Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

504 records · Page 28

Reference Model 5 Full Scale Geometry (RM5: Oscillating Surge Flap)

Contains the Reference Model 5 (RM5) full scale geometry files of the Oscillating Surge Flap, developed by the Reference Model Project (RMP). These full scale geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. This data was generated upon completion of the project on September 30, 2014. The Reference Model Project (RMP), sponsored by the U.S. Department of Energy (DOE), was a partnered effort to develop open-source MHK point designs as reference models (RMs) to benchmark MHK technology performance and costs, and an open-source methodology for design and analysis of MHK technologies, including models for estimating their capital costs, operational costs, and levelized costs of energy. The point designs also served as open-source test articles for university researchers and commercial technology developers. The RMP project team, led by Sandia National Laboratories (SNL), included a partnership between DOE, three national laboratories, including the National Renewable Energy Laboratory (NREL), Pacific Northwest National Laboratory (PNNL), and Oak Ridge National Laboratory (ORNL), the Applied Research Laboratory of Penn State University, and Re Vision Consulting. Reference Model 5 (RM5) is a type of floating, oscillating surge wave energy converter (OSWEC) that utilizes the surge motion of waves to generate electrical power. The reference wave energy resource for RM5 was measurement data from a National Data Buoy Center (NDBC) buoy near Eureka, in Humboldt County, California. The flap was designed to rotate against the supporting frame to convert wave energy into electrical power from the relative rotational motion induced by incoming waves. The RM5 design is rated at 360 kilowatts (kW), uses a flap of 25 m in width and 19 m in height (16 m in draft), and the distance from the top of the water surface piercing flap to the mean water surface (freeboard) is 1.5 m. The flap is connected to a shaft with a 3-m diameter that rotates against the supporting frame. The supporting frame is assumed to have an outer diameter of 2 m, and the total length of the device structure is 45 m. The RM5 OSWEC was designed for deep-water deployment, at depths between 50 m and 100 m, and was tension-moored to the seabed.

16 TIDAL AND WAVE POWER↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Chemical Cleaning: A New Process for Chemically Cleaning Savannah River Waste Tanks

At the Savannah River Site (SRS) there are 49 High Level Waste (HLW) tanks that eventually must be emptied, cleaned, and closed. The current method of chemically cleaning SRS HLW tanks, commonly referred to as Bulk Oxalic Acid Cleaning (BOAC), requires about a half million liters (130,000 gallons) of 8 weight percent (wt%) oxalic acid to clean a single tank. During the cleaning, the oxalic acid acts as the solvent to digest sludge solids and insoluble salt solids, such that they can be suspended and pumped out of the tank. Because of the volume and concentration of acid used, a significant quantity of oxalate is added to the HLW process. This added oxalate significantly impacts downstream processing. In addition to the oxalate, the volume of liquid added competes for the limited available tank space. A search, therefore, was initiated for a new cleaning process. Using TRIZ (Teoriya Resheniya Izobretatelskikh Zadatch or roughly translated as the Theory of Inventive Problem Solving), Chemical Oxidation Reduction Decontamination with Ultraviolet Light (CORD-UV{reg_sign}), a mature technology used in the commercial nuclear power industry was identified as an alternate technology. Similar to BOAC, CORD-UV{reg_sign} also uses oxalic acid as the solvent to dissolve the metal (hydr)oxide solids. CORD-UV{reg_sign} is different, however, since it uses photo-oxidation (via peroxide/UV or ozone/UV to form hydroxyl radicals) to decompose the spent oxalate into carbon dioxide and water. Since the oxalate is decomposed and off-gassed, CORD-UV{reg_sign} would not have the negative downstream oxalate process impacts of BOAC. With the oxalate destruction occurring physically outside the HLW tank, re-precipitation and transfer of the solids, as well as regeneration of the cleaning solution can be performed without adding additional solids, or a significant volume of liquid to the process. With a draft of the pre-conceptual Enhanced Chemical Cleaning (ECC) flowsheet, taking full advantage of the many CORD-UV{reg_sign} benefits, performance demonstration testing was initiated using available SRS sludge simulant. The demonstration testing confirmed that ECC is a viable technology, as it can dissolve greater than 90% of the sludge simulant and destroy greater than 90% of the oxalates. Additional simulant and real waste testing are planned.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Development of a Technical Standard for Radiological Characterization of DAW - 19552

