Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Synchrotron X-ray Microdiffraction Analysis of Proton Irradiated Polycrystalline Diamond Films

X-ray microdiffraction is a non-destructive technique that allows for depth-resolved, strain measurements with sub-micron spatial resolution. These capabilities make this technique promising for understanding the mechanical properties of MicroElectroMechanical Systems (MEMS). This investigation examined the local strain induced by irradiating a polycrystalline diamond thin film with a dose of 2x10(exp 17) H(+)per square centimeter protons. Preliminary results indicate that a measurable strain, on the order of 10(exp -3), was introduced into the film near the End of Range (EOR) region of the protons.

Newton, R. I.↗

Preliminary Assessment of Suomi-NPP VIIRS On-orbit Radiometric Performance

The Visible-Infrared Imaging Radiometer Suite (VIIRS) is a key instrument on-board the Suomi National Polar-orbiting Partnership (NPP) spacecraft that was launched on October 28th 2011. VIIRS was designed to provide moderate and imaging resolution of most of the globe twice daily. It is a wide-swath (3,040 km) cross-track scanning radiometer with spatial resolutions of 370.and 740 m at nadir for imaging and moderate bands, respectively. It has 22 spectral bands covering the spectrum between 0.412 11m and 12.01 11m, including 14 reflective solar bands (RSB), 7 thermal emissive bands (TEB), and 1 day-night band (ON B). VIIRS observations are used to generate 22 environmental data products (EORs). This paper will briefly describe NPP VIIRS calibration strategies performed by the independent government team, for the initial on-orbit Intensive Calibration and Validation (ICV) activities. In addition, this paper will provide an early assessment of the sensor on-orbit radiometric performance, such as the sensor signal to noise ratios (SNRs), dual gain transition verification, dynamic range and linearity, reflective bands calibration based on the solar diffuser (SO) and solar diffuser stability monitor (SOSM), and emissive bands calibration based on the on-board blackbody calibration (OBC). A comprehensive set of performance metrics generated during the pre-launch testing program will be compared to VIIRS on-orbit early performance, and a plan for future cal/val activities and performance enhancements will be presented.

Oudrari, Hassan↗

Mars Sample Return Using Commercial Capabilities: ERV Trajectory and Capture Requirements

Mars Sample Return was presented as the highest priority planetary science mission of the next decade [1]. Lemke et al. [2] present a Mars Sample Return mission concept in which the sample is returned directly from the surface of Mars to an Earth orbit. The sample is recovered in Earth Orbit instead of being transferred between spacecraft in Mars Orbit. This paper provides the details of this sample recovery in Earth orbit and presents as such a sub-element of the overall Mars sample return concept given in [2]. We start from the assumption that a Mars Ascent Vehicle (MAV), initially landed on Mars using a modified SpaceX Dragon capsule, has successfully delivered the sample, already contained within an Earth Return Vehicle (ERV), to a parking orbit around Mars. From the parking orbit, the ERV imparts sufficient Delta-V to inject itself into an earthbound trajectory and to be captured into an Earth orbit eventually. We take into account launch window and Delta-V considerations as well as the additional constraint of increased safety margins imposed by planetary protection regulations. We focus on how to overcome two distinct challenges of the sample return that are driven by the issues of planetary protection: (1) the design of an ERV trajectory meeting all the requirements including the need to avoid contamination of Earth's atmosphere; (2) the concept of operations for retrieving the Martian samples in Earth orbit in a safe way. We present an approach to retrieve the samples through a rendezvous between the ERV and a second SpaceX Dragon capsule. The ERV executes a trajectory that brings it from low Mars orbit (LMO) to a Moon-trailing Earth orbit at high inclination with respect to the Earth-Moon plane. After a first burn at Trans-Earth Injection (TEI), the trajectory uses a second burn at perigee during an Earth flyby maneuver to capture the ERV in Earth orbit. The ERV then uses a non-propulsive Moon flyby to come to a near-circular Moon-trailing orbit. To perform the Earth Orbit Rendezvous (EOR), a second Dragon capsule is then launched from Earth and a similar lunar flyby is performed to rendezvous with the ERV. The requirements for rendezvous, close proximity operations and capture of the sample canister are described. A concept of operations for sample retrieval is presented along with design specifications of the ERV, the required modifications to the Dragon capsule, as well as the hardware, software, sensors, actuators, and capture mechanisms used. In our concept, a container is mounted to the front hatch of Dragon, capable of accommodating the sample canister and sealing it from the rest of the capsule. The sample canister is captured using a robotic arm with a magnetic grappling mechanism. Dragon then performs a propulsive maneuver to return to Earth for a controlled re-entry while the ERV (sans sample container) is left in the Moon trailing orbit. Contingency cases and related mitigation strategies are also discussed, including the advantages and disadvantages of performing the ERV rendezvous with a crew.

