Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HVAC Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Development of a Roof Savings Calculator

A web-based Roof Savings Calculator (RSC) has been deployed for the Department of Energy as an industry-consensus tool to help building owners, manufacturers, distributors, contractors and researchers easily run complex roof and attic simulations. This tool employs the latest web technologies and usability design to provide an easy input interface to an annual simulation of hour-by-hour, whole-building performance using the world-class simulation tools DOE-2.1E and AtticSim. Building defaults were assigned and can provide estimated annual energy and cost savings after the user selects nothing more than building location. In addition to cool reflective roofs, the RSC tool can simulate multiple roof types at arbitrary inclinations. There are options for above sheathing ventilation, radiant barriers, and low-emittance surfaces. The tool also accommodates HVAC ducts either in the conditioned space or in the attic with custom air leakage rates. Multiple layers of building materials, ceiling and deck insulation, and other parameters can be compared side-by-side to generate an energy/cost savings estimate between two buildings. The RSC tool was benchmarked against field data for demonstration homes in Ft. Irwin, CA.

DOE cool roof calculator↗

Smart Ventilation Controls Boost Energy Efficiency and Indoor Air Quality

The average American household spends more than $2,200 a year on energy, and heating, ventilating, and air conditioning (HVAC) costs comprise nearly half of the bill. This is one reason why home builders focus on tightening building envelopes to save energy. Yet, limiting the potential for air exchange can negatively impact indoor air quality (IAQ). When outdoor conditions are most extreme during occupied periods, there may be comfort implications from continuing high levels of ventilation during associated weather events. This is true even with heat recovery. To mitigate risks, the Florida Solar Energy Center developed and tested approaches for “smart” ventilation system controls that enable more reliable design, installation, and operation to achieve desired IAQ while also minimizing energy and comfort impacts.

Building America↗

Smart Ventilation Controls Boost Energy Efficiency and Indoor Air Quality

The average American household spends more than $2,200 a year on energy, and heating, ventilating, and air conditioning (HVAC) costs comprise nearly half of the bill. This is one reason why home builders focus on tightening building envelopes to save energy. Yet, limiting the potential for air exchange can negatively impact indoor air quality (IAQ). When outdoor conditions are most extreme during occupied periods, there may be comfort implications from continuing high levels of ventilation during associated weather events. This is true even with heat recovery. To mitigate risks, the Florida Solar Energy Center developed and tested approaches for “smart” ventilation system controls that enable more reliable design, installation, and operation to achieve desired IAQ while also minimizing energy and comfort impacts.

30 DIRECT ENERGY CONVERSION↗

Development of a hardware-in-the-loop testbed for laboratory performance verification of flexible building equipment in typical commercial buildings

The goals of reducing energy costs, shifting electricity peaks, increasing the use of renewable energy, and enhancing the stability of the electric grid can be met in part by fully exploiting the energy flexibility potential of buildings and building equipment. The development of strategies that exploit these flexibilities could be facilitated by publicly available high-resolution datasets illustrating how control of HVAC systems in commercial buildings can be used in different climate zones to shape the energy use profile of a building for grid needs. This article presents the development and integration of a Hardware-In-the-Loop Flexible load Testbed (HILFT) that integrates physical HVAC systems with a simulated building model and simulated occupants with the goal of generating datasets to verify load flexibility of typical commercial buildings. Compared to simulation-only experiments, the hardware-in-the-loop approach captures the dynamics of the physical systems while also allowing efficient testing of various boundary conditions. The HILFT integration in this article is achieved through the co-simulation among various software environments including LabVIEW, MATLAB, and EnergyPlus. Although theoretically viable, such integration has encountered many real-world challenges, such as: 1) how to design the overall data infrastructure to ensure effective, robust, and efficient integration; 2) how to avoid closed-loop hunting between simulated and emulated variables; 3) how to quantify system response times and minimize system delays; and 4) how to assess the overall integration quality. Lessons-learned using the examples of an AHU-VAV system, an air-source heat pump system, and a water-source heat pump system are presented.