Since the Manhattan Project, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. During the ongoing site cleanup program, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. Implementation of a consistent, standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and environmental restoration programs. In response to a request from DOE, the Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) is supporting the development of a new DOE Technical Standard for Radiological Characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. An EFCOG/WMWG technical team has prepared a Technical Basis Document (TBD) to support the development and utilization of the new standard. The TBD provides detailed reference information for use by site personnel when implementing the guidance to be provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD is an essential resource and will be included as an appendix to the proposed standard. Formulation of the new standard will draw upon the information contained in the TBD in order to integrate and improve the utilization of current site-specific methodologies and processes. It will also include a comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been identified in the TBD and will be referenced for relevancy and applicability to the new proposed standard. A Project Justification Statement (PJS) was also developed by the EFCOG/WMWG Team. Following internal Team review and approval by EFCOG, the draft PJS was submitted through Argonne National Laboratory (ANL) and the DOE Argonne Site Office Technical Standards Managers for review and approval by the DOE Argonne Site Office Manager. After resolution of comments and approval by the Manager, the PJS will be submitted to the DOE/HQ Technical Standards Program Manager (TSPM) for formal coordination. Following resolution of technical comments received during the PJS coordination process and receipt of a technical standards project number assigned by the TSPM, the Team will confirm the overall preparation schedule and develop an Internal Draft Technical Standard for coordination with the DOE Argonne Site Office. Following comment resolution, the Team will then prepare a Coordination Draft for submittal to the DOE Technical Standards RevCom review process and will respond to comments generated during this Complex-wide review. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DiskSat: Demonstration Mission for a Two-Dimensional Satellite Architecture

The DiskSat is a quasi-two-dimensional satellite bus architecture designed for applications requiring high power, large apertures, and/or high maneuverability in a low-mass satellite. A representative DiskSat structure is a composite flat panel, one meter in diameter and 2.5 cm thick. The volume is almost 20 liters, equivalent to a hypothetical 20U CubeSat, while the structural mass is less than 3 kg. The surface area is large enough to host over 200 W of solar cells without deployable solar panels. For launch, multiple DiskSats are stacked in a fully enclosed container/deployer using a simple mechanical interface and are released individually in orbit. The Aerospace Corporation, with the support of the NASA Space Technology Mission Directorate (STMD), is preparing a flight of four DiskSats for launch in 2024 to demonstrate the feasibility of both the dispenser and the DiskSat bus. In addition, the flight is expected to demonstrate several features of the DiskSat including the unprecedented high power-to-mass ratio, the maneuverability of the bus using low-thrust electric propulsion, and the ability to fly continuously in a low-drag orientation, enabling operations in very low Earth orbits (VLEO). The DiskSats will be launched in and deployed from a dispenser that provides a containerized rideshare environment; the dispenser fully encloses the DiskSats during launch and then opens to dispense the satellites one at a time once in orbit. The dispenser is modular in design and expandable from the capacity of four DiskSats for this flight to as many as 20 DiskSats for future flights. NASA STMD seeks disruptive and innovative technologies that could help lead to the next-generation systems for future science and exploration missions. DiskSat is a potentially disruptive technology leading to new, enabling architectures using ever-more capable small spacecraft. Data generated from this flight will inform the drafting of a DiskSat standard intended to encourage easy and frequent access to space, in the same manner as the CubeSat standard. DiskSat is expected to become a standard format for rideshare-compatible, high-power, maneuverable, low-mass satellites for Earth-orbit, cis-lunar, and deep space applications.

Richard Welle↗

In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.

