Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A Predictive Approach to Eliminating Errors in Software Code

NASA s Metrics Data Program Data Repository is a database that stores problem, product, and metrics data. The primary goal of this data repository is to provide project data to the software community. In doing so, the Metrics Data Program collects artifacts from a large NASA dataset, generates metrics on the artifacts, and then generates reports that are made available to the public at no cost. The data that are made available to general users have been sanitized and authorized for publication through the Metrics Data Program Web site by officials representing the projects from which the data originated. The data repository is operated by NASA s Independent Verification and Validation (IV&V) Facility, which is located in Fairmont, West Virginia, a high-tech hub for emerging innovation in the Mountain State. The IV&V Facility was founded in 1993, under the NASA Office of Safety and Mission Assurance, as a direct result of recommendations made by the National Research Council and the Report of the Presidential Commission on the Space Shuttle Challenger Accident. Today, under the direction of Goddard Space Flight Center, the IV&V Facility continues its mission to provide the highest achievable levels of safety and cost-effectiveness for mission-critical software. By extending its data to public users, the facility has helped improve the safety, reliability, and quality of complex software systems throughout private industry and other government agencies. Integrated Software Metrics, Inc., is one of the organizations that has benefited from studying the metrics data. As a result, the company has evolved into a leading developer of innovative software-error prediction tools that help organizations deliver better software, on time and on budget.

Source record↗

A Cost-Benefit Analysis of Automated Physiological Data Acquisition Systems Using Data-Driven Modeling

Precision medicine and the continuous analysis of “Big data” promises to improve patient outcomes dramatically in the near future. Very recently, healthcare facilities have started to explore automatic collection of patient-specific physiological data with the aim of reducing nursing workload and decreasing manual data entry errors. In addition to those purposes, continuous physiological data can be used for the early detection and prevention of common, and possibly fatal, diseases. For instance, poor patient outcomes from sepsis, a leading cause of mortality in healthcare facilities and a major driver of hospital costs in the USA, can be mitigated when detected early using screening tools that monitor the changing dynamics of physiological data. However, the potential cost of collecting continuous physiological data remains a barrier to the widespread adoption of automated high-frequency data collection systems. In this paper, we perform cost-benefit analysis (CBA) of machine learning applied to various types of acquisition systems (with different collection intervals) to determine if the benefits of such systems will outweigh their implementation costs. Although such systems can be used in the detection of various complications, in order to showcase the immediate benefits, we focus on the early detection of sepsis, one of the major challenges of hospital systems. We present a general approach to conduct such analysis for a wide range of hospitals and highlight its applicability using a case study for a small hospital with 150 beds and 3000 annual patients where the acquisition system would collect data at 1-min intervals. Finally, we discuss how the analysis may help guide incentives/policies with regard to adopting automated data acquisition systems.

99 GENERAL AND MISCELLANEOUS↗

SCIENTIFIC EFFICIENCY OF GROUND-BASED TELESCOPES

I scanned the six major astronomical journals of 2008 for all 1589 papers that are based on new data obtained from ground-based optical/IR telescopes worldwide. Then I collected data on numbers of papers, citations to them in 3+ years, the most-cited papers, and annual operating costs. These data are assigned to four groups by telescope aperture. For instance, while the papers from telescopes with an aperture >7 m average 1.29 more citations than those with an aperture of 2 to <4 m, this represents a small return for a factor of four difference in operating costs. Among the 17 papers that have received {>=}100 citations in 3+ years, only half come from the large (>7 m) telescopes. I wonder why the large telescopes do so relatively poorly and suggest possible reasons. I also found that papers based on archival data, such as the Sloan Digital Sky Survey, produce 10.6% as many papers and 20.6% as many citations as those based on new data. Also, the 577.2 papers based on radio data produced 36.3% as many papers and 33.6% as many citations as the 1589 papers based on optical/IR telescopes.