Chen, zhelun↗

High-efficiency Commercial Cold Climate Heat Pump

United Technologies Research Center (UTRC) proposed in 2012 to design, develop and demonstrate an air-source 10TR high-efficiency commercial cold climate heat pump (CCCHP). The proposed heat pump would be scalable beyond 40TR, cost effective with a simple payback of < 3 years upon commercialization and would reduce annual electricity use for building space heating in cold climates by at least 20%. This would represent an annual savings of $2.3 billion and a 20% displacement of total greenhouse gases generated upon full commercialization. The primary objective was to develop a highly integrated system that shall meet or exceed DOE capacity and efficiency targets at key conditions and is scalable, cost-effective and simple relative to the state-of-the-art. Specifically, the goal of the project was to design, develop and demonstrate a CCCHP that exceeds DOE capacity degradation requirements at +17F and -13F conditions (0 and <15% degradation vs. 10 and 25% DOE requirements, respectively) while meeting or exceeding DOE capacity and system efficiency requirements at all other conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measuring Impact: Evaluating Thermal Zoning Simplification on Energy Efficiency Measures Analysis

Building Energy Modeling (BEM) is a versatile tool for designing, retrofitting, ensuring code compliance, obtaining certifications, qualifying for incentives, and enabling real-time building control. However, capturing all the details of building geometry for thermal zoning can be time-consuming, costly, and sometimes computationally challenging. As a result, modelers have been applying zoning simplification based on factors such as space functions and internal loads, as well as relying on their experience and judgment while adhering to zoning rules outlined in industry standards. Despite the prevalence of this common practice, a notable gap exists in the literature regarding studies quantifying the influence of simplified thermal zoning on the evaluation of Energy Efficiency Measures (EEMs). Recognizing this gap, this paper seeks to contribute to the field by enhancing the understanding of how the simplification of thermal zoning influences the evaluation of EEMs against a baseline design. The study utilized a medium office prototype model with a detailed floor plan featuring over 20 zones per floor covering diverse functional spaces with varying internal loads and occupancy schedules. A standard thermal zoning strategy outlined in ASHRAE Standard 90.1 Appendix G was employed as the simplified zoning method. This strategy condenses the zoning into a core zone and four perimeter zones per floor. It was compared with the detailed zoning approach, which involves one zone per space. Common Energy EEMs, such as enhanced envelope, high-efficiency appliances and equipment, and HVAC controls, were individually implemented and evaluated. The results indicate that the performance comparison between the two zoning methods varies depending on the type of measures considered. Basic measures, such as adding wall insulation, demonstrate similar energy impacts, while advanced HVAC control measures, such as static pressure reset, exhibit a more substantial difference that cannot be overlooked.

Xie, Jiarong↗

Advancing Replicable Solutions for High-Performance Homes in the Southeast - JMC - Patrick Square

The work presented in this report advances the goals of the U.S. Department of Energy Building America program by improving the energy peformance of affordable and market-rate housing. Southface Energy Institute (Southface), part of the U.S. Department of Energy Building America research team Partnership for Home Innovation, worked with owners and builders with various market constraints and ultimate goals for three projects in three climate zones (CZs): Savannah Gardens in Savannah, Georgia (CZ 2); JMC Patrick Square in Clemson, South Carolina (CZ 3); and LaFayette in LaFayette, Georgia (CZ 4). This report documents the design process, computational energy modeling, construction, envelope performance metrics, long-term monitoring results, and successes and failures of the design and execution of these highperformance homes. The JMC Patrick Square project is a single floor with 1,828 ft2 of conditioned living space, three bedrooms, two bathrooms, and an attached two-car garage. This small-scale production builder wanted to increase its level of energy efficiency beyond its current green building practices, including bringing ducts into conditioned space. The team met this goal through a combination of upgrade measures and achieved many Zero Energy Ready Home program requirements. Monitoring the four ducted HPWHs in LaFayette and one in Savannah revealed that HPWH exhaust air impacts attic air during HPWH runtime only, and attic conditions return to previous levels shortly after the HPWH turns off. The HPWH did not appear to impact the loads on the heating and cooling systems, which were also placed in the attic. HPWHs should not be considered dehumidifiers if one is needed in an attic or basement/crawlspace. Ducting the HPWHs did not negatively impact performance compared to other published data of field performance. Changing duct configurations also did not alter the coefficient of performance. HPWHs in efficiency mode (heat pump only) could satisfy hot water demand for most residents. This mode maximizes energy efficiency. Adding .5 in. of insulated sheathing using the Huber ZIP System R Sheathing reduced peak summer temperatures and increased minimum winter temperatures inside the wall assemblies compared to the neighboring home. The neighboring home experienced significantly more risk of condensation and failed the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Standard 160-2009: Criteria for Moisture-Control Design Analysis in Buildings. Despite the fact that energy modeling predicted only a 2% annual savings from the insulated sheathing, preliminary data indicate that reduced heating, ventilating, and air-conditioning runtimes and energy consumption attributed to this measure provide significantly greater savings. Additional research is necessary.

