Probing a set of trajectories to maximize captured information.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Converting biomass to biochar presents exciting opportunities to mitigate climate change, improve forest and soil health, decrease wildfire risk, bolster ecosystem services, and revitalize rural economies. Our expert panel examined how biomass is harvested, converted to biochar and applied and where operational changes and funding could significantly magnify biochar's contributions. To advance knowledge and efficacies, we found that a rigorous combination of coordinated long-term research, market research and development and enhancement of business support infrastructure that leads to collaborative policy development is essential. We also identified how barriers to five specific biochar technology sectors could be overcome and provide guidelines for effective funding.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.
Explore the source record for details and available documents.
In 2020, the Federal Energy Regulatory Commission (FERC) approved a rule, Order 2222, that requires market operators to create pathways enabling distributed energy resource aggregators (DERAs) to compete in all regional organized wholesale electric markets. The goal is to encourage various forms of distributed energy resources (DERs) to participate in electricity markets in a way that would enhance competition, encourage innovation, and drive down costs for consumers. In this document, we briefly discuss how FERC Order 2222 affects the opportunities for participation in electricity markets for building owners and operators, the role of aggregators, and the involvement of buildings in the electricity market.
In the wake of the Fukushima Daiichi nuclear power plant accident in 2011, the accident tolerant fuels (ATF) program was initiated to enhance the safety of light-water reactor fuels, placing significant emphasis on cladding. A crucial step for the broad implementation of ATF in commercial reactors involves irradiation testing of the fuel designs. ATF-2D, the latest experiment in the ATF series, is slated to undergo irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). ATF-2D is a joint effort of the INL with industry partners General Electric Global Research; Framatome; General Atomics; the Japan Atomic Energy Agency; Hitachi-GE Nuclear Energy, Ltd; Global Nuclear Fuel-Japan Co., Ltd; Nippon Nuclear Fuel Development Co., Ltd; and Mitsubishi Heavy Industries, Ltd. The ATF-2D test train design consists of four tiers, each housing six rodlets. The device will be inserted in Loop 2A within the central flux trap of the ATR, and is anticipated to undergo irradiation throughout three 60-day cycles. Typical pressurized water reactor conditions will be emulated during the irradiation. The objective of the work presented here is to dimension neutron-absorbing hafnium (Hf) components surrounding the fuel rodlets, such that the axial power profile is flattened, while simultaneously ensuring that the total fission power output of the entire test train remains below 200 kW.
In the wake of the Fukushima Daiichi nuclear power plant accident in 2011, the accident tolerant fuels (ATF) program was initiated to enhance the safety of light-water reactor fuels, placing significant emphasis on cladding. A crucial step for the broad implementation of ATF in commercial reactors involves irradiation testing of the fuel designs. ATF-2D, the latest experiment in the ATF series, is slated to undergo irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). ATF-2D is a joint effort of the INL with industry partners General Electric Global Research; Framatome; General Atomics; the Japan Atomic Energy Agency; Hitachi-GE Nuclear Energy, Ltd; Global Nuclear Fuel-Japan Co., Ltd; Nippon Nuclear Fuel Development Co., Ltd; and Mitsubishi Heavy Industries, Ltd. The ATF-2D test train design consists of four tiers, each housing six rodlets. The device will be inserted in Loop 2A within the central flux trap of the ATR, and is anticipated to undergo irradiation throughout three 60-day cycles. Typical pressurized water reactor conditions will be emulated during the irradiation. The objective of the work presented here is to dimension neutron-absorbing hafnium (Hf) components surrounding the fuel rodlets, such that the axial power profile is flattened, while simultaneously ensuring that the total fission power output of the entire test train remains below 200 kW.
Our goal is to teach a robot to walk in an energy efficient way. Inspired by nature [1], we create a reinforcement learning method that balances distance traveled and energy consumption, which we call “utility.” Further, each step is symmetric to ensure equal strides while walking straight. We achieve our goal by rewarding decisions that lead to the best utility over several training iterations.
The traditional commissioning process uses sampling to select equipment for functional acceptance testing when large quantities of equipment are present. Although this approach is generally effective in identifying wide-spread issues, it has several shortcomings: it fails to evaluate equipment not included in the sample, provides only a one-time validation of equipment operation, and the standard documentation is a simple checklist of pass/fail questions. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. This presentation highlights the advantages offered by automated functional testing in this critical laboratory setting: (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with Connected Commissioning and the important conversations with key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.
The commercial and industrial building sectors have a major role to play in a U.S. low-carbon future. Building owners can make a difference by deploying on-site renewable generation and storage technologies, which facilitates future-proofing their buildings as well as more effectively meeting the service requirements of the building. This resource provides an overview of common generation, storage, and load management technologies in behind-the-meter systems, and serves as a primer to demonstrate the impact on net building loads required from the grid for different sizes of renewable generation along with on-site electrical and thermal storage. These discussions can help commercial building owners communicate the value of these systems to project teams and develop innovative behind-the-meter solutions to achieve their energy goals.
Explore the source record for details and available documents.
CO 2 storage through CO 2 enhanced oil recovery (EOR) is considered as one of the technologies to help promote larger scale deployment of CO 2 storage because of associated economic benefits through oil recovery, 45Q tax credits and the utilization of existing infrastructure. The objective of this study is to demonstrate how optimal reservoir management and operation strategies (including well completions and controls) can be used to optimize both CO 2 storage and oil recovery. The optimization problem was focused on jointly estimating the well completions (i.e., fraction of injection/production well perforations in each reservoir layer) and CO 2 injection/oil production controls that maximize the net present value (NPV) in a CO 2 EOR and storage operation. We utilized the newly developed StoSAG algorithm, one of the most efficient optimization algorithms in the reservoir management community, to solve the optimization problem. The performance of joint optimization approach was compared with the performance of well control only optimization approach. In addition, the performance of co-optimization of CO 2 storage and oil recovery approach was compared with the performances of maximization of only CO 2 storage and maximization of only oil recovery approaches. The optimization results showed that a joint optimization of well completions and well controls can achieve an 8.84% higher final NPV than the one obtained from the optimization of only well controls. It was observed that the NPV incremental for joint optimization is mainly due to the fact that the optimal well completions and controls approach results in efficient CO 2 storage and oil production from different reservoir layers depending on the differences in individual layer properties. Comparison of co-optimization (i.e., maximization of NPV) and maximization of only CO 2 storage or only oil recovery showed that the co-optimization and maximization of only oil recovery result in significantly higher final NPV than that obtained through maximization of only CO 2 storage approach while maximization of only CO 2 storage can achieve significantly higher CO 2 storage in the reservoir compared to the other two scenarios. The similar results for co-optimization and maximization of oil production are obtained because of the difference in oil revenue compared to CO 2 storage tax credit. To the best of our knowledge, this is the first study in oil/gas industry and CO 2 storage community to perform joint optimization of well completions and well controls in the fields. We expect that the proposed optimization framework will be a useful and efficient tool for field engineers to optimally manage CO 2 EOR projects to maximize revenue through oil recovery as well as CO 2 storage by taking advantage of the new 45Q tax law.
Measurements of maximal grip strength and endurance at 40 percent max strength were obtained for 7 men 19-21 years of age, 1-2 days before and on the first recovery day during three 2-week bedrest (BR) periods, each separated by a 3-week ambulatory recovery period. The subjects performed isometric exercise (IME) for 1 hr/day, isotonic exercise (ITE) for 1 hr/day, and no exercise (NOE) in the three BR periods. It was found that the mean maximal grip strength was unchanged after all three BR periods. Mean grip endurance was found to be unchanged after IME and ITE training, but was significantly reduced after NOE. These results indicate that IME and ITE training during BR do not increase or decrease maximal grip strength, alghough they prevent loss of grip endurance, while the maximal strength of all other major muscle groups decreases in proportion to the length of BR to 70 days. The maximal strength reduction of the large muscle groups was found to be about twice that of the small muscle groups during BR. In addition, it is shown that changes in maximal strength after spaceflight, BR, or water immersion deconditioning cannot be predicted from changes in submaximal or maximal oxygen uptake values.