Early_Commisioning_Data
This is very early commissioning data (2019) from the newly established APPL facility at ORNL. Instruments, and technologies are in active development at this stage.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This is very early commissioning data (2019) from the newly established APPL facility at ORNL. Instruments, and technologies are in active development at this stage.
The sPHENIX experiment is a state-of-the-art jet and heavy flavor physics detector, which successfully recorded its first Au + Au collision data at 200 GeV at the Relativistic Heavy Ion Collider (RHIC). sPHENIX will provide heavy flavor physics measurements at RHIC, covering an unexplored kinematic region and unprecedented precision, to probe the parton energy loss mechanism, parton transport coefficients in quark–gluon plasma, and the hadronization process under various medium conditions. At the center of sPHENIX, the monolithic active pixel sensor (MAPS)-based VerTeX detector (MVTX) is a high-precision silicon pixel detector. The MVTX provides excellent position resolution and the capability of operating in continuous streaming readout mode, allowing precise vertex determination and recording a large data sample, both of which are particularly crucial for heavy flavor physics measurements. In this work, we will show the general performance of heavy-flavor hadron reconstruction. In addition, we will discuss the commissioning experience with sPHENIX. Finally, we will provide the projection of b-hadron and jet observables and discuss the estimated constraints on theoretical models.
During 2012, the Department of Energy (DOE) instituted an Advanced Reactor Concepts Technical Review Panel process to evaluate viable reactor concepts from industry and identify research and development needs. Early in the process, the Technical Review Panel members and advanced reactor designers noted the need to develop a regulatory framework for non-light water advanced reactors to reduce risk and uncertainty to the industry. Concurrently, and in response to Congressional direction, the Nuclear Regulatory Commission (NRC) provided a report to Congress on advanced reactors. In this report, NRC noted that several reactor vendors also identified the need for regulatory guidance for advanced non-light water reactor designs.
This presentation provides an overview of the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) efforts to provide customized technical support specific to state public utility commissions (PUCs), specifically on the integration of distributed energy resources (DERs). The goals are to increase awareness of existing materials and support to help state PUCs move forward on DER interconnection activities, to help participants make connections to colleagues with similar challenges (and solutions), and to help the GMLC/National Renewable Energy Laboratory project team understand context and implementation challenges.
The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)
Administrative changes and funding issues have delayed the Department of Energy (DOE) from establishing and commissioning a National Repository for mercury as required under the Mercury Export Ban Act (MEBA) of 2008. In the interim, a few hazardous waste Treatment, Storage, and Disposal Facilities (TSDFs) have been authorized to accept mercury classified as a hazardous waste as under Subtitle C of the Resource Conservation and Recovery Act (RCRA). Waste generators are charged (either by weight or by volume) for the waste they manifest to these TSDFs. In many cases, mercury and mercury compounds have chemically sorbed to (or physically lodged into) the interstitial spaces of a substrate material. This almost always causes the amount of waste generated to be unnecessarily large, due to the extra volume (or weight) of the accompanying, non-mercury materials. Depending on a multitude of factors, it could be financially beneficial for waste generators to take greater control of their mercury affairs by separating these substrate materials from the mercury and mercury compounds that have become associated with them. Building and operating an on-site mercury Concentration and Holding Facility (CHF) could help relieve a waste generator's overall cost burden. The purpose of such CHFs is not to treat or dispose of mercury, but to recover and concentrate mercury from bulky mercury-laden materials to the extent that the host substrate to which the mercury may have previously been sorbed could pass a Toxicity Characteristic Leaching Procedure (TCLP) test and either be disposed of at a conventional landfill, or be disposed of at a hazardous waste landfill, but absent additional restrictions specifically for mercury. A CHF represents a way for waste generators to save money by separating mercury from common host materials, concentrating it, and then safely storing it until transportation to an authorized TSDF takes place This paper focuses on the critical design elements waste generators should consider when designing and operating a mercury CHF. (authors)
Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)
Like many organizations and groups, the Department of Energy Environmental Management program and the nuclear industry are facing an aging employee population and record numbers of employee retirements. This 'silver tsunami' of retirees means the industry as a whole is recruiting graduates at a fast pace. So, how do we ensure the nuclear industry has a robust pipeline of graduates with the necessary background? Fluor Idaho's investment in science, technology, engineering, and mathematics (STEM) education programs helps promote the next generation of technical professionals, benefiting both the company and the industry. Through community outreach initiatives and student mentoring programs, Fluor Idaho promotes kids' interest in STEM. The programs are designed to spark STEM interest in grade school and then foster and grow that interest through high school and higher education. After igniting student excitement about STEM topics in school, Fluor Idaho focuses on providing work-specific opportunities including mentoring and intern programs. These programs give students a better look at real-world job opportunities while still stimulating their interest in STEM. These programs ultimately provide career opportunities for the students and a pipeline of workers. Fluor Idaho's strategy for its summer interns has been to place students in a wide variety of projects - from the commissioning of a first-of-a-kind nuclear processing facility, to operating nuclear waste management facilities, to developing computer programs and applications - and give them responsibilities that make them feel like valued contributors. This approach has created a positive and rewarding summer-intern program experience for the students. Fluor Idaho's investment in its future today is reducing the knowledge gap - or cliff - that many contractors in the nuclear industry are facing. It's a worthwhile investment that is readily visible within its many cleanup projects. The next generation of technical professionals is making an impact now - benefiting both the company and the nuclear industry. This paper will review Fluor Idaho's programs, including STEM community outreach and education and mentoring programs. It will also present statistics about the reach of those programs and their successes. (authors)
