Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

DOE NETL Gas Hydrate Project FWP 65213: Kinetic Parameters for the Exchange of Hydrate Formers (Final Report)

This report documents the research activities sponsored by the U.S. Department of Energy, National Energy Technology Laboratory (NETL), by the Pacific Northwest National Laboratory (PNNL) for the gas hydrate project entitled, “Kinetic Parameters for the Exchange of Hydrate Formers.” This project started June 1, 2013 and concluded December 31, 2018, and comprised five budget periods, under FWP-65213. The overarching goal of this project was to gain an improved understanding of the dynamic processes of gas hydrate accumulations in geologic media by combining laboratory studies, numerical simulation, and analysis of shipboard infrared imaging of hydrate core samples. This project comprised four principal components: 1) fundamental laboratory investigations, 2) numerical simulator development and verification, 3) hydrate core characterization and analysis, and 4) applied laboratory and numerical investigations. Laboratory and field experiments have demonstrated the four core methodologies for producing natural gas hydrates from geologic formations: 1) depressurization, 2) thermal stimulation, 3) inhibitor injection, and 4) guest molecule exchange. Converting these methodologies into viable commercial technologies remains challenging, either from an economic or technical perspective. This project was largely focused with the technical challenges associated with the guest molecule exchange method, which is often referred to as gas swapping. Previous research by PNNL had shown that gas swapping with pure CO 2 was not feasible, as first originally thought, principally due to the formation of secondary hydrates, which clogged or reduced the effective permeability of the hydrate-bearing formation. This research was directed at discovering the potential for using mixtures of gases to affect the gas swapping methodology at commercial scales. The Ignik Sikumi Gas Hydrate Field Trial demonstrated the injection of a N 2 -CO 2 gas mixture into a natural gas hydrate bearing layer, and exchange behavior with the CH 4 hydrate former or guest molecules. The original concept behind the use of a N 2 -CO 2 was to maintain gas conditions at the reservoir state. Pure CO 2 would have existed under supercritical conditions, with an associated density closer to a liquid than gas. One of the key outcomes from this research project has been the discovery, through laboratory experiments and numerical simulation, that gas mixtures, especially those with components having different gas hydrate equilibria conditions provide a control option for the guest molecule exchange methodology. For example, the dissociation or formation of hydrate could be controlled by adjusting the composition of the gas mixture. This research project was dynamic in that the discoveries during each budget period would set the course of research during successive budget periods. Therefore, this report is arranged in chronological order progressing through the five budget periods of the project.

03 NATURAL GAS↗

Advanced Research Projects Agency - Energy Annual Report for FY 2014

This report presents a summary of the activities of the Advanced Research Projects Agency-Energy (ARPA-E) during Fiscal Year 2014 (FY2014). In FY2014, ARPA-E issued funding solicitations and selected projects for three new programs covering a broad array of energy technologies, including: 27 million dollars to develop next-generation power switching devices that improve energy efficiency in a wide range of applications; 30 million dollars for hybrid solar energy beyond current photovoltaic (PV) and concentrated solar power (CSP) technologies; and 33 million dollars for electrochemical technologies to enable low-cost distributed power generation. ARPA-E released three additional funding opportunities in FY2014 with project selections that were ultimately announced in FY2015. These programs include: 30 million dollars for localized heating and cooling devices to expand temperature ranges within buildings reducing energy consumption; 30 million dollars for low-cost, high-sensitivity systems to detect and measure methane emissions; and 30 million dollars for low-cost tools to aid in the future development of fusion power. ARPA-E also continued the use of a rolling open solicitation to quickly support innovative applied energy research that has the potential to lead to new focused programs. In addition to these new programs, ARPA-E hosted the fifth annual Energy Innovation Summit from February 24-26, 2014. The Summit brought together leaders from academia, government, and business to discuss the foremost energy issues, showcase the latest technology innovations, and cultivate relationships to help advance cutting-edge technologies to market. The event drew over 2,100 attendees and featured over 120 speakers and keynote addresses. At the Summit, ARPA-E announced at least 24 ARPA-E project teams that have formed new companies and more than 16 ARPA-E projects, which have partnered with other government agencies for further development. Additionally, 22 ARPA-E projects have attracted more than 625 million dollars in private-sector follow-on funding after ARPA-E’s investment of approximately 95 million dollars. Lastly, ARPA-E continued to focus on providing awardees with practical training and critical business information as part of the Agency’s Technology-to-Market program. This support equips projects with a clear understanding of market needs to guide technical development and help projects succeed the marketplace.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual Scientific Focus Area Report for the Energy Exascale Earth System Model Project: Phase II

