Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Probabilistic Risk Assessment Approach for the Versatile Test Reactor

A probabilistic risk assessment (PRA) has been initiated to assist with the design, authorization, and future operation of the Versatile Test Reactor (VTR). The PRA is a vital part of a larger risk-informed authorization approach and is being developed in accordance with two applicable standards.

Grabaskas, David↗

CSR in the Probabilistic Resource Adequacy Suite (PRAS): Fast Interregional Transmission Models for Renewable Integration Studies

NREL's Probabilistic Resource Adequacy Suite (PRAS) was developed for use in renewable integration studies, to assess the resource adequacy of large interconnected power systems with potentially significant interregional transfers of power. This presentation provides an overview of the tool and the methods it uses to solve multi-regional transmission and storage dispatch problems in a computationally-efficient manner.

composite system reliability↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗

Use of Flooding Probabilistic Risk Assessment

General slide information on using flooding Probabilistic Risk Assessment (PRA) taken from published INL reports or public Nuclear Regulatory Commission (NRC) information. Topics covered are: SDP related to flooding in US Door integrity tests at Idaho State University Smoothed Particle Hydrodynamics for external flooding NRC-INL Flood Barrier project

99 GENERAL AND MISCELLANEOUS↗

Dynamic Probabilistic Safety Assessment Studies for Advanced Reactor Using RAVEN

Probabilistic Safety Assessment (PSA) is used extensively to evaluate the risks associated with complex engineering systems like Nuclear Power Plants (NPPs). Current PSA models are based on the Event-Tree/Fault-Tree (ET/FT) methodology. ET and FT models are static and are based on Boolean logic approaches. In the past, concerns have been raised in the literature regarding the capability of the traditional static modelling approaches to adequately account for the impact of process, hardware, software, firmware and human interactions on the stochastic system behaviour. To overcome the limitations of the traditional approach to PSA, several dynamic PSA methodologies have been proposed. One of the dynamic PSA methodologies used for dynamic evaluations is Dynamic Event Tree (DET) framework which can be used to assess the impact of the parameter variability and scenario dynamics on the PSA model for the initiating event. The DET framework couples the stochastic model (number of component/trains that start on demand, operator action timing, etc.) with a Thermal-Hydraulic (TH) model of the plant. This paper explores the use of DET along with a case study on advanced reactor. The initiating event selected for the study was Class IV power supply failure event. The TH analysis considering uncertainty in various parameters was performed using RELAP5 and Reactor Analysis and Virtual control ENvironment (RAVEN) tool. Based on the uncertainty analysis, it is concluded that the peak clad temperatures (PCT) are within the limits in all the code runs implying a high-degree of safety margin. However, variation in time to reach the PCT was observed among the code runs and the mean time to reach the PCT was found to be around 8590sec (approximately 2.4 hours). Hence, sufficient time margin is available for human intervention and the operator might have a relatively stress-free state during such an accident scenario. Due to the static nature of the traditional PSA models, the safety margin available was lesser, whereas, with the help of dynamic PSA models, one can demonstrate that the actual available safety margin is more in the present case study and is valuable input from the design point of view.

99 GENERAL AND MISCELLANEOUS↗

The Publication and Endorsement of the ASME/ANS Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants

Due to growing interest in non-light water reactor (NLWR) concepts, the predecessor to the American Nuclear Society (ANS)/American Society of Mechanical Engineers (ASME) Joint Committee on Nuclear Risk Management (JCNRM) initiated development of a NLWR probabilistic risk assessment (PRA) standard in 2006. The developed standard, released for trial use in 2013, was the first integral PRA standard created by the JCNRM, containing requirements ranging from the development of initiating events to the analysis of offsite radiological consequence. Based on feedback from pilot applications of the trial standard, a revised version of the standard was developed and balloted in 2020, with unanimous passage by the JCNRM and formal publication as an American National Standards Institute (ANSI) standard in 2021. The paper provides an overview of the standard and its development process. In addition, the paper reviews the latest status of U.S. Nuclear Regulatory Commission endorsement efforts through Regulatory Guide 1.247.