54 ENVIRONMENTAL SCIENCES↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Essay: Bob Siemann-SLC Days at SLAC

Bob Siemann was a great experimentalist and an excellent teacher.We will greatly miss him. Bob came to SLAC in early 1991 to work on the Stanford Linear Collider (SLC). The SLC was a challenging accelerator which began operating in the late 1980's but still had numerous obstacles to be overcome years into operation. One of the compounding difficulties was making reproducible measurements, since the stability of the collider was poor and the diagnostics were insufficient. Bob dove into this challenge and helped design experiments and diagnostics that provided further clarity. I first got to know Bob while I was still a graduate student, trying to finish my thesis and performing some experimental studies on the SLC, which, at the time, was proving to be very difficult. Most of my expertise had been in beam theory and simulation. Dealing with the real issues of the accelerator was challenging. Bob helped me understand the difference between systematic and statistical errors, and separate operational issues from the fundamental physics. His way of teaching was not to provide an explanation but to ask enough questions so that I could find the answer on my own - this was the best way to learn. I later asked Bob to be a reader on my thesis. As in all things, he took this role extremely seriously. He read through the draft and marked every page to the point where I was regretting my decision. However, his questions again helped me understand my own work better and greatly improved my thesis. Bob was also the de facto leader of an effort focused on the damping rings and the bunch compressors. He was great to work with. He made people think for themselves and refused to simply provide answers. He also worked hard himself, expressing real interest and curiosity. After the studies of the SLC damping rings identified a sawtooth instability due to the vacuum chamber impedance as a source of many downstream fluctuations, Bob took charge of upgrading the rings. As part of this program, I suggested an extensive upgrade that also replaced the dipoles with combined function magnets which might have reduced the horizontal emittance another factor of 3. Although he was extremely busy, Bob helped me develop the proposal and understand the magnetic limitations as well as the potential impacts on the beam dynamics. He helped me consider issues well beyond my initial scope. While the proposal never went anywhere and I think Bob had been aware that there was no funding to pursue the option, he saw that it would be a great learning experience for me and it was. In the early 1990's I had simulated a new regime for the beam-ion instability and, with Frank Zimmermann, I developed a model for the effect which was predicted to occur within the high current, low emittance bunch trains in future storage rings or linear colliders. I thought this was pretty good work but Bob convinced me that the next step had to be confirming the theory with measurements. Because the growth rate was inversely dependent on beam sizes and proportional to the vacuum pressure, measurements required significantly increasing the vacuum pressure in existing facilities. Most people discounted trying such an experiment, but with Bob's urging and suggestions and John Byrd's excitement, we managed to make the measurements at the Advanced Light Source (ALS) at Berkeley. By the mid-1990's Bob was completely focused on advanced acceleration concepts and I was not interacting with him as often. At the time, SLAC was putting together a large effort in designing and documenting a design for the Next Linear Collider (NLC) while constructing the NLC Test Accelerator. Bob was worried that a straightforward extrapolation of the microwave technology would be difficult to bring to fruition because of the cost. He wanted to focus on more cost-effective approaches that could enable future accelerators for high energy physics. As usual, he was correct. The experimental programs that he started in direct laser acceleration and plasma-wakefield acceleration have made great progress. He accomplished this with lots of hard work and by engaging the people around him, especially students and postdocs. In the process, he created a group of extremely talented people which has enabled these technologies to be developed to the point where it seems likely that they are viable and will offer two cost-effective approaches to high-gradient acceleration.

