Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IEEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Data-driven based coordinated smart inverter control for distributed energy resources

Smart inverters (SI) for distributed energy resources (DER) are becoming popular since they have the ability to stabilize as well as restore the voltage and frequency of power systems. Aiming at establishing the mathematical models combined with SI control methods, multiple optimization methods are developed. However, the computational complexity of solving such a mathematical model with various uncertainties limits the real-time application of the SI control. To conquer this challenge, a data-driven-based SI control approach is developed to achieve coordinated control in the high penetration DER system. First, an optimization problem for maximizing the active power generation and minimizing the power loss is designed using the Volt/VAR control. To reduce the time consumption, the recurrent neural network (RNN) is proposed to model the relationship between the uncertainties and control actions during the offline site. The RNN with different sub-structures such as the long short-term memory cell and gated recurrent unit cell are included to enrich the diversity of features. In the last stage, different experiment comparisons, including multiple uncertainties maps and stateof- art machine learning methods, are conducted to verify the effectiveness of the proposed method based on the IEEE 123 bus power system. The results demonstrate that the proposed method can effectively achieve a rapid and coordinated control with a lower error rate.

Qiu, Wei↗

A Unified Analytical Method to Quantify Three Types of Fast Frequency Response from Inverter-Based Resources

With more inverter-based resources (IBRs), our power systems have lower frequency nadirs following N-1 contingencies, and undesired under-frequency load shedding (UFLS) can occur. To address this challenge, IBRs can be programmed to provide at least three types of fast frequency response (FFR), e.g., step response, proportional response (P/f droop response), and derivative response (synthetic inertia). However, these heterogeneous FFR challenge the study of power system frequency dynamics. Thus, this paper develops an analytical frequency nadir prediction method that allows for the consideration of all three potential forms of FFR provided by IBRs. The proposed method provides fast and accurate frequency nadir estimation after N-1 generation tripping contingencies. Our method is grounded on the closed-form solution for the frequency nadir, which is solved from the second-order system frequency response model considering the governor dynamics and three types of FFR. The simulation results in the IEEE 39-bus system with different types of FFR demonstrate that the proposed method provides an accurate and fast prediction of the frequency nadir under various disturbances.

fast frequency response↗

Fault-tolerant grid frequency measurement algorithm during transients

Many critical electric grid operations rely on accurate grid frequency measurements. Unfortunately, the measurement accuracy can be easily undermined by power system transient faults. During a power system transient fault, the power grid voltages and currents are usually highly distorted by high-frequency components. What is worse, the power grid signals could have discontinuity during some system transient faults such as phase angle jump, and the discontinuity could result in large measurement errors to state-of-the-art grid measurement algorithms. In this study, a fault-tolerant grid frequency measurement algorithm during transients is proposed. The new algorithm consists of two stages. The first stage is a transient detector, and it can detect the occurrence of system transient faults instantaneously. The second stage is the intelligent frequency estimator, and it will adapt its measurements according to the transient detector. The performance of the algorithm is evaluated under different steady-state and transient conditions. Both dependability and security of the fault-tolerant algorithm are assessed by using PSCAD simulation data and IEEE Standard test data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Binary particle swarm optimisation‐based optimal substation coverage algorithm for phasor measurement unit installations in practical systems

Phasor measurement units (PMUs) play an important role in the wide‐area monitoring and protection of modern power systems. Historically, their deployment was limited by the prohibitive cost of the device itself. Therefore, the objective of the conventional optimal PMU placement problem was to find minimum number of devices, which when carefully placed throughout the network, maximised observability subject to different constraints. Due to improvements in relay technology, digital relays can now serve as both relays and PMUs. Under such circumstances, the substation installations consume the largest portion of the deployment cost, and not the devices themselves. Thus, for minimising cost of synchrophasor deployment, number of substation installations must be minimised. This study uses binary particle swarm optimisation to minimise number of substations in which installations must be performed for making all voltage levels observable, while being subject to various practical constraints. Standard IEEE systems have been used to explain the technique. Finally, a large‐scale network of Dominion Virginia Power is used as the test bed for implementation.

