Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A Community for Polar Early Career Researchers Engaging With the Interagency Arctic Research Policy Committee

The Interagency Arctic Research Policy Committee (IARPC) is tasked with implementation of the Arctic Research Plan (ARP) by coordinating representatives from federal and state agencies, academic, industry, and Indigenous partners with interests in Arctic research. IARPC is organized into several collaboration teams and discipline-specific communities of practice that interface on the IARPC Collaborations website. The Early Career Community of Practice (ECCoP) is one such community that was established to promote the research of early career researchers (ECR) and increase ECR engagement with the ARP, program managers, collaboration teams, and communities of practice. The ECCoP has grown to develop regular newsletters promoting recent ECR research publications ad sharing training, job, funding, and collaboration opportunities relevant to community members at all life stages that self-identify as ECRs. Within IARPC, the ECCoP continues to promote ECR participation in monthly community of practice meetings and webinars and to report on ECR efforts that contribute to deliverables of the ARP Biennial Implementation Plan. Recent activity of the ECCoP includes developing an annual survey of the ECR cohort on IARPC to follow change in demographics over time and to identify community needs to improve diversity and inclusion in the polar research space and to address gaps in training needs for ECRs.

Katy Smith↗

Europa Clipper Payload Verification and Validation: Early Architecture and Implementation

NASA’s Europa Clipper mission will investigate the Jovian icy moon Europa with a sophisticated payload consisting of a suite of nine instruments. Clipper’s observations will help provide answers to a broad range of scientific objectives related to Europa’s habitability. As the project proceeds through Phase C, we are building confidence in the system’s ability to achieve these science goals by implementing a rigorous payload verification and validation (V&V) program. This paper details the planned structure and implementation of the Europa Clipper payload V&V program as it exists leading up to the project critical design review (CDR), before the bulk of instrument- or payload- level V&V activities have begun. We first explain the context for payload V&V on Europa Clipper, including its interfaces with other parts of the project system. We then describe the taxonomy of V&V concepts and their interrelationships, followed by a discussion on how this framework allows us to codify interfaces, processes, and ideas that are key to a successful V&V program. We focus on key aspects of the planning phases of V&V, especially establishing a complete set of verification items and accurately mapping them into appropriate verification activities. The second half of the paper describes the logistics of implementing this framework onto our actual payload system, including the processes and tools we use to manage and communicate agreements, changes, and risks across the project. We conclude with a reflection on the unique drivers and challenges of the V&V program concept development so far and the work that is planned for phase D implementation.

Srivastava, Priyanka↗

The Deep Space Network Tracking System, Mark 4-A, 1986

The Deep Space Network (DSN) Tracking System provides highly precise measurements of spacecraft Doppler and range. It was recently extensively modified as part of the Mark 4-A implementation. The DSN Tracking System as currently implemented, its performance in support of Voyager 2, and plans for new implementation are described.

Wackley, J. A.↗

Joint operations planning for space surveillance missions on the MSX satellite

The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.

Stokes, Grant↗

Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

recommendation↗

Stochastic Evolutionary Algorithms for Planning Robot Paths

A computer program implements stochastic evolutionary algorithms for planning and optimizing collision-free paths for robots and their jointed limbs. Stochastic evolutionary algorithms can be made to produce acceptably close approximations to exact, optimal solutions for path-planning problems while often demanding much less computation than do exhaustive-search and deterministic inverse-kinematics algorithms that have been used previously for this purpose. Hence, the present software is better suited for application aboard robots having limited computing capabilities (see figure). The stochastic aspect lies in the use of simulated annealing to (1) prevent trapping of an optimization algorithm in local minima of an energy-like error measure by which the fitness of a trial solution is evaluated while (2) ensuring that the entire multidimensional configuration and parameter space of the path-planning problem is sampled efficiently with respect to both robot joint angles and computation time. Simulated annealing is an established technique for avoiding local minima in multidimensional optimization problems, but has not, until now, been applied to planning collision-free robot paths by use of low-power computers.

Fink, Wolfgang↗

Configuration and Data Management Plan for the Thermophysics Facilities

This document establishes the Configuration and Data Management Plan for the Thermophysics Facilities Branch (TSF) and describes the implementation of the plan within the organization. Its intent is to control and document changes to facility hardware, software, and facility operating procedures; to control changes to Quality System documents; to ensure that all documents and drawings are current; and to provide for quick retrieval of facility information and documentation while safeguarding original records and documents.

Jeanne A Dominguez↗

HEDS Goals

In November of 1996, NASA made the decision to fully integrate several areas of robotic and human Mars exploration study and planning. As a result of this decision, requirements for unmanned robotic missions to support human Mars exploration were identified and a plan to meet these requirements was developed. Concrete progress in the implementation of this plan has been made. Three experiments have been selected and are in development for the Mars Surveyor Program 2001 Orbiter and Lander missions which will provide critical data for the planning of human missions to Mars. An Announcement of Opportunity for the Mars Surveyor Program 2003 Lander mission has recently been released which solicited proposals related to planning for a human mission. In order to define HEDS objectives for Mars robotic missions, it is important to understand what information is required as a foundation for mounting a program of exploration of this magnitude. We identify areas of research on robotic missions that will enable future human missions. These areas include Site Selection for Human Missions, Hazards to Human Explorers, Living off the Land, and Testing Critical Technologies in the Mars Environment.

Pline, A.↗

Next Generation Relay Services at Mars via an International Relay Network

Nearly all data acquired by vehicles on the surface of Mars are returned to Earth via Mars orbiters – more than 1.7 terabits so far. Successful communication between the various spacecraft is achieved via the careful implementation of internationally recognized CCSDS telecommunications protocols and the use of planning and coordination services provided by NASA’s Mars Program Office and the Multimission Ground Systems and Services (MGSS) Program at the Jet Propulsion Laboratory in Pasadena, CA. This modern Mars relay network has evolved since its inception in 2004 with the addition and loss of several missions, but it has fundamentally remained unchanged. Ground interfaces between the various spacecrafts’ mission operations centers on Earth remain largely unique for each participant, each mission maintains its own interfaces with deep space communications networks (e.g. DSN, ESTRACK), which are similar but still unique; and relay sessions at Mars require careful ground planning, coordination, and implementation. This paper will discuss the existing architecture and consider how several technologies may be applied to the next generation of relay services at Mars. Ultimately, these are expected to lead to the implementation of a delay and disruption tolerant network at Mars, a precursor to becoming a major element in an emerging Solar System Internet.

Edwards, Charles D. Jr↗

PV history: Lessons for the future

A history of terrestrial photovoltaics is presented indicating that the photovoltaic potential was well perceived and a good technology developent plan was formulated and implemented. Major accomplishments of the technology plan are highlighted. Research objectives and research needs for the future are outlined.

Ralph, E. L.↗

Maintaining consistency between planning hierarchies: Techniques and applications

In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

Zoch, David R.↗

Development and implementation of a scrub habitat compensation plan for Kennedy Space Center

Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.

Schmalzer, Paul A.↗

CASPER Version 2.0

CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.

Chien, Steve↗

APGEN Version 5.0

Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.

Maldague, Pierre↗

Development of Level 2 Calibration and Validation Plans for GOES-R; What is a RIMP?

Calibration and Validation (CalVal) plans for Geostationary Operational Environmental Satellite version R (GOES-R) Level 2 (L2) products were documented via Resource, Implementation, and Management Plans (RIMPs) for all of the official L2 products required from the GOES-R Advanced Baseline Imager (ABI). In 2015 the GOES-R program decided to replace the typical CalVal plans with RIMPs that covered, for a given L2 product, what was required from that product, how it would be validated, and what tools would be used to do so. Similar to Level 1b products, the intent was to cover the full spectrum of planning required for the CalVal of L2 ABI products. Instead of focusing on step-by-step procedures, the RIMPs concentrated on the criteria for each stage of the validation process (Beta, Provisional, and Full Validation) and the many elements required to prove when each stage was reached.

Validation↗