Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Funding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Infrastructure for Training and Partnershipes: California Water and Coastal Ocean Resources

The purpose of this project was to advance the existing ICESS/Bren School computing infrastructure to allow scientists, students, and research trainees the opportunity to interact with environmental data and simulations in near-real time. Improvements made with the funding from this project have helped to strengthen the research efforts within both units, fostered graduate research training, and helped fortify partnerships with government and industry. With this funding, we were able to expand our computational environment in which computer resources, software, and data sets are shared by ICESS/Bren School faculty researchers in all areas of Earth system science. All of the graduate and undergraduate students associated with the Donald Bren School of Environmental Science and Management and the Institute for Computational Earth System Science have benefited from the infrastructure upgrades accomplished by this project. Additionally, the upgrades fostered a significant number of research projects (attached is a list of the projects that benefited from the upgrades). As originally proposed, funding for this project provided the following infrastructure upgrades: 1) a modem file management system capable of interoperating UNIX and NT file systems that can scale to 6.7 TB, 2) a Qualstar 40-slot tape library with two AIT tape drives and Legato Networker backup/archive software, 3) previously unavailable import/export capability for data sets on Zip, Jaz, DAT, 8mm, CD, and DLT media in addition to a 622Mb/s Internet 2 connection, 4) network switches capable of 100 Mbps to 128 desktop workstations, 5) Portable Batch System (PBS) computational task scheduler, and vi) two Compaq/Digital Alpha XP1000 compute servers each with 1.5 GB of RAM along with an SGI Origin 2000 (purchased partially using funds from this project along with funding from various other sources) to be used for very large computations, as required for simulation of mesoscale meteorology or climate.

Siegel, David A.↗

Constellation X-Ray Mission and Support

This is the Third Annual Report of work performed by the Smithsonian Astrophysical Observatory (SAO) for NASA Goddard Space Flight Center (GSFC) under Cooperative Agreement NCC5-3681. The Agreement is entitled 'Constellation X-ray Mission Study and Support.' Work performed through January 31, 2001 was reported in a supplement to the Second Annual Report. That supplemental report was submitted in order to obtain funding subsequent to March 2001 which has, as the result of prior funding actions, become the de facto beginning of the funding year under the Agreement. This report covers the balance of the third year of the Agreement from February 1, 2001 through September 30, 2001. The Agreement as currently configured runs for two more years. When funding is significantly different from the originally approved amounts, SAO submits a revised budget. One such revision was submitted last year and was the basis for funding a portion of the work reported here. This report summarizes the main areas of SAO activity. Most of the work has been performed jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). Consequently, we do not claim that such activities were carried out exclusively by SAO. Rather, we describe SAO participation in these efforts. Under the Agreement, SAO performed work in seven major areas of activity. These areas related to: (1) Constellation X-ray Mission Facility Definition Team and Study Management; (2) Science Support; (3) Spectroscopy X-ray Telescope (SXT); (4) Systems Engineering; (5) Travel; and (6) In-house Management and Coordination.

Tananbaum, H.↗

National Directory of NASA Space Grant Contacts

Congress enacted the National Space Grant College and Fellowship Program (also known as Space Grant). NASA's Space Grant Program funds education, research, and public service programs in all 50 States, the District of Columbia, and the Commonwealth of Puerto Rico through 52 university-based Space Grant consortia. These consortia form a network of colleges and universities, industry partners, State and local Government agencies, other Federal agencies, museum and science centers, and nonprofit organizations, all with interests in aerospace education, research, and training. Space Grant programs emphasize the diversity of human resources, the participation of students in research, and the communication of the benefits of science and technology to the general public. Each year approximately one-third of the NASA Space Grant funds support scholarships and fellowships for United States students at the undergraduate and graduate levels. Typically, at least 20 percent of these awards go to students from underrepresented groups, and at least 40 percent go to women. Most Space Grant student awards include a mentored research experience with university faculty or NASA scientists or engineers. Space Grant consortia also fund curriculum enhancement and faculty development programs. Consortia members administer precollege and public service education programs in their States. The 52 consortia typically leverage NASA funds with matching contributions from State, local, and other university sources, which more than double the NASA funding. For more information, consult the Space Grant Web site at http://education.nasa.gov/spacegrant/