43 PARTICLE ACCELERATORS↗

NASA-DoD Lead-Free Electronics Project. DRAFT Joint Test Report

The use of conventional tin-lead (SnPb) in circuit board manufacturing is under ever-increasing political scrutiny due to increasing regulations concerning lead. The "Restriction of Hazardous Substances" (RoHS) directive enacted by the European Union (EU) and a pact between the United States National Electronics Manufacturing Initiative (NEMI), Europe's Soldertec at Tin Technology Ltd. and the Japan Electronics and Information Technology Industries Association (JEITA) are just two examples where worldwide legislative actions and partnerships/agreements are affecting the electronics industry. As a result, many global commercial-grade electronic component suppliers are initiating efforts to transition to lead-free (Pb-free) in order to retain their worldwide market. Pb-free components are likely to find their way into the inventory of aerospace or military assembly processes under current government acquisition reform initiatives. Inventories "contaminated" by Pb-free will result in increased risks associated with the manufacturing, product reliability, and subsequent repair of aerospace and military electronic systems. Although electronics for military and aerospace applications are not included in the RoHS legislation, engineers are beginning to find that the commercial industry's move towards RoHS compliance has affected their supply chain and changed their parts. Most parts suppliers plan to phase out their non-compliant, leaded production and many have already done so. As a result, the ability to find leaded components is getting harder and harder. Some buyers are now attempting to acquire the remaining SnPb inventory, if it's not already obsolete. Original Equipment Manufacturers (OEMs), depots, and support contractors have to be prepared to deal with an electronics supply chain that increasingly provides more and more parts with Pb-free finishes-some labeled no differently than their Pb counterparts-while at the same time providing the traditional Pb parts. The longer the transition period, the greater the likelihood of Pb-free parts inadvertently being mixed with Pb parts and ending up on what are supposed to be Pb systems. As a result, OEMs, depots, and support contractors need to take action now to either abate the influx of Pb-free parts, or accept it and deal with the likely interim consequences of reduced reliability due to a wide variety of matters, such as Pb contamination, high temperature incompatibility, and tin whiskering. Allowance of Pb-free components produces one of the greatest risks to the reliability of a weapon system. This is due to new and poorly understood failure mechanisms, as well as unknown long-term reliability. If the decision is made to consciously allow Pb-free solder and component finishes into SnPb electronics, additional effort (and cost) will be required to make the significant number of changes to drawings and task order procedures. This project is a follow-on effort to the Joint Council on Aging Aircraft/Joint Group on Pollution Prevention (JCAA/JG-PP) Pb-free Solder Project which was the first group to test the reliability of Pb-free solder joints against the requirements of the aerospace and military community.

Kessel, Kurt↗

Commercial Smallsat Data Acquisition Program: Airbus U.S. Synthetic Aperture Radar Quality Assessment Summary

Quality assessment of the Airbus X-band Synthetic Aperture Radar (SAR) satellite products was conducted by the Commercial Smallsat Data Acquisition (CSDA) program’s radar subject matter experts, following the Joint NASA/ESA (European Space Agency) assessment draft guidelines. All three Airbus SAR spacecraft (TerraSAR-X, TanDEM-X, and PAZ) are based on the TerraSAR-X platform, and each have an active phased array antenna that is 4.8 x 0.7 m in the along-track and cross-track dimensions, respectively. TerraSAR-X and TanDEM-X are in a helical orbit, creating a bistatic imaging geometry, in addition to being capable of independent monostatic observations. The PAZ mission follows TerraSAR-X and TanDEM-X in the same 11-day orbit with a 5.5-day lag. TerraSAR-X and TanDEM-X are designed, developed, and operated through a Public-Private Partnership, while PAZ is a dual-use mission (civil and defense agencies), funded and owned by the Spanish Ministry of Defense and managed by Hisdesat (Hisdesat Servicios Estratégicos, S.A.), a Spanish private communications company. The assessment presented in this document is divided into two main parts: documentation review and the assessment of test datasets. The documentation review in sections 2.1 through 2.4 includes the assessment of the Airbus documentation provided to the CSDA evaluation team. The grading of these documents is given in columns 1-4 of the maturity matrix shown in section 1.1. Section 2.5 summarizes the evaluation performed by NASA using the data purchased through the CSDA program. The grading for this is given in the last column of the maturity matrix. Section 3 provides more detailed explanations on the methods and the results of the data analysis performed by NASA. Only the documents provided by Airbus for the evaluation were considered for the review. Additional documentation with more detailed description of the calibration and validation procedures may be available online but were not considered for this evaluation. The product information provided in the available documentation (RD-1, RD-2) and the product metadata together provided adequate information to work with the data. The product details in the metadata included the required information to work with the data in the common XML file format. Metrological traceability documentation was not provided to CSDA. All relevant characterization of the SAR system and data were provided, and the metadata include all relevant ancillary information. Documentation provided to CSDA included limited pre-flight and post-launch calibration information.