79 ASTRONOMY AND ASTROPHYSICS↗

Net-zero energy building design and life-cycle cost analysis with air-source variable refrigerant flow and distributed photovoltaic systems

Net-zero energy building (NZEB) design has been gaining widespread acceptance as a major driver to reach feasible long-term goals of energy reductions in a building sector for the coming decades. Accordingly, net-zero energy targets for commercial buildings have been specified by federal and/or local government agencies in U.S. Although moving toward NZEB goals has technically feasible long-term advantages, economic issues are one of primarily concerns by building owners and designers for the application of advanced building technologies in NZEB design of their retrofit or new building construction. However, the lack of life cycle cost (LCC) data has still hindered reliable understanding of adopting NZEB design by building owners in a cost-effective manner. In response to this gap, this study conducts life-cycle cost analysis (LCCA) of NZEB design with an energy-efficient heating, ventilation, and air conditioning (HVAC) system and a solar power generation system. Here, to enable NZEB design, an air-source VRF heat pump (HP) type system is considered for energy-efficient HVAC equipment in an office building model with a grid-tied photovoltaic (PV) system. Results reveal that the LCC of NZEBs varies primarily due to a combined effect of annual site EUIs, on-site power generation, and cost-items of each location in U.S. climates. Some hot and mild climate zones in the U.S. represent that LCC values of NZEBs are considerably lower. In contrast, some other cold zones result in unattractive LCC values for NZEBs, caused by a combined effect of relatively lower potential of on-site PV electricity generation and city cost indices. Yet, with subsidized financing by the federal government for PV installation costs, LCC values of NZEBs become significantly attractive in most climate locations.

42 ENGINEERING↗

Data base management study

Data base management techniques and applicable equipment are described. Recommendations which will assist potential NASA data users in selecting and using appropriate data base management tools and techniques are presented. Classes of currently available data processing equipment ranging from basic terminals to large minicomputer systems were surveyed as they apply to the needs of potential SEASAT data users. Cost and capabilities projections for this equipment through 1985 were presented. A test of a typical data base management system was described, as well as the results of this test and recommendations to assist potential users in determining when such a system is appropriate for their needs. The representative system tested was UNIVAC's DMS 1100.

Source record↗

Machine processing of remotely acquired data

The two major branches of remote sensing are based on image orientation and numerical orientation. Numerically oriented systems tend to involve computers for data analysis. In designing an information-gathering system, the sensor as well as the means of analysis must be well mated to the type of system orientation. Attention is given to sensor types as related to system types, the multispectral approach and pattern recognition, the multispectral scanner as data source, an illustrative example, procedural details in the use of pattern recognition, the speed and cost of data processing, the use of spatial information, and data preprocessing steps.

Landgrebe, D. A.↗

Cost-Effectiveness Analysis of Infrapopliteal Drug-Eluting Stents

IntroductionThere are no cost-utility data about below-the-knee placement of drug-eluting stents. The authors determined the cost-effectiveness of infrapopliteal drug-eluting stents for critical limb ischemia (CLI) treatment. The event-free individual survival outcomes defined by the absence of any major events, including death, major amputation, and target limb repeat procedures, were reconstructed on the basis of two published infrapopliteal series. The first included spot Bail-out use of Sirolimus-eluting stents versus bare metal stents after suboptimal balloon angioplasty (Bail-out SES).The second was full-lesion Primary Everolimus-eluting stenting versus plain balloon angioplasty and bail-out bare metal stenting as necessary (primary EES). The number-needed-to-treat (NNT) to avoid one major event and incremental cost-effectiveness ratios (ICERs) were calculated for a 3-year postprocedural period for both strategies. Overall event-free survival was significantly improved in both strategies (hazard ratio (HR) [confidence interval (CI)]: 0.68 [0.41-1.12] in Bail-out SES and HR [CI]: 0.53 [0.29-0.99] in Primary EES). Event-free survival gain per patient was 0.89 (range, 0.11-3.0) years in Bail-out SES with an NNT of 4.6 (CI: 2.5-25.6) and a corresponding ICER of 6,518 Euro-Sign (range 1,685-10,112 Euro-Sign ). Survival gain was 0.91 (range 0.25-3.0) years in Primary EES with an NNT of 2.7 (CI: 1.7-5.8) and an ICER of 11,581 Euro-Sign (range, 4,945-21,428 Euro-Sign ) per event-free life-year gained. Two-way sensitivity analysis showed that stented lesion length >10 cm and/or DES list price >1000 Euro-Sign were associated with the least economically favorable scenario in both strategies. Both strategies of bail-out SES and primary EES placement in the infrapopliteal arteries for CLI treatment exhibit single-digit NNT and relatively low corresponding ICERs.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Feasibility and cost study on VOIR SAR data transfer via a bent pipe link