Source record↗

Implementing Technology with Industrial Community: The SBIR Example

The Earth-Sun system Technology Office (ESTO) works with Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs to supplement its own technology development program. The SBIR/STTR program is a highly competitive program that encourages small business to explore their technological potential to fulfill technology needs identified by ESTO. SBIR program has three phases. The Phase 1 contracts last for 6 months with a maximum funding of $70,000, and Phase 2 contracts last for 24 months with a maximum funding of $600,000. For Phase 3, the small business must find funding in the private sector or other non-SBIR federal agency funding. During this phase ESTO evaluates Phase 2 graduates and selects those that need to be further developed for airborne or spaceflight demonstration and provides funding. This paper will discuss the all three phases in and role of ESTO in this program.

Ghuman, Parminder↗

Astro2020 APC White Paper Project: The Simons Observatory

The Simons Observatory (SO) is a ground-based cosmic microwave background (CMB) experiment sited on Cerro Toco in the Atacama Desert in Chile that promises to provide breakthrough discoveries in fundamental physics, cosmology, and astrophysics. Supported by the Simons Foundation, the Heising-Simons Foundation, and with contributions from collaborating institutions, SO will see first light in 2021 and start a five year survey in 2022. SO has 287 collaborators from 12 countries and 53 institutions, including 85 students and 90 postdocs. The SO experiment in its currently funded form (‘SO-Nominal’) consists of three 0.4 m Small Aperture Telescopes (SATs) and one 6 m Large Aperture Telescope (LAT). Optimized for minimizing systematic errors in polarization measurements at large angular scales, the SATs will perform a deep, degree-scale survey of 10% of the sky to search for the signature of primordial gravitational waves. The LAT will survey 40% of the sky with arc-minute resolution. These observations will measure (or limit) the sum of neutrino masses, search for light relics, measure the early behavior of Dark Energy, and refine our understanding of the intergalactic medium, clusters and the role of feedback in galaxy formation. With up to ten times the sensitivity and five times the angular resolution of the Planck satellite, and roughly an order of magnitude increase in mapping speed over currently operating (“Stage 3”) experiments, SO will measure the CMB temperature and polarization fluctuations to exquisite precision in six frequency bands from 27 to 280 GHz. SO will rapidly advance CMB science while informing the design of future observatories such as CMB-S4. Construction of SO-Nominal is fully funded, and operations and data analysis are funded for part of the planned five-year observations. We will seek federal funding to complete the observations and analysis of SO-Nominal, at the $25M level. The SO has a low risk and cost efficient upgrade path – the 6 m LAT can accommodate almost twice the baseline number of detectors and the SATs can be duplicated at low cost. We will seek funding at the $75M level for an expansion of the SO (‘SO-Enhanced’) that fills the remaining focal plane in the LAT, adds three SATs, and extends operations by five years, substantially improving our science return. By this time SO may be operating as part of the larger CMB-S4 project. This white paper summarizes and extends material presented in, which describes the science goals of SO-Nominal, and which describe the instrument design.

Abitbol, Maximilian H.↗

DOE Workshop; Pan-Gass Conference on the Representation of Atmospheric Processes in Weather and Climate Models