Mishra, Chetan↗

Stochastic assessment of distributed generation hosting capacity and energy efficiency in active distribution networks

Active network management (ANM) aims to increase the capacity of variable distributed generation (DG), which can be connected to existing distribution networks. In this study, it is proposed to simultaneously consider the efficient use of energy resources when high shares of DG are procured through the ANM approach. To that end, a multi-period and multiobjective optimisation algorithm, based on the linearised optimal power flow, is formulated. The algorithm seeks to maximise the installed capacity of DG while minimising the energy losses and consumption of voltage-dependent loads. The objectives are optimised considering the coordinated operation of voltage regulators and on-load tap changers, and the management of DG generation curtailment and reactive power compensation from DG. Additionally, the effects of load and generation uncertainties are addressed through a two-stage stochastic programming formulation of the multiobjective problem. The result is a set of non-inferior solutions, which allows exploring the degree of conflict among the objectives. The proposed approach was tested on two IEEE test feeders and the solutions show a significant improvement in the system's energy efficiency with a low impact on the amount of connected DG.

Quijano, Darwin Alexis↗

Optimal allocation of series FACTS devices in large‐scale systems

Series flexible AC transmission systems devices, such as the variable series reactor, have the ability to continuously regulate the transmission line reactance so as to control power flow. This study presents a new approach to optimally locating such devices in the transmission network considering multiple operating states and contingencies. To investigate optimal investment, a single target year planning with three different load patterns is considered. The transmission contingencies may occur under any of the three load conditions and the coupling constraints between base case and contingencies are included. A reformulation technique transforms the original mixed integer non‐linear programming model into mixed integer linear programming model. To further relieve the computational burden and enable the planning model to be directly applied to practical large‐scale systems, a two‐phase decomposition algorithm is introduced. Detailed numerical simulation results on IEEE 118‐bus system and the Polish 2383‐bus system illustrate the efficient performance of the proposed algorithm.

Zhang, Xiaohu↗

Deep‐learning‐based power distribution network switch action identification leveraging dynamic features of distributed energy resources

This study proposes a data‐driven approach for identifying switch actions in power distribution networks. Simulated micro‐phasor measurement unit data is utilised to train a convolutional neural network (CNN) model. The trained CNN model can identify multi‐phase multi‐switch actions. Instead of working as a blackbox, the proposed approach extracts the features from the hidden layers of the trained CNN for engineering interpretation and error check. In addition, a random‐forest‐based feature ranking algorithm is proposed to identify the most important features. The proposed approach is validated on the IEEE 123‐node feeder modelled in GridLAB‐D. The CNN model is built and trained using TensorFlow. The proposed approach achieves 96.57% identification accuracy.

42 ENGINEERING↗

Distribution system versus bulk power system: identifying the source of electric service interruptions in the US

This study reports on the results from efforts by the Institute of Electric and Electronics Engineers (IEEE) Distribution Reliability Working Group (DRWG) and the U.S. Energy Information Administration (EIA) to improve the usefulness of reliability metrics by developing and then applying consistent, yet distinct measures of the continuity of supply based on the portion of the electric power system from which power interruptions originate: the lower voltage distribution system versus the high‐voltage bulk power system. The modified metrics better support reliability planning in the US because they separately measure the effectiveness of actions to improve reliability made by the two distinct groups of firms (and their regulators or oversight bodies) that are responsible for planning and operating each portion of the US electric power system. The authors then present for the first time quantitative information on the reliability of each portion of the US electric power system. When reliability is measured using the system average interruption duration index and the system average interruption frequency index, they find that the distribution system accounts for at least 94 and 92%, respectively, of all interruptions. They also find that these relationships have been stable over the recent past.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-Oriented PMU Placement Approach in Electric Power Systems

The objective of traditional PMU placement approaches is to use the minimal number of PMUs to cover system complete observability. Very few consider the probability and the consequence severity of observability loss. For example, following line trip, grid topology changes, which may results in observability loss and overloaded lines. As long as the overloaded lines are still observable, then we can take action in time to correct the system; and the consequence of the observability loss is not severe, although some parts of the system is not observable. Otherwise, if the overloaded lines become unobservable, then we lose the situation awareness of the system and the consequence of the observability loss is severe. To address the above points in PMU placement, this paper proposes a risk-oriented PMU placement approach. The proposed approach uses two indices, namely the probability of observability loss and its corresponding consequence of severity to design the optimal PMU placement strategy. We show that our proposed approach is able to capture the critical events while the traditional approaches fail to do so. Extensive simulation results carried out on the IEEE 39-bus and 118-bus systems demonstrate its effectiveness.

observability, risk of observability loss, PMUs pl↗

Maximising the investment returns of a grid‐connected battery considering degradation cost

Energy storage systems (ESSs) are being deployed widely due to numerous benefits including operational flexibility, high ramping capability, and decreasing costs. This study investigates the economic benefits provided by battery ESSs when they are deployed for market‐related applications, considering the battery degradation cost. A comprehensive investment planning framework is presented, which estimates the maximum revenue that the ESS can generate over its lifetime and provides the necessary tools to investors for aiding the decision making process regarding an ESS project. The applications chosen for this study are energy arbitrage and frequency regulation. Lithium‐ion batteries are considered due to their wide popularity arising from high efficiency, high energy density, and declining costs. A new degradation cost model based on energy throughput and cycle count is developed for Lithium‐ion batteries participating in electricity markets. The lifetime revenue of ESS is calculated considering battery degradation and a cost–benefit analysis is performed to provide investors with an estimate of the net present value, return on investment and payback period. The effect of considering the degradation cost on the estimated revenue is also studied. The proposed approach is demonstrated on the IEEE Reliability Test System and historical data from PJM Interconnection.

25 ENERGY STORAGE↗

Assessing the benefits of capacity payment, feed‐in‐tariff and time‐of‐use programme on long‐term renewable energy sources integration

Recently, demand response programmes (DRPs) have captured great attention in electric power systems. DRPs such as time‐of‐use (ToU) programme can be efficiently employed in the power system planning to reform the long‐term behaviour of the load demands. The composite generation expansion planning (GEP) and transmission expansion planning (TEP) known as composite GEP–TEP is of high significance in power systems to meet the future load demand of the system and also integrate renewable energy sources (RESs). In this regard, this study presents a dynamic optimisation framework for the composite GEP–TEP problem taking into consideration the ToU programme and also, the incentive‐based and supportive programmes. Accordingly, the performances of the capacity payment and feed‐in tariff mechanisms and the ToU programme in integrating RESs and reducing the total cost have been evaluated in this study. The problem has been formulated and solved as a standard two‐stage mixed‐integer linear programming model aimed at minimising the total costs. In this model, the ToU programme is applied and the results are fed into the expansion planning problem as the input. The proposed framework is simulated on the IEEE Reliability Test System to verify the effectiveness of the model and discuss the results obtained from implementing the mentioned mechanisms to support the RESs integration.

Javadi, Mohammad Sadegh↗

Effective restoration strategies of interdependent power system and communication network

The power system is continuously evolving towards a smarter grid by adding intelligent electrical devices that leverage communication technologies to provide visualisation, control and automation. The integration of power system and communication network has brought challenges into the resilience of interdependent networks. Following an outage or blackout, system operators cannot only restore one network while simply ignoring the interconnection with the other network. Effective restoration strategies that involve co‐ordination between power system and communication network have become critical in enhancing the resilience. An optimisation‐based restoration strategy is developed to coordinate the restoration actions between two networks. The problem is modelled as a mixed integer linear programming problem, with the objective of activating every node in both networks with the minimum number of activation/energisation of branches. The developed strategies are tested on the modified IEEE 14‐bus system incorporating communication network. Simulation results demonstrate that the coordinated restoration strategies are effective and critical in the successful recovery of interdependent networks. The developed model could also provide insights in network design and planning to enhance the resilience of interdependent power system and communication network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantification of storage required for preserving frequency security in wind‐integrated systems