An INTELSAT/DOMSAT double hop bent pipe link for the Venus orbiting imaging radar synthetic aperture radar imaging data transfer from deep space stations 43 and 63 to the Jet Propulsion Laboratory was investigated. The cost for the bent pipe transfer was estimated and compared to that for the planned tape record/airfreight-the-tape transfer method.

Park, Y. H.↗

Cambium Documentation: Version 2020

This is the documentation for the 2020 version of Cambium. Cambium is a tool that assembles structured data sets of simulated hourly cost and operational data for modeled futures of the U.S. electric sector with metrics designed to be useful for long-term decision-making. In this documentation, we define the metrics reported in Cambium databases and document the Cambium-specific methods for calculating those metrics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A ModEx Framework for Watershed Subsurface Investigation With Limited Geophysical Data Using Machine Learning and Hydrologic Modeling

Abstract Subsurface heterogeneity influences watershed hydrology strongly but remains difficult to characterize at catchment scales with sparse and costly field data. Geophysical surveys such as electromagnetic induction (EMI) provide local spatial subsurface images yet scaling them to watershed scales and converting EMI‐derived resistivity into hydraulic properties remains a challenge. We present a Model–Experiment (ModEx) framework that integrates limited EMI data with machine learning (ML) and hydrologic modeling to improve process representation and guide field investigations. Sparse EMI surveys were scaled to the catchment scale using a Random Forest model, and the resulting resistivity fields were combined with nearby borehole constraints to parameterize a hydrologic model. The EMI‐informed hydrological simulations improved predictions of streamflow sustained by subsurface flow and shallow saturation patterns. By combining EMI data and ML with hydrologic modeling, the ModEx framework guides future subsurface surveys, providing a transferable and efficient strategy for data–model integration across diverse watersheds. Plain Language Summary Mapping the underground network of soil and rock that controls water is essential for predicting floods and droughts, but seeing underground is difficult and expensive. We cannot drill everywhere, so scientists use geophysical tools to scan broad areas. There are two key challenges: these geophysical scans are often sparse across the whole watershed, and the geophysical data is hard to translate into water‐related properties. We used artificial intelligence to solve these problems. We taught a computer to find patterns linking the limited geophysical data to the land surface properties. This allowed it to fill in the gaps and create a complete, useful subsurface map for the entire watershed. This new map improves hydrologic simulations, leading to more accurate predictions of water movement in the watershed. It also helps scientists build better models with less data and generates a priority map showing where to measure next, making future investigations more efficient. Key Points Limited EMI scaled with ML improves catchment‐scale subsurface parameterization for hydrologic models The framework integrates hydrologic modeling with limited geophysical data to support subsurface investigation design ModEx framework offers a transferable data–model integration strategy that quantifies and reduces uncertainty guiding watershed studies

Chen, Hang↗

DCS: A global satellite environmental data collection system study

Cost analysis and technical feasibility data are presented on five medium orbiting and six geosynchronous satellite data collection systems with varying degrees of spacecraft and local user terminal complexity. Data are also provided on system approaches, user requirements, and user classes. Systems considered include orbiting ERTS and EOS type satellites and geosynchronous SmS and SEOS type data collectors.

Source record↗

DOE Annual Progress Report: Water Needs and Constraints for Hydrogen Pathways

Water is a critical feedstock in the production of hydrogen. In fact, water and many of the energy transformations upon which society depends are inextricably linked. Approximately 39% of freshwater withdrawals are used for cooling of power plants, and another 8% are used in industry and mining (including oil and gas extraction and refining). Major changes in the energy infrastructure (as envisioned in a transformation to a hydrogen economy) will necessarily result in changes to the water infrastructure. Depending on the manner in which a hydrogen economy evolves, these changes could be large or small, detrimental or benign. Water is used as a chemical feedstock for hydrogen production and as a coolant for the production process. Process and cooling water must meet minimum quality specifications (limits on mineral and organic contaminants) at both the inlet to the process and at the point of discharge. If these specifications are not met, then the water must be treated, which involves extra expenditure on equipment and energy. There are multiple options for water treatment and cooling systems, each of which has a different profile of equipment cost and operational requirements. The engineering decisions that are made when building out the hydrogen infrastructure will play an important role in the cost of producing hydrogen, and those decisions will be influenced by the regional and national policies that help to manage water resources. In order to evaluate the impacts of water on hydrogen production and of a hydrogen economy on water resources, this project takes a narrowly-scoped lifecycle analysis approach. We begin with a process model of hydrogen production and calculate the process water, cooling, electricity and energy feedstock demands. We expand beyond the production process itself by analyzing the details of the cooling system and water treatment system. At a regional scale, we also consider the water use associated with the electricity and fuel that feed hydrogen production and distribution. The narrow scope of the lifecycle analysis enables economic optimization at the plant level with respect to cooling and water treatment technologies. As water withdrawal and disposal costs increase, more expensive, but more water-efficient technologies become more attractive. Some of the benefits of these technologies are offset by their increased energy usage. We use the H2A hydrogen production model to determine the overall cost of hydrogen under a range of water cost and technology scenarios. At the regional level, we are planning on following the hydrogen roll-out scenarios envisioned by Greene and Leiby (2008) to determine the impact of hydrogen market penetration on various watersheds. The economics of various water technologies will eventually be incorporated into the temporal and geographic Macro System Model via a water module that automates the spreadsheet models described. At the time of this progress report, the major achievement for FY2009 has been the completion of the framework and analytical results of the economic optimization of water technology for hydrogen production. This accomplishment required the collection of cost and performance data for multiple cooling and water treatment technologies, as well as the integration of a water and energy balance model with the H2A framework. 22 (twenty-two) different combinations of production method (SMR, electrolysis), scale (centralized, forecourt), cooling (evaporative tower, dry) and water treatment (reverse osmosis, ion exchange) were evaluated. The following data were collected: water withdrawal, water discharge, electricity consumption, equipment footprint, equipment cost, installation cost, annual equipment and material costs and annual labor costs. These data, when consolidated, fit into a small number of input cells in H2A. Items such as capital cost end up as line-items for which there is space in the existing H2A spreadsheets. Items such as electricity use are added to the values that already exist in H2A. Table 1 lists eight potential technology combinations for cooling and water treatment associated with centralized SMR hydrogen production. When water costs are very low, the most economical system is described by row B, however, as water purchase and discharge prices rise, systems with higher water efficiency prevail. Tables 2a, 2b and 2c show the price of hydrogen production as a function of water purchase and discharge price. In table 2a, the technology is fixed. In table 2b, the price is the lowest of the eight available water technology options. Table 2c identifies the chosen technology for the economic conditions. This analysis has shown that at current prices, water is not expected to have a major impact on hydrogen deployment. In previous years work, it was show, qualitatively, that acquisition of water rights (permitting) can present a major issue for any new water user, particularly in highly water stressed areas.

13 HYDRO ENERGY↗

Considerations in developing geographic informations systems based on low-cost digital image processing

The potential of digital image processing systems costing $20,000 or less for geographic information systems is assessed with the emphasis on the volume of data to be handled, the commercial hardware systems available, and the basic software for: (1) data entry, conversion and digitization; (2) georeferencing and geometric correction; (3) data structuring; (4) editing and updating; (5) analysis and retrieval; (6) output drivers; and (7) data management. Costs must also be considered as tangible and intangible factors.

Henderson, F. M.↗

Re-Organizing Earth Observation Data Storage to Support Temporal Analysis of Big Data

The Earth Observing System Data and Information System archives many datasets that are critical to understanding long-term variations in Earth science properties. Thus, some of these are large, multi-decadal datasets. Yet the challenge in long time series analysis comes less from the sheer volume than the data organization, which is typically one (or a small number of) time steps per file. The overhead of opening and inventorying complex, API-driven data formats such as Hierarchical Data Format introduces a small latency at each time step, which nonetheless adds up for datasets with O(10^6) single-timestep files. Several approaches to reorganizing the data can mitigate this overhead by an order of magnitude: pre-aggregating data along the time axis (time-chunking); storing the data in a highly distributed file system; or storing data in distributed columnar databases. Storing a second copy of the data incurs extra costs, so some selection criteria must be employed, which would be driven by expected or actual usage by the end user community, balanced against the extra cost.

data storage↗

Towards standardized nuclear reactors: Seismic isolation and the cost impact of the earthquake load case

We report nuclear energy has a key role to play in global decarbonization. Impediments to the widespread deployment of reactors are their projected high capital cost and levelized cost of energy, and time required to analyze, design, license, construct, and commission them. The earthquake load case is a key cost driver for a new build nuclear plant, because near-surface soils and seismic hazard are different at each site, requiring site-specific analysis, design, engineering, qualification, licensing, and regulatory review, essentially making every design First-of-a-Kind (FoaK). To enable deployment at the scale needed for deep decarbonization, the cost and time impact of the seismic load case must be significantly mitigated, and plants must be standardized. Seismic base isolation has been proven to considerably reduce the earthquake response of structures and equipment but has yet to be applied to a nuclear power plant in the United States, in part because the financial impacts, positive or negative, are not known. Because there are no recent non-proprietary data to characterize the influence of the seismic load case on capital cost, it is difficult to confidently quantify the financial benefits of seismic isolation. Scheme-level designs of two fundamentally different advanced reactor buildings were developed to assemble cost data on the influence of the seismic load case. Both buildings were equipped with three bespoke pieces of safety-related equipment and analyzed for incremented levels of earthquake shaking to quantify the seismic penalty on equipment, in terms of vessel weights and horizontal accelerations. Using analysis results, a questionnaire was developed and transmitted to nuclear utilities, reactor developers, engineers, and equipment suppliers to collect cost data on engineering and fabrication costs for these unique pieces of safety-class equipment. Synthesis of the cost data showed that the seismic load case significantly affects the capital cost (sum of engineering and fabrication cost) of safety-class equipment, with engineering costs being comparable to fabrication costs. Standardization of safety-class equipment is made possible by seismic isolation, that is, equipment designed for minimal seismic robustness can resist earthquake shaking at a site of much higher seismic hazard. The average reduction in the capital cost of the safety-related equipment, enabled by seismic isolation, is a factor of two for FoaK equipment and a factor of five for standardized equipment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

UMass 2-Body WEC Techno-Economic Assessment

The University of Massachusetts (UMass) is developing a 2-body wave energy converter (WEC) device that is converting mechanical power into electricity using a mechanical motion rectifier that allows the system to couple to a flywheel. UMass has completed numerical modeling, wave tank testing, and PTO sub-system testing and needed assistance in developing a techno-economic model to enable optimization of their topology, comparison to a generic heaving point absorber topology, and guide the next steps in their development efforts. The core objective was to develop a techno-economic approach and modeling tool that allows benchmarking of the two topologies across a wide range of scales to evaluate their respective competitiveness in different application spaces. This data includes the final report as well as a supporting spreadsheet containing the data produced for this report.

16 TIDAL AND WAVE POWER↗

Meta-Analysis of Advanced Nuclear Reactor Cost Estimations

Supporting Data can be downloaded at: https://gain.inl.gov/content/uploads/4/2024/06/INL-RPT-24-77048-R1.xlsx Nuclear energy is a critical cornerstone of the current United States clean energy supply and may play a larger role in the future in support of a transition to a net-zero economy. The current fleet of nuclear reactors predominantly consists of large light-water reactors (LWRs), while many of the reactor designs under consideration are smaller and/or different technologies. Because these new designs have not yet been built, there is a high degree of uncertainty associated with their cost. This complicates energy-planning efforts because cost projections are not always standardized, consistent, and centralized in an easily accessible location. To help support energy planning in the US, this report provides advanced nuclear cost ranges using a transparent methodology along with other relevant information that can be used to help support decision making and energy planning. The purpose of this work was to conduct a methodical process for cost evaluation using only public information that was vetted with the end-goal to provide reference cost projections for nuclear energy. To provide a solid basis for these values, the approach and assumptions are explicitly laid out throughout the report allowing any user of the data to challenge or reconsider them. Because future US nuclear-reactor costs are still unknown due to little recent observed data, the report opted to compile a comprehensive list of bottom-up estimates and evaluate averages/trends within the data to identify reference ranges. This was deemed preferable to opining on the robustness or validity of one cost estimation versus another. To that end, the work evaluated thousands of lines of cost subaccounts from several bottom-up cost estimates. A wide variety of different reactor types captured in the data are of various sizes and technologies. Some of these reactors will be representative of advanced reactors under development while others will not. Thus, the results here are dependent on the data that are available and the accuracy of the estimates that are used. Each bottom-up estimate was reviewed to determine whether it was complete. Incomplete data sets were corrected to ensure an adequate basis of cross-comparison. The report is not without limitations and should be interpreted as an initial step to develop cost ranges for nuclear technology. Ultimately, future work can build upon the methodology with refined cost estimates to reduce uncertainty. US-based overnight capital cost (OCC) estimates were compiled from extensive data sets into ranges for both large and small reactor sizes for 2030. To project the cost declines over time, learning rates were sampled from literature sources. No SMRs were previously built; hence, learning rates based on bottom-up approaches (e.g., by quantifying the impact stemming from fabrication of different components, modular work, site construction, commissioning) were prioritized. For larger reactors, actual learning rates from deployments were used to project future costs (adjusted to account for standardization or lack thereof between designs). Other costs included are fixed and variable operations and maintenance costs. The final variables were capacity factors and ramp rates to support energy planning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Audacity of huge: overcoming challenges of data scarcity and data quality for machine learning in computational materials discovery

Machine learning (ML)-accelerated discovery requires large amounts of high-fidelity data to reveal predictive structure–property relationships. For many properties of interest in materials discovery, the challenging nature and high cost of data generation has resulted in a data landscape that is both scarcely populated and of dubious quality. Data-driven techniques starting to overcome these limitations include the use of consensus across functionals in density functional theory, the development of new functionals or accelerated electronic structure theories, and the detection of where computationally demanding methods are most necessary. When properties cannot be reliably simulated, large experimental data sets can be used to train ML models. In the absence of manual curation, increasingly sophisticated natural language processing and automated image analysis are making it possible to learn structure–property relationships from the literature. Finally, models trained on these data sets will improve as they incorporate community feedback.

36 MATERIALS SCIENCE↗