This is the first meeting of the whole new GEWEX (Global Energy and Water Cycle Experiment) Atmospheric System Study (GASS) project that has been formed from the merger of the GEWEX Cloud System Study (GCSS) Project and the GEWEX Atmospheric Boundary Layer Studies (GABLS). As such, this meeting will play a major role in energizing GEWEX work in the area of atmospheric parameterizations of clouds, convection, stable boundary layers, and aerosol-cloud interactions for the numerical models used for weather and climate projections at both global and regional scales. The representation of these processes in models is crucial to GEWEX goals of improved prediction of the energy and water cycles at both weather and climate timescales. This proposal seeks funds to be used to cover incidental and travel expenses for U.S.-based graduate students and early career scientists (i.e., within 5 years of receiving their highest degree). We anticipate using DOE funding to support 5-10 people. We will advertise the availability of these funds by providing a box to check for interested participants on the online workshop registration form. We will also send a note to our participants' mailing lists reminding them that the funds are available and asking senior scientists to encourage their more junior colleagues to participate. All meeting participants are encouraged to submit abstracts for oral or poster presentations. The science organizing committee (see below) will base funding decisions on the relevance and quality of these abstracts, with preference given to under-represented populations (especially women and minorities) and to early career scientists being actively mentored at the meeting (e.g. students or postdocs attending the meeting with their adviser).

99 GENERAL AND MISCELLANEOUS↗

Department of Energy Support of Energy Intensive Manufacturing Related to Refractory Research

For many years, the United States Department of Energy (DOE) richly supported refractory related research to enable greater energy efficiency processes in energy intensive manufacturing industries such as iron and steel, glass, aluminum and other non-ferrous metal production, petrochemical, and pulp and paper. Much of this support came through research projects funded by the former DOE Energy Efficiency and Renewable Energy (EERE) Office of Industrial Technologies (OIT) under programs such as Advanced Industrial Materials (AIM), Industrial Materials of the Future (IMF), and the Industrial Technologies Program (ITP). Under such initiatives, work was funded at government national laboratories such as Oak Ridge National Laboratory (ORNL), at universities such as West Virginia University (WVU) and the Missouri University of Science and Technology (MS&T) which was formerly the University of Missouri Rolla, and at private companies engaged in these manufacturing areas once labeled industries of the future by DOE due to their strategic and economic importance to American industry. Examples of such projects are summarized below with information on the scope, funding level, duration, and impact. This is only a sampling of representative efforts funded by the DOE in which ORNL was involved over the period extending from 1996 to 2011. Other efforts were also funded during this time at various other national laboratories, universities and private companies under the various programs mentioned above. Discussion of the projects below was chosen because I was an active participant in them and it is meant to give a sampling of the magnitude and scope of investments made by DOE in refractory related research over this time period.

Hemrick, James Gordon↗

Utilization of the St. Peter Sandstone in the Illinois Basin for CO2 Sequestration

This project is part of a larger project co-funded by the United States Department of Energy (US DOE) under cooperative agreement DE-FE0002068 from 12/08/2009 through 9/31/2014. The study is to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon Sandstone as potential targets for carbon dioxide (CO2) sequestration in the Illinois and Michigan Basins. This report evaluates the potential injectivity of the Ordovician St. Peter Sandstone. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data acquired through funding in this project as well as existing data from two additional, separately funded projects: the US DOE funded Illinois Basin – Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) Project funded through the American Recovery and Reinvestment Act (ARRA), which received a phase two award from DOE. This study addresses the question of whether or not the St. Peter Sandstone may serve as a suitable target for CO2 sequestration at locations within the Illinois Basin where it lies at greater depths (below the underground source of drinking water (USDW)) than at the IBDP site. The work performed included numerous improvements to the existing St. Peter reservoir model created in 2010. Model size and spatial resolution were increased resulting in a 3 fold increase in the number of model cells. Seismic data was utilized to inform spatial porosity distribution and an extensive core database was used to develop porosity-permeability relationships. The analysis involved a Base Model representative of the St. Peter at “in-situ” conditions, followed by the creation of two hypothetical models at in-situ + 1,000 feet (ft.) (300 m) and in-situ + 2,000 ft. (600 m) depths through systematic depthdependent adjustment of the Base Model parameters. Properties for the depth shifted models were based on porosity versus depth relationship extracted from the core database followed by application of the porosity-permeability relationship. Each of the three resulting models were used as input to dynamic simulations with the single well injection target of 3.2 million tons per annum (MTPA) for 30 years using an appropriate fracture gradient based bottom hole pressure limit for each injection level. Modeling results are presented in terms of well bottomhole pressure (BHP), injection rate profiles, and three-dimensional (3D) saturation and differential pressure volumes at selected simulation times. Results suggest that the target CO2 injection rate of 3.2 MTPA may be achieved in the St. Peter Sandstone at in-situ conditions and at the in-situ +1,000 ft. (300 m) depth using a single injector well. In the latter case the target injection rate is achieved after a ramp up period which is caused by multi-phase flow effects and thus subject to increased modeling uncertainty. Results confirm that the target rate may not be achieved at the in-situ +2,000 ft. (600 m) level even with multiple wells. These new modeling results for the in-situ case are more optimistic than previous modeling results. This difference is attributed to the difference in methods and data used to develop model permeability distributions. Recommendations for further work include restriction of modeling activity to the in-situ +1,000 ft. (300 m) and shallower depth interval, sensitivity and uncertainty analysis, and refinement of porosity and permeability estimates through depth and area selective querying of the available core database. It is also suggested that further modeling efforts include scope for evaluating project performance in terms of metrics directly related to the Environmental Protection Agency (EPA) Class VI permit requirements for the area of review (AoR) definition and post injection site closure monitoring.