Batuhan Osmanoglu↗

Microalgae Commodities from Coal-Fired Power Plant Flue Gas CO 2 (Draft Final Report, October 1, 2015 to June 30, 2018)

The Orlando Utilities Commission (OUC) operates an approximately 900-MWe coal fired-power plant at Stanton Energy Center (SEC), which was the site for this project to develop an integrated process for microalgae utilization of flue gas CO 2 for the production of biofuels and animal feeds. Microalgae have both potentially high yields (tons biomass/acre-year) and can be used for biofuels or high value animal feeds. The high biomass yields of microalgae cultures allows efficient use of land and water resources. They can also use wastewaters, recycle fertilizers, and have lower overall greenhouse gas emissions than conventional biofuels or animal feeds. However, many technical issues and technology gaps related to large-scale algae biomass production still must be resolved before such a process can be scaled-up. In this project, techno-economic analyses (TEAs) and life cycle assessments (LCAs) were carried out, projecting the costs and impacts of large-scale algae biomass cultivation for production of biofuels and animal feeds using OUC-SEC flue gas CO 2 . In addition, 3.5-m 2 (~ 40-ft 2 ) experimental raceway ponds were used for the cultivation of microalgae at OUC-SEC and also at the University of Florida. A large-scale algae farm was designed for a 1,300-acre site (~500-ha) located near the OUC-SEC plant, consisting of 400 hectares (1,000 acres) of paddle wheel mixed raceway ponds (each 4 ha), receiving flue gas piped approximately 3 km (2 miles) from the SEC plant. In the first year of this project (Budget Period 1, BP1), the TEA and LCA studies focused on the production of biogas produced from algae biomass and its use to replace coal at the power plant. However, due to the resulting very high cost of CO 2 mitigation, the process was modified to produce compressed natural gas (‘renewable natural gas’, RNG) for transportation fuel from the biogas, in conjunction with wastewater treatment by the algae cultures. During Budget Period 2 (BP2), the TEA and LCA studies focused on the production of animal feeds by the algae farm, using fresh water and agricultural fertilizers. In this case, CO 2 mitigation costs would be entirely covered if the algal biomass could be sold at between a two to three-fold premium above soybean feed, based on a higher nutritional value for the algal biomass. In support of the above analyses, microalgae cultivation experiments were carried out for over two years during this project in small 3.5-m 2 ponds at both SEC and the University of Florida. The most important results were the demonstration at SEC of the cultivation, on flue gas CO 2 , of filamentous algae biomass, which can be harvested at much lower cost than processes required for the colloidal algae species, as currently used by almost all algal mass culture biofuels and animal feeds projects. The yield of biogas production from the algal biomass was investigated by the University of Florida, and the value of the algal biomass as animal feed was projected based on biochemical analysis of the SEC ad UF biomasses. The conclusion from TEA/LCA carried out for the biogas case in BP1 was that a 400-ha algae system producing biomethane for co-firing at OUC-SEC could generate 27,500 MWh/yr of renewable power, offsetting 28,400 Mg CO 2eq /yr, which amounted to less than 1% of the CO 2 emitted by the SEC plant. (Mg = metric ton = 1.10 short tons). The overall cost was projected at $820/Mg of CO 2eq reduction, making this process unfeasible under any possible scenario. More favorable economics were projected when the biogas was converted to higher value transportation fuel, RNG, which also would benefit from renewable fuel (RINs) and possibly other credits. However, only by combining RNG production with municipal wastewater treatment in the algal ponds would CO 2 utilization result in no net cost or even be economically beneficial (i.e., generate income to the power plant). However, in that case the amount of CO 2 utilization would be even lower than that in the biogas case, because a large fraction of the carbon required would be supplied from the wastewater and CO 2 recovered during biogas upgrading to RNG. In brief, use of power plant CO 2 emissions for algal biofuels production was not favorable, even with optimistic assumptions about biomass productivity and biogas yields. For the animal feed case, developed during BP2, algