistics on generated flow rates processed with bi-cubic interpolation and sensor simulations are the combined uncertainties which already accounted for the effects of all those three uncertainty sources. A preliminary analysis based on the current meter data obtained through an upgrade acceptance test of a single unit located in a mainstem plant has been presented.

Smith, Brennan T↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Dynamic Modeling and Grid Interaction of a Tidal and River Generator

This presentation provides a high-level overview of the deployment of a river generator installed in a small system. The turbine dynamics of a river generator, electrical generator, and power converter are modeled in detail. Various simulations can be exercised, and the impact of different control algorithms, failures of power switches, and corresponding impacts can be examined.

13 HYDRO ENERGY↗

Report to Congress on the Potential Environmental Effects of Marine and Hydrokinetic Energy Technologies

This report focuses on potential impacts of marine and hydrokinetic technologies to aquatic environments (i.e. rivers, estuaries, and oceans), fish and fish habitats, ecological relationships, and other marine and freshwater aquatic resources. The report does not address impacts to terrestrial ecosystems and organisms that are common to other electricity-generating technologies (e.g., construction and maintenance of transmission lines) or possible effects on the human environment, including: human use conflicts, aesthetics, viewsheds, noise in the terrestrial environment, light, recreation, transportation, navigation, cultural resources, socioeconomic impacts.

13 HYDRO ENERGY↗

PUMP-STORAGE HYDROPOWER DESIGN IN A WASTEWATER TREATMENT FACILITY WITH AN AERATING RUNNER, ADDITIVE MANUFACTURED MATERIAL ANALYSIS, AND TESTING OF HYDROKINETIC TURBINE RUNNER.

The feasibility and design of a novel pumped storage system in a wastewater treatment facility is investigated. Analysis covers the added benefit of aeration, costs, and specifications. For the given sub-megawatt system, off-the-shelf runner designs are not available. This research builds on an existing pump-turbine research and design through a combination of introducing aeration into the operating processes, analysis of large format metal additive manufacturing, and testing and validation of a hydrokinetic turbine runner that uses the same response surface optimization methodology as the discussed pump-turbine design. Two concepts are generated and proposed along with a baseline scenario. Two potential site locations are provided with relevant information The Stickney Wastewater Reclamation Plant and The Navy Wastewater Treatment Plant, Joint Base Pearl Harbor-Hickam, Oahu Hawaii. Results show that aeration is the primary benefit of such a system. The system is capable of meeting the required dissolved oxygen (DO) levels in wastewater treatment. The system produces volume averaged DO levels between 1.2 and 1.4 mg/l. The system is shown to be a scalable open-loop system that can be sized for application. Area requirements of the system are acceptable due to the use of a single pedestal elevated tank The implementation timeline and nuances of this system are largely unknown. In attempt to reduce costs, advanced manufacturing methods are investigated. Investigation into advanced methods showed that mechanical properties of additive manufactured metals using a GMAW system produce equal results to wrought materials and have the potential to produce custom wear properties.

additive manufacturing↗

Thermal Energy Storage and its Potential Applications in Solar Thermal Power Plants and Electricity Storage

With the rapid growth of renewable power generation, economically storing large quantities of solar- and wind-generated electricity may become as important as renewable power itself. The combination of renewable power generation and energy storage can overcome the variability of renewable power generation alone and create the opportunity for renewable generation to provide base-load electricity.For peak power usage, the integration of renewable power and storage of excess electricity has several significant and positive impacts: expanding the renewable energy portion of total electricity generation, improving the peak-load response, and coordinating the electricity supply and demand over the grid. Several energy storage approaches exist, with mechanical, chemical, and electricalmethods either in use now or being developed. Comparing their efficiencies as well as their economic uses for different scales and applications helps determine the right technology for the right purpose. This paper will study the possibility of using thermal energy storage as a means for electricity storage, and compare it to other energy storage methods including batteries, flywheels, compressed air, and pumped hydropower.

14 SOLAR ENERGY↗

Zambia : long-term generation expansion study - executive summary.