Will, Robert↗

Geothermal Resource Reporting Metric (GRRM) Developed for the U.S. Department of Energy's Geothermal Technologies Office

This paper reviews a methodology being developed for reporting geothermal resources and project progress. The goal is to provide the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. This framework will allow the GTO to assess the effectiveness of research, development, and deployment (RD&D) funding, prioritize funding requests, and demonstrate the value of RD&D programs to the U.S. Congress and the public. Standards and reporting codes used in other countries and energy sectors provide guidance to develop the relevant geothermal methodology, but industry feedback and our analysis suggest that the existing models have drawbacks that should be addressed. In order to formulate a comprehensive metric for use by the GTO, we analyzed existing resource assessments and reporting methodologies for the geothermal, mining, and oil and gas industries, and sought input from industry, investors, academia, national labs, and other government agencies. Using this background research as a guide, we describe a methodology for evaluating and reporting on GTO funding according to resource grade (geological, technical and socio-economic) and project progress. This methodology would allow GTO to target funding, measure impact by monitoring the progression of projects, or assess geological potential of targeted areas for development.

15 GEOTHERMAL ENERGY↗

BOTTLE 7 - Industry Projects & Engagement

One of BOTTLE's primary goals is to work with industry to catalyze new technologies towards our overall vision and mission using a centralized industry engagement plan which aims to 1) solve real-world problems in plastics upcycling via targeted, company-funded projects; 2) promote industrial engagement via streamlined access to BOTTLE partners and technologies; and 3) collaborate with companies to scale and deploy BOTTLE technologies into the economy. Our approach follows a 5-stage model: prospecting, initial engagement, knowledge sharing, proposal and contracting, and opportunity won. Since FY21, BOTTLE has onboarded a full-time Chief Technology Officer to spearhead industry engagement and lead industrially-funded research projects. To date, BOTTLE has engaged with >150 companies, executed 6 industrial funds-in CRADAs, completed 2 industry projects successfully, extended 2 CRADAs with follow-on funds, and submitted over 30 patent applications. Industry projects span the Deconstruction, Upcycling, and Redesign tasks, harness the capabilities of the cross-cutting tasks, and take advantage of the broad IP portfolio developed through DOE funding. BOTTLE partners have an inventory of innovations that can inform the design of industry-specific collaborative projects with the highest probability of producing novel IP. Engaging with a diverse set of companies has also directly informed our R&D portfolio towards maximizing impact and utility of BOTTLE innovations.

