Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Critical Asset Management at the Start of the Pandemic

COVID-19 has changed the daily lives of so many people and forced many companies to examine their way of doing business, including their Asset Management programs. This virus has given way to an unprecedented set of challenges to continue conducting business as usual when everything is unusual. On June 16, 2020, members of the Northern California Chapter of the Association of Asset Management Professionals came together for a panel discussion on Critical Asset Management during the COVID-19 pandemic and beyond. Participants were representatives from health care, water, and national security, which are all considered essential industries.

Administration and management↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Turbocharger system with turbine bypass circuit to reduce emissions during engine cold start

An engine system includes an engine having first and second exhaust manifolds each having outlet ports and a bypass runner. A first turbocharger is in fluid communication with the outlet port of the first manifold, and a second turbocharger in fluid communication with the outlet port of the second manifold. An exhaust aftertreatment device is in fluid communication with the first and second turbochargers. A turbocharger bypass circuit includes a valve assembly having an inlet side connected in fluid communication with the bypass runners of the first and second manifolds, an outlet side in fluid communication with the aftertreatment device, and a valve having an open position in which the inlet and outlet sides are in fluid communication and a closed position in which the inlet and outlet sides are not in fluid communication.

Plagens, Keith Michael↗

Start-to-End Tracking Simulations of the Compact Linear Collider

We present the current status of the beam tracking simulations of the Compact Linear Collider (CLIC) from the exit of the damping ring to the interaction point, including the ring to main linac (RTML) section, main linac, beam delivery system (BDS) and beam-beam interactions. This model introduces realistic alignment survey errors, dynamic imperfections and also the possibility to study collective effects in the main linac and the BDS. Special emphasis is put on low emittance transport and beam stabilisation studies, applying beam based alignment methods and feedback systems. The aim is to perform realistic integrated simulations to obtain reliable luminosity predictions.

43 PARTICLE ACCELERATORS↗