Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and­ treat system using a single extraction well and treatment by zero-valent iron (ex situ treatment system). The contingency action was optimized in 2015 with the installation of8 extraction wells and 16 monitoring wells in a focused area of the aquifer, the area of attainment (AOA). Contaminated water is treated by solar evaporation at an existing facility at the LM repository.

54 ENVIRONMENTAL SCIENCES↗

Accurate Holdup Calculations with Predictive Modeling & Data Integration

In facilities that process special nuclear material (SNM) it is important to account accurately for the fissile material that enters and leaves the plant. Although there are many stages and processes through which materials must be traced and measured, the focus of this project is material that is “held-up” in equipment, pipes, and ducts during normal operation and that can accumulate over time into significant quantities. Accurately estimating the holdup is essential for proper SNM accounting (vis-à-vis nuclear non-proliferation), criticality and radiation safety, waste management, and efficient plant operation. Usually it is not possible to directly measure the holdup quantity and location, so these must be inferred from measured radiation fields, primarily gamma and less frequently neutrons. Current methods to quantify holdup, i.e. Generalized Geometry Holdup (GGH), primarily rely on simple source configurations and crude radiation transport models aided by ad hoc correction factors. This project seeks an alternate method of performing measurement-based holdup calculations using a predictive model that employs state-of-the-art radiation transport codes capable of accurately simulating such situations. Inverse and data assimilation methods use the forward transport model to search for a source configuration that best matches the measured data and simultaneously provide an estimate of the level of confidence in the correctness of such configuration. In this work the holdup problem is re-interpreted as an inverse problem that is under-determined, hence may permit multiple solutions. A probabilistic approach is applied to solving the resulting inverse problem. This approach rates possible solutions according to their plausibility given the measurements and initial information. This is accomplished through the use of Bayes’ Theorem that resolves the issue of multiple solutions by giving an estimate of the probability of observing each possible solution. To use Bayes’ Theorem, one must have a model y(x) that maps the state variables x (the solution in this case) to the measurements y. In this case, the unknown state variables are the configuration and composition of the heldup SNM. The measurements are the detector readings. Thus, the natural model is neutral-particle radiation transport where a wealth of computational tools exists for performing these simulations accurately and efficiently. The combination of predictive model and Bayesian inference forms the Data Integration with Modeled Predictions (DIMP) method that serves as foundation for this project. The cost functional describing the model-to-data misfit is computed via a norm created by the inverse of the covariance matrix of the model parameters and responses. Since the model y(x) for the holdup problem is nonlinear, a nonlinear optimization on Q is conducted via Newton-type iterative methods to find the optimal values of the model parameters x. This project comprised a collaboration between NC State University (NCSU), the University of South Carolina (USC), and Oak Ridge National Laboratory (ORNL). The project was originally proposed in seven main tasks with an eighth contingency task to be performed if time and funding permitted; in fact time did not permit commencement of the contingency task and it was not performed. The remaining tasks involved holdup analysis with gamma detection strategies and separately with neutrons based on coincidence counting. Early in the project, and upon consultation with experts in coincidence counting it became evident that this approach is not viable for holdup applications and this task was replaced with an alternative, but valuable investigation that was carried out by the USC partner. Nevertheless, the experimental 4 measurements at ORNL of both gamma and neutron sources for the purpose of constructing Detector Response Functions (DRFs) with the associated uncertainties were indeed completed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Development of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization and operator interaction interface, based on specifications provided by MSU. The project was performed from October 2012 to December 2016, at the end of which the L-RAS tool, as described above, was completed and demonstrated. The project resulted in the following innovations and contributions: (a) the L-RAS software prototype, tested on a simulated system, vetted by utility personnel, and potentially ready for wider testing and commercialization; (b) an RTDS-based test bed that can be used for future research in the field; (c) a suite of breakthrough theoretical contributions to the field of power system stability and control; and (d) a new tool for visualization of power system stability margins. While detailed descriptions of the development and implementation of the various project components have been provided in the quarterly reports, this final report provides an overview of the complete project, and is demonstrated using public domain test systems commonly used in the literature. The SCE system, and demonstrations thereon, are not included in this report due to Critical Energy Infrastructure Information (CEII) restrictions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamics Informed Optimization for Resilient Energy Systems

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the Western System Coordinating Council (WSCC) 9-bus test system using synthetic multi-device outage scenarios. Towards integrating our modeling framework with real threats and more realistic power systems, we explore applying hybrid dynamics to power systems. Our work is applied to basic RL circuits with the ultimate goal of using the methodology to model protective tripping schemes in the grid. Finally, we survey mitigation techniques for HEMP threats and describe a GIS application developed to create threat scenarios in a grid with geographic detail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electron Cloud Simulations for the Electron-Ion Collider in Brookhaven National Laboratory