Faber, Nicolas F.↗

Improvements to the Search for Cosmic Dawn Using the Long Wavelength Array

We present recent improvements to the search for the global Cosmic Dawn signature using the Long Wavelength Array station located on the Sevilleta National Wildlife Refuge in New Mexico, USA (LWA{SV). These improvements are both in the methodology of the experiment and the hardware of the station. An improved observing strategy along with more sophisticated temperature calibration and foreground modelling schemes have led to improved residual RMS limits. A large improvement over previous work using LWA{SV is the use of a novel achromatic beamforming technique which has been developed for LWA{SV. We present results from an observing campaign which contains 29 days of observations between March 10th, 2021 and April 10th 2021. The reported residual RMS limits are 6 times above the amplitude of the potential signal reported by the Experiment to Detect the Global EoR Signature (EDGES) collaboration.

Christopher Dilullo↗

Attitude Profile Reference for the Earth Orbit Raising Phase of NASA Gateway’s Co-Manifested Vehicle

As part of NASAs lunar exploration Artemis program, the agency is designing a Gateway to orbit8near the moon and provide long term support of a sustained lunar presence at the moon’s south pole.9The first element launched for the Gateway is the Co-Manifested Vehicle (CMV), comprised of the10Power and Propulsion Element (PPE) and Habitation and Lunar Outpost (HALO). The PPE Mission11Design team of McGuire & et. al (2021) has developed a Design Reference Mission (DRM) trajectory12for CMV’s Earth Orbit Raising (EOR) mission phase, which provides the vehicle’s 3 degrees of freedom13(DoF) trajectory information during the approximately yearlong spiral out from low Earth orbit and14into the lunar near-rectilinear halo orbit (NRHO). In tandem, the PPE GN&C team is developing a15high-fidelity and fine temporal resolution 6DoF model of the CMV spacecrafts GN&C performance16for delivery to the Gateway team; this work acts to bridge the gap between Mission Designs 3DoF17reference and detailed GN&Cs attitude simulation.

Guidance Navigation and Control↗

Reactant Carrier Microfoam Technology for In-Situ Remediation of Radionuclide and Metallic Contaminants in Deep Vadose Zone

The U.S. Department of Energy (DOE) is currently developing advanced remedial technologies for addressing metal and radionuclide (Cr, Tc, and U) contamination in deep vadose zone environments. One of the transformational technology alternatives being considered by the DOE Office of Environmental Management, is the use of Reactant Carrier Microfoams (RCM) as a minimally invasive method for delivery and emplacement of reagents for in-situ immobilization of contaminants. Penetration of low permeability zones deep within the subsurface for Enhance Oil Recovery (EOR) has been well-established. Use of surfactant foams have also been explored for mobilizing DNAPL from sediments. So far, the concept of using RCM for immobilizing labile metal and long-lived radionuclide contaminants in the deep vadose zone has not been explored. We, at the Pacific Northwest National Laboratory (PNNL), conducted studies to develop stable foams as a means to deliver reductive and/or precipitating reactants to the deep subsurface. To test the feasibility of this approach, we developed a preliminary foam formulation consisting of a mixture of an anionic and a nonionic surfactant with a reactant consisting of a 9:1 blend of tripoly- and orthophosphate. The MSE Technology Applications, Inc (MSE) in collaboration with PNNL, conducted a scale-up test to evaluate the efficacy of this reactant carrier foam for in-situ immobilization of U containing sediment zones in a heterogenous sediment matrix. The data indicated that successful immobilization of U contamination is feasible using specifically tailored reactant carrier foam injection technology. Studies are continuing for developing more robust optimized RCM for highly mobile contaminants such as Cr (VI), Tc (VII) in the deep vadose zone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in Geological CO{sub 2} Sequestration and Co-Sequestration with O{sub 2}