Fleming, K.↗

Data-Driven Computation of Probabilistic Marching Cubes for Efficient Visualization of Level-Set Uncertainty

Uncertainty visualization is an important emerging research area. Being able to visualize data uncertainty can help scientists improve trust in analysis and decision-making. However, visualizing uncertainty can add computational overhead, which can hinder the efficiency of analysis. In this paper, we propose novel data-driven techniques to reduce the computational requirements of the probabilistic marching cubes (PMC) algorithm. PMC is an uncertainty visualization technique that studies how uncertainty in data affects level-set positions. However, the algorithm relies on expensive Monte Carlo (MC) sampling for the multivariate Gaussian uncertainty model because no closed-form solution exists for the integration of multivariate Gaussian. In this work, we propose the eigenvalue decomposition and adaptive probability model techniques that reduce the amount of MC sampling in the original PMC algorithm and hence speed up the computations. Our proposed methods produce results that show negligible differences compared with the original PMC algorithm demonstrated through metrics, including root mean squared error, maximum error, and difference images. We demonstrate the performance and accuracy evaluations of our data-driven methods through experiments on synthetic and real datasets.

Athawale, Tushar↗

Dose Consequence and Probabilistic Risk Assessment Integration into Digital Documented Safety Analysis

This is an intern poster presentation. The current reactor authorization process is complex and error prone. The development of a digital Documented Safety Analysis has been proposed to provide an automated and integrated solution to enhance the design and authorization process. The digital DSA will consist of interlinked models, analyses, and reports, all of which will be updated using automated workflows when design changes are made. This poster examines the integration of the probabilistic risk assessment (PRA) with the transient and dose consequence analyses. A PRA for a generic high temperature gas-cooled reactor (HTGR) has been constructed which will drive the input parameters for a transient analysis model currently being constructed. Dose consequence will be determined using the results of the transient analysis and the Radiation Safety Analysis Computer (RSAC) code. Dose consequence data will then be input back into the PRA to drive design parameters.

42 ENGINEERING↗

U.S. Nuclear Operating Experience Program for Probabilistic Risk Assessment Parameter Estimations

This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.

99 GENERAL AND MISCELLANEOUS↗

On-chip probabilistic inference for charged-particle tracking at the sensor edge

Modern scientific instruments operate under increasingly extreme constraints on bandwidth, latency, and power. Inference at the sensor edge determines experimental data collection efficiency by deciding which information to save for further analysis. Particle tracking detectors at the Large Hadron Collider exemplify this challenge: pixelated silicon sensors generate rich spatiotemporal ionization patterns, yet most of this information is discarded due to data-rate limitations. Concurrently, advancements in co-design tools provide rapid turn-around for incorporating machine learning into application-specific integrated circuits, motivating designs for particle detectors with new integrated technologies. We demonstrate that neural networks embedded in the front-end electronics can infer charged-particle kinematic parameters from a single silicon layer. We regress hit positions and incident angles with calibrated uncertainties, while satisfying stringent constraints on numerical precision, latency, and silicon area. Our results establish a path toward probabilistic inference directly at the edge, opening new opportunities for intelligent sensing in high-rate scientific instruments.

Das, Arghya Ranjan [Purdue U.] (ORCID:000000018451↗

MOOSE ProbML: Parallelizable Probabilistic Machine Learning and Uncertainty Quantification Capabilities

The Multiphysics Object Oriented Simulation Environment (MOOSE) is a widely used open- source finite element software for performing multiphysics multiscale simulations in a massively parallel fashion. Recently, the computational team at Idaho National Laboratory (INL) has implemented Probabilistic Machine Learning (ProbML) capabilities in MOOSE—in a parallelized fashion—and enable active learning with large-scale computational models for tasks such as surrogate model development, scale bridging, forward/inverse uncertainty quantification (UQ), Bayesian optimization, etc. This presentation summarizes these developments in MOOSE along with demonstrations on several real applications relevant to nuclear energy. At the fundamental level, samplers like Monte Carlo/Latin Hypercube, variance reduction, parallelized Markov Chain Monte Carlo (MCMC) support uncertainty propagation in both forward and inverse settings. These samplers can be integrated with the Gaussian processes (GP) suite in MOOSE, which offer several variants like scalar GPs, multi-output GPs, and deep GPs, to enable active learning. These GPs can be tuned using gradient-based optimization methods like Adam and its variants or gradient-free methods like the elliptical slice sampler (a variant of MCMC adept under Gaussian settings) for more complex covariance kernels or likelihoods whose gradient computations can be cumbersome. A variety of batch acquisition functions permit parallelized evaluation of the computational model and support different learning objectives with high efficiency like Bayesian inference, global surrogate development, optimization, etc. Furthermore, libtorch integration supports training, evaluation, and re-training of neural networks and other complex machine learning models in active learning settings. The impacts of these developments are shown on several real applications: (1) nuclear fuel inverse UQ and model inadequacy assessment using the Kennedy O’Hagan framework; (2) uncertainty aware surrogate modeling for additive manufacturing to predict field quantities; (3) nuclear reactor rare events analysis; and (4) complex fluid flow prediction using a global surrogate with quantified prediction uncertainty. Finally, the outlook of MOOSE ProbML is discussed for both outer-loop and inner-loop computations in the broad view to accelerate fuels and materials qualification, address gaps in knowledge and data, and assess new reactor/fuel systems.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP (Presentation)

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. Idaho National Laboratory has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal hydraulics modeling to enhance security planning while reducing costs. A reduced order model for thermal hydraulic simulations performed by the Modular Accident Analysis Program (MAAP) was developed to evaluate reactor core behavior during attack scenarios. MAAP simulations are computationally intensive and must be run in a secure environment, complicating analysis and validation. By pre-computed scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. To address this, Idaho National Laboratory [JL2.1]has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal-hydraulics modeling [JL3.1]to enhance security planning while reducing costs. We developed a tool that produces reduced order models using thermal hydraulic simulations from the Modular Accident Analysis Program (MAAP) [1]. These models can quickly evaluate reactor core behavior during attack simulations, and in so doing, address two barriers of traditional methods: (1) MAAP simulations are computationally intensive, and (2) attack scenarios must be run in a secure environment, which complicates analysis and validation. By precomputing scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Performance Assessment of a Low-Level Radioactive Waste Disposal Site on the Nevada Test Site

The Area 5 Radioactive Waste Management Site on the Nevada Test Site has been disposing of low-level, mixed low-level, and transuranic radioactive waste since 1961. In 1988, the U.S. Department of Energy implemented performance objectives for low-level radioactive waste disposal site performance and required all site operators to prepare a performance assessment. Since then, an iterative performance assessment process has been implemented that consists of repeated cycles of site characterization, conceptual model formation/revision, and performance assessment modeling. At the end of each cycle uncertainty and sensitivity analysis are used to determine the need for revision and to identify topics requiring additional research and development. The performance assessment model is implemented in the GoldSim{reg_sign} probabilistic simulation platform. The current site conceptual model, based on site characterization data and process model results, assumes that there is no groundwater pathway under current climatic conditions and that radionuclide releases are predominately upward to the land surface. Radionuclides are released to the land surface by upward liquid advection/diffusion, gas diffusion, biointrusion, and inadvertent human intrusion. The model calculates dose for four members of public exposure scenarios and two intruder scenarios. The highest mean-dose, 0.04 mSv yr{sup -1}, is expected for a low-probability exposure scenario: establishment of a rural community at the site boundary at the end of institutional control. At the end of institutional control, doses are contributed primarily by {sup 3}H in agricultural products produced onsite. After approximately 300 years, the doses are contributed equally by {sup 99}Tc and {sup 210}Pb ingested in vegetables grown at the residence. Technetium is released to the surface by the coupled processes of liquid advection/diffusion occurring deep in the cover and plant uptake/animal burrowing occurring at shallower depths. Lead-210 is deposited in shallow cover soil by the radioactive decay of {sup 222}Rn diffusing in the gas phase. The highest mean dose for the more likely exposure scenario of transient recreational use of the site is 0.002 mSv yr{sup -1}. The transient visitor's dose is contributed predominantly by external irradiation from {sup 214}Pb and {sup 214}Bi, deposited in the cover by diffusion of {sup 222}Rn.

54 ENVIRONMENTAL SCIENCES↗

Incorporation of probabilistic seismic phase labels into a Bayesian multiple-event seismic locator

We add probabilistic phase labels to the multiple-event joint probability function of Myers et al., 2007 that formerly included event locations, travel-time corrections, and arrival-time measurement precision. Prior information on any of the multiple-event parameters may be used. The phase-label model includes a null label that captures phases not belonging to the collection of phases under consideration. Using the Markov-Chain Monte Carlo method, samples are drawn from the multiple-event joint probability function to infer the posteriori distribution that is consistent with priors and the arrival-time data set. Using this approach phase-label error can be accessed and phase-label error is propagated to all other multiple-event parameters. We test the method using a ground-truth data set of nuclear explosions at the Nevada Test Site. We find that posteriori phase labels agree with the meticulously analyzed data set in more than 97% of instances and the results are robust even when the input phase-label information is discarded. Only when a large percentage of the arrival-time data are corrupted does prior phase label information improve resolution of multiple-event parameters. Simultaneous modeling of the entire multiple-event system results in accurate posteriori probability regions for each multiple-event parameter.

58 GEOSCIENCES↗

Probabilistic Design Optimization and Reliability Assessment of High Temperature Thermoelectric Devices

Thermoelectric (TE) devices, subcomponents of which are made of brittle materials, generate an electrical potential when they are subjected to thermal gradients through their thickness. These devices are of significant interest for high temperature environments in transportation and industrial applications where waste heat can be used to generate electricity (also referred to as "waste heat recovery" or "energy harvesting"). TE devices become more efficient as larger thermal gradients are applied across them. This is accomplished by larger temperature differences across the TE's hot and cold junctions or the use of low thermal conductivity TE materials or both. However, a TE brittle material with a combination of poor strength, low thermal conductivity, and large coefficient of thermal expansion can translate into high probability of mechanical failure (low reliability) in the presence of a thermal gradient, thereby preventing its use as intended. Therefore, the objective of this work is to demonstrate the use of an established probabilistic design methodology developed for brittle structural components and corresponding design sensitivity analyses to optimize the reliability of an arbitrary TE device. This method can be used to guide TE material and design selection for optimum reliability. The mechanical reliability of a prototypical TE device is optimized from a structural ceramic perspective, using finite element analysis and the NASA CARES/Life integrated design code. Suggested geometric redesigns and material selection are identified to enhance the reliability of the TE device.

42 ENGINEERING↗

Robust Design of Advanced Thermoelectric Conversion Systems: Probabilistic Design Impacts on Specific Power and Power Flux Optimization

Advanced, direct thermal energy conversion technologies are receiving increased research attention in order to recover waste thermal energy in advanced vehicles and industrial processes. Advanced thermoelectric (TE) systems necessarily require integrated system-level analyses to establish accurate optimum system designs. Past system-level design and analysis has relied on well-defined deterministic input parameters even though many critically important environmental and system design parameters in the above mentioned applications are often randomly variable, sometimes according to complex relationships, rather than discrete, well-known deterministic variables. This work describes new research and development creating techniques and capabilities for probabilistic design and analysis of advanced TE power generation systems to quantify the effects of randomly uncertain design inputs in determining more robust optimum TE system designs and expected outputs. Selected case studies involving stochastic TE .material properties demonstrate key stochastic material impacts on power, optimum TE area, specific power, and power flux in the TE design optimization process. Magnitudes and directions of these design modifications are quantified for selected TE system design analysis cases

30 DIRECT ENERGY CONVERSION↗

Fuzzy-probabilistic calculations of water-balance uncertainty

Hydrogeological systems are often characterized by imprecise, vague, inconsistent, incomplete, or subjective information, which may limit the application of conventional stochastic methods in predicting hydrogeologic conditions and associated uncertainty. Instead, redictions and uncertainty analysis can be made using uncertain input parameters expressed as probability boxes, intervals, and fuzzy numbers. The objective of this paper is to present the theory for, and a case study as an application of, the fuzzyprobabilistic approach, ombining probability and possibility theory for simulating soil water balance and assessing associated uncertainty in the components of a simple waterbalance equation. The application of this approach is demonstrated using calculations with the RAMAS Risk Calc code, to ssess the propagation of uncertainty in calculating potential evapotranspiration, actual evapotranspiration, and infiltration-in a case study at the Hanford site, Washington, USA. Propagation of uncertainty into the results of water-balance calculations was evaluated by hanging he types of models of uncertainty incorporated into various input parameters. The results of these fuzzy-probabilistic calculations are compared to the conventional Monte Carlo simulation approach and estimates from field observations at the Hanford site.

54 ENVIRONMENTAL SCIENCES↗