The project's long-term goal is to assert and maintain an international scientific leadership position in the development of Earth system models that address the grand challenge of actionable predictions of Earth system variability and change, with an emphasis on the most critical scientific questions facing the nation and DOE. The grand challenge will be addressed by overcoming three major limitations: Pushing the high-resolution frontier of Earth system modeling through a combination of strategic model development and computational advances targeting exascale computers and beyond. Bridging the gap in scales and processes by developing a new class of models that couple the natural, managed, and man-made systems across scales to address energy sector vulnerability to variability and change. The project will achieve its goal through four intersecting project elements: A series of prediction and simulation experiments addressing scientific questions and mission needs; A well-documented and tested, continuously advancing, evolving, and improving system of model codes that comprise the E3SM Earth system model; The ability to use effectively leading (and “bleeding”) edge computational facilities soon after their deployment at DOE national laboratories; and An infrastructure to support code development, hypothesis testing, simulation execution, and analysis of results. To achieve the Grand Challenge of actionable Earth system predictions to address the most critical scientific questions facing our nation and DOE, the E3SM project defined its strategy in a fifteen-year roadmap with four intersecting project elements: A series of prediction and simulation experiments addressing scientific questions and mission needs; A well-documented and tested, continuously advancing, evolving, and improving system of model codes that comprise the E3SM Earth system model ; The ability to use effectively leading (and “bleeding”) edge computational facilities soon after their deployment at DOE national laboratories; and An infrastructure to support code development, hypothesis testing, simulation execution, and analysis of results. Figure 1 depicts the E3SM Project Roadmap, showing the relationships among the first three major project elements: the simulations, the modeling system to perform those simulations, and the machines on which they will be executed. Unlike the other three elements that have distinct but overlapping phases, the fourth element, the infrastructure, will evolve continuously based on the requirements imposed by project needs.

54 ENVIRONMENTAL SCIENCES↗

Comparing Offshore Wind Energy Procurement and Project Revenue Sources Across U.S. States

The pace of offshore wind energy procurement in the United States has rapidly accelerated in recent years. U.S. states along the Atlantic Coast have set procurement goals for offshore wind energy to meet renewable portfolio standards and serve state policy needs. By the end of 2019, projects with a total capacity of 6.4 gigawatts (GW) had established long-term contracts (or equivalent regulatory requirements) with utility off-takers. The prices established in these contracts since 2017 have been well below expectations from many industry observers, prompting stakeholders to compare price levels across U.S. states and globally. However, comparing procurement prices across projects and jurisdictions is often challenging because of differences in project parameters, support regimes, supply chains, and the applicable tax and regulatory environment. These characteristics provide critical context for understanding project revenue streams, delivery obligations, and risk allocation, which need to be accounted for when comparing across different projects. In combination, variation in these characteristics between projects results in measurable differences in project costs and revenues and, consequently, in different offer bids. In this report, we systematically analyze offshore wind energy support regimes across U.S. states. Because offshore wind energy procurement prices from U.S. projects are often compared not only among states but also with European tenders, this report also provides an overview of support regimes and taxonomy used in European offshore wind markets. The content of this report was derived from a literature review, primarily regulatory filings and summary reports, and 16 interviews with leading industry experts from state agencies, energy sector consultancies, and law practices. The comparison between U.S. states focuses on several dimensions, including statutory authority, solicitation procedures, procurement goals and awards, and the structuring of physical and transactional delivery of energy services.

17 WIND ENERGY↗

Energy Storage Financing: Project and Portfolio Valuation

This study investigates the issues and challenges surrounding energy storage project and portfolio valuation and provide insights in to improving visibility into the process for developers, capital providers, and customers so they can make more informed choices. Energy storage project valuation methodology is typical of power sector projects through evaluating various revenue and cost assumptions in a project economic model. The difference is that energy storage projects have many more design and operational variables to incorporate, and the governing market rules that control these variables are still evolving. This makes project valuation for energy storage more difficult. As the number of operating projects grow, portfolios of these projects are being developed, garnering the interest of larger investors. Valuation challenges of these portfolios can be even more challenging as market role and geographical diversity can actually exacerbate the variability, not mitigate it. By proposing additional visibility of key factors and drivers for industry participants, the US DOE can reduce investment risk, expanding both the number and types of investors, plus helping emerging energy storage technology into sustained commercialization.

