Experience on Safety Review of Liquid and Gaseous Effluent Monitoring System for Nuclear Power Plants in Korea - 16237
The liquid and gaseous effluent monitoring systems are important components in order to evaluate and minimize the radiation environmental impacts from Nuclear Power Plants (NPPs). Therefore, licensee should install liquid and gaseous effluent monitoring systems and these systems should be reviewed by regulatory body. In Korea, the criteria of liquid and gaseous effluent monitoring systems for NPPs are stipulated in Nuclear Safety Act (NSA) and subordinate statute, and it is stated in 'Regulation on Technical Standards for Nuclear Reactor Facilities, etc.' that 'Instrumentation shall be provided to monitor related variables, including the following, and systems over their anticipated ranges of normal operations, anticipated operational occurrences, and accident conditions'. RG-1.97(Rev. 3, 1983) of US Nuclear Regulatory Commission (NRC) was used as criterion for accident monitoring instrumentations for NPPs in Korea. Licensee, however, started to apply RG-1.97(Rev. 4, 2006) as new criterion for accident monitoring instrumentation of the Construction Permit (CP) of new NPPs (Shin-kori Unit 5 and 6). Licensee submitted the report for type selection criteria and this report shows selection criteria of from 'Type A variables' to 'Type E variables'. Licensee of Korea has plans to submit the validation report regarding the criteria for accident monitoring instrumentation during Operation License (OL) and regulatory body of Korea also will conduct safety review of these reports. A graded approach to establishing a sampling program is required in ANSI/HPS N13.1-1999. Because deaerator release pipe of Shin-kori unit 5, 6 was integrated into condenser vacuum system release pipe, regulatory body reviewed application of a graded approach on this integration. Output of PWR GALE shows that iodine released from turbine building is 0.12% of total iodine release amount and this value is potential impact categories (PICs) 3 in ANSI/HPS N13.1-1999. So, periodic sampler installed in condenser vacuum system release pipe in Shin-kori unit 5, 6 is suitable. (authors)