Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Recovery Act”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Mixed Waste Storage Unit (MWSU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application to the Nevada Division of Environmental Protection focuses on continued operation of the Mixed Waste Storage Unit at the Nevada National Security Site (NNSS), under the auspices of DOE’s National Nuclear Security Administration Nevada Field Office (NNSA/NFO). Low-level mixed waste (LLMW) accepted at the NNSS contains both radioactive and hazardous material components as defined by various laws and regulations. The Mixed Waste Storage Unit (MWSU) is located at the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC are used to store LLMW generated at or shipped to the NNSS prior to disposal at the Mixed Waste Disposal Unit (MWDU). The document describes the MWSU, its general design, its operation, the materials it stores, and relevant health and safety regulations with which NNSS complies. The currently permitted MWSU has been operated since December 2010. Each of the four designated storage areas is RCRA-compliant for the storage of hazardous waste. This application represents a renewal request by DOE for the permitted MWSU. For security reasons, some of the contents of the full application are not available for public viewing. This version of the application contains most but not all of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel – 19002

ABSTRACT In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO2) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO2, the container remained in storage. Treatment and disposal of the NaK and KO2 container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands–on instruction associated with: • Hazards associated with handling and using sodium and NaK • Proper personal protection equipment, spill control techniques, and first aid • Common design approaches for buildings, systems, and equipment used to contain sodium and NaK • What to expect in the event of a water reaction and how to respond • How to properly prepare for a fire and contain/extinguish small metal fires • A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability.

99 GENERAL AND MISCELLANEOUS↗

HWMA RCRA Storage and Treatment Permit for the Material and Fuels Complex on the Idaho National Laboratory

Owners and operators of facilities that treat, store, and dispose of hazardous waste must obtain an operating permit required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The operating permit for the Materials and Fuels Complex is the Hazardous Waste Management Act (HWMA)/RCRA Storage and Treatment Permit. The permit defines the conditions and requirements that apply to the treatment and storage of hazardous waste managed at the treatment, storage and disposal facilities (TSDF). The regulations governing the permitting process are found at 40 CFR Pa 124 and 270.

99 GENERAL AND MISCELLANEOUS↗

Treatment of Problematic Reactive Metal Wastes Using GeoMelt ICV - WM2020 Conference Paper

Decommissioning of sodium-cooled reactors and fast reactor technologies has generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt® In-Container Vitrification (ICV)™ technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV™ melts that processed elemental sodium into stable non-reactive glass. INL is currently implementing GeoMelt® technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate sodium cooled reactor components into waste forms that comply with existing disposition pathways. Reactive metal wastes require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics to comply with land disposal restrictions. GeoMelt®, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions first demonstrated the effectiveness of the GeoMelt® ICV™ process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glass-formers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt® ICV™ at a higher waste loading relative to previously demonstrated work performed in 2016; the higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. Additionally, follow-on demonstration testing in 2018 and 2019 focused on more complex shapes and other reactive-metals (mocked up Experimental Breeder Reactor II [EBR-II] subassembly, sodium filled heat exchanger, and a can containing sodium potassium alloy) which were all performed at engineering-scale. Since 2018, a 10-metric ton full-scale GeoMelt unit (GeoMelt® Richland) was designed, installed, and commissioned at Perma-Fix Northwest in Richland, Washington for the treatment of reactive metal wastes. As of September 2019, over 900 55-gallon drums containing a total of around 3,500 lb of sodium with low levels of radioactivity have been treated at GeoMelt ® Richland, with resulting glass monoliths disposed at the Nevada National Security Site (NNSS). A full-scale radiological demonstration melt on an actual EBR-II subassembly has also been performed using the full-scale melter in 2019. The GeoMelt® technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt® technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt® can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results generated as a part of the 2018-2019 demonstration program are presented in the paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydraulic Isolation of Waste Disposal Areas at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) is the location of several large waste disposal areas that received waste from more than 50 years of operation, production, and research activities at ORNL and the U.S. Atomic Energy Commission's Southern Regional Burial Ground for wastes from more than 50 other facilities. The major burial grounds in the valley are Solid Waste Storage Areas (SWSAs) 4, 5, and 6, where wastes were buried in more than 850 unlined trenches and more than 1500 unlined auger holes. The area includes 3 seepage pits and 3 gravel-filled trenches used by ORNL for the disposal of liquid low level wastes. The burial grounds contained several hundred thousand cubic yards of waste, and the combined inventory of the burial grounds and liquid disposal sites was well over 1 million curies. The Record of Decision for Interim Actions for the Melton Valley Watershed at ORNL selected hydraulic isolation of major waste sources as the primary mechanism for remediation of the watershed. Isolation was to be accomplished mainly through the construction of multi-layer caps over the burial grounds, seepage pits, and trenches. Groundwater diversion and collection systems were installed along the up-gradient and down-gradient edges, respectively, of selected caps to enhance the performance of the isolation system. The waste areas were covered with both Resource Conservation and Recovery Act (RCRA)-type and isolation multi-layer caps. A total of 13 multi-layer caps covering 58.7 hectares (ha) (plan view) were constructed in Melton Valley between 2003 and 2006. The project encountered considerable challenges, not the least of which was its scale, involving simultaneous construction activities at widely scattered sites across the 430-ha watershed. Detailed planning and coordination enabled year-round fieldwork, an essential requirement necessary to retain a skilled, experienced workforce and meet the contract milestone for completion. Other factors key to the success of the project involved the use of an on-site borrow area and construction of a dedicated haul road for transfer of materials from the borrow area to the capping sites. In summary: Remedy effectiveness data obtained during 2007 for the Melton Valley ROD actions collectively indicate that the remedy is generally operating and functioning as planned. Contaminant releases of the principal contaminants of concern in Melton Valley have decreased significantly during and since remediation of the contaminant source areas. Hydrologic isolation systems at the burial grounds functioned as intended as demonstrated by attainment of groundwater level goals in most areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Options To Cleanup Site-wide Vadose Zone Contamination At The Hanford Site, WA, State