25 ENERGY STORAGE↗

DARHT : Enduring Lessons from a Technical Project in a National Laboratory Context [Slides]

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility at Los Alamos National Laboratory (LANL) is the world’s first flash x-ray facility able to take multiple high-resolution radiographs of the interior features of fast-moving dense objects during a single experiment. DARHT’s radiography and complimentary diagnostics makes it an important diagnostic tool in support of the US Department of Energy’s (DOE)/National Nuclear Security Administration (NNSA)’s stewardship of the US nuclear deterrent. The project to construct DARHT ran from 1988 through 2003. Initial Operating Capability along a single axis began in 1999. A technical issue delayed Critical Decision 4 for the full dual-axis capability until 2008. DARHT was characterized by several directed changes resulting from an environmental impact study, changes to the global security context resulting from the end of underground nuclear testing, and rapid evolution of applicable technology. Conventional building and lab-space construction were part of the project, but the project was dominated by Special Facility Equipment that, together with the mission to support the nuclear weapons program, required the project to be completed by national laboratories. Although the project pre-dated implementation of DOE Order 413.3, several important lessons for national laboratory projects remain applicable today and will be discussed here, including projects appropriate for the national laboratory environment, scope stability, risk acceptance and mitigation, communication, and collaboration. Finally, considerations for DOE contractor project managers are offered based upon the DARHT experience.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Systematic Framework for Projecting the Future Cost of Offshore Wind Energy

Offshore wind costs are expected to decline rapidly in the short and medium term future as the industry grows and gains experience in manufacturing, installing, and operating commercial scale projects. Estimating the future costs of offshore wind energy is critical for evaluating the technology's economic performance, how it can fit into a broader clean energy economy, and how R&D investment can be allocated to advance the technology. We present a newly developed approach for forecasting these costs which focuses on an empirically-derived learning rate for capital costs and prescribed cost and performance improvements for operational costs and capacity factor. We establish baseline costs for a series of reference fixed-bottom and floating projects in 2021 and project cost trajectories to 2035, presenting both an average cost trajectory as well as describing the range of potential future costs associated with site-specific cost variations and uncertainty in the estimate of the learning rate. We also conduct sensitivity analyses showing the impact of different global deployments by 2035 and variations in the prescribed operational costs and capacity factors. The results show that fixed-bottom and floating offshore wind capital costs could decrease to around $\$$2,400/kW and $\$$3,300/kW by 2035, respectively, with ranges of $\$$2,100/kW - $\$$2,750/kW for fixed-bottom projects and $\$$2,850/kW - $\$$5,500/kW for floating projects. The levelized cost of energy of fixed-bottom and floating wind projects could decrease to $\$$53.1/MWh and $\$$63.9/MWh by 2035, with ranges of $\$$48.4/MWh - $\$$59.7/MWh for fixed-bottom projects and $\$$46.5/MWh - $\$$99.9/MWh for floating projects. By presenting the uncertainty associated with the forecast we provide a transparent description of the spectrum of potential cost trajectories for offshore wind.

17 WIND ENERGY↗

Development of Low-Cost, High-Performance, Easy-To-Apply, Non-Flammable, Inorganic Phase Change Material (PCM) Technology (Project Final Report)