Abstract The penetration of wind power generation into the power grid has been accelerated in recent times due to the aggressive emission targets set by governments and other regulatory authorities. Although wind power has the advantage of being environment‐friendly, wind as a resource is intermittent in nature. In addition, wind power contributes little inertia to the system as most wind turbines are connected to the grid via power electronic converters. These negative aspects of wind power pose serious challenges to the frequency security of power systems as penetration increases. In this work, an approach is proposed where an energy storage system (ESS) is used to mitigate frequency security issues of wind‐integrated systems. ESSs are well equipped to supply virtual inertia to the grid due to their fast‐acting nature, thus replenishing some of the energy storage capability of displaced inertial generation. In this work, a probabilistic approach is proposed to estimate the amount of inertia required by a system to ensure frequency security. Reduction in total system inertia due to the displacement of conventional synchronous generation by wind power generation is considered in this approach, while also taking into account the loss of inertia due to forced outages of conventional units. Monte Carlo simulation is employed for implementing the probabilistic estimation of system inertia. An ESS is then sized appropriately, using the system swing equation, to compensate for the lost inertia. The uncertainty associated with wind energy is modeled into the framework using an autoregressive moving average technique. Effects of increasing the system peak load and changing the wind profile on the expected system inertia are studied to illustrate various factors that might affect system frequency security. The proposed method is validated using the IEEE 39‐bus test system.

17 WIND ENERGY↗

Transactive energy systems for distributed blackstart and service recovery

Abstract Current transactive controls use marginal benefits and marginal costs to achieve an economic market efficiency during normal grid operations. However, the transactive mechanisms designed for normal economic operations cannot be applied directly for the contingencies because the grid operations during contingencies are often dictated by technical needs rather than purely economic criteria. For instance, one of the key technical requirements for the blackstart is to have at least one blackstart capable resource cleared which cannot be ensured by the transactive mechanism designed for normal economic operations because they work primarily based on the marginal benefit and marginal cost of the participants. This article presents one of the first attempts to develop a transactive mechanism to be used during grid contingencies. A distributed blackstart and service recovery is used as an example contingency to evaluate the performance of the proposed transactive mechanism. The performance of the proposed transactive mechanism is demonstrated for various use cases using a modified IEEE‐123 node test system. The simulation results demonstrated the proof of concept of applying a transactive mechanism to enable distributed blackstart and service recovery by engaging the mix of blackstart capable and non‐capable distributed energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ensemble voting-based fault classification and location identification for a distribution system with microgrids using smart meter measurements

This study presents an ensemble learning approach for fault classification and location identification in a smart distribution network containing photovoltaics (PV)-based microgrid. Lack of available data points and the unbalanced nature of the distribution system make fault handling a challenging task for utilities. The proposed method uses event-driven voltage data from smart meters to classify and locate faults. The ensemble voting classifier is composed of three base learners; random forest, k-nearest neighbours, and artificial neural network. The fault location (FL) task has been formulated as a classification problem where the fault type is classified in the first step and based on the fault type, the faulty bus is identified. The method is tested on IEEE-123 bus system modified with added PV-based microgrid along with dynamic loading conditions and varying fault resistances from 0 to 20 Ω for both unbalanced and balanced fault types. A further sensitivity analysis has been done to test the robustness of the proposed method under various noise levels and data loss errors in the smart meter measurements. The ensemble method shows improved performance and robustness compared to some previously proposed FL methods. Finally, the proposed method has been experimentally validated on a real-time simulation-based testbed using a state-of-the-art digital real-time simulator, industry standard DNP3 communication protocol and a cpu-based control centre running the FL algorithm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The LSBmax algorithm for boosting resilience of electric grids post (N‐2) contingencies

Abstract A computationally improved algorithm is presented to find the best transmission switching (TS) candidate for boosting resilience of electricity grids subject to ( N ‐2) contingencies. Here, resilience is computed as the reduction in load shed after the above‐mentioned ( N‐ ) contingencies. TS is a planned line outage, and past research shows that changing the transmission system's topology changes the power flow and removes post contingency violations. Finding the best TS candidate in a computationally suitable time for effectively boosting resilience is a challenge. The best TS candidate is found using a novel heuristic method by decreasing the search space based on proximity to the bus with the maximum load shedding (LSB). The LSB algorithm is faster than existing algorithms in the literature; and, it is compatible with both the AC and DC optimal power flow formulations. To validate the authors' claims of speedup and accuracy, two metrics are used to analyze the results from the IEEE 39‐bus and 118‐bus systems. Finally, the inherent parallelism of the LSB algorithm is leveraged on a high‐performance computing platform and applied to the large‐scale Polish 2383‐bus test system to validate scalability in both size and speedup in computation time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