Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “federated computing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ensemble Federated Machine Learning‐Based Cybersecurity Situational Awareness in Microgrid Network

Cyber-physical microgrids are vulnerable to stealthy cybersecurity threats that disguise their actions through the exploitation of system knowledge. Such actions can severely impacts microgrids deployed in defense bases, slowing the response time of military forces during national emergencies. Several machine-learning algorithms have been proposed to detect intrusions in the grid networks; however, these traditional machine-learning algorithms lack data privacy and are subject to several adversarial machine-learning threats. This paper proposes a novel federated machine learning (FML)-based three-model framework to detect and identify stealthy data-integrity attacks while ensuring data privacy in microgrid networks. The proposed architecture uses a variational mode decomposition technique to extract derived features from incoming measurement and control datasets. The extraction of these derived features allows FML models to learn minute variations in data patterns that allow them to perform significantly better than the models trained with generic datasets consisting of raw features. Our experimental results show the efficient performance of the proposed methodology against different types of data integrity attacks while considering primary and secondary controllers in microgrids. Further, the applied FML-integrated random forest ensemble algorithm outperforms the existing generic FML algorithms during noisy and noise-free datasets with prediction latencies of only 91–134 µs per sample within the 0.1 s sampling interval and requires communication bandwidth of around ∼8.25 KB/s at the control center and ∼2.7 KB/s per edge client for communication.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Cybersecurity and Digital Components: Supply Chain Deep Dive Assessment

The report “America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition” lays out the challenges and opportunities faced by the United States in the energy supply chain as well as the federal government plans to address these challenges and opportunities. It is accompanied by several issue-specific deep dive assessments, including this one, in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. As the energy sector has become more globalized and increasingly complex, digitized, and even virtualized, its supply chain risk for digital components – the software, virtual platforms and services, and data – in energy systems has evolved and expanded. All digital components in U.S. energy sector systems are vulnerable and may be subject to cyber supply cha in risks stemming from a variety of threats, vulnerabilities, and impacts. This includes digital components in all systems within the ESIB, namely those systems operated by asset owners across different energy subsectors (e.g., electricity, oil and natural gas, and renewables) and the systems operated by a worldwide industrial complex with capabilities to perform research and development and design, produce, operate, and maintain energy sector systems, subsystems, components, or parts to meet U.S. energy requirements. Supply chain risks for digital components including software, virtual platforms and services, and data have grown in recent years as increasingly sophisticated cyber adversaries have targeted exploiting vulnerabilities in these digital assets. Supply chain risks for digital components in energy sector systems will continue to evolve and likely increase as these systems are increasingly interconnected, digitized, and remotely operated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Idaho National Laboratory CY 2025 National Emission Standards for Hazardous Air Pollutants Analysis, Methodology, and Results for Radionuclides

This report details calculations of potential dose—at public receptor locations surrounding the Idaho National Laboratory (INL) Site boundary and INL in-town facilities—from radionuclides reported to be in use and potentially emitted from INL facilities during calendar year (CY) 2025. All calculations were performed in accordance with the requirements of Code of Federal Regulations (CFR), Title 40, “Protection of the Environment,” Part 61, “National Emission Standards for Hazardous Air Pollutants (NESHAPs),” Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” (40 CFR 61, Subpart H). Modeling methodology, model-input parameters, and contribution to dose by facility, source, and radionuclide at the maximally exposed individual (MEI) location are also discussed. The information in this report supports the “National Emission Standards for Hazardous Air Pollutants—Calendar Year 2025 INL Report for Radionuclides” (DOE-ID 2026). During CY 2025, the estimated annual potential dose at the INL Site MEI location was 2.45E-02 mrem/yr, up from the previous year, but remaining far less than the regulatory standard of 10 mrem/yr (CFR 40 Part 61, Subpart H). Approximately 92% of the total dose to the INL Site MEI originated from Materials and Fuels Complex sources. Emissions from INL in-town facilities resulted in an estimated annual potential dose of 4.50E-03 mrem/yr to the MEI, down slightly from the CY 2024 estimated dose. Year-to-year variations in estimated annual dose can be attributed to adjustments in laboratory operations, changes to facility infrastructure, and variation in meteorological conditions.