The injection of CO{sub 2} for Enhanced Oil Recovery (EOR) and sequestration in brine-bearing formations for long term storage has been in practice or under investigation in many locations globally. This study focused on the assessment of cement wellbore seal integrity in CO{sub 2}- and CO{sub 2}-O{sub 2}-saturated brine and supercritical CO{sub 2} environments. Brine chemistries (NaCl, MgCl{sub 2}, CaCl{sub 2}) at various saline concentrations were investigated at a pressure of 28.9 MPa (4200 psi) at both 50{degree}C and 85{degree}C. These parameters were selected to simulate downhole conditions at several potential CO{sub 2} injection sites in the United States. Class H portland cement is not thermodynamically stable under these conditions and the formation of carbonic acid degrades the cement. Dissociation occurs and leaches cations, forming a CaCO{sub 3} buffered zone, amorphous silica, and other secondary minerals. Increased temperature affected the structure of C-S-H and the hydration of the cement leading to higher degradation rates.

54 ENVIRONMENTAL SCIENCES↗

RVA: A Plugin for ParaView 3.14

RVA is a plugin developed for the 64-bit Windows version of the ParaView 3.14 visualization package. RVA is designed to provide support in the visualization and analysis of complex reservoirs being managed using multi-fluid EOR techniques. RVA, for Reservoir Visualization and Analysis, was developed at the University of Illinois at Urbana-Champaign, with contributions from the Illinois State Geological Survey, Department of Computer Science and National Center for Supercomputing Applications. RVA was designed to utilize and enhance the state-of-the-art visualization capabilities within ParaView, readily allowing joint visualization of geologic framework and reservoir fluid simulation model results. Particular emphasis was placed on enabling visualization and analysis of simulation results highlighting multiple fluid phases, multiple properties for each fluid phase (including flow lines), multiple geologic models and multiple time steps. Additional advanced functionality was provided through the development of custom code to implement data mining capabilities. The built-in functionality of ParaView provides the capacity to process and visualize data sets ranging from small models on local desktop systems to extremely large models created and stored on remote supercomputers. The RVA plugin that we developed and the associated User Manual provide improved functionality through new software tools, and instruction in the use of ParaView-RVA, targeted to petroleum engineers and geologists in industry and research. The RVA web site (http://rva.cs.illinois.edu) provides an overview of functions, and the development web site (https://github.com/shaffer1/RVA) provides ready access to the source code, compiled binaries, user manual, and a suite of demonstration data sets. Key functionality has been included to support a range of reservoirs visualization and analysis needs, including: sophisticated connectivity analysis, cross sections through simulation results between selected wells, simplified volumetric calculations, global vertical exaggeration adjustments, ingestion of UTChem simulation results, ingestion of Isatis geostatistical framework models, interrogation of joint geologic and reservoir modeling results, joint visualization and analysis of well history files, location-targeted visualization, advanced correlation analysis, visualization of flow paths, and creation of static images and animations highlighting targeted reservoir features.

Source record↗

CarbonSAFE Illinois - Macon County

CarbonSAFE Illinois is a a Feasibility study to develop an established geologic storage complex in Macon County, Illinois, for commercial-scale storage of industrially sourced CO2. Feasibility activities are focused on the Mt. Simon Storage Complex; a step-out well will be drilled near existing storage sites (i.e., the Midwest Geological Sequestration Consortium’s Illinois Basin – Decatur Project and the Illinois Industrial Carbon Capture and Storage Project) to further establish commercial viability of this complex and to evaluate EOR potential in a co-located oil-field trend. The Archer Daniels Midland facility (ethanol plant), City Water, Light, and Power in Springfield, Illinois (coal-fired power station), and other regional industries are potential sources of anthropogenic CO2 for storage at this complex. Site feasibility will be evaluated through drilling results, static and dynamic modeling, and quantitative risk assessment. Both studies will entail stakeholder engagement, consideration of infrastructure requirements, existing policy, and business models. Project data will help calibrate the National Risk Assessment Partnership (NRAP) Toolkit to better understand the risks of commercial-scale carbon storage.

Whittaker, Steve↗

Kemper County IGCC Final Public Design Report

The Kemper County IGCC plant is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; KBR; and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions-control equipment, the facility is designed to produce marketable products of ammonia (NH3), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon entering to sell for enhanced oil recovery (EOR), which makes the Kemper County plant’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. This report describes the basic design and function of the plant as determined at the end of the Detailed Design phase of the project. The technical sections of the report were completed in October 2013, and the cost information was incorporated into Section 6.0 in March 2018.

