Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

user experience↗

STS-97 Crew Interviews: Brent W. Jett Jr.

Live footage of a preflight interview with Commander Brent W. Jett Jr. is shown. The interview addresses many different questions including why Jett became interested in the space program, the events that led to his interest, and his vigorous training in the astronaut program. Other interesting information that this one-on-one interview discusses are the main goals of the STS-97 mission, its scheduled docking with the new International Space Station (ISS), and its delivery of the first set of U.S.-provided solar arrays, batteries, and radiators. Jett mentions his responsibilities during the much-anticipated docking as well as during the scheduled space-walks.

Source record↗

Radiation Susceptibility Assessment of Off the Shelf (OTS) Hardware

The reduction in budgets, shortening of schedules and necessity of flying near state of the art technology have forced projects and designers to utilize not only modern, non-space rated EEE parts but also OTS boards, subassemblies and systems. New instrumentation, communications, portable computers and navigation systems for the International Space Station, Space Shuttle, and Crew Return Vehicle are examples of the realization of this paradigm change at the Johnson Space Center. Because of this change, there has been a shift in the radiation assessment methodology from individual part testing using low energy heavy ions to board and box level testing using high-energy particle beams. Highlights of several years of board and system level testing are presented along with lessons learned, present areas of concern, insights into test costs, and future challenges.

Culpepper, William X.↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

Kidd, Luanne↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

STS-40 Get Away Special Experiment Preflight Briefing

Live footage shows the preflight briefing of the Get Away Special Experiment for STS-40. The focus of the discussion is the payloads that STS-40 will carry. Some of the experiments that are scheduled include crystal growth, melting and re-growing of gallium nitride, fluid behaviors, ecological alteration of plants, growth of semiconductors, thermal transfer, flux behavior, orbiter stability, and the effects of cosmic rays on floppy disks. Also shown is a video release of the STS-40/SLS-1 mission. The STS-40 crew, Commander Bryan D. O'Connor, Pilot Sidney M. Gutierrez, Mission Specialists James P. Bagian, Tamara E. Jernigan, M. Rhea Seddon, and Payload Specialists F. Drew Gaffney, and Millie-Hughes Fulford, are seen while they exercise and perform their experiments.

Source record↗

Development and Capabilities of Unique Structural Seal Test Rigs

High temperature structural seals are necessary in many aerospace and aeronautical applications to minimize any detrimental effects originating from undesired leakage. The NASA Glenn Research Center has been and continues to be a pioneer in the development and evaluation of these types of seals. The current focus for the development of structural seals is for the 3rd Generation Reusable Launch Vehicle (RLV), which is scheduled to replace the current space shuttle system around 2025. Specific areas of development under this program include seals for propulsion systems (such as the hypersonic air-breathing ISTAR engine concept based upon Rocket Based Combined Cycle technology) and control surface seals for spacecraft including the autonomous rescue X-38 Crew Return Vehicle and the X-37 Space Maneuver Vehicle.

DeMange, Jeffrey J.↗

Update on the Development and Capabilities of Unique Structural Seal Test Rigs

High temperature structural seals are necessary in many aerospace and aeronautical applications to minimize any detrimental effects originating from undesired leakage. The NASA Glenn Research Center has been and continues to be a pioneer in the development and evaluation of these types of seals. The current focus for the development of structural seals is for the 3rd Generation Reusable Launch Vehicle (RLV), which is scheduled to replace the current space shuttle system by 2025. Specific areas of development under this program include seals for propulsion systems (such as the hypersonic air-breathing ISTAR engine concept based upon Rocket Based Combined Cycle technology) and control surface seals for spacecraft including the autonomous rescue X-38 Crew Return Vehicle and the X-37 Space Maneuver Vehicle.

DeMange, Jeffrey J.↗

STS-101: Crew Interview / James S. Voss

Live footage of a preflight interview with Mission Specialist James S. Voss is seen. The interview addresses many different questions including why Voss became an astronaut, the individuals who influenced him, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is his reaction to and the reasons for the change of the mission objectives. Voss also mentions the scheduled space-walk that he will perform with Jeffrey N. Williams, docking with the International Space Station (ISS), the repairs of equipment, and the change of the batteries. Voss explains why himself, Susan J. Helms, and Yuri Vladimirovich Usachev are the perfect choice for this mission because of their certification from Russia to work on the Zarya Control Module.

Source record↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

STS-97 Crew Interviews: Michael J. Bloomfield

Live footage of a preflight interview with Pilot Michael J. Bloomfield is shown. The interview addresses many different questions including why Bloomfield became interested in the space program, the events and people that influence him and ultimately led to his interest, and his vigorous training in the astronaut program. Other interesting information that this one-on-one interview discusses are the main goals of the STS-97 mission, its scheduled docking with the new International Space Station (ISS), and its delivery of the first set of U.S.-provided solar arrays, batteries, and radiators. Bloomfield briefly discusses his responsibilities during the much-anticipated docking as well as during the scheduled space-walks.

Source record↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Virtual environment and computer-aided technologies used for system prototyping and requirements development

The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.

Logan, Cory↗

Moving Towards a Common Ground and Flight Data Systems Architecture for NASA's Exploration Missions

The National Aeronautics and Space Administration has embarked on an ambitious effort to return man to the moon and then on to Mars. The Exploration Vision requires development of major new space and ground assets and poses challenges well beyond those faced by many of NASA's recent programs. New crewed vehicles must be developed. Compatible supply vehicles, surface mobility modules and robotic exploration capabilities will supplement the manned exploration vehicle. New launch systems will be developed as well as a new ground communications and control infrastructure. The development must take place in a cost-constrained environment and must advance along an aggressive schedule. Common solutions and system interoperability and will be critical to the successful development of the Exploration data systems for this wide variety of flight and ground elements. To this end, NASA has assembled a team of engineers from across the agency to identify the key challenges for Exploration data systems and to establish the most beneficial strategic approach to be followed. Key challenges and the planned NASA approach for flight and ground systems will be discussed in the paper. The described approaches will capitalize on new technologies, and will result in cross-program interoperability between spacecraft and ground systems, from multiple suppliers and agencies.

Rader. Steve↗

Combining Solar Electric Propulsion and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Robotic Mission (ARRM), including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARRM mission.

Percy, Tom↗

Combining Solar Electric and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Mission, including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARM mission.

Percy, Tom↗