The U.S. Department of Energy (DOE) Hanford Site in south central Washington State lies along the Columbia River and is one of DOE's largest legacy waste management sites. Enormous radionuclide and chemical inventories exist below-ground. These include Resource Conservation and Recovery Act (RCRA) storage facilities where hazardous and radioactive contaminants were discharged and leaked to the soil surface and to the deep vadose zone and groundwater. The vadose zone is also contaminated from facilities regulated by the RCRA and Comprehensive Environmental Response Compensation and Liability Act (CERCLA) Act. Hanford now contains as much as 28,300 cubic meters of soil contaminated with radionuclides from liquid wastes released near processing facilities. The Hanford Federal Facility Agreement and Consent Order, Tri-Party Agreement (TPA) has set the completion of the cleanup of these sites by 2024. There are numerous technical and regulatory challenges to cleanup of the vadose zone at the Hanford site. This paper attempts to identify the categories of deep vadose zone problem and identifies a few possible regulatory options to clean up the site under the mix of state and federal regulatory authorities. There are four major categories of vadose contamination areas at the Hanford Site. The first is laterally extensive with intermediate depth (ground surface to about 45 meters depth) mostly related to high volume effluent discharge into cribs, ponds and ditches of designated CERCLA facilities. The second is dominated by laterally less extensive mostly related to leaks from RCRA tank farms. The later contamination is often commingled at depth with wastes from adjacent CERCLA facilities. The third category is from the high volume CERCLA facilities extending from the surface to more than 60 meters below ground. Contamination from the later category crosses the entire thickness of the vadose zone and reached groundwater. The fourth category is the lower volume waste sites. There are multiple management options to clean up the above four categories of vadose zones sites. The following are some of the options considered for detailed evaluation: - Maintain separate decision processes for each RCRA and CERCLA units/waste sites with a more accommodating schedule. - Create new vadose zone operable units with limited geographical boundaries regardless of site category/origin and make an integrated decision. - Expand the existing CERCLA groundwater operable units to include the deep vadose zone - Use a combination of the above. Each option has pros and cons and regulatory limitations. Detailed evaluation of these options is required to support a cost effective expedited cleanup. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cleanup of the Idaho National Laboratory Status Report

This paper describes the status of the cleanup of the U.S. Department of Energy's Idaho National Laboratory site (INL). On May 1, 2005 CH2M.WG Idaho, LLC (CWI) began its 7-year, $2.4 billion cleanup of the INL. When the work is completed, 3,406,871 liters (900,000 gallons) of sodium-bearing waste will have been treated; 15 high-level waste tanks will have been grouted and Resource Conservation and Recovery Act (RCRA)- closed; more than 200 facilities will have been demolished or disposed of, including three reactors, several spent fuel basins, and hot cells; thousands of containers of buried transuranic waste will have been retrieved; more than 8,000 cubic meters (10,464 cubic yards) of contact-handled transuranic waste and more than 500 cubic meters (654 cubic yards) of remote-handled transuranic waste will have been characterized, packaged, and shipped offsite; almost 200 release sites and voluntary consent order tank systems will have been remediated; and 3,178 units of spent fuel will have been moved from wet to dry storage. In 2007, CWI began the construction of the Integrated Waste Treatment Unit that will treat the sodium-bearing waste for eventual disposal; removed and disposed the 112-ton Engineering Test Reactor vessel; demolished all significant radiological facilities at Test Area North; continued the exhumation of buried transuranic wastes from the Subsurface Disposal Area at the Radioactive Waste Management Complex; shipped the first of hundreds of containers of remote-handled transuranic waste to the Waste Isolation Pilot Plant; disposed of thousands of cubic meters of low-level and low-level mixed radioactive wastes both onsite and offsite while meeting all regulatory cleanup objectives. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements in Container Management of Transuranic and Low-Level Radioactive Waste Stored at the Central Waste Complex at Hanford

