Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Trajectory reconstruction and aerodynamic results from the first Discovery flight, STS-14(41-D)

Trajectory reconstruction results for the first Discovery flight are presented. Spacecraft dynamic measurements from IMU2 were utilized in conjunction with the ground based tracking data from two S-band stations, eight C-band, and five cameras at Edwards Air Force Base to determine the spacecraft trajectory from epoch through roll-out on Runway 17. Specifics as to the trajectory reconstruction are discussed in Section 1. The final inertial profile is BT14NO2/UN=169750N. Merging of this file with the final LAIRS atmosphere is discussed in Section 2. The final Extended BET is ST14BET/UN=274885C. Section 3 presents plots of relevant parameters from the AEROBET as well as aerodynamic performance comparison results. High frequency files for maneuver extraction were also generated as discussed in Section 4. Appendices are attached which contain: (1) spacecraft and physical parameters utilized, (2) final residuals obtained from the data fitting process, (3) listing of trajectory parameters, and (4) archival information.

Kelly, G. M.↗

Ka-band (32-GHz) downlink capability for deep space communications

The first quarter century of U.S. solar system exploration using unmanned spacecraft has involved progressively higher operating frequencies for deep space telemetry: L-band (960 MHz) in 1962 to S-band (2.3 GHz) in 1964 to X-band (8.4 GHZ) in 1977. The next logical frequency to develop for deep space is the Ka-band (32 GHz) for which a primary deep space allocation of 500 MHz between 31.8 to 32.3 GHz was established in 1979. The telecommunications capability was improved by a factor of 77 (18.9 dB) through the frequency changes from L-band to X-band. Another improvement factor of 14.5 (11.6 dB) can be achieved by going to Ka-band. Plans to develop and demonstrate Ka-band capability include the continued measurement of weather effects at Deep Space Network (DSN) sites, development of a prototype DSN ground antenna and supporting subsystems, augmentation of planned spacecraft with Ka-band beacons, and development of spacecraft prototype modules for future Ka-band transmitters. Plans for augmenting the DSN with Ka-band capability by 1995 were also developed. A companion set of articles describes the Ka-band performance and technology in greater detail.

Smith, J. G.↗

Proposed upgrade of the Deep Space Network research and development station

Continued exploration of the solar system will require continued evolution of capabilities to support deep space communication and navigation. That evolution will rely, as it has in the past, on the development, demonstration, and field testing of communication and navigation technologies. The existing Deep Space Network (DSN) research and development station, DSS 13, at the Venus site, Goldstone, California was instrumental in those prior developments. However, the present antenna is no longer able to provide the necessary support for technology. The 26 meter antenna has good performance at S-band, fair performance at X-band, but is unusable at the anticipated Ka-band. It is not suitable for conversion to beam waveguides, and is not usable as a test bed for demonstrating high efficiency because of structural pliancy. Additionally, its size and age are increasingly a liability in demonstrations. A 34 meter beam waveguide version of the existing DSN high efficiency (HEF) antennas was proposed for FY-88 Construction of Facilities budget. The antenna is to be built at the Venus site, adjacent to the old antenna, and serve as the DSN research and development antenna through the end of the century.

Smith, Joel G.↗

Goldstone radar observations of Mars: The 1986 opposition

Radar echoes from the planet Mars were obtained on 27 S-band (wavelength = 12.5 cm) and 2 X-band (wavelength = 3.5 cm) tracks using the Goldstone Solar System Radar. These observations took advantage of the favorable 1986 opposition since the Earth-Mars distance was 0.40 AU at opposition and radar echo strength is proportional to inverse-fourth-power of the distance to the target. The coverages of the Goldstone observations are summarized. The observations were conducted via the CW-spectra techniques described by Harmon et al. A continuous tone was transmitted at Mars and the radar echo was sampled to obtain a Doppler spread spectrum. Each received event was separated into polarized (opposite sense circular) and depolarized (same sense circular) periods. There was one successful ranging run which had a resolution of 2 microseconds. This should yield surface heights accurate to 300 meters.

Thompson, T. W.↗

Phased array antenna for space shuttle orbiter

The National Aeronautics and Space Administration is developing a distributed phased array antenna at the Lyndon B. Johnson Space Center as a possible upgrade for the Space Shuttle Orbiter S-band phase modulation communications system. The antenna consists of an eight-element transmit section, eight-element receive section, and a single L-band receive element. The antenna design is constrained by the existing Orbiter system and space environment. The solution to the interface design problems led to an antenna system which provides improved link margins and yet supports previous operational configurations. This paper describes the system development, antenna hardware, and the interface consideration which led to the final design.

Davidson, Shayla E.↗

DSN 63 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, July 1986

The Deep Space Network (DSN) 64-meter antenna in Spain (DSN 63) has been calibrated prior to its upgrading to a 70-meter high efficiency configuration in preparation for the Voyager Neptune encounter in August 1989. The S-band (2285 MHz) and X-band (8420 MHz) effective area efficiency and system noise temperature calibrations were carried out during July 1986 to establish a baseline system performance for this station. It is expected that the 70-meter will result in at least a 1.9 dB G/T improvement at X-band relative to the 64-meter baseline reference.

Slobin, S. D.↗

DSS 43 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, January 1987

The Deep Space Network (DSN) 64-meter antenna in Australia has been calibrated prior to its upgrading to a 70-meter configuration in preparation for the Voyager Neptune encounter in August 1989. The S-band (2285 MHz) and X-band (8420 MHz) antenna area efficiency and system noise temperature calibrations were carried out during December 1986 and January 1987 to establish a baseline system performance for this station.

