Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Direct Laser Impulse (DLI) System Alignment: Requirements Engineering Project

The National Ignition Facility (NIF) is the world’s largest and most energetic laser, and it is comprised of 192 laser beams that must align onto one target for the purpose of learning about Internal Confinement Fusion (ICF) and High Energy Density (HED) physics. A new NIF capability under development is the Direct Laser Impulse (DLI). The DLI capability will provide a test environment where high pulsed laser energy is delivered to a three-dimensional target. Achieving this delivery to target relies on a precision alignment and positioning of the two redirected NIF beams, as shown in Figure 1. When aligned, the two combined beams—with a frequency converted from infrared (IR) to green laser light, at a fluence (energy per unit area) of roughly 20 joules per square centimeter—will be capable of delivering up to 30 kilojoules of direct, unfocused energy to a one cubic foot target. The 40-cm x 40-cm aligned impulse area at the DLI target interaction plane (TIP) is achieved by using a beam path comprised of pickoff and transport mirrors, frequency conversion crystals, optics serving as environmental barriers, and debris shields. A separate aligned diagnostic beam path is also required for impulse to TIP characterization. Final in-situ alignment is required for the two populated diverted NIF beam paths onto the DLI target as well as the diagnostic optical beam path. Existing NIF alignment subsystems do not offer references that meet DLI’s unique demand. The new DLI Red Box, which has been designed to allow for alignment, has been shown to require deviation from the intended configuration and operational use case to obtain adequate functionality. A systems engineering evaluation has identified a solution that meets the stakeholder requirements while optimizing key performance parameters. The solution, referred to in this document as the Red Box “+” Rotated, was determined to be an improved version of the current DLI Red Box. This system offers improved system repeatability and alignment stability while maintaining similar interfaces and decreasing the demand for engineer/operator interaction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Engineering evaluations of nuclear material storage containers against the packaging requirements at TA-55 (FY22 Rules of Use Report)

A set of obligations in the yearly storage container surveillance program, ensures that a retrospective approach is applied with loaded containers in inventory to confirm compliance with all “users” to ensure nuclear material storage container requirements are being followed. Validation that packaged containers are properly used, within a specific set of container types prescribed “bounding conditions of use,” is based on meeting requirements as identified in operating procedures associated with TA55-DOP-091, TA-55 Nuclear Material Packaging, and PA-RD-01022, Nuclear Material Packaging Requirements. The surveillance plan obligation requires the application of local area nuclear material accountability software or (LANMAS) to produce queries. The data queries are used to assess attributes of containers in storage these investigations are conducted on a bi-annual basis. This rules of use (ROU) compliance process ensures proper usage of storage containers as containment systems and therefore provides effective worker protection. It is structured as a supporting effort by implementing aspects of PA-AP-01207, Nuclear Material Container Safety Management at TA-55.

36 MATERIALS SCIENCE↗

The Impact of Increased Requirements for Verification Measurements of Category III and IV Receipts

As part of the regular nuclear material accounting and control process, sites that have accountable nuclear material regularly perform measurements of the material in their possession. The expectation for the type of measurements and their frequency is set out in Department of Energy (DOE) Order 474.2, and further detailed in each site’s respective material control and accountability (MC&A) plan and associated controlling documents. The measurements of interest in this report are those performed on external (between DOE sites) transfer receipts of Category III or IV accountable materials. In 2020, a revision of DOE Order 474.2 was proposed that would significantly increase the requirement that measurements be performed upon receipt of material, and further, that those measurements be quantitative verification (rather than qualitative confirmatory) measurements. A survey was performed of DOE sites to discuss the impact on their MC&A measurements program if more rigorous verification measurements requirements for Category III and IV receipts were implemented. An assessment of nondestructive assay (NDA) measurement instruments to meet those needs was also performed. Across the board, sites indicated that personnel and budget would cause the largest impact. Sites which are qualified as Category I/II indicated a reduced impact as these sites already have the measurement capabilities and some personnel but would require the acquisition of additional measurement systems. Category III/IV sites indicated a much larger impact as these sites generally have smaller MC&A programs. A few smaller sites stated a measurement program would need to be created to handle the demand. Calorimetry, quantitative gamma spectroscopy and neutron coincidence counting systems were identified as common systems that could meet the verification measurement requirements. The other, and perhaps larger issue is the need for calibration standards for the calorimetry and neutron coincidence counting systems. It is proposed that a comparative study be performed for ISOCS and ISOTOPICS, qualification of a COTS calorimetry system be performed, and development of an AWCC system that uses a neutron generator.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

High Energy Physics Network Requirements Review: Two-Year Update

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet interconnects DOE national laboratories, user facilities, and major experiments so that scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large datasets, and access distributed data repositories. ESnet is specifically built to provide a range of network services tailored to meet the unique requirements of the DOE’s data-intensive science. In July 2023, the Energy Sciences Network (ESnet) and the High Energy Physics program (HEP) of the DOE SC organized an interim ESnet requirements review of HEP-supported activities, to follow up on the work started during the 2020 HEP Network Requirements Review. Preparation for these events included checking back with the key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare updates to their previously submitted case study documents, so that ESnet could update the understanding of any changes to the current, near-term, and long-term status, expectations, and processes that will support the science activities of the program.

97 MATHEMATICS AND COMPUTING↗

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Maturation of Rhodobacter capsulatus Multicopper Oxidase CutO Depends on the CopA Copper Efflux Pathway and Requires the cutF Product

Copper (Cu) is an essential cofactor required for redox enzymes in all domains of life. Because of its toxicity, tightly controlled mechanisms ensure Cu delivery for cuproenzyme biogenesis and simultaneously protect cells against toxic Cu. Many Gram-negative bacteria contain extracytoplasmic multicopper oxidases (MCOs), which are involved in periplasmic Cu detoxification. MCOs are unique cuproenzymes because their catalytic center contains multiple Cu atoms, which are required for the oxidation of Cu 1+ to the less toxic Cu 2+ . Hence, Cu is both substrate and essential cofactor of MCOs. Here, we investigated the maturation of Rhodobacter capsulatus MCO CutO and its role in periplasmic Cu detoxification. A survey of CutO activity of R. capsulatus mutants with known defects in Cu homeostasis and in the maturation of the cuproprotein cbb 3 -type cytochrome oxidase ( cbb 3 -Cox) was performed. This revealed that CutO activity is largely independent of the Cu-delivery pathway for cbb 3 -Cox biogenesis, except for the cupric reductase CcoG, which is required for full CutO activity. The most pronounced decrease of CutO activity was observed with strains lacking the cytoplasmic Cu chaperone CopZ, or the Cu-exporting ATPase CopA, indicating that CutO maturation is linked to the CopZ-CopA mediated Cu-detoxification pathway. Our data demonstrate that CutO is important for cellular Cu resistance under both aerobic and anaerobic growth conditions. CutO is encoded in the cutFOG operon, but only CutF, and not CutG, is essential for CutO activity. No CutO activity is detectable when cutF or its putative Cu-binding motif are mutated, suggesting that the cutF product serves as a Cu-binding component required for active CutO production. Bioinformatic analyses of CutF-like proteins support their widespread roles as putative Cu-binding proteins for several Cu-relay pathways. Our overall findings show that the cytoplasmic CopZ-CopA dependent Cu detoxification pathway contributes to providing Cu to CutO maturation, a process that strictly relies on cutF .

59 BASIC BIOLOGICAL SCIENCES↗

Iodate Reduction by Shewanella oneidensis Requires Genes Encoding an Extracellular Dimethylsulfoxide Reductase

Microbial iodate (IO 3 – ) reduction is a major component of the iodine biogeochemical reaction network in anaerobic marine basins and radioactive iodine-contaminated subsurface environments. Alternative iodine remediation technologies include microbial reduction of IO 3 – to iodide (I – ) and microbial methylation of I – to volatile gases. The metal reduction pathway is required for anaerobic IO 3 – respiration by the gammaproteobacterium Shewanella oneidensis . However, the terminal IO 3 – reductase and additional enzymes involved in the S. oneidensis IO 3 – electron transport chain have not yet been identified. In this study, gene deletion mutants deficient in four extracellular electron conduits (EECs; Δ mtrA , Δ mtrA -Δ mtrDEF , Δ mtrA -Δ dmsEF , Δ mtr A-ΔSO4360) and DMSO reductase (Δ dmsB ) of S. oneidensis were constructed and examined for anaerobic IO 3 – reduction activity with either 20 mM lactate or formate as an electron donor. IO 3 – reduction rate experiments were conducted under anaerobic conditions in defined minimal medium amended with 250 μM IO 3 – as anaerobic electron acceptor. Only the Δ mtrA mutant displayed a severe deficiency in IO 3 – reduction activity with lactate as the electron donor, which suggested that the EEC-associated decaheme cytochrome was required for lactate-dependent IO 3 – reduction. The Δ mtrA -Δ dmsEF triple mutant displayed a severe deficiency in IO 3 – reduction activity with formate as the electron donor, whereas Δ mtrA -Δ mtrDEF and Δ mtr A-ΔSO4360 retained moderate IO 3 – reduction activity, which suggested that the EEC-associated dimethylsulfoxide (DMSO) reductase membrane-spanning protein DmsE, but not MtrA, was required for formate-dependent IO 3 – reduction. Furthermore, gene deletion mutant Δ dmsB (deficient in the extracellular terminal DMSO reductase protein DmsB) and wild-type cells grown with tungsten replacing molybdenum (a required co-factor for DmsA catalytic activity) in defined growth medium were unable to reduce IO 3 – with either lactate or formate as the electron donor, which indicated that the DmsAB complex functions as an extracellular IO 3 – terminal reductase for both electron donors. Results of this study provide complementary genetic and phenotypic evidence that the extracellular DMSO reductase complex DmsAB of S. oneidensis displays broad substrate specificity and reduces IO 3 – as an alternate terminal electron acceptor.

, Shewanella oneidensis↗

Requirements for a global data infrastructure in support of CMIP6

The World Climate Research Programme (WCRP)'s Working Group on Climate Modelling (WGCM) Infrastructure Panel (WIP) was formed in 2014 in response to the explosive growth in size and complexity of Coupled Model Intercomparison Projects (CMIPs) between CMIP3 (2005–2006) and CMIP5 (2011–2012). This article presents the WIP recommendations for the global data infrastructure needed to support CMIP design, future growth, and evolution. Developed in close coordination with those who build and run the existing infrastructure (the Earth System Grid Federation; ESGF), the recommendations are based on several principles beginning with the need to separate requirements, implementation, and operations. Other important principles include the consideration of the diversity of community needs around data – a data ecosystem – the importance of provenance, the need for automation, and the obligation to measure costs and benefits. This paper concentrates on requirements, recognizing the diversity of communities involved (modelers, analysts, software developers, and downstream users). Such requirements include the need for scientific reproducibility and accountability alongside the need to record and track data usage. One key element is to generate a dataset-centric rather than system-centric focus, with an aim to making the infrastructure less prone to systemic failure. With these overarching principles and requirements, the WIP has produced a set of position papers, which are summarized in the latter pages of this document. They provide specifications for managing and delivering model output, including strategies for replication and versioning, licensing, data quality assurance, citation, long-term archiving, and dataset tracking. They also describe a new and more formal approach for specifying what data, and associated metadata, should be saved, which enables future data volumes to be estimated, particularly for well-defined projects such as CMIP6. The paper concludes with a future facing consideration of the global data infrastructure evolution that follows from the blurring of boundaries between climate and weather, and the changing nature of published scientific results in the digital age.

54 ENVIRONMENTAL SCIENCES↗

Automated preliminary design of simplified wing structures to satisfy strength and flutter requirements

A simple structural model of an aircraft wing is used to show the effects of strength (stress) and flutter requirements on the design of minimum-weight aircraft-wing structures. The wing is idealized as an isotropic sandwich plate with a variable cover thickness distribution and a variable depth between covers. Plate theory is used for the structural analysis, and piston theory is used for the unsteady aerodynamics in the flutter analysis. Mathematical programming techniques are used to find the minimum-weight cover thickness distribution which satisfies flutter, strength, and minimum-gage constraints. The method of solution, some sample results, and the computer program used to obtain these results are presented. The results indicate that the cover thickness distribution obtained when designing for the strength requirement alone may be quite different from the cover thickness distribution obtained when designing for either the flutter requirement alone or for both the strength and flutter requirements concurrently. This conclusion emphasizes the need for designing for both flutter and strength from the outset.

Stroud, W. J.↗

Remote sensor support requirements for planetary missions

The study approach, methods, results, and conclusions of remote sensor support requirements for planetary missions are summarized. Major efforts were made to (1) establish the scientific and engineering knowledge and observation requirements for planetary exploration in the 1975 to 1985 period; (2) define the state of the art and expected development of instrument systems appropriate for sensing planetary environments; (3) establish scaling laws relating performance and support requirements of candidate remote sensor systems; (4) establish fundamental remote sensor system capabilities, limitations, and support requirements during encounter and other dynamical conditions for specific missions; and (5) construct families of candidate remote sensors compatible with selected missions. It was recommended that these data be integrated with earlier results to enhance utility, and that more restrictions be placed on the system.

Weddell, J. B.↗

Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

Source record↗

Functional requirements for design of the Space Ultrareliable Modular Computer (SUMC) system simulator

The functional requirements for the design of an interpretive simulator for the space ultrareliable modular computer (SUMC) are presented. A review of applicable existing computer simulations is included along with constraints on the SUMC simulator functional design. Input requirements, output requirements, and language requirements for the simulator are discussed in terms of a SUMC configuration which may vary according to the application.

Curran, R. T.↗

Space tools and support equipment - Current technology and future requirements.

Space tools and supporting equipment developed for past and current missions are summarized, along with projected tool and powered maneuvering aid requirements for future earth orbital missions. These tools, designed for functions such as general maintenance, replacement and repair, are reviewed and classified according to their intended application. A synopsis of the Skylab on-orbit maintenance requirements is presented, and the tools necessary for accomplishing the maintenance functions are listed. The proposed missions for future Earth Orbital Systems are summarized, and the potential functions (e.g., Remove/Replace, Cargo Transfer, etc.) are outlined. The current tool and support technology status is compared with future requirements for crew equipment to determine if these future requirements can be adequately satisfied. Of particular interest is a discussion of the augmentation of the astronaut with teleoperators (remote manipulator systems).

Brown, N. E.↗

Navigation requirements for advanced deep space missions.

Study of the navigation system requirements and capabilities for potential advanced deep space missions of the 1978 to 1990 era. Following a review of these potential missions, the mission-by-mission assessments of the critical navigation system requirements for a mission set selected are presented. The requirements are related to subsystem research and development implications and are used to formulate recommendations for future developments in navigation systems. Programmatic directions required for deep space navigation are presented.

Friedman, L. D.↗

Earth orbital experiment program and requirements study, volume 1, sections 1 - 6

A reference manual for planners of manned earth-orbital research activity is presented. The manual serves as a systems approach to experiment and mission planning based on an integrated consideration of candidate research programs and the appropriate vehicle, mission, and technology development requirements. Long range goals and objectives for NASA activities during the 1970 to 1980 time period are analyzed. The useful and proper roles of manned and automated spacecraft for implementing NASA experiments are described. An integrated consideration of NASA long range goals and objectives, the system and mission requirements, and the alternative implementation plans are developed. Specific areas of investigation are: (1) manned space flight requirements, (2) space biology, (3) spaceborne astronomy, (4) space communications and navigation, (5) earth observation, (6) supporting technology development requirements, (7) data management system matrices, (8) instrumentation matrices, and (9) biotechnology laboratory experiments.

Source record↗

Estimating trajectory correction requirements for multiple outer planet missions.

General approach to the problem of estimating trajectory correction requirements for multiple outer planet flyby missions when the navigation system uses onboard optical measurements made during approach to each target planet to complement the ground-based radio measurements. The accuracy and reliability of the onboard measurement system plays a critical role in sizing the trajectory correction capability required. An illustration of the combined use of radio and optical measurements is provided for the particular case of a Jupiter-Uranus-Neptune mission. Use of the statistical technique developed for computing the trajectory correction margin required to account for uncertainties in subsystem performance, permits trajectory correction savings of 100 to 20 m/sec over 'worst case' designs. This represents weight savings of about 50% of the science payload. For the example case trajectory correction requirements are estimated for two candidate optical systems and the radio alone case. The use of onboard measurements allows a trajectory correction savings of approximately 140 m/sec.

Friedman, L. D.↗

Technology requirements for communication satellites in the 1980's

The key technology requirements are defined for meeting the forecasted demands for communication satellite services in the 1985 to 1995 time frame. Evaluation is made of needs for services and technical and functional requirements for providing services. The future growth capabilities of the terrestrial telephone network, cable television, and satellite networks are forecasted. The impact of spacecraft technology and booster performance and costs upon communication satellite costs are analyzed. Systems analysis techniques are used to determine functional requirements and the sensitivities of technology improvements for reducing the costs of meeting requirements. Recommended development plans and funding levels are presented, as well as the possible cost saving for communications satellites in the post 1985 era.

Burtt, J. E.↗