The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The analysis involved the hydro operations studies of the Zambezi river basin and the systems planning studies for the least-cost generation expansion planning. Two well-known and widely accepted computer models were used in the analysis: PC-VALORAGUA model for the hydro operations and optimization studies and the WASP-III Plus model for the optimization of long-term system development. The WASP-III Plus model is a part of the Argonne National Laboratory's Energy and Power Evaluation Model (ENPEP). The analysis was conducted in close collaboration with the Zambia Electricity Supply Corporation (ZESCO). On the initiative from The World Bank, the sponsor of the study, ZESCO formed a team of experts that participated in the analysis and were trained in the use of computer models. Both models were transferred to ZESCO free of charge and installed on several computers in the ZESCO corporate offices in Lusaka. In September-October 1995, two members of the ZESCO National Team participated in a 4-week training course at Argonne National Laboratory near Chicago, U.S.A., focusing on the long-term system expansion planning using the WASP and VALORAGUA models. The hydropower operations studies were performed for the whole Zambezi river basin, including the full installation of the Kariba power station, and the Cahora Bassa hydro power station in Mozambique. The analysis also included possible future projects such as Itezhi-Tezhi, Kafue Gorge Lower, and Batoka Gorge power stations. As hydropower operations studies served to determine the operational characteristics of the existing and future hydro power plants, it was necessary to simulate the whole Zambezi river basin in order to take into account all interactions and mutual influences between the hydro power plants. In addition, it allowed for the optimization of reservoir management and optimization of hydro cascades, resulting in the better utilization of available hydro potential. Numerous analyses were performed for different stages of system development. These include system configurations that correspond to years 1997, 2001, 2015 and 2020. Additional simulations were performed in order to determine the operational parameters of the three existing hydro power stations Victoria Falls, Kariba, and Kafue Gorge Upper, that correspond to the situation before and after their rehabilitation. The rehabilitation works for these three major power stations, that would bring their operational parameters and availability back to the design level, are planned to be carried out in the period until 2000. The main results of the hydro operations studies are presented in Table ES-1. These results correspond to VALORAGUA simulations of system configurations in the years 2001 and 2015. The minimum, average, and maximum electricity generation is based on the simulation of monthly water inflows that correspond to the chronological series of unregulated water inflows at each hydro profile in the period from April 1961 to March 1990. The recommended hydrology dataset provided in the Hydrology Report of the SADC Energy Project AAA 3.8 was used for this study.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power plant fuel switching and air quality in a tropical, forested environment

How a changing energy matrix for electricity production affects air quality is considered for an urban region in a tropical, forested environment. Manaus, the largest city in the central Amazon Basin of Brazil, is in the process of changing its energy matrix for electricity production from fuel oil and diesel to natural gas over an approximately 10-year period, with a minor contribution by hydropower. Three scenarios of urban air quality, specifically afternoon ozone concentrations, were simulated using the Weather Research and Forecasting (WRF-Chem) model. The first scenario used fuel oil and diesel for electricity production, which was the reality in 2008. The second scenario was based on the fuel mix from 2014, the most current year for which data were available. The third scenario considered nearly complete use of natural gas for electricity production, which is the anticipated future, possibly for 2018. For each case, inventories of anthropogenic emissions were based on electricity generation, refinery operations, and transportation. Transportation and refinery operations were held constant across the three scenarios to focus on effects of power plant fuel switching in a tropical context. The simulated NO x and CO emissions for the urban region decrease by 89 and 55 %, respectively, after the complete change in the energy matrix. The results of the simulations indicate that a change to natural gas significantly decreases maximum afternoon ozone concentrations over the population center, reducing ozone by >70 % for the most polluted days. The sensitivity of ozone concentrations to the fuel switchover is consistent with a NO x -limited regime, as expected for a tropical forest having high emissions of biogenic volatile organic compounds, high water vapor concentrations, and abundant solar radiation. There are key differences in a shifting energy matrix in a tropical, forested environment compared to other world environments. Therefore, policies favoring the burning of natural gas in place of fuel oil and diesel have great potential for ozone reduction and improved air quality for growing urban regions located in tropical, forested environments around the world.