BIOMASS FUELS↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Cost Savings Initiative - 12339

Savannah River enjoyed two years of increased funding as a result of the American Reinvestment and Recovery Act and Department of Energy (DOE) directed scope additions. Moving into FY2012, a much lower funding level is anticipated. In the past, the first response to a reduced funding scenario was to defer scope and slow down the program. This time, Savannah River decided that a better process was needed to try to maximize value to the government. This approach was named the Cost Savings Initiative (CSI). The CSI process is similar to a zero-based budget concept. Every element of work scope was screened to eliminate everything that was not directly related to safety and regulatory compliance. Then the schedules for the regulatory-driven scope were deferred such that the regulatory milestones were achieved just in time with no acceleration. This resulted in a strategy that met regulatory requirements in FY2012-13 with some remaining funding but not in FY2014-15. The remaining funding was then invested in cost savings initiatives in FY2012-13 to reduce the future cost of doing business in the FY2014-15 timeframe and beyond. This resulted in a Strategy that: - Meets all regulatory commitments; - Meets some regulatory commitments early; and - Preserves most of the life cycle savings that were built in to the baseline plan The CSI process used at Savannah River may be considered for application elsewhere in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effective Stakeholder Communications in a Changing Budgetary Environment - 15541

Effective communications allow stakeholders to maintain trust and avoid misunderstandings by building relationships that foster better teamwork, more informed decision making, and faster problem-solving. This presentation and accompanying paper will feature a case study on the Liquid Waste program of Savannah River Remediation LLC (SRR) at the Savannah River Site (SRS) in South Carolina exemplifying its effective communication strategies with stakeholders and its partnership approaches to deliver consistent, constructive, and concise communications with stakeholders. Furthermore, this presentation proposes for consideration new models for communication with stakeholders regarding funding across DOE waste cleanup sites. This presentation also proposes a model for consideration instituting a competitive set-aside incentive program for DOE contractors to foster further efficiency, innovation, and measurable progress. The set-aside pool of funding would reward DOE site's on tangible measurable benefits such as progress in meeting milestones, furthering specific environmental risk reducing life-cycle costs. Reduced budgetary funding can lead to much consternation for stakeholders, potentially causing a breakdown of years of hard-earned trust and jeopardizing future cleanup efforts. Therefore, organizations should pro-actively work together to develop a strategy to communicate effectively with stakeholders in order to assuage stakeholder concerns, mitigate risks, and continue to carry out its mission. In the face of funding reductions, effective communication can help promote better understanding by providing more information to help stakeholders understand DOE's funding allocation for each site. Furthermore, providing a set-aside competitive program could further incentivize innovation and reward progress. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Taking in Nuclear Operation of the Plasma Facility for Treatment Industrial Radioactive Waste - 19346

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. Previous paper describes the construction and testing of the plasma melting facility at the Kozloduy NPP in Bulgaria. Now the paper focus on the nuclear starting up conducted in May 2018 with real radioactive waste and illustrates the first operational results such as types of waste treated, volume reduction factors, etc The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD and through Bulgarian national funding -Nuclear Facilities Decommissioning Fund and Radioactive Waste Fund. The KIDSF is funded by the European Union as well by the contributors to the KIDSF - Austria, Belgium, France, Greece, Ireland, The Netherlands, Spain, United Kingdom and Switzerland. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contech to Accelerate Cleantech: Seeding Emerging Innovation Programs for Construction Productivity and Energy Efficiency Integration; Preprint

Investments in U.S.-based start-ups that focus on advanced building construction technologies to increase construction productivity (contech) surged to approximately $3.1 billion in 2018 (as per Crunchbase data). More recently, emerging programs by government funding agencies, philanthropic foundations, and venture capitalists have been instrumental in supporting contech start-ups for innovations that increase productivity of energy efficiency integration and accelerate clean energy technologies (cleantech) for the buildings sector. These programs include R&D support and funding mechanisms for contech and cleantech. Traditionally, contech and cleantech are considered as two different innovation ecosystems. To enhance and scale up energy efficiency in buildings, creative programs that bring together contech and cleantech are critical. This paper provides a landscape assessment of the "contech-for-cleantech" innovation ecosystem in the U.S. and its impact in accelerating technology readiness and the development pipeline of "contech-for-cleantech". Technologies highlighted are robotics for retrofits, prefabrication of energy-efficient products, and advanced manufacturing of low-carbon net-zero buildings construction. Programs discussed include those led by (1) government funding agencies: American-Made Challenges with prizes like E-ROBOT for retrofits with robotics, (2) philanthropic foundations: Wells Fargo Innovation Incubator (IN2) that includes focus on energy efficiency and prefabrication, and (3) venture capitalists: Shadow Ventures Green Building Accelerator program which provides funding support to start-ups with ambitious plans for decarbonizing the built environment. This paper will also expand upon robust processes and criteria involved in judging and down-selection of start-ups through vetting and feedback from national lab researchers and industry experts in both cleantech and contech.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Meeting the imperative to accelerate environmental bioelectromagnetics research