This report describes a 45-months long research program focused on the development of novel, easy-to-apply, non-flammable, and high-performance inorganic phase change materials (PCMs) for building and industrial applications. The University of Massachusetts Lowell (UML) formed a world-class team consisting of researchers form InsolCorp (only N. American manufacturer of inorganic PCM systems for building applications), and a group of industrial advisors, to develop a universal/multipurpose, simple-to-manufacture and cost-effective PCM technology. The project team expects that the results of this work will spur in the future the adoption of thermal storage materials – a key building energy saving technology as identified by DOE BTO – for a variety of building envelope applications. The main goal of this project was to demonstrate a suite of low-cost, multipurpose, and durable inorganic PCM formulations with phase transition temperatures encompassing typical building applications (between +5 o C and +55 o C). The first objective was to design, fabricate, and experimentally validate a performance of inexpensive, durable, highly efficient, non-flammable, and easy to manufacture PCMs. To allow a variety of building applications, the project team focused on formulations that exhibit repeatable phase transitions between +5 o C and +55 o C. To follow the DOE BTO cost efficiency target without compromising thermal performance, our work was based on inorganic compounds (mostly salt hydrates) and their blends, which represent a fraction of the cost of most of organic PCMs with about twice as high density as well as significantly higher thermal conductivity and phase change enthalpy. The second objective was to develop easy-to-manufacture and -install packaging/encapsulation designs that are 1) a superior barrier to current state-of-the-art macro-packaging, which significantly reduces the risk of loss of hydration water and PCM leak, and 2) optimal in enhancing the heat exchange rates with the surroundings and within the PCM core to ensure complete charging/discharging of the entire PCM within the product. Finally, the project’s intend was to scale-up the fabrication process to demonstrate installation on system-scale applications, and to validate the performance under field conditions. This work aimed at developing low-cost, high-energy storage, and reliable latent heat storage technology for building applications. This development was realized by formulating and integrating the following two technology components: 1) inorganic salt hydrate based PCMs that have high latent enthalpies and are low-cost and durable, and 2) PCM encapsulation (packaging) technology that maximizes PCM concentration and enhances heat transport characteristics in the product and with the external environment/materials. High thermal storage capacity, low cost and fire resistance are key to the building market entry for PCM technology. Therefore, the project’s focus was on salt-hydrate-based formulations which satisfy all these criteria. Packaging and/or encapsulation of PCM is a key processing step. The project team recognized that a low-cost and simple-to-manufacture salt hydrate-based PCM technology holds the best chance to be successful in the building construction market, a market which is traditionally extremely sensitive to cost and where commodity thermal insulations are the benchmark for envelope-related energy saving measures. That is why, in this project, the main intention was to minimize the production cost and maximize the product energy storage density without sacrificing the PCM performance. It was achieved through: 1. Minimizing the non-PCM components (plastics, additives, packaging/encapsulation materials, etc.) because they are significantly more expensive than salt hydrates, 2. Using highly thermally conductive and lightweight PCM carrier (packaging material) to facilitate more complete phase cycling, and 3. Optimizing the thickness and minimizing air spaces in product design (such as in pouched PCM). For this purpose, our approach was to enable an easy system design, including selection of the PCM operating temperatures, optimizing the necessary heat storage capacity (by stacking together several layers of PCM products), and if needed, a synchronized usage of PCM products of different temperatures. A specially designed, robust, highly thermally conducting and highly impermeable packaging (to retain salt hydrate water during phase transition cycles) was designed and tested to increase the overall system thermal performance and durability. All PCM products developed during this project were tested in both lab scale and in full scale field conditions. It is expected that, after further developments and commercialization, the developed PCM technologies may be also applied in space conditioning, energy storage technologies, and heat transfer applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗

Final DOE-ASR Report for the Project “Using LASSO to bridge the gap between model and observations and to learn about atmospheric convection”

Atmospheric convection spans a wide range of spatial and temporal scales and involves complex interactions with the surrounding dynamic and thermodynamic environment, particularly over tropical continental regions. These processes remain a major source of uncertainty in weather and climate models, including persistent biases in the diurnal cycle of convective precipitation that directly affect estimates of climate sensitivity. Addressing these challenges requires the combined use of high-resolution observations and cloud-resolving modeling frameworks. In this context, the DOE Atmospheric Radiation Measurement (ARM) program’s Large-Eddy Simulation ARM Symbiotic Simulation and Observation (LASSO) activity provides a powerful platform that pairs comprehensive observations with numerical simulations to enable process-level understanding of atmospheric convection. Within this context, this Research and Development Partnership Pilot (RDPP) project was designed to initiate and expand DOE ARM/ASR research capacity at minority-serving institutions, while advancing scientific understanding of convective processes over the Amazon rainforest. Consistent with the RDPP mission, the project emphasized partnership development, training, and workforce capacity building alongside exploratory research activities. On the scientific side, the project produced two peer-reviewed journal articles, and one manuscript currently under review (see list in section 3.1). Together, these studies combine long-term ARM observations and cloud-resolving and convection-permitting modeling to investigate the environmental controls on the shallow-to-deep convective transition during the Amazon wet season. The results demonstrate the central role of early-day moisture preconditioning and large-scale dynamical forcing in regulating isolated deep convection, provide mechanistic insight into convective evolution, and establish physically informed modeling frameworks for future sensitivity experiments. These scientific outcomes are described in sections 2.1 to 2.3 and were disseminated in 8 conference presentations (see section 3.2) and 5 invited talks (see section 3.3), reflecting broad engagement with our community. Equally important, the project achieved its RDPP capacity-building objectives (see section 2.4). A sustained research partnership was established among the University of Maryland, Baltimore County (UMBC), Morgan State University (MSU), and Howard University (HU), and extended to include collaboration with Pacific Northwest National Laboratory (PNNL). The project organized multiple multi-day training events focused on ARM data, LASSO simulations, and quantitative analysis methods, directly engaging students, postdoctoral researchers, and faculty across institutions. These activities broadened participation in ASR research and led to independent adoption of LASSO workflows by students beyond the immediate project team. Finally, the project successfully positioned the participating institutions to pursue future DOE research. Preliminary scientific results, coupled with strengthened partnerships and technical capacity, enabled the submission of follow-on proposals to DOE ASR funding opportunities. In this way, the project fulfilled the RDPP goal of seeding durable research capacity and laying the foundation for larger-scale, sustained engagement with DOE ARM and ASR programs.

54 ENVIRONMENTAL SCIENCES↗

Lac Courte Oreilles Energy Analysis Project

The Lac Courte Oreilles Tribe applied for first step funding in 2007 and was awarded in October of that year. We wanted to perform an audit to begin fulfilling two commitments we made to our membership and resolutions that we adopted. One was the Kyoto Protocol and reduce our carbon emissions by 25% and to produce 25% of our energy by sustainable means. To complete these goals we needed to begin with first assessing what our carbon emissions are and begin taking the steps to conserve on the energy we currently use. The First Step Grant gave us the opportunity to do this. Upon funding the Energy Project was formed under the umbrella of the LCO Public Works Department and Denise Johnson was hired as the coordinator. She quickly began fulfilling the objectives of the project. Denise began by contact the LCO College and hiring interns who were able to go to each Tribal entity and perform line logging to read and document the energy used for each electrical appliance. Data was also gathered for one full year from each entity for all their utility bills (gasoline, electric, natural gas, fuel oil, etc.). Relationships were formed with the Green Team and other Green Committees in the area that could assist us in this undertaking. The Energy Task Force was of great assistance as well recommending other committees and guidance to completing our project. The data was gathered, compiled and placed into spreadsheets that would be understandable for anyone who didn't have a background in Renewable Resources. While gathering the data Denise was also looking for ways to conserve energy usage, policies changes to implement and any possible viable renewable energy resources. Changes in the social behaviors of our members and employees will require further education by workshops, energy fairs, etc.. This will be looked into and done in coordination with our schools. The renewable resources seem most feasible are wind resources as well as Bio Mass both of which need further assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

02 PETROLEUM↗

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

300 FF-5 Operable Unit↗

Agile Machining and Inspection Non-Nuclear Report (NNR) Project

This report is a high level summary of the eight major projects funded by the Agile Machining and Inspection Non-Nuclear Readiness (NNR) project (FY06.0422.3.04.R1). The largest project of the group is the Rapid Response project in which the six major sub categories are summarized. This project focused on the operations of the machining departments that will comprise Special Applications Machining (SAM) in the Kansas City Responsive Infrastructure Manufacturing & Sourcing (KCRIMS) project. This project was aimed at upgrading older machine tools, developing new inspection tools, eliminating Classified Removable Electronic Media (CREM) in the handling of classified Numerical Control (NC) programs by installing the CRONOS network, and developing methods to automatically load Coordinated-Measuring Machine (CMM) inspection data into bomb books and product score cards. Finally, the project personnel leaned perations of some of the machine tool cells, and now have the model to continue this activity.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

StreamNet Project : Annual Report Fiscal Year 2008.

Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project's primary means of disseminating fish data, was completely redesigned this year to improve the user experience and make locating and acquiring data simpler. A primary goal was to significantly reduce the sequence of steps needed. The new site was in final testing at the end of the fiscal year, and will go live in the first quarter of FY-09. Use of the website remained strong, with 941,687 total page views representing 345,855 visits from 123,684 unique visitors. There were 18,797 actual views of tabular datasets from the online query system, plus many interactive map views, not counting downloads of the entire database direct data and information requests.

13 HYDRO ENERGY↗

A Compilation and Review of Alaska Energy Projects

There have been many energy projects proposed in Alaska over the past several decades, from large scale hydro projects that have never been built to small scale village power projects to use local alternative energy sources, many of which have also not been built. This project was initially intended to review these rejected projects to evaluate the economic feasibility of these ideas in the light of current economics. This review included contacting the agencies responsible for reviewing and funding these projects in Alaska, including the Alaska Energy Authority, the Denali Commission, and the Arctic Energy Technology Development Laboratory, obtaining available information about these projects, and analyzing the economic data. Unfortunately, the most apparent result of this effort was that the data associated with these projects was not collected in a systematic way that allowed this information to be analyzed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The KTOI Ecosystem Project Relational Database : a Report Prepared by Statistical Consulting Services for KTOI Describing the Key Components and Specifications of the KTOI Relational Database.

Data are the central focus of any research project. Their collection and analysis are crucial to meeting project goals, testing scientific hypotheses, and drawing relevant conclusions. Typical research projects often devote the majority of their resources to the collection, storage and analysis of data. Therefore, issues related to data quality should be of foremost concern. Data quality issues are even more important when conducting multifaceted studies involving several teams of researchers. Without the use of a standardized protocol, for example, independent data collection carried out by separate research efforts can lead to inconsistencies, confusion and errors throughout the larger project. A database management system can be utilized to help avoid all of the aforementioned problems. The centralization of data into a common relational unit, i.e. a relational database, shifts the responsibility for data quality and maintenance from multiple individuals to a single database manager, thus allowing data quality issues to be assessed and corrected in a timely manner. The database system also provides an easy mechanism for standardizing data components, such as variable names and values uniformly across all segments of a project. This is particularly an important issue when data are collected on a number of biological/physical response and explanatory variables from various locations and times. The database system can integrate all segments of a large study into one unit, while providing oversight and accessibility to the data collection process. The quality of all data collected is uniformly maintained and compatibility between research efforts ensured. While the physical database would exist in a central location, access will not be physically limited. Advanced database interfaces are created to operate over the internet utilizing a Web-based relational database, allowing project members to access their data from virtually anywhere. These interfaces provide users with the ability to upload, download, edit, and search data remotely, creating a dynamic system that is continually updated with the most recent information. At the same time, data are protected through user access restrictions, by implementing user profiles and password protected security. This accessibility could be set to any combination of read/write/edit abilities from an administrator capacity with full access to all data, to a highly restricted public access capability limited to general project information. Generation of customized summary reports and basic graphical routines could also be obtained through a Web-based interference. Using these types of features, users could produce summary tables, track trends of specified response variables over time or location, and compare results from various disciplines. Exploration of data in this manner can help users to better define and clarify their research goals and provide a means of integrating various aspects of a larger research project.

13 HYDRO ENERGY↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

Empirical Estimation of the Energy Impacts of Projects Installed through Residential Property Assessed Clean Energy Financing Programs in California

We examine the energy use impacts of energy efficiency and solar PV projects financed by residential property assessed clean energy (R-PACE) programs in California. We leverage household-level interval meter data to apply normalized metered energy consumption (NMEC) methods at significant scale—more than 25,000 electric meters and more than 15,000 gas meters. We develop a comparison group to account for non-project-related changes in usage. The projects include homes that replaced existing HVAC equipment with higher-efficiency units and homes that installed central heating or air conditioning equipment for the first time. We have limited information on pre-project household equipment stock so we develop a method to infer new installations. We find that projects that installed energy efficiency technologies reduce electricity consumption by approximately 3% and gas consumption by approximately 3.5% on average. When we remove homes that installed new cooling and heating equipment for the first time, savings rise to approximately 5% for electricity and approximately 6% for gas. Given the California climate and the results of an existing study of similar California projects, these results are in line with expectations. Solar PV projects produce electricity that offsets approximately 69% of household electricity consumption on average. We estimate that California R-PACE projects installed through the end of 2019 produce annual reductions in grid-tied electricity consumption of 506 GWh (equivalent to the electricity consumption of approximately 74,000 California households) and gas consumption reductions of 2 million therms (equivalent to the gas consumption of approximately 4700 California households) in a typical weather year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