Array↗

Machine learning-enhanced MPC for demand flexibility in small commercial buildings: An experimental study

Small- and medium-sized commercial buildings (SMCBs) represent the majority of U.S. commercial building stock and a significant share of peak electricity demand, yet they often lack centralized building automation systems, representing a significant untapped resource for urban energy management. This infrastructure gap makes advanced control implementation challenging, limiting the potential for widespread demand flexibility. Model Predictive Control (MPC) has shown strong potential for load shifting, peak demand reduction, and cost savings, but its effectiveness is hindered by unmeasured disturbances such as internal heat gains. This paper presents a Hybrid MPC framework that integrates a physics-based gray-box building thermal model, identified using a lumped disturbance (LD) approach, with a machine learning (ML) model for forecasting unmeasured disturbances. The hybrid approach is designed for buildings with multiple individually controlled heat pump and thermostat pairs, common in SMCBs, and aims to optimize coordinated scheduling of multiple heat pumps under dynamic electricity pricing while respecting comfort constraints. The methodology is validated through both simulations of case study buildings and experimental studies at a highly-instrumented test facility. Simulation results show that the Hybrid MPC achieves substantial load shifting and peak demand reduction, approaching the performance of an ideal MPC with perfect disturbance knowledge, and outperforming a conventional MPC without disturbance forecasting. In experiments, the Hybrid MPC reduced daily HVAC energy costs by 8.7%, peak-price time load (load shifting) by 41.7%, and peak demand by 29.2% compared to baseline control, demonstrating comparable benefits to the 11.6% cost savings, 42.9% load shifting, and 23.2% peak reduction of the ideal MPC. These results demonstrate that the proposed hybrid modeling approach can significantly improve MPC performance in real-world SMCB applications without requiring additional disturbance measurements.

Demand Flexibility↗

Hydronic Heating Coil Versus Propane Furnace, Rehoboth Beach, Delaware (Fact Sheet)

Insight Homes constructed two houses in Rehoboth Beach, Delaware, with identical floor plans and thermal envelopes but different heating and domestic hot water (DHW) systems. Each house is 1,715-ft 2 with a single story, three bedrooms, two bathrooms, and the heating, ventilation, and air conditioning (HVAC) systems and ductwork located in conditioned crawlspaces. The standard house, which the builder offers as its standard production house, uses an air source heat pump (ASHP) with supplemental propane furnace heating. The Building America test house uses the same ASHP unit with supplemental heat provided by the DHW heater (a combined DHW and hydronic heating system, where the hydronic heating element is in the air handler). Both houses were occupied during the test period. Results indicate that efficiency of the two heating systems was not significantly different. Three issues dominate these results; lower system design performance resulting from the indoor refrigerant coil selected for the standard house, an incorrectly functioning defrost cycle in the standard house, and the low resolution of the natural gas monitoring equipment. The thermal comfort of both houses fell outside the ASHRAE Standard 55 heating range but was within the ACCA room-to-room temperature range when compared to the thermostat temperature. The monitored DHW draw schedules were input into EnergyPlus to evaluate the efficiency of the tankless hot water heater model using the two monitored profiles and the Building America House Simulation Protocols. The results indicate that the simulation is not significantly impacted by the draw profiles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Residential Central Air Conditioning and Heat Pump Installation – Workshop Outcomes

DOE's Building Technologies Office works with researchers and industry partners to develop and deploy technologies that can substantially reduce energy consumption in residential and commercial buildings. This report aims to advance BTO’s energy savings, emissions reduction, and other program goals by identifying research and development (R&D), demonstration and deployment, and other non-regulatory initiatives for improving the design and installation of residential central air conditioners (CAC) and central heat pumps (CHP). Improving the adoption of CAC/CHP design and installation best practices has significant potential to reduce equipment costs, improve indoor air quality and comfort, improve system performance, and most importantly, reduce household energy consumption and costs for heating and cooling by addressing a variety of common installation issues.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technology Solutions Case Study: High-Performance Ducts in Hot-Dry Climates

Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, and builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.

