Infiltration and Injection of a Ca-Citrate-PO4 Solution to Form Apatite In Situ for Sr-90 Remediation at the Hanford 100N Area – An Update

Sr-90 present in groundwater and the vadose zone at the Hanford 100N area due to past waste disposal practices has reached the nearby Columbia River, as evidenced by Sr-90 concentrations in near river wells and aquifer tubes and near shore sediments. Sr-90 is currently being remediated by adsorption onto apatite (55 times stronger than Sr-90 adsorption to sediment), followed by incorporation of the Sr-90 into the apatite structure. If the Sr-90 can remain immobilized for 300 years (~ten 29.1-yr half-lives of Sr-90 decay), it will have decayed below regulatory limits to Y-90 and to stable Zr-90. Apatite [Ca10(PO4)6(OH)2] is being precipitated in situ in saturated zone sediments by injection of a aqueous solution of Ca-citrate and Na-phosphate through a series of 16 wells. For the treatability study, field scale demonstration of the technology was implemented through injection of a low-concentration, apatite-forming solution, followed by high concentration solution injections as required to emplace sufficient treatment capacity to meet treatability test objectives. Analysis of field cores collected after the low concentration injections indicates that targeted apatite contents were achieved and that ~25% of the Sr-90 associated with the sediment was incorporated in the apatite structure. Aqueous Sr-90 monitoring in four compliance monitoring wells over a year following the high concentration injections indicates 84% to 95% decrease in Sr-90 concentrations (relative to the low and high end of the baseline range, respectively). Cores are currently being analyzed to confirm the apatite mass and Sr-90 substitution in apatite after these high concentration injections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions

In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody s biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

54 ENVIRONMENTAL SCIENCES↗

Scale-Up Testing-Foam as a Remedial Amendment Carrier

This paper describes results from intermediate-scale, two-dimensional testing of foam injection into sedimentary materials collected from the U.S. Department of Energy (DOE) Hanford Site. The testing was performed to evaluate the effects of delivery pressure, injection rate, foam stability, foam quality, and formation heterogeneities on the migration of foam, water, remediation amendment, and contaminants within a sedimentary volume. Testing was accomplished in a test bed that is configured in the form of two thin rectangular boxes. Each of the boxes holds approximately 135 liters (255 kilograms) of sediment. Foam was injected into each box through a segment of polyvinyl chloride slotted well casing, and air was extracted from the boxes through a similar system. Four sets of tests were conducted. During Test 1, both of the boxes were loaded in a homogeneous manner, while in Tests 2, 3, and 4, both of the boxes were loaded so as to contain two rectangular zones of heterogeneity. In addition, a zone of the sediment contained in the test bed used for Test 4 was augmented with uranium-rich calcite to produce a known concentration of uranium. The injection rate varied between the boxes during the Test 1 but was the same for each box during the final three tests. The foam generation formula for Tests 1 and 2 consisted of an aqueous solution of anionic surfactant. The foam generation formula used in Test 3 consisted of an aqueous solution of anionic surfactant and contained 25,000 milligrams per liter (mg/L) of phosphate in the form of a 9:1 mixture of sodium phosphate and sodium tripolyphosphate. The foam generating formula used in Test 4 consisted of an aqueous solution of an anionic surfactant and a nonionic surfactant and also contained 5,000 mg/L of phosphate as the aforementioned mixture. Subsequent to each of the four tests, the test beds were disassembled, and samples of the sediments were taken and analyzed for a number of parameters, depending on the specific test. This paper presents the results of the intermediate-scale testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Soil Vapor Extraction Remediation Performance and Closure: A Review