Highlights: • Concerns mount about adverse health effects of low-level radiofrequency (RF) radiation. • Bioelectronics and environmental RF effects research both need an omics platform. • Standard bioelectromagnetic data models would advance dosimetry and omics work. • Steps toward developing standards and a shared research platform are proposed. In this article, the author draws on his experience in the world of geospatial information technology standards to suggest a path toward acceleration of bioelectromagnetics science. Many studies show biological effects of extremely low frequency (ELF) and radiofrequency (RF) radiation despite that fact that the radiation is too weak to cause temperature changes in biological features. Considered together in worst case scenarios, such effects, many of which appear to have long latencies, could have potentially disastrous consequences for the health and safety of humans and wildlife. Other studies show no such effects, and in both cases, often there are significant research quality deficits that make it difficult to draw firm conclusions from the data. The progress of bioelectromagnetics science is retarded by a lack of standard data models and experimental protocols that could improve the overall quality of research and make it easier for researchers to benefit from omics-related bioinformatics resources. {sup C}ertainty of safety{sup }of wireless devices used in digital communications and remote sensing (radar) is impossible without dosimetry standards that reflect the effects of non-thermal exposures. Electrical signaling in biological systems, a poorly funded research domain, is as biologically important as chemical signaling, a richly funded research domain, and these two types of signaling are inextricably connected. Entreprenuerial scientists pursuing bioelectronic innovations have begun to attract new funding. With appropriate institutional coordination, this new funding could equally benefit those investigating environmental effects of ELF and RF radiation. The author proposes a concerted effort among both bioelectronics technology stakeholders and environmental bioelectromagnetics science researchers to collaborate in developing institutional arrangements and standard data models that would give the science a stronger bioinformatics platform and give researchers better access to omics data. What is proposed here is essentially a bioelectromagnetics omics initiative.

54 ENVIRONMENTAL SCIENCES↗

Assessment of the American Recovery and Reinvestment Act Upon the Department of Energy Weatherization Assistance Program: Assessment of the ARRA

The Department of Energy (DOE) administers the national low-income Weatherization Assistance Program (WAP). Under this program, DOE provides grants to states (grantees), which then provide grants to local weatherization agencies (subgrantees), to weatherize income-eligible homes for free. The American Recovery and Reinvestment Act (ARRA) of 2009 allocated $5 billion in funding to WAP, a very significant increase from an annual appropriation that ranged in the $200–250 million range for many years. Furthermore, as part of a major evaluation of WAP, states and local weatherization agencies were surveyed, in part, to assess their experiences during the ARRA period. The substantial funding increase created a number of issues for the national weatherization network: the political visibility of their programs increased significantly, organizational responsibilities were shifted, new laws and regulations were passed that impacted their programs, media attention of their programs increased, federal oversight of their programs increased; and programmatic costs increased because of the increased oversight and because ARRA required WAP to operate under the provisions of the Davis-Bacon Act of 1931. There was also some concern within the national weatherization network that the influx of ARRA funds would permanently damage nonfederal funding leveraging relationships. However, two-thirds of grantees and over 40% of subgrantees stated that they believe that the long-term impacts of ARRA on leveraging relationships will be positive.

54 ENVIRONMENTAL SCIENCES↗