Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Pretreatment Engineering Platform Phase 1 Final Test Report

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Intersection Control on Battery Electric Vehicle Energy Consumption

Battery electric vehicle (BEV) sales have significantly increased in recent years. They have different energy consumption patterns compared to the fuel consumption patterns of internal combustion engine vehicles (ICEVs). This study quantified the impact of intersection control approaches—roundabout, traffic signal, and two-way stop controls—on BEVs’ energy consumption. The paper systematically investigates BEVs’ energy consumption patterns compared to the fuel consumption of ICEVs. The results indicate that BEVs’ energy consumption patterns are significantly different than ICEVs’ patterns. For example, for BEVs approaching a high-speed intersection, the roundabout was found to be the most energy-efficient intersection control, while the two-way stop sign was the least efficient. In contrast, for ICEVs, the two-way stop sign was the most fuel-efficient control, while the roundabout was the least efficient. Findings also indicate that the energy saving of traffic signal coordination was less significant for BEVs compared to the fuel consumption of ICEVs since more regenerative energy is produced when partial or poorly coordinated signal plans are implemented. The study confirms that BEV regenerative energy is a major factor in energy efficiency, and that BEVs recover different amounts of energy in different urban driving environments. The study suggests that new transportation facilities and control strategies should be designed to enhance BEVs’ energy efficiency, particularly in zero emission zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Software Sustainability $\&$ High Energy Physics

New facilities of the 2020s, such as the High Luminosity Large Hadron Collider (HL-LHC), will be relevant through at least the 2030s. This means that their software efforts and those that are used to analyze their data need to consider sustainability to enable their adaptability to new challenges, longevity, and efficiency, over at least this period. This will help ensure that this software will be easier to develop and maintain, that it remains available in the future on new platforms, that it meets new needs, and that it is as reusable as possible. This report discusses a virtual half-day workshop on "Software Sustainability and High Energy Physics" that aimed 1) to bring together experts from HEP as well as those from outside to share their experiences and practices, and 2) to articulate a vision that helps the Institute for Research and Innovation in Software for High Energy Physics (IRIS-HEP) to create a work plan to implement elements of software sustainability. Software sustainability practices could lead to new collaborations, including elements of HEP software being directly used outside the field, and, as has happened more frequently in recent years, to HEP developers contributing to software developed outside the field rather than reinventing it. A focus on and skills related to sustainable software will give HEP software developers an important skill that is essential to careers in the realm of software, inside or outside HEP. The report closes with recommendations to improve software sustainability in HEP, aimed at the HEP community via IRIS-HEP and the HEP Software Foundation (HSF).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LIFETIME MEASUREMENT WITH PSEUDO MOVEABLE SEPTUM IN NSLS X-RAY RING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source currently under construction at Brookhaven National Laboratory and starts to commission in 2014. The beam injection works with two septa and four fast kicker magnets in an injection section. To improve the injection stability and reproducibility, we plan to implement a slow local bump on top of the fast bump so that the fast kicker strength is reduced. This bump works as a pseudo movable septum. We can also use this 'movable' septum to measure the storage ring beam partial lifetime resulting from the septum edge and possibly increasing the lifetime by moving the stored beam orbit away from the edge. We demonstrate the feasibility of this idea, by implementing DC bump in NSLS X-ray ring. We report the results of beam lifetime measurements as a function of the amplitude of this bumped orbit relative to the septum and the idea of a slow bump that could reduce the fast bump magnet strengths.

43 PARTICLE ACCELERATORS↗

Performance of the H- Ion Source Supporting 1-MW Beam Operations at SNS

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory reached 1-MW of beam power in September 2009, and now routinely operates near 1-MW for the production of neutrons. This paper reviews the performance, operational issues, implemented and planned mitigations of the SNS H- ion source to support such high power-level beams with high availability. Some results from R&D activities are also briefly described.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Enterprise analytics.

Ranking search results is a thorny issue for enterprise search. Search engines rank results using a variety of sophisticated algorithms, but users still complain that search can't ever seem to find anything useful or relevant! The challenge is to provide results that are ranked according to the users definition of relevancy. Sandia National Laboratories has enhanced its commercial search engine to discover user preferences, re-ranking results accordingly. Immediate positive impact was achieved by modeling historical data consisting of user queries and subsequent result clicks. New data is incorporated into the model daily. An important benefit is that results improve naturally and automatically over time as a function of user actions. This session presents the method employed, how it was integrated with the search engine,metrics illustrating the subsequent improvement to the users search experience, and plans for implementation with Sandia's FAST for SharePoint 2010 search engine.

99 GENERAL AND MISCELLANEOUS↗

Let your users do the ranking.

Ranking search results is a thorny issue for enterprise search. Search engines rank results using a variety of sophisticated algorithms, but users still complain that search can't ever seem to find anything useful or relevant! The challenge is to provide results that are ranked according to the users' definition of relevancy. Sandia National Laboratories has enhanced its commercial search engine to discover user preferences, re-ranking results accordingly. Immediate positive impact was achieved by modeling historical data consisting of user queries and subsequent result clicks. New data is incorporated into the model daily. An important benefit is that results improve naturally and automatically over time as a function of user actions. This session presents the method employed, how it was integrated with the search engine,metrics illustrating the subsequent improvement to the users' search experience, and plans for implementation with Sandia's FAST for SharePoint 2010 search engine.

99 GENERAL AND MISCELLANEOUS↗

An update on land-ice modeling in the CESM

Mass loss from land ice, including the Greenland and Antarctic ice sheets as well as smaller glacier and ice caps, is making a large and growing contribution to global sea-level rise. Land ice is only beginning to be incorporated in climate models. The goal of the Land Ice Working Group (LIWG) is to develop improved land-ice models and incorporate them in CESM, in order to provide useful, physically-based sea-level predictions. LJWG efforts to date have led to the inclusion of a dynamic ice-sheet model (the Glimmer Community Ice Sheet Model, or Glimmer-CISM) in the Community Earth System Model (CESM), which was released in June 2010. CESM also includes a new surface-mass-balance scheme for ice sheets in the Community Land Model. Initial modeling efforts are focused on the Greenland ice sheet. Preliminary results are promising. In particular, the simulated surface mass balance for Greenland is in good agreement with observations and regional model results. The current model, however, has significant limitations: The land-ice coupling is one-way; we are using a serial version of Glimmer-CISM with the shallow-ice approximation; and there is no ice-ocean coupling. During the next year we plan to implement two-way coupling (including ice-ocean coupling with a dynamic Antarctic ice sheet) with a parallel , higher-order version of Glimmer-CISM. We will also add parameterizations of small glaciers and ice caps. With these model improvements, CESM will be able to simulate all the major contributors to 21st century global sea-level rise. Results of the first round of simulations should be available in time to be included in the Fifth Assessment Report (ARS) of the Intergovernmental Panel on Climate Change.

54 ENVIRONMENTAL SCIENCES↗

Water Peer Review

All programs with the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) are required to undertake rigorous, objective peer review of their funded projects on a yearly basis in order to ensure and enhance the management, relevance, effectiveness, and productivity of those projects.

water, hydropower, WWPTO, water power program, con↗

Generic Fortran Containers (GFC)

The Fortran language does not provide a standard library that implements generic containers, like linked lists, trees, dictionaries, etc. The GFC software provides an implementation of generic Fortran containers natively written in Fortran 2003/2008 language. The following containers are either already implemented or planned: Stack (done), Linked list (done), Tree (done), Dictionary (done), Queue (planned), Priority queue (planned).

Liakh, Dmitry↗