This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)
This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)
In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. During the final phase of commissioning prior to radiological operations, regeneration of the high temperature filters in the process gas filter (PGF) vessel became ineffective. After approximately 50 days of testing, the differential pressure across the filters began increasing exponentially and the plant had to be shutdown. Subsequent investigation revealed that the Inconel 625 (I625) sintered metal filter media was corroding in the 550 deg. C reducing environment. A pilot plant run tested four candidate replacement filter media. The top candidate was further tested during a long-term pilot plant run to validate the selection. Data from the testing indicate the selected filters will provide reliable service throughout the life of the project, including after in-situ radiological decontamination. This paper presents the data from this effort and reinforces the value of pilot plant testing. (authors)
At Sellafield, in the North West of the United Kingdom (UK), there are a number of redundant plutonium processing facilities. Over the past three decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. As previously presented at WM2017 (Paper Ref 17081) some of these challenges have recently been addressed through a new approach which introduced a number of innovations. The purpose of these innovations is to seek ways to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. This paper provides an update on the progress of these innovations since 2017. Additionally, the paper also provides details of the new decommissioning technologies which have been introduced over the past 2 years to enable the most challenging aspects of the redundant plutonium processing facility to be decommissioned. These new decommissioning technologies address challenges associated with the preparation of process vessels and pipework to enable their safe in-situ size reduction by remote means: - New decommissioning techniques have been introduced to allow penetrations to be remotely cut into process vessels and pipework to provide a means of accessing and controlling the venting of any potential hydrogen gas present. - Additionally, a new large scale bespoke remote diamond wire cutting machine has been designed and manufactured to enable the process vessels to be size reduced in situ. Both of these new cutting technologies have involved collaborative working with specialist equipment suppliers including extensive development, trialling demonstration and commissioning prior to bringing the equipment into operational service. Several years of work have now culminated in reaching the final stages of decommissioning of the redundant plutonium processing facility with decommissioning of the final process vessels now underway and completion expected by the end of 2019. (authors)
Construction of the Synroc Waste Treatment Facility is well underway at ANSTO. This plant has been designed to treat intermediate level liquid waste arising from the production of Mo-99 within the newly constructed ANSTO Nuclear Medicine (ANM) precinct [1]. The facility utilises ANSTO Synroc technology that has been tailored to the chemical, physical, and radiological properties of the waste. The result is a highly durable wasteform with a significant reduction in the final volume of the treated waste. This paper presents the construction status of the Synroc Waste Treatment Facility and the status of the associated technology maturation plan. Construction of the building is scheduled for completion in late 2020 followed by process installation and commissioning. A key component of the technology maturation plan has been the construction of an Inactive Engineering Demonstrator [2]. This has aided in the mitigation of risks with respect to technology selection, process integration, and process nuclearisation. Furthermore, the demonstration facility has provided an environment for the design and development of the instrumentation and control philosophy resulting in a seamlessly integrated plant control system. Successful demonstration of the technology by the inactive engineering demonstrator has significantly reduced the associated risks. Details of the Synroc Waste Treatment Facility project progress will also be presented. (authors)
Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)
Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)
Abstract The stability of efficient, deep blue organic light‐emitting diodes (OLEDs) remains a major challenge in the field of organic electronics. Poor device stability originates from the high probability for destructive non‐radiative triplet exciton annihilation events. Phosphor‐sensitized fluorescence (PSF) is proposed to achieve an efficient, deep blue color by energy transfer from phosphors to fluorophores. Recently, the polariton‐enhanced Purcell (PEP) effect is introduced to decrease the triplet radiative lifetime and density, resulting in an increase in blue phosphorescent OLED lifetime. Here, the PEP effect is introduced to enhance the stability of the PSF‐OLEDs. It is shown that the PEP effect increases all radiative decay rates of the phosphors and fluorophores, leading to a reduction in the triplet annihilation events. Using a Pt‐complex phosphor sensitizer and a so‐called multi‐resonance fluorescent emitter in a PEP cavity, a 3.1‐fold lifetime increase is observed at a current density ofJ= 10 mA cm −2 , reduced EQE roll‐off and deep blue color with Commission Internationale de l'Eclairage coordinates of (0.13, 0.09). The PEP effect maximally extends PSF‐OLED lifetimes in devices with the highest triplet‐to‐singlet energy transfer rates. Moreover, this work suggests that the benefits of PEPs apply to all triplet‐based OLEDs.
Abstract This study investigated the influence of the Three Gorges Dam (TGD) on the evolution of nearby channels in the Yangtze River (Changjiang River) system in order to better understand the environmental impact of large‐scale reservoir operations. From 2003 to 2017, the amounts of runoff and sediment transport in the Yangtze River were reduced by 3.3–14.5% and 67.8–92.7%, respectively, relative to 1955–2002 before the TGD was operational. Topographic measurements of the middle reaches (Yichang to Hukou) of the Yangtze River were analyzed from 1975 to 2017, during which time the cumulative erosion of the flood channel was 22.78 × 10 8 m 3 , and the dry channel accounted for 90.3% of the erosion. Following commissioning of the TGD, the scouring intensity of the sandy gravel section near the dam initially increased then decreased, whereas the scouring intensity of sandy sections away from the dam continued to increase. Beaches on convex banks of curved sections were scoured, and deep channels on concave banks became silted. In braided sections, the braids tended to shrink, and the diversion ratio of the main branch during dry seasons reduced, resulting in frequent branch alternation. Compared to changes in the downstream river channels of other large reservoirs worldwide, scouring from the TGD is extensive. The findings of this study are significant for river channel regulation and waterway planning in the Yangtze River and worldwide.
Background: In a recent study, we reported beam quality correction factors, f Q , in carbon ion beams using Monte Carlo (MC) methods for a cylindrical and a parallel-plate ionization chamber (IC). A non-negligible perturbation effect was observed; however, the magnitude of the perturbation correction due to the specific IC subcomponents was not included. Furthermore, the stopping power data presented in the International Commission on Radiation Units and Measurements (ICRU) report 73 were used, whereas the latest stopping power data have been reported in the ICRU report 90. Purpose: The aim of this study was to extend our previous work by computing f Q correction factors using the ICRU 90 stopping power data and by reporting IC-specific perturbation correction factors. Possible energy or linear energy transfer (LET) dependence of the f Q correction factor was investigated by simulating both pristine beams and spread-out Bragg peaks (SOBPs). Methods: The TOol for PArticle Simulation (TOPAS)/GEANT4 MC code was used in this study. A 30 × 30 × 50 cm 3 water phantom was simulated with a uniform 10 × 10 cm 2 parallel beam incident on the surface. A Farmer-type cylindrical IC (Exradin A12) and two parallel-plate ICs (Exradin P11 and A11) were simulated in TOPAS using the manufacturer-provided geometrical drawings. The f Q correction factor was calculated in pristine carbon ion beams in the 150–450 MeV/u energy range at 2 cm depth and in the middle of the flat region of four SOBPs. The k Q correction factor was calculated by simulating the f Qo correction factor in a 60 Co beam at 5 cm depth. The perturbation correction factors due to the presence of the individual IC subcomponents, such as the displacement effect in the air cavity, collecting electrode, chamber wall, and chamber stem, were calculated at 2 cm depth for monoenergetic beams only. Additionally, the mean dose-averaged and track-averaged LET was calculated at the depths at which the f Q was calculated. Results: The ICRU 90 f Q correction factors were reported. The p dis correction factor was found to be significant for the cylindrical IC with magnitudes up to 1.70%. The individual perturbation corrections for the parallel-plate ICs were <1.0% except for the A11 p cel correction at the lowest energy. The f Q correction for the P11 IC exhibited an energy dependence of >1.00% and displayed differences up to 0.87% between pristine beams and SOBPs. Conversely, the f Q for A11 and A12 displayed a minimal energy dependence of <0.50%. The energy dependence was found to manifest in the LET dependence for the P11 IC. A statistically significant LET dependence was found only for the P11 IC in pristine beams only with a magnitude of <1.10%. Conclusions: The perturbation and k Q correction factor should be calculated for the specific IC to be used in carbon ion beam reference dosimetry as a function of beam quality.