01 COAL, LIGNITE, AND PEAT↗

Topical Report: Kemper County IGCC Final Public Design Report

The Kemper County IGCC plant is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; KBR; and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions-control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon entering to sell for enhanced oil recovery (EOR), which makes the Kemper County plant’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. This report describes the basic design and function of the plant as determined at the end of the Detailed Design phase of the project. The technical sections of the report were completed in October 2013, and the cost information was incorporated into Section 6.0 in March 2018.

01 COAL, LIGNITE, AND PEAT↗

Enabling Coal Technology with Carbon Capture for Future Markets with Flameless Pressurized Oxy-Combustion (FPO)

Future markets for power are expected to require more load following power plants, which reduces output during the night and early morning. This is when the demand for electricity is the lowest, so plants must respond rapidly at any time to peak loads resulting from the variable output of wind and solar power. A coal power plant based on Flameless Pressurized Oxy-combustion (FPO) can go from 5% to 100% of capacity rate in less than 30 minutes in response to fluctuating demand, operating at capacity when power prices are highest. FPO is a proven oxy-combustion technology that was developed to recover energy from low ranking coal, other brown fuels and wastes. ITEA began developing FPO in 2003 on a 5-MWth pilot in Gioia del Colle, Italy, to destroy hazardous industrial waste and as such, design objectives were very high combustion efficiencies and capture of metals in the fuel in the vitreous slag. The technology was subsequently deployed in 2009 at the 15-MWth scale at the Jurong Island petrochemical cluster in Singapore for waste incineration. FPO is an oxy-combustion process whereby oxygen is separated from the air, and it is used in combustion with recirculated flue gas to maintain combustion temperatures at acceptable levels. The resultant flue gas is primarily CO 2 and water, which allows for a relatively simple and cheap CO 2 capture process. This is in contrast to air-combustion systems which require a complex and costly post-combustion capture (PCC) process. Coal is fed to the combustor slurried in water, and the combustor operates at elevated pressure (approximately 12 bar) which improves the overall efficiency and reduces the size and cost of the combustor. Notably, the FPO cycle maintains high efficiency by recovering most of the heat of vaporisation of the contained water. The combustor is designed to coalesce the molten ash particles so that they settle to the chamber walls and drain to the outlet, significantly reducing the particulate content in the exhaust gas and allowing the use of coals with up to 40% alkaline ash content. FPO is a low-emission technology: zero thermal NOx minimises overall NOx; any organic nitrogen is converted to elemental nitrogen (N2). Total organic content (TOC) at combustor exit is hundreds of times lower than for traditional combustion processes, with dioxin and furans close to zero. Work commenced on a DOE funded pilot demonstration project in October 2016 to provide the design for a 50-MWth FPO pilot plant that can fire a wide range of high-to-low rank coals. The project will investigate updating and improving the cycle for power generation with CO 2 capture by incorporating a turbo-expander with a principal steam power island that utilizes a heat recovery steam generator, increasing the overall efficiency of the cycle. A cost study is also performed on the updated FPO design as part of the project. The FPO pilot plant built based on the design will then be demonstrated over a 3-year test program to generate data for the design of a commercial-scale 500 MWth firing module commercial power plant with integral carbon capture and sequestration (CCS), which could start construction in 2025. A discussion of the levelized cost of electricity (LCOE) of various cases are presented, including a comparison of established supercritical with PCC (SCPC) technologies with FPO fitted with CO 2 compression and liquefaction, and FPO ready for carbon capture and sequestration (CCS-ready). This would enable CO 2 capture for use in enhanced oil recovery (EOR) or sequestration when market conditions make it attractive to do so. In addition, a comparison of LCOE of FPO and conventional processes for firing low-ranking coals with high water and ash content will be provided.

01 COAL, LIGNITE, AND PEAT↗

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

Topical Report: Kemper County IGCC Commissioning and Startup Report

The Kemper County IGCC plant was a lignite-fueled 2 x 1 Integrated Gasification Combined-Cycle (IGCC) facility that demonstrated the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company, KBR, Inc. (KBR), and the U.S. Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Ala. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon producing a CO 2 stream for use in enhanced oil recovery (EOR), making the plant carbon emissions comparable to those of a natural gas-fired combined cycle power plant. This report describes the unit commissioning activities from the end of construction through first coal operations to the gasifier. These activities include precommissioning planning, commissioning of major equipment, and operation of processes leading up to first coal feed.