54 ENVIRONMENTAL SCIENCES↗

Southwestern Power Administration Annual Report 2012

Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

2012, annual report, southwestern, Arkansas, Kansa↗

Southwestern Power Administration Annual Report 2011

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Oklahoma, T↗

Southwestern Power Administration Annual Report 2010

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Texas, Okla↗

The Global Technical, Economic, and Feasible Potential of Renewable Electricity

Renewable electricity generation will need to be rapidly scaled to address climate change and other environmental challenges. Doing so effectively will require an understanding of resource availability. We review estimates for renewable electricity of the global technical potential, defined as the amount of electricity that could be produced with current technologies when accounting for geographical and technical limitations as well as conversion efficiencies; economic potential, which also includes cost; and feasible potential, which accounts for societal and environmental constraints. We consider utility-scale and rooftop solar photovoltaics, concentrated solar power, onshore and offshore wind, hydropower, geothermal electricity, and ocean (wave, tidal, ocean thermal energy conversion, and salinity gradient energy) technologies. We find that the reported technical potential for each energy resource ranges over several orders of magnitude across and often within technologies. Therefore, we also discuss the main factors explaining why authors find such different results. According to this review and on the basis of the most robust studies, we find that technical potentials for utility-scale solar photovoltaic, concentrated solar power, onshore wind, and offshore wind are above 100 PWh/year. Hydropower, geothermal electricity, and ocean thermal energy conversion have technical potentials above 10 PWh/year. Rooftop solar photovoltaic, wave, and tidal have technical potentials above 1 PWh/year. Salinity gradient has a technical potential above 0.1 PWh/year. The literature assessing the global economic potential of renewables, which considers the cost of each renewable resource, shows that the economic potential is higher than current and near-future electricity demand. Fewer studies have calculated the global feasible potential, which considers societal and environmental constraints. While these ranges are useful for assessing the magnitude of available energy sources, they may omit challenges for large-scale renewable portfolios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydropower from Wastewater

The project described in this report evaluates the potential for building a business around harvesting energy in wastewater effluent streams. This business could easily grow into other markets, notably the potable public water supply in which pressure reduction valves are used to throttle (reduce) the pressure by dissipating energy rather than capturing it. Industrial processes that are heavy users of water are also likely candidates.

13 HYDRO ENERGY↗

Evaluating greenhouse gas emissions from hydropower complexes on large rivers in Eastern Washington

Water bodies, such as freshwater lakes, are known to be net emitters of carbon dioxide (CO2), and methane (CH4). In recent years, significant greenhouse gas (GHG) emissions from tropical, boreal, and mid-latitude reservoirs have been reported. At a time when hydropower is increasing worldwide, better understanding of seasonal and regional variation in GHG emissions is needed in order to develop a predictive understanding of such fluxes within man-made impoundments. We examined power-producing dam complexes within xeric temperate locations in the northwestern United States. Sampling environments on the Snake (Lower Monumental Dam Complex) and Columbia Rivers (Priest Rapids Dam Complex) included tributary, mainstem, embayment, forebay, and tailrace areas during winter and summer 2012. At each sampling location, GHG measurement pathways included surface gas flux, degassing as water passed through dams during power generation, ebullition within littoral embayments, and direct sampling of hyporheic pore-water.

Arntzen, Evan V.↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

A forecast-driven decision-making model for long-term operation of a hydro-wind-photovoltaic hybrid system

Hydro-wind-photovoltaic (PV) hybrid system has the potential to increase the integration of renewable energy sources into an existing grid. For the long-term operation of the system, due to the non-storable nature of wind and PV power, it is essentially to decide the optimal long-term carryover storage of cascade reservoirs. However, it remains a challenge due to high uncertainties of long-term forecasts and complicated hydraulic/electrical relationships between cascade reservoirs. Here in this study, a forecast-driven decision-making model is proposed for the hybrid system, which converts the multi-stage long-term operation process into a two-stage operation problem (including current stage and carryover stage) to avoid using longer-horizon forecast information with lower accuracy. First, the carryover stage energy surfaces (CESs) considering the forecast uncertainties of wind, solar and hydro resources are proposed to characterize carryover stage benefit quantitatively. Then a CESs-based forward decision-making optimization model is developed to guide the long-term operation of a hydro-wind-photovoltaic hybrid system. The applications in a hydro-wind-PV hybrid system of Yalong River basin results show that: compared with conventional operation, 1) power generation increases 9.03%; 2) in terms of the carryover storages control, the reservoir impounding and drawdown timing are delayed, and the drawdown depth is increased, which can be used to formulate better reservoir operation rules.

13 HYDRO ENERGY↗