For high-intensity circular accelerators and storage rings, if the secondary electron emission yield (SEY) of the vacuum chamber surfaces is high, an EC (Electron Cloud) could build up with the passage of the circulating beam. The presence of EC can strongly affect the beam quality, such as transverse instabilities, transverse emittance growth, and beam loss. Furthermore, the heat load from EC can exceed the available cryogenic capability. For the RHIC superconducting (SC) arc magnets, to be used for the hadron storage ring of the Electron-Ion Collider (EIC), the dynamic heat load budget is 0.5 W/m to the 4.5 K stainless steel beam pipe. This can limit the maximum beam bunches or intensity of the EIC, hence diminishing the luminosity provided by the EIC. The EC has affected the beam instability and significantly contributed to cryogenic heat load in the Large Hadron Collider (LHC). Positron storage rings for which ECs have been a critical factor in the design and performance include KEKB in Japan and EC buildup remains one of the concerns for future high-intensity accelerators design. EC considerations have driven the SuperKEKB collider design and the positron damping ring for the proposed International Linear Collider (ILC). The LHC luminosity upgrade is contingent on reducing the bunch spacing to 25 ns; at this bunch spacing, severe EC buildup has been observed. The success of the upgrade is likely contingent on limiting EC buildup. To study the EC heat load, we did some EC simulations with PyECLOUD code for the dipole, quadrupole, sextupole magnets, and the warm (drift) section of the EIC hadron storage ring. PyECLOUD is an EC simulation code developed by CERN. The code has been validated and used to study EC in the LHC, SPS, and PS. To eliminate EC buildup, the sources of electrons must be minimized. First, we will reduce the production of electrons due to residual gas ionization by specifying the maximum gas density, which requires a vacuum chamber with low electron-stimulated desorption (ESD) yields and a sufficient (preferably distributed) pumping speed. Second, we should reduce the secondary electrons with a lower secondary electron yield (SEY) material.

43 PARTICLE ACCELERATORS↗

A nonsmooth nonconvex optimization algorithm for two-stage optimization problems

An optimization algorithm for a group of nonsmooth nonconvex problems inspired by two-stage stochastic programming problems is proposed. The main challenges for these problems include (1) the problems lack the popular lower-type properties such as prox-regularity assumed in many nonsmooth nonconvex optimization algorithms, (2) the objective can not be analytically expressed and (3) the evaluation of function values and subgradients are computationally expensive. To address these challenges, this report first examines the properties that exist in many two-stage problems, specifically upper-C 2 objectives. Then, we show that quadratic penalty method for securityconstrained alternating current optimal power flow (SCACOPF) contingency problems can make the contingency solution functions upper-C 2 . Based on these observations, a simplified bundle algorithm that bears similarity to sequential quadratic programming (SQP) method is proposed. It is more efficient in implementation and computation compared to conventional bundle methods. Global convergence analysis of the algorithm is presented under novel and reasonable assumptions. The proposed algorithm therefore fills the gap of theoretical convergence for smoothed SCACOPF problems. The inconsistency that might arise in our treatment of the constraints are addressed through a penalty algorithm whose convergence analysis is also provided. Finally, theoretical capabilities and numerical performance of the algorithm are demonstrated through numerical examples.

97 MATHEMATICS AND COMPUTING↗

Library of Advanced Models of large-scale PV (LAMP) (Final Technical Report)

A suite of dynamic models of photovoltaic (PV) systems is developed in this project to accurately capture PV system dynamics during different contingencies. The following models are included: (i) quasi-dynamic, (ii) high-fidelity electromagnetic transient (EMT), (iii) advanced, and (iv) baseline. The models have the flexibility to consider different control functionalities at different controller levels. The study’s requirements determine the type of model needed. For example, high-fidelity EMT models are recommended for contingency studies. Advanced models are recommended for online or real-time implementations with resource constraints, whereas quasi-dynamic models are useful for studying the impact of weather variations.

14 SOLAR ENERGY↗

An Iterative Approach for Solving the SCOPF Problem Applying LP, SOCP, and NLP Subproblems

We propose to develop efficient algorithms and software for the SCOPF problem. We will employ an iterative approach that will: a) use linear subproblems and other active set filtering techniques to identify the most important contingencies and drastically reduce the SCOPF model size; b) solve SOCP relaxations of the reduced SCOPF to converge to the neighborhood of the global optimal solution and establish a lower bound on the solution, and; c) use a non-convex, nonlinear interior-point solver, Artelys Knitro, to converge quickly to the optimal solution. To identify the most effective approach, we will experiment with several techniques to identify the tradeoffs between contingency subproblem complexity and fast solvability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Study of the Protection Improvements for a Weak Grid Area With High Inverter-Based Resources (IBRs)

This project designs enhanced protection scheme for the real-world weak grid area with a high penetration of IBRs. As the existing protection schemes are originally designed for traditional synchronous machines, we first evaluate if the protection scheme will continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with IBR original equipment manufacturer black-box models is used to perform fault studies and generate COMTRADE data, which are replayed by a real-time digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBR-only scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. Enhanced protection is designed to address the challenge of lack of negative sequence current from IBRs, including increased restraining factors a2 and k2 to block 32Q or using V instead QV ORDER for ground faults, enhanced mho distance element with voltage and phase angle supervision for L-L faults. The efficacy of enhanced protection logic is validated and proven to work reliably. Additionally, IEEE Std. 2800-2022 negative sequence current compliant GFL and GFM IBRs from another vendor are tested and proven to work reliably without need for enhanced logic. Therefore, this work provides valuable decision-making for utilities facing protection system challenges due to IBRs, either designing enhanced protection scheme or requesting their IBRs being IEEE Std. 2800-2022 compliant to produce regulated negative sequence current for protection relay to make correct decision.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF↗

Evaluating Protection System Performance for a Real-World Weak Grid Area With High Inverter-Based Resources

This paper evaluates an existing protection scheme implemented in a real-world weak grid area with a high penetration of inverter-based resources (IBRs). The study aims to assess the reliability and adequacy of protection schemes originally designed for traditional synchronous machine systems and determine whether they can continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with an IBR original equipment manufacturer black-box model is used to perform fault studies and generate COMTRADE data, which are replayed by a realtime digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBRonly scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. These findings provide utilities with valuable insights for improving their protection systems in high-IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Apollo experience report: The application of a computerized visualization capability to lunar missions

The development of a computerized capability to depict views from the Apollo spacecraft during a lunar mission was undertaken before the Apollo 8 mission. Such views were considered valuable because of the difficulties in visualizing the complex geometry of the Earth, Moon, Sun, and spacecraft. Such visualization capability originally was desired for spacecraft attitude verification and contingency situations. Improvements were added for later Apollo flights, and results were adopted for several real time and preflight applications. Some specific applications have included crewmember and ground control personnel familiarization, nominal and contingency mission planning, definition of secondary attitude checks for all major thrust maneuvers, and preflight star selection for navigation and for platform alinement. The use of this computerized visualization capability should prove valuable for any future space program as an aid to understanding the geometrical relationships between the spacecraft and the celestial surroundings.

Hyle, C. T.↗

A preliminary investigation of the environmental Control and Life Support Subsystems (EC/LSS) for animal and plant experiment payloads

A preliminary study of the environmental control and life support subsystems (EC/LSS) necessary for an earth orbital spacecraft to conduct biological experiments is presented. The primary spacecraft models available for conducting these biological experiments are the space shuttle and modular space station. The experiments would be housed in a separate module that would be contained in either the shuttle payload bay or attached to the modular space station. This module would be manned only for experiment-related tasks, and would contain a separate EC/LSS for the crew and animals. Metabolic data were tabulated on various animals that are considered useful for a typical experiment program. The minimum payload for the 30-day space shuttle module was found to require about the equivalent of a one-man EC/LSS; however, the selected two-man shuttle assemblies will give a growth and contingency factor of about 50 percent. The maximum payloads for the space station mission will require at least a seven-man EC/LSS for the laboratory colony and a nine-man EC/LSS for the centrifuge colony. There is practically no room for growth or contingencies in these areas.

Wells, H. B.↗

Some aversive characteristics of centrifugally generated gravity.

The effective weight of rats was manipulated by centrifugation. Two effective weight levels were obtained. In three escape avoidance conditions a lever press produced a change from a base level of 2.1 g to a response level of 1.1 g. In a punishment condition a response produced a change from a 1.1 g level to a 2.1 g level and in an extinction condition responses had no effect on the 2.1 g effective weight level present. All changes took 30 sec and were maintained for an additional 10 sec before a return to base level was initiated. When responses occurred closer together than the 40 sec, they delayed the return to base level by 40 sec. This 40 sec interval is referred to as response-contingent-time. The response rate and amount of response-contingent-time served as the data. The results confirmed previous data that centrifugation is aversive. The results are interpreted as indicating that the aversiveness is attributable to the increase in effective weight, and that rats can discriminate the different angular velocity-radius of rotation combinations used.

Altman, F.↗