Slobin, S. D.↗

Non-linearity in measurement systems: Evaluation method and application to microwave radiometers

A simple method for determination and correction of nonlinaearity in measurement systems is presented. The technique is applicable to a wide range of measuring systems. The basic concept, an analysis, and a sample application are given. Nonlinearity of the Goldstone DSS 13 low noise HEMT 2.3 GHz (S-band) radiometer system results in noise temperature measurement errors. These errors are successfully correct with this method.

Stelzried, C. T.↗

X-band uplink ground systems development: Part 2

The prototype X-band exciter testing has been completed. Stability and single-sideband phase noise measurements have been made on the X-band exciter signal (7.145-7.235 GHz) and on the coherent X- and S-band receiver test signals (8.4-8.5 GHz and 2.29-2.3 GHz) generated within the exciter equipment. Outputs are well within error budgets.

Johns, C. E.↗

A 2.3-GHz low-noise cryo-FET amplifier

A cryogenic cooled, low-noise Field Effect Transistor (FET) amplifier assembly for use at 2.2 to 2.3 GHz was developed for the DSN to meet the requirements of a Very Long Baseline Interferometry (VLBI) upgrade. An amplifier assembly was developed at JPL that uses a commercial closed-cycle helium refrigerator (CCR) to cool a FET amplifier to an operating temperature of 15 K. A cooled probe waveguide-to-coaxial transition similar to that used in the research and development Ultra-Low-Noise S-band Traveling Wave Maser (TWM) is used to minimize input line losses. Typical performance includes an input flange equivalent noise contribution of 14.5 K, a gain slope of less than 0.05 dB/MHz across a bandwidth of 2.2 to 2.3 GHz, an input VSWR of 1.5:1 at 2.25 GHz, and an insertion gain of 45 + or - 1 dB across the bandwidth of 2.2 to 2.3 GHz. Three 2.3 GHz FET/CCR assemblies were delivered to the DSN in the spring of 1987.

Loreman, J.↗

The atmosphere of Uranus - Results of radio occultation measurements with Voyager 2

The Uranian atmosphere is investigated on the basis of S-band and X-band occultation observations (including measurements of Doppler frequency perturbations) obtained during the Voyager 2 encounter with Uranus in January 1986. The data are presented in extensive tables and graphs and characterized in detail. The atmosphere is assumed to have an H2/He abundance ratio of about 85/15, but also to contain small amounts of CH4 at above-cloud relative humidity 30 percent, cloud-base relative humidity 78 percent, and below-cloud mixing ratio 2.3 percent by number density. Other parameters estimated include magnetic-field rotation period 17.24 h, 1-bar equatorial radius 25,559 + or - 4 km, polar radius 24,973 + or - 20 km, equatorial acceleration of gravity 8.69 + or - 0.01 m/sec sq, and atmospheric temperature 76 + or - 2 K (assuming 85 + or - 3 percent H2).

Lindal, G. F.↗

Spectrum utilization for the International Space Station communications and tracking systems

The frequency spectrum which will be used over the lifetime of the International Space Station Program is discussed. Primary communications traffic will initially occur in the S-band and Ku-band regions. Tracking will initially consist mostly of L-band satellite links. As the service demand increases, use of millimeter and optical wavelengths will be required. The particular space/ground links, space/space links, and other links that will be used are described.

Novosad, Sydney W.↗

An expert system for shuttle and satellite radar tracker scheduling

This expert system automates and optimizes radar tracker selection for shuttle missions. The expert system is written in the FORTRAN and C languages on an HP9000. It is portable to any UNIX machine having both ANSI-77 FORTRAN and C language compilers. It is a rule based expert system that selects tracking stations from the S-band and C-band radar stations and the TDRSS east and TDRSS west satellites under a variety of conditions. The expert system was prototyped on the Symbolics in the Automated Reasoning Tool (ART) and ZetaLisp. After the prototype demonstrated an acceptable automation of the process of selecting tracking stations to support the orbit determination requirements of Shuttle missions, the basic ART rules of the prototype were ported to the HP9000 computer using the CLIPS language. CLIPS is a forward-chaining rule-based expert system language written in C. Prior to the development of this expert system the selection process was a tedious manual process and expensive in terms of human resources. Manual tracking station selection required from 1 to 2 man weeks per mission; whereas the expert system can complete the selection process in about 2 hours.

Mitchell, Paul↗

Passive microwave remote sensing of salinity in coastal zones

The theory of measuring coastal-zone salinity from airborne microwave radiometers is developed. The theory, as presented, shows that precision measurements of salinity favor the lower microwave frequencies. To this end, L- and S-Band systems were built, and the flight results have shown that accuracies of at least one part per thousand were achieved.The aircraft results focus on flights conducted over the Chesapeake Bay and the mouth of the Savanna River off the Georgia Coast. This paper presents no new work, but rather summarizes the capabilities of the remote sensing technique.

Swift, Calvin T.↗

Capabilities of a single TDRS to support user orbit determination

It is shown that the single-TDRS S-band tracking configuration satisfies the navigation certification requirements for operational orbit determination support for the Landsat-5, SMM, SME, and Earth Radiation Budget Satellite (ERBS) spacecraft. It is also shown that a pair of 3-min bilateration ranging transponder system (BRTS) tracking passes every 4 hrs, one each from two different BRTS locations, is sufficient to maintain user orbit accuracy to the navigation certification requirements. The BRTS tracking requirements for the single-TDRS configuration will also apply to each TDRS in a multiple-TDRS configuration.

Cappellari, J. O., Jr.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