Soil vapor extraction (SVE) is a baseline remediation approach for volatile contaminants. While SVE is generally effective for removal of contaminants from higher permeability portions of the vadose zone, contamination in low-permeability zones can persist due to mass transfer processes that limit the removal effectiveness. Thus, a diminishing rate of contaminant extraction over time is typically observed, yet contamination may remain in low-permeability zones. Under these conditions, SVE performance needs to be evaluated to determine whether the system should be optimized, terminated, or transitioned to another technology to replace or augment SVE. Methodologies have been developed to quantify SVE performance over time and to evaluate the impact of persistent vadose zone contamination sources on groundwater quality. Recently, these methods have applied mass flux/discharge concepts to quantify contaminant source strength. Methods include field measurement techniques using the SVE system to quantify source strength and predictive analyses with analytical and numerical models to evaluate the impact of the contaminant source on groundwater.

remediation↗

Environmental Remediation

At Pacific Northwest National Laboratory, we are a leader in subsurface science and remediation. We use our expertise in these areas to characterize subsurface contaminants and assess contaminant transport. We're also using our capabilities to restore the Hanford Site in southeastern Washington State to a safe, clean environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in PFAS Monitoring and Remediation Using a Functionalized Material Approach

The growing global concerns about the effects to public health from human exposure to per- and polyfluoroalkyl substances (PFAS) motivates the development of strategies for reliable monitoring of PFAS in environmental streams, as well as for their rapid, effective removal if detected. For the continuous PFAS monitoring, an inexpensive, field-deployable, in situ sensor is urgently needed; yet the prevalent in situ techniques often struggle to strike a balance between the practical sensitivity and selectivity demands of the real world. Similarly, for effective PFAS removal, strategies for their fast, selective, and quantitative capture are desired, yet the present commercially available sorbents are unable to meet the requirements of rapid, quantitative capture of all PFAS components, and are notably inefficient in removing the more toxic smaller chains. To address these twin challenges, Pacific Northwest National Laboratory is developing strategies for improved detection and remediation of PFAS. For the rapid, selective, quantitative removal of PFAS from environmental streams, the strategy relies on designing capture probes with exclusively tailored electronic and spatial affinities for the PFAS that are able to selectively capture them from environmental streams. For the in situ detection and quantification of PFAS in complex, multicomponent matrices such as groundwater, the approach relies on the targeted capture of specific PFAS by these PFAS-specific capture probes immobilized on a platform. The platform acts as an electrode to directly measure PFAS concentration through a proportional change in electrical response upon their capture. A combination of optimization of platform design and incorporation of additional, sensitive detection modalities have allowed us to achieve detection limits as low as 0.5 ng/L for detection of PFAS compounds (compared to the 70 ng/L Health Advisory Limit of the U.S. Environmental Protection Agency).

Per- and poly-fluorinated alkyl substances (PFAS),↗

Remediation of acid mine drainage with sulfate reducing bacteria

Sulfate reducing bacteria have been shown to be effective at treating acid mine drainage through sulfide production and subsequent precipitation of metal sulfides. In this laboratory experiment for undergraduate environmental chemistry courses, students design and implement a set of bioreactors to remediate acid mine drainage and explain observed changes in dissolved metal concentrations and pH. Using synthetic acid mine drainage and combinations of inputs, students monitor their bioreactors for decreases in dissolved copper and iron concentrations.

01 COAL, LIGNITE, AND PEAT↗

Safety Improves Dramatically In Fluor Hanford Soil and Groundwater Remediation Project

This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walk-downs, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site. (authors)

54 ENVIRONMENTAL SCIENCES↗

Advanced Remediation Technologies

The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the cleanup of nation's nuclear weapons program legacy wastes, along with waste associated with nuclear energy programs and research. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term; and the effort also has a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. This article will provide some insight into the Advanced Remediation Technologies (ART) projects that may enhance cleanup efforts and reduce life cycle costs. (authors)

54 ENVIRONMENTAL SCIENCES↗

D and D (System Closure) Mockup Testing Demonstration. Remediation of Legacy Radioactive Piping and Tank Systems at the Reactor Technology Complex (RTC) (2007)