ARBI↗

Beneficial Integration of Energy Storage and Load Management with Photovoltaic (PV)

In recent years, a number of industry activities have aimed at addressing the integration challenges posed by the variability and uncertainty of higher penetration of renewable generation sources, like solar photovoltaic (PV) – one of the key objectives of the Sustainable and Holistic Integration of Energy Storage and Solar PV (SHINES) program launched by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE). This EPRI led Beneficial Integration of Energy Storge, and Load Management with PV project aimed to design, develop, and demonstrate end-to-end distributed energy resource (DER) integration solution to build on these activities. EPRI led project team designed and implemented a local controller that uses model predictive control (MPC) algorithm to optimally manage DERs on site by planning for a receding horizon while executing the control settings for the first step of its plan. The team has also developed a system controller to interface with the local controller to demonstrate the hierarchical control and how it can leverage DER capabilities to address challenges like over voltage and thermal limit violations which typically limits the DER hosting capacity of distribution feeders. Team has demonstrated how the local controller with optimization algorithm can effectively manage controllable loads like HVAC, water heater, and pool pumps to allow for greater integration of PV with relatively smaller energy storage system requirements. Optimal utilization of the load control can also reduce the depth of discharge of batteries to meet grid export/import limit from behind-the-meter (BTM) DERs. Proper utilization of DER capabilities via local control intelligence, like the one developed and demonstrated in this project can help the industry to address integration challenges of higher penetration of solar PV in economically efficient manner. This can help to accelerate deployment of clean renewable energy systems at lower societal cost.

14 SOLAR ENERGY↗

Verification and Validation of EnergyPlus Phase Change Material Model for Opaque Wall Assemblies

Phase change materials (PCMs) represent a technology that may reduce peak loads and HVAC energy consumption in buildings. A few building energy simulation programs have the capability to simulate PCMs, but their accuracy has not been completely tested. This study shows the procedure used to verify and validate the PCM model in EnergyPlus using a similar approach as dictated by ASHRAE Standard 140, which consists of analytical verification, comparative testing, and empirical validation. This process was valuable, as two bugs were identified and fixed in the PCM model, and version 7.1 of EnergyPlus will have a validated PCM model. Preliminary results using whole-building energy analysis show that careful analysis should be done when designing PCMs in homes, as their thermal performance depends on several variables such as PCM properties and location in the building envelope.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal performance and potential annual energy impact of retrofit thin-glass triple-pane glazing in US residential buildings

Heat transfer through the building envelope and associated air leakage comprise the largest HVAC loads in most climates, and windows, which are known as the weakest link in the thermal envelope, are responsible for about 5 Quads, or approximately 10%, of building energy use. Therefore, windows offer a significant opportunity for building energy savings. High performance windows, such as triple glazing, though comprised of less than 2% of all US window sales in 2016 and has remained stagnant because they typically require a full and expensive redesign of the typical window sash and frame. One potential low incremental cost solution to kick start the market is upgrading the glazing with a thin-glass triple-pane design that does not require modifications to existing frame and sash. Here in this work, we first define the characteristics and performance of current “typical” residential windows through an examination of the National Fenestration Rating Council (NFRC) Certified Products Directory (CPD). With knowledge of the typical window, we determine the potential thermal performance impact of replacing typical glazing with thin-glass triple-pane glazing. Finally, with an understanding of the potential improvements to traditional performance metrics, such as U-factor, we show the energy savings potential of the thin-triple glazing in place of typical low-e windows in residential buildings is 16% in heating dominated climates such as Minneapolis, MN, 12% in mixed climates such as Washington DC, and 7% in cooling dominated climates such as Houston, TX.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lancaster County Career and Technology Center (LCCTC) Green Homes

With the support of the U.S. Department of Energy (DOE) Building America Program, Home Innovation Research Labs partnered with Lancaster County Career and Technology Center (LCCTC) to build a third new construction test house (NCTH) in Apprentice Green, a community next to the school in Mount Joy, Lancaster County, Pennsylvania (International Energy Conservation Code [IECC] climate zone [CZ] 5A). The overall program goals for the NCTH research project: - Develop a design to achieve 40% whole-house energy savings over the Building America B10 benchmark (the B10 benchmark is equivalent to meeting the 2009 IECC). - DOE Challenge Home certification (DOE 2013). - Document and evaluate costs for efficiency measures. - National Green Building Standard gold level green certification (NGBS 2009).

Array↗

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means of obtaining significant program-level energy savings across a variety of building types. Energy savings are expected to be more robust and persistent for MBCx projects than for conventionally commissioned ones. Impacts of future programs can be maximized by benchmarking energy use and targeting the commissioning towards particularly energy-intensive facilities such as laboratories.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: High Performance Ducts in Hot-Dry Climates; Technology Solutions for New and Existing Homes, Energy Efficiency & Renewable Energy (EERE)

?Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, and builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