01 COAL, LIGNITE, AND PEAT↗

A Forecast of Crude Oil Production from Carbon Dioxide Enhanced Oil Recovery in the United States through 2018

CO2 supply for enhanced oil recovery operations in the United States is expected to increase 64% between 2012 and 2018, from 3.3 BCFd to 5.4 BCFd. The CO2 utilization rate (URNet the amount of CO2 supplied per incremental barrel of crude oil produced) can be used to estimate crude oil production based on CO2 supply rate. Based on compiled historical data we estimate the following regional CO2 Utilization rates: Permian basin, 8,500 scf/bbl, Rocky mountain, 8,000 scf/bbl, Gulf Coast, 25,000 scf/bbl. Applying these rates to the regional forecast for CO2 supply we forecast production from CO2 EOR in the United States in 2018 will be 500,000 bpd.

GHG↗

Developing CO 2 Source and Storage Opportunities across the Illinois Basin Subtask 5.3 – Regional Roadmap for Source Network and Storage Deployment Topical Report

Large-scale anthropogenic CO 2 sources (>100,000 tonnes/year) were catalogued for the CarbonSAFE Illinois East Sub-Basin carbon capture and storage pre-feasibility study. The source portfolio is diverse, consisting of fossil-base power production, ethanol production operations, chemical development, and refinery facilities, most of which are relatively new or modernized (i.e. post year 2000). Ten facilities were considered for potential commercial-scale geological storage in a regional CO 2 source and storage network study. The study area has a number of potential geologic sequestration targets, including three significant deep saline reservoirs with corresponding seals, and potential enhanced oil recovery (EOR) opportunities. Recent research has focused on a high-porosity, highly arkosic zone within the Lower Mt. Simon Sandstone. Based on this work, we present a conceptual CO 2 source and storage network, which focuses on the arkosic zone in the Lower Mt. Simon as a prospective storage resource play in the Illinois East Sub-Basin region.

01 COAL, LIGNITE, AND PEAT↗

StrmtbGen Fortran Program, Version 2

This zip file contains files storing Fortran source code, compiled files, an executable file for Windows computers, and example input and output files for StrmtbGen. StrmtbGen is a Fortran program that generates streamlines and stream tubes. StrmtbGen and StrmtbFlow comprise the FE/NETL CO2 Prophet Model, which is a streamline/stream tube reservoir simulator for modeling CO2 EOR. StrmtbGen's user’s manual as well as StrmtbFlow and its user's manual and a report on the mathematical basis for the FE/NETL CO2 Prophet Model are available on NETL's website under the Collection Name: FE/NETL CO2 Prophet Model.

Morgan, David↗

CarbonSAFE East Sub-Basin Site Feasibility Plan Subtask 4.5 – Topical Report: DOE-FE0029445-12

Regional industrial facilities were considered for potential commercial-scale [50 million metric tons (55 tons) or more] geological storage in a CO 2 source and storage network study for the CarbonSAFE Illinois East Sub-Basin region (DOE-FE0029445-9). The study area has a number of potential geologic sequestration targets, including three significant deep saline reservoirs with corresponding seals, and potential enhanced oil recovery (CO 2 -EOR) opportunities (Figure 1). Recent geological research has focused on a high porosity, arkosic zone within the Lower Mt. Simon Sandstone as a prospective storage resource play in the region. This report summarizes the regional geology of the East Sub-Basin and discusses considerations leading from pre-feasibility work into the Wabash CarbonSAFE feasibility project (DE-FE0031626), recently underway in conjunction with the Wabash Valley Resources (WVR) ammonia plant retrofit taking place at the former US DOE Integrated Gasification Combined Cycle (IGCC) plant located near Terre Haute, Indiana. As part of the feasibility study, geological and site characterization work will address data gaps and risks outlined in Table 1 and will aid continued steps toward commercial-scale CCS at the WVR site. The feasibility plan discussed here draws upon regional assessment work in the East Sub-Basin as it pertains to risk and data needs to characterize the WVR site, highlights plans for data acquisition to support characterization efforts, and offers insight into the legal and permitting landscape surrounding CCS in the state of Indiana.

01 COAL, LIGNITE, AND PEAT↗