This paper presents the results of an integrated mockup demonstration of technologies and equipment designed to remove radioactively contaminated piping systems from underground vaults and pipe trenches at the Idaho National Laboratory. The integrated mockup demonstration included performing a bench scale wax fixative study and field demonstrations of the remotely operated equipment that will be used to remove radioactively contaminated pipe systems. The bench-scale wax fixative study involved defining optimum temperature and moisture conditions for effectively filling pipe sections containing residual wastes with a wax based fixative. The field demonstrations involved dismantling underground vault and trench piping systems, including pipe sections filled with the wax fixative. The purpose of the demonstration was to ensure the selected technologies and equipment would be effective prior to field deployment. The demonstration was conducted as a joint effort by MSE Technology Applications, Inc., and CWI on behalf of the U.S. Department of Energy at the Mike Mansfield Advanced Technology Center in Butte Montana. In summary: The mockup included two main tests at the MSE facility: 1) a vault mockup that included stainless and carbon steel pipe cutting and removal; and 2) a trench mockup that included cutting and removing buried Duriron and ductile iron piping. Both mockups included cutting and removing a pipe filled with the WAXFIX stabilizing material. Based on the MSE moisture tests, project personnel concluded that the WAXFIX product would be effective when used on wastes with different moisture contents that may be encountered in piping systems during the closure of the TRA-630 Catch Tank System at INL. A section of stainless steel pipe was also used to test a number of leak stop alternatives for wax leaks that may be encountered in a degraded piping system. Both the vault and the trench mockup demonstration proved successful for ICP, DOE, and MSE. The ICP operators received valuable hands-on training using the selected equipment and tooling in situations very similar to what they will encounter at INL. Proper tool selection and tool change procedures were defined as situations requiring these operations were encountered. Methodologies for approaching similar trench and vault situations (including safety concerns) were identified and experienced, and wax filled pipes were successfully cut and removed without spilling the surrogate materials within the pipes. All of the tools performed well except the band saw tool. The band saw was specifically designed to cut pipe; however, it was not robust enough and generally the shear was used in its place. Mockups are essential in gaining actual hands on training before going to the field. Mockups improve efficiency and safety that results in cost effective remediation. The MSE facility provides a valuable resource for demonstration of mockups. The facility has several acres of available space and a highly qualified support staff. The integrated mockup demonstration was considered a great success by all involved parties. ICP operators received valuable experience using the equipment selected for catch tank system closure before field deployment in a radiological contaminated environment. The selected equipment proved to be applicable to the safe and effective closure of the catch tank systems, and MSE demonstrated the ability to provide facility and services necessary to support closure mockup demonstrations. (authors)

42 ENGINEERING↗

Safety-Related Activities of the IAEA for Radioactive Waste, Decommissioning and Remediation - 13473

To fulfil its mandate and serve the needs of its Member States, the IAEA is engaged in a wide range of safety-related activities pertaining to radioactive waste management, decommissioning and remediation. One of the statutory obligations of the IAEA is to establish safety standards and to provide for the application of these standards. The present paper describes recent developments in regard to the IAEA's waste safety standards, and some of the ways the IAEA makes provision for their application. The safety standards and supporting safety demonstration projects seek to establish international consensus on methodologies and approaches for dealing with particular subject areas, for example, safety assessment for radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509

Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previously employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Agricultural approaches of remediation in the outside of the Fukushima Daiichi nuclear power plant

This paper outlines agricultural approaches of remediation activity done in contaminated areas around the Fukushima Daiichi Nuclear Power Plant. About the decontamination examination of contaminated areas, we have tried the land scale test of a rice field before and after planting by the use of currently recommended methods. Since farmers would carry out the land preparation by themselves, generation of secondary radioactive waste should be as low as possible through the decontamination works. For the radioactive nuclide migration control of rice by wet rice production, several types of decontamination methods such as zeolite addition and potassium fertilization in the soil have been examined. The results are summarized in the 4 following points. 1) Plowing and water discharge are effective for removing radioactive cesium from rice field. 2) Additional potassium fertilization is effective for reducing cesium radioactivity in the product. 3) No significant difference is observed with or without the zeolite addition. 4) Very low transfer factor of cesium from soil to brown rice has been obtained compared with literature values.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Basis for Gas-Phase Vadose Zone Remediation Technologies at Hanford: A Review - 12186

In situ vadose zone remediation approaches are being evaluated as potential options to mitigate the transport of inorganic and radionuclide contaminants from the vadose zone to the groundwater. Some of the candidate approaches are based on changing the contaminant or subsurface conditions in a way that slows downward migration of the contaminants through the vadose zone using amendments delivered in the gas-phase. Two promising approaches that have undergone testing at Hanford include soil desiccation to address technetium-99 contamination and ammonia-induced sequestration of uranium. For soil desiccation, a dry gas is injected to desiccate a targeted portion of the subsurface and thereby decrease contaminant movement by removing moisture and decreasing the hydraulic conductivity of the desiccated zone. Ammonia-induced sequestration of uranium relies on changing the pore water chemistry, primarily through pH changes, to induce dissolution and precipitation processes that decrease the amount of mobile uranium in the vadose zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Soil Vapor Extraction Remediation Performance and Closure: A Review - 12188

Soil vapor extraction (SVE) is a baseline remediation approach for volatile contaminants. While SVE is generally effective for removal of contaminants from higher permeability portions of the vadose zone, contamination in low-permeability zones can persist due to mass transfer processes that limit the removal effectiveness. Thus, a diminishing rate of contaminant extraction over time is typically observed, yet contamination may remain in low-permeability zones. Under these conditions, SVE performance needs to be evaluated to determine whether the system should be optimized, terminated, or transitioned to another technology to replace or augment SVE. Methodologies have been developed to quantify SVE performance over time and to evaluate the impact of persistent vadose zone contamination sources on groundwater quality. Recently, these methods have applied mass flux/discharge concepts to quantify contaminant source strength. Methods include field measurement techniques using the SVE system to quantify source strength and predictive analyses with analytical and numerical models to evaluate the impact of the contaminant source on groundwater. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scientific Opportunities for Monitoring of Environmental Remediation Sites (SOMERS) - 12224

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to pre-disposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Khazar Iodine Production Plant Site Remediation in Turkmenistan. NORM Contaminated Waste Repository Establishment - 12398

Radiation safety provisions for NORM contaminated areas are in use in a number of the former Soviet republics. Some of these areas were formed by absorbed radionuclides at the iodine and bromine extraction sites. As a rule, there are not any plant radiation monitoring systems nor appropriate services to ensure personnel, population and environmental radiation safety. The most hazardous sites are those which are situated in the Caspian Sea coastal zone. The bulk of the accumulated waste is represented by a loose mixture of sand and charcoal, which was basically used as the iodine extraction sorbent. The amounts of these wastes were estimated to be approximately 20,000 metric tons. The waste contamination is mainly composed of Ra-226 (U-238 decay series) and Ra-224, Ra-228 (Th-232 decay series). In 2009, the 'ECOMET-S', a Closed Joint-Stock Company from St. Petersburg, Russian Federation, was authorized by the Turkmenistan government to launch the rehabilitation project. The project includes D and D activities, contaminated areas remediation, collected wastes safe transportation to the repository and its disposal following repository closure. The work at the Khazar chemical plant started in September, 2010. Comprehensive radiological surveys to estimate the waste quantities were carried out in advance. In course of the rehabilitation work at the site of the Khazar chemical plant additional waste quantities (5,000 MT, 10,000 m{sup 3}) were discovered after the sludge was dumped and drained. Disposal volumes for this waste was not provided initially. The additional volume of the construction wastes was required in order to accommodate all the waste to be disposed. For the larger disposal volume the project design enterprise VNIPIET, offered to erect a second wall outside the existing one and this solution was adopted. As of May, 2011, 40,575 m{sup 3} of contaminated waste were collected and disposed safely. This volume represents 96.6% of the initial repository volume. Now work is underway to erect the second repository wall, which will allow housing of the additional 16,800 m{sup 3} The Khazar chemical plant territory restoration work is underway as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