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation and Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE's) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and offsite waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste containers. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements. (authors)

42 ENGINEERING↗

Initial Results of ISCO for a Large TCE DNAPL Source Area

This paper will describe the results of an in situ chemical oxidation (ISCO) remedial action currently in progress to address subsurface contamination by trichloroethene (TCE) dense nonaqueous phase liquid (DNAPL). The U.S. Department of Energy is responsible for the cleanup of environmental media at the Portsmouth Gaseous Diffusion Plant (PORTS) in southern Ohio. The X-701B Solid Waste Management Unit is an unlined surface impoundment at PORTS which was operated from 1954 to 1988. A TCE plume in groundwater emanates from the unit and is approximately 2,200 feet in length. Metals, radioactive inorganics, and other organic chemicals are also present at lower concentrations in the groundwater. An ongoing 1.6-acre TCE DNAPL source area for the plume is believed to exist up-gradient in the vicinity of the X-701B pond. The extent of the source area is inferred from actual recovery of DNAPL in production wells and from detection of TCE concentrations between 100 and 1,000 mg/L in monitoring wells. Previous remedial activities at X-701B have included a Resource Conservation and Recovery Act (RCRA) closure and a technology demonstration that recirculated permanganate solutions between two horizontal wells. Results of sampling after these remedial activities showed that the permanganate effectively destroyed TCE in portions of the aquifer where adequate contact was achieved, but that uniform distribution by the recirculation system was problematic. As a result, the TCE concentration in the groundwater eventually rebounded after the treatment. To overcome distribution issues and to more aggressively remediate the source, a new remediation approach is being implemented for the unit. The new approach involves the injection of Modified Fenton's Reagent directly into the source area using temporary direct push injection points. This new approach provides the ability to overcome limitations imposed by heterogeneities in the subsurface by injecting relatively small quantities of reagent into a large number of temporary injection points across the source area. These injections are then repeated, as necessary, on a grid pattern until performance goals are achieved. The remediation is being implemented in four phases under a work plan approved by the Ohio Environmental Protection Agency. Phase I, the pilot test, was conducted over a small portion of the source area. Phase II currently involves full-scale treatment of the source area. In Phase III, the source area will be monitored for TCE rebound. Phase IV will involve limited treatment for the down-gradient portion of the plume. (authors)

54 ENVIRONMENTAL SCIENCES↗

Deep Vadose Zone Characterization at the Hanford Site: Accomplishments from the Last Ten Years

The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at Hanford. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory (PNNL) to perform detailed analyses on vadose zone sediments collected within/adjacent to the twelve single-shell tank farms contained within Hanford's Central Plateau region. This work has been performed under the Resource Conservation and Recovery Act (RCRA) Corrective Action Program and is associated with the Hanford Federal Facility Agreement and Consent Order. While there are many facets to the laboratory studies employed by PNNL, the four primary objectives of this work are to: identify the type and quantity of contamination present, understand the physical processes that affect the transport of contaminants in the vadose zone sediments, when practical, identify the source(s) of the contamination found in the sediment samples, and when practical, determine if a link can be made between the vadose zone contamination observed and any known groundwater contaminants in the vicinity. Since its inception in 1997, PNNL's Vadose Zone Characterization Project has evolved to better meet these four key objectives. The single-largest adaptation of the Vadose Zone Characterization Project over its ten years of operation was the advent of a tiered sample analysis approach. Use of a tiered approach allows resources to be focused on those samples/tests that provide the largest amount of scientific information to best meet the four key project objectives within the budget available. Another significant, but more recent, adaptation has been the implementation of a rapid turnaround characterization process in which sediment samples are analyzed in near real-time to aid drilling activities within the tank farms. This paper highlights details of the characterization activities performed as well as significant findings from the last ten years. (authors)

54 ENVIRONMENTAL SCIENCES↗

Results for the January 2023 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the January 2023 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained.1 The chemical and radionuclide contaminant results from the characterization of the January 2023 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR)2 and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP).3 This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request.2 Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRMC request will be obtained semiannually for the January 2023 and July 2023 Tank 50 samples.

Crawford, Charles L.↗

Expediting Groundwater Sampling at Hanford and Making It Safer - 13158

The CH2M HILL Plateau Remediation Company (CHPRC) manages the groundwater monitoring programs at the Department of Energy's 586-square-mile Hanford site in southeastern Washington state. These programs are regulated by the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), and the Atomic Energy Act (AEA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. Each year, more than 1,500 wells are accessed for a variety of reasons. Historically, the monitoring activities have been very 'people intensive'. Field personnel or 'samplers' have been issued pre-printed forms showing information about the well(s) for a particular sampling evolution. This information is taken from two official electronic databases: the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS). The samplers traditionally used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and other personnel posted the collected information. In Automating Groundwater Sampling at Hanford (HNF-38542-FP Revision 0, Presented at Waste Management 2009 Conference, March 1 - March 5, 2009, Phoenix, AZ), we described the methods, tools, and techniques that would be used in automating the activities associated with measuring water levels. The Field Logging and Electronic Data Gathering (FLEDG) application/database that automates collecting the water-level measurement data has now been implemented at Hanford. In addition to eliminating the need to print out documents, the system saves three-to-four man days each month for the field personnel taking the measurements and the scientists and administrators managing the data and the documentation. After the information has received technical review, FLEDG automatically updates the database for water-level measurements and loads the document management system with the completed sampling report. Due to safety considerations, access to wells is conditional. A spreadsheet with appropriate data not only lists the wells that are cleared for work, but also the safety personnel who must be present before work can start. This spreadsheet is used in planning daily activities. Daily plans are structured to ensure that the wells to be sampled are cleared for work and the appropriate safety personnel have been assigned and are present before the work starts. Historically, the spreadsheets have been prepared manually, and as a result, are potentially subject to human error. However, a companion database application has been developed to work with FLEDG - making the entire sampling process more efficient and safer for personnel. The Well Access List - Electronic, WAL-E, is a database that contains much the same information that was previously manually loaded into the spread sheet. In addition, WAL-E contains a managed work-flow application that shows the access requirements and allows for appropriate reviews of the compiled well. Various CHPRC organizations, including Industrial Hygiene, RADCON, and Well Maintenance and Sample Administration are able to enter and review the wells added or deleted from the WAL-E database. The FLEDG system then accesses this database information to identify appropriate support personnel and provide safety requirements to field personnel. In addition, WAL-E offers the assurance that wells have appropriate locks and are correctly labeled and electrically grounded as required, before well activities begin. This feature is an extremely important aspect of the FLEDG/WAL-E system because it adds another safety check to the work evolution and reduces the potential for unsafe conditions to exist that would lead to a stop-work situation. This paper will further describe the technical aspects of both electronic programs/databases and their successful application at Hanford. (authors)

54 ENVIRONMENTAL SCIENCES↗

An Exploration of Mercury Soils Treatment Technologies for the Y-12 Plant - 13217

There are a number of areas at the Y-12 National Security Complex (Y-12) that have been contaminated with mercury due to historical mercury use and storage. Remediation of these areas is expected to generate large volumes of waste that are Resource Conservation and Recovery Act (RCRA) characteristically hazardous. These soils will require treatment to meet RCRA Land Disposal Restrictions (LDR) prior to disposal. URS - CH2M Oak Ridge LLC (UCOR) performed a feasibility assessment to evaluate on-site and off-site options for the treatment and disposal of mercury-contaminated soil from the Y-12 Site. The focus of the feasibility assessment was on treatment for disposal at the Environmental Management Waste Management Facility (EMWMF) located on the Oak Ridge Reservation. A two-phase approach was used in the evaluation process of treatment technologies. Phase 1 involved the selection of three vendors to perform treatability studies using their stabilization treatment technology on actual Y-12 soil. Phase II involved a team of waste management specialists performing an in-depth literature review of all available treatment technologies for treating mercury contaminated soil using the following evaluation criteria: effectiveness, feasibility of implementation, and cost. The result of the treatability study and the literature review revealed several viable on-site and off-site treatment options. This paper presents the methodology used by the team in the evaluation of technologies especially as related to EMWMF waste acceptance criteria, the results of the physical treatability studies, and a regulatory analysis for obtaining regulator approval for the treatment/disposal at the EMWMF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring Report Generation Tools - 12005

Compliance with National and State environmental regulations (e.g. Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) aka SuperFund) requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include maps, data tables, charts and statistics. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. These process improvements enhanced quality and consistency by centralizing the information, and have reduced manpower and production time through automated efficiencies. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full Focus Needed on Finishing Hanford's Waste Treatment Plant - 12196

The United States Department of Energy's (US DOE's) Hanford Nuclear Site has 177 underground waste storage tanks located 19 to 24 km (12 to 15 miles) from the Columbia River in south-central Washington State. Hanford's tanks now hold about 212,000 cu m (56 million gallons) of highly radioactive and chemically hazardous waste. Sixty-seven tanks have leaked an estimated 3,785 cu m (1 million gallons) of this waste into the surrounding soil. Further releases to soil, groundwater, and the Columbia River are the inevitable result of the tanks continuing to age. The risk from this waste is recognized as a threat to the Northwest by both State and Federal governments. US DOE and Bechtel National, Inc., are building the Waste Treatment and Immobilization Plant (WTP) to treat and vitrify (immobilize in glass) the waste from Hanford's tanks. As is usual for any groundbreaking project, problems have arisen that must be resolved as they occur if treatment is to take place as specified in the court-enforceable Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) and the Consent Decree, entered into by US DOE, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology (Ecology). At times, US DOE's approach to solving these critical issues seems to have caused undue wastes of time, energy, and, ultimately, public funds. Upon reviewing the history of Hanford's tank waste treatment project, Ecology hopes that constructive criticism of past failures and praise of successes will inspire US DOE to consider changing practices, be more transparent with regulatory agencies and the public, and take a 'lean production' approach to successfully completing this project. All three Tri-Party Agreement agencies share the goal of completing WTP on time, ensuring it is operational and in compliance with safety standards. To do this, Ecology believes US DOE should: - Maintain focus on the primary goal of completing the five major facilities of WTP. - Construct a supplemental low-activity waste (LAW) vitrification facility for the two-thirds balance of LAW that will not be treated by the vitrification facility under construction. - Prepare infrastructure for waste feed from the tanks and facilities to handle the WTP waste streams. To support this project track, Ecology expedites dangerous waste permitting by using a design-build approach to integrate WTP into the Resource Conservation and Recovery Act permit for Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cementitious Grout for Closing SRS High Level Waste Tanks - 12315

In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. Ancillary equipment abandoned in the tanks will also be filled to the extent practical. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and to be chemically reducing with a reduction potential (Eh) of -200 to -400. Grouts with this chemistry stabilize potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted to support the mass placement strategy developed by Savannah River Remediation (SRR) Closure Operations. Subsequent down selection was based on compressive strength and saturated hydraulic conductivity results. Fresh slurry property results were used as the first level of screening. A high range water reducing admixture and a viscosity modifying admixture were used to adjust slurry properties to achieve flowable grouts. Adiabatic calorimeter results were used as the second level screening. The third level of screening was used to design mixes that were consistent with the fill material parameters used in the F-Tank Farm Performance Assessment which was developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closures. The cement and slag contents of a mix selected for filling Tanks 18-F and 19-F should be limited to no more than 125 and 210 lbs/cyd, respectively, to limit the heat generated as the result of hydration reaction during curing and thereby enable mass pour placement. Trial mixes with water to total cementitious materials ratios of 0.550 to 0.580 and 125 lbs/cyd of cement and 210 lbs/cyd of slag met the strength and permeability requirements. Mix LP no.8-16 was selected for closing SRS Tanks 18-F and 19-F because it meets or exceeds the design requirements with the least amount of Portland cement and blast furnace slag. This grout is expected to flow at least 45 feet. A single point of discharge should be sufficient for unrestricted flow conditions. However, additional entry points should be identified as back-up in case restrictions in the tank impede flow. The LP no.8 series of trial mixes had surprisingly high design compressive strengths (2000 to 4000/5000 psi) which were achieved at extended curing times (28 to 90 days, respectively) given the small amount of Portland cement in the mixes (100 to 185 lbs/cyd). The grouts were flowable structural fills containing 3/8 inch gravel and concrete sand aggregate. These grouts did not segregate and require no compaction. They have low permeabilities (≤ 10{sup -9} cm/s) and are consequently expected to be very durable. This series of trial mixes contained by-product materials, i.e., slag and Class F fly ash, and an admixture system initially specified for the grouts used to close Tanks 17-F and 20-F at SRS. The mix designs have low CO{sub 2} footprints because Portland cement contents are very low and can be considered environmentally friendly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