42 - ENGINEERING↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cyber Labeling for Energy Industrial IoT

The U.S. Department of Energy’s (DOE) Office of Cybersecurity, Energy Security and Emergency Response (CESER), at the request of the Deputy National Security Advisor for Cyber and Emerging Technologies, Anne Neuberger, initiated research in 2023 to develop a cybersecurity labeling proof-of-concept for energy products to expand on the Federal Communications Commission’s (FCC) proposed U.S. Cyber Trust Mark program. DOE mobilized researchers from six National Laboratories to develop and gather feedback on a proof-of concept label for solar inverters and smart meters, which serve as representative products for market-facing energy sector Industrial Internet of Things (IIoT). This report details the research team’s process across two phases and the resulting findings, which include challenges facing cyber labeling programs and recommendations to implement an expanded IIoT cyber labeling program in the U.S.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

2025 Review and Revision of Federal Guidance Report 15

Federal Guidance Report No. 15 (FGR 15), External Exposure to Radionuclides in Air, Water and Soil, published in 2019 and referred to below as FGR 2019, provides age-specific effective dose rate coefficients for reference persons externally exposed to each of 1252 radionuclides homogenously distributed in environmental media. Soon after completion of FGR 2019, the International Commission on Radiological Protection (ICRP) published a similar report (ICRP Publication 144, 2020) addressing the same radionuclides and many of the external exposure scenarios addressed in FGR 2019. In 2023 Argonne National Laboratory (ANL) published a review of dose coefficients in FGR 2019, concluding that “The external effective dose from beta radiation is not appropriately accounted for in FGR 15 for both low- and high-energy beta emitters in air, in soil, and on soil surfaces.” That conclusion was based largely on comparisons of dose coefficients in FGR 2019 with values in ICRP Publication 144 but also on consideration of some unexpected patterns of equivalent dose rate coefficients across tissues and of effective dose rate coefficients across different soil depths, for a selected set of low-energy beta emitters. In response to the ANL report, the Center for Radiation Protection Knowledge (CRPK) at Oak Ridge National Laboratory (ORNL) performed an extensive reexamination of the methods and published values of FGR 2019. CRPK found that coding errors had resulted in inaccurate estimates, primarily overestimates, in many of the dose coefficients tabulated in FGR 2019 but that many of the differences between results in FGR 2019 and ICRP Publication 144 could be traced to differences in methodology. CRPK has corrected all errors in FGR 2019 associated with the coding errors and has taken the opportunity to improve a major portion of the remaining dose coefficients in FGR 2019, primarily through additional Monte Carlo calculations resulting in improved statistics for tissue equivalent dose rate coefficients for exposure to monoenergetic sources. This has eliminated the need for extrapolation of results from high and medium energies to low energies, as was done in FGR 2019. In addition, inconsistencies in the methodology identified in the review, such as computational representation of the adult female, were eliminated. The revised effective dose rate coefficients are consistent with values in ICRP Publication 144 except for differences in values clearly arising from differences in methodology; and differences in values for a relatively small set of very low-energy radionuclides with highly uncertain dose coefficients regardless of methodology.

54 ENVIRONMENTAL SCIENCES↗

DOE Repository Metadata Profile (DRMP): A Metadata Framework for Advancing Interoperability and AI Readiness Across Scientific Repositories

The Department of Energy (DOE) funds a diverse and distributed ecosystem of repositories that steward scientific data, publications, and software across its research programs, user facilities, and national laboratories. While significant progress has been made in standardizing dataset-level metadata, the metadata describing repositories themselves (their identity, governance, access interfaces, policies, and technical capabilities) remains inconsistent and fragmented across DOE-funded systems. This variability limits discoverability, interoperability, automated validation, and AI-driven analysis, all of which are increasingly essential for modern scientific workflows. To address this gap, the DOE Data Curation Working Group (DCWG) developed the DOE Repository Metadata Profile (DRMP). The DRMP is a practical, community-driven framework that defines how repositories can describe themselves in a consistent, machine-actionable, and scalable manner. The DRMP is not a new metadata schema. Instead, it is a mapping profile and structured element set capturing the essential characteristics of DOE repositories. It harmonizes repository-level metadata across six widely adopted community schemas: RE3Data; DCAT-US v3; Schema.org; Dublin Core; DataCite 4.6; and PREMIS 3.0. This harmonization eliminates reinvention and enables interoperability within DOE and across the broader scientific ecosystem. A core objective of the DRMP is to reduce burden on repositories by allowing them to reuse their existing metadata through a Rosetta-style crosswalk rather than redesigning local implementations. The profile introduces a three-level conformance model that supports incremental adoption: • Level 1 – Minimum Viable Record (MVR): foundational identification elements required for workflows, project registration, and basic repository presence. • Level 2 – Interoperable: structured metadata enabling alignment with national and international discovery systems. • Level 3 – AI-Ready: enhanced provenance, policy transparency, fixity, semantic context, and capabilities that support automated reasoning, model training governance, and machine-assisted curation. To support implementation, the DRMP includes JSON Schema definitions, OpenAPI patterns, and MCP templates that allow repositories to publish machine-readable metadata directly within existing platforms. These resources are modular and lightweight, enabling adoption without major architectural change. Adopting the DRMP enables repositories to: • Enhance discoverability and interoperability by aligning identifiers, classifications, and descriptive elements across widely used schema standards. • Support federated discovery and cross-registration across DOE systems, Data.gov, and international catalogs. • Enable AI agents and workflow orchestration systems to interpret repository-level metadata within the American Science Cloud (AmSC) through Model Context Protocol (MCP)-based context publication. • Demonstrate alignment with DOE’s open science, stewardship, and FAIR data priorities. This guidance represents a community-driven step forward. Through voluntary adoption and continued feedback, the DRMP advances a cohesive, machine-actionable description of DOE repositories that supports FAIR data practices, preparing the infrastructure for AI-enabled research, and strengthening the discoverability and reuse of DOE’s scientific outputs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A Systems Engineering Analysis of National Ignition Facility Industrial Controls Systems and Safety Interlock Systems Remote Input/Output Networking Migration from ControlNet to EtherNet/IP

The ControlNet industrial communications protocol and modules used in the Industrial Control System (ICS) and Safety Interlock System (SIS) at the National Ignition Facility (NIF) are no longer necessary and the ICS and SIS would be better served by migrating the communications structure to use EtherNet/Industrial Protocol (IP) and EtherNet bridge modules instead. By the admission of the vendor of ControlNet hardware, Rockwell Automation, in literature by Bill Petro [1], “Moving forward, customers will be able to optimize their asset utilization better using EtherNet/IP protocol than with ControlNet.” The NIF is one of the key elements of the Inertial Confinement Fusion (ICF) program at Lawrence Livermore National Laboratory (LLNL), a federally funded research and development center (FFRDC). The NIF contains the systems and provides the operational capacity to perform ICF, high energy density (HED), and discovery science experiments utilizing 192 individual beamlines, a host of diagnostics, and all the industrial systems required to facilitate these beamlines and diagnostics. The industrial systems are governed by the ICS and SIS, with the ICS providing control and the SIS providing monitoring and permissives. Construction on the NIF began in 1997 and was certified complete in 2009 and, as a result, the ICS and SIS were developed during this time using the tools that were available then. This includes the communications structure and protocols for these systems, much of which was, and still is, ControlNet. ControlNet, particularly during the time that the ICS and SIS were being built, has several attractive features. ControlNet hardware is exclusive to Rockwell Automation, which was the automation hardware chosen for the ICS and SIS. One feature that could be considered an advantage or a disadvantage depending on the communication needs of the system is that ControlNet also utilizes no active network components, excluding repeaters which are not always necessary. According to the architect of the ICS system at the NIF, Gordon Lau, one of the most attractive features of the ControlNet protocol during development of the ICS and SIS was that it is deterministic, providing timing of data transfer that is executed exactly as it is defined by the developer.

42 ENGINEERING↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards provision of regularly updated climate data from the Coupled Model Intercomparison Project

The Coupled Model Intercomparison Project (CMIP) is a flagship of the World Climate Research Programme (WCRP). CMIP has become a recognised ‘brand’ in climate circles evolving over the last thirty years from a targeted research activity by a small number of climate modelling centres intercomparing their Earth System Model (ESM) simulations to a broad international coordinated research effort (Durack et al, 2025). CMIP is organized as a research activity leveraging funded and in-kind contributions from experts within modelling centres and the broader scientific community supported more recently by a fully-funded International Project Office. Within CMIP, Model Intercomparison Projects (MIPs) are community-designed to understand past, present and future climate. CMIP data provides a valuable resource for climate research and is routinely used to assess model representation of climate processes and test scientific hypotheses in the context of model uncertainty and (forced and internal) variability as evident from its prolific use in scientific publications1 . The impact relies on enabling infrastructure (most prominently via the Earth System Grid Federation (ESGF)), which allows sharing of simulation output, provision of the boundary conditions used in each simulation, and definition of the data standards that are essential to facilitating wide use of the data. The impact is supplemented by the wide-ranging scrutiny to which model simulations are subjected. Beyond its use in research, CMIP data is a key resource for communities producing derived climate information from downscaling and impact studies, such as the Coordinated Regional Downscaling Experiment (CORDEX; Gutowski et al., 2016) and the Intersectoral Impacts MIP (ISIMIP; Frieler et al., 2024). Government, academic and commercial entities also increasingly rely on CMIP and its downstream data for climate risk assessments and climate services (for example, Copernicus Climate Change Service and World Bank portal). This means that, although CMIP is a research activity, it increasingly serves a secondary and very relevant role as a provider of climate data – a long-recognised dichotomy (Stevens, 2024). Research and applications have distinct needs, with the former requiring flexibility and generality and the latter consistency. Here we explain how the design of the research activity has been adapted to reduce the burdens imposed by applications and how the research infrastructure might evolve to further enable scientific inquiry. We propose one possible approach to consistently providing model information and projections for applications in the future.

Environmental sciences↗

Terry Turbopump Expanded Operating Band Modeling and Simulation Efforts in Fiscal Year 2021 Extended Period of Performance (Final Report)

This report documents the progress made under the Terry Turbine Expanded Operating Band (TTEXOB) program's modeling and simulation (MODSIM) initiative at Sandia National Laboratories (SNL ). It describes the US Federal Fiscal Year 2021 (FY21) extended period-of-performance MODSIM work completed since the closure of FY20 with due reference to the Texas A&M University (TAMU) hybrid milestone 5/6 experimental program. This work, which falls under Milestone 7 of the program, provides a counterpart to the various experiments. The overall TTEXOB program and its milestone-based approach are described in the program's Summary Plan. Details of the individual milestone test plans can be found in the corresponding detailed test plan, e.g. the Milestone 3 and 4 Detailed Test Plan. SNL MODISM is conducted alongside experiments performed at TAMU, and SNL technical staff regularly consults with TAMU on the experimental program. In FY21, MELCOR code models and capabilities were exercised in two different contexts: experimental comparisons to the TAMU ZS-1 and GS-2, and stand-alone analyses of a station black-out (SBO) scenario in a generic boiling water reactor (BWR). Code to experiment comparisons met with fair success when turbine losses were well characterized as for the ZS-1 turbine. Both deterministic and Bayesian calibration processes were used to find a recommended turbine torque multiplier for ZS-1 type turbines. This process could be repeated for GS-2 type turbines if GS-2 losses were better understood. Stand-alone generic BWR SBO calculations revealed that three different modes of self-regulating turbopump behavior may be observed depending on certain modeling parameters and choices having to do with turbine nozzles. Aspects of this predicted behavior may have been observed in TAMU GS-2 experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Ecological information and approaches needed for risk communication dialogs for acute or chronic environmental crises

Scientists, social scientists, risk communicators, and many others are often thrust into a crisis situation where they need to interact with a range of stakeholders, including governmental personnel (tribal, U.S. federal, state, local), local residents, and other publics, as well as other scientists and other risk communicators in situations where information is incomplete and evolving. This paper provides: (1) an overall framework for thinking about communication during crises, from acute to chronic, and local to widespread, (2) a template for the types of ecological information needed to address public and environmental concerns, and (3) examples to illustrate how this information will aid risk communicators. The main goal is providing an approach to the knowledge needed by communicators to address the challenges of protecting ecological resources during an environmental crisis, or for an on-going, chronic environmental issue. To understand the risk to these ecological resources, it is important to identify the type of event, whether it is acute or chronic (or some combination of these), what receptors are at risk, and what stressors are involved (natural, biological, chemical, radiological). For ecological resources, the key information a communicator needs for a crisis is whether any of the following are present: threatened or endangered species, species of special concern, species groups of concern (e.g., neotropical bird migrants, breeding frogs in vernal ponds, rare plant assemblages), unique or rare habitats, species of commercial and recreational interest, and species/habitats of especial interest for medicinal, cultural, or religious activities. Communication among stakeholders is complicated with respect to risk to ecological receptors because of differences in trust, credibility, empathy, perceptions, world view valuation of the resources, and in many cases, a history of misinformation, disinformation, or no information. Exposure of salmon spawning in the Columbia River to hexavalent chromium from the Hanford Site is used as an example of communication challenges with different stakeholders, including Native Americans with Tribal Treaty rights to the land.

54 ENVIRONMENTAL SCIENCES↗

Low-Lying Excited States of Linear All- Trans Polyenes: Insights from Analytic Gradient and Nonadiabatic Coupling Calculations Based on Multireference Configuration Interaction

Polyenes serve as a rigorous test for theoretical models and electronic structure methods, playing a key role in advancing computational and theoretical chemistry. Here, we present a high-level theoretical investigation of linear, all-trans polyenes using energy gradients and nonadiabatic coupling vectors based on an MR-CISD wave function to describe electronic transitions involving the ground state (1 1 A g – ) and three low-lying excited states (2 1 A g – , 1 1 B u + , and 2 1 B u – ) of hexatriene, octatetraene, and decapentaene. This approach enables accurate evaluation of both adiabatic and vertical excitation and emission energies, yielding results in excellent agreement with experiment, as well as locating minima on the crossing seam between adiabatic states. Our results show that vertical excitation energies to the 1 1 B u + state are blue-shifted by 0.2–0.3 eV relative to the experimental absorption maximum, whereas the vertical emission energy from the 2 1 A g – state is red-shifted by ∼0.2 eV relative to the experimental emission maximum. Upon relaxation from the Franck–Condon geometry, the 2 1 A g – state stabilizes by around 1 eV, compared to 0.2–0.3 eV for the 1 1 B u + state. An analysis of the S 1 /S 0 crossing seam in hexatriene shows that its minimum involves asymmetric backbone deformations and provides an efficient channel for ultrafast internal conversion to the ground state, consistent with the absence of detectable fluorescence in this molecule. These results demonstrate the power of analytic gradients and nonadiabatic coupling vectors based on an MR-CISD wave function for accurately characterizing the electronic structure and photophysics of polyenes.

Excited states↗

ComStock Measure Scenario Documentation: Chiller Replacement

Building on a 3-year effort to calibrate and validate the U.S. Department of Energy's ResStock (TM) and ComStock (TM) models, this work produces national datasets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of questions regarding their commercial building stock. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual energy consumption (at a subhourly resolution) of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. The goal of this work is to develop energy efficiency and demand flexibility end-use load shapes that cover high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to various "what-if" scenarios that can be applied to buildings. An end-use savings shape is the difference in energy consumption between a baseline building (or collection of buildings) and a building with an energy efficiency or demand flexibility measure applied. It results in a time-series profile broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step, as well as annual aggregations. This report describes the modeling methodology for a single end-use savings shape measure - chiller replacement - and briefly introduces key results. The full public dataset can be accessed on the ComStock (TM) data lake or via the Data Viewer at comstock.nrel.gov. The public data set enables users to create custom aggregations of results for their use case (e.g., filter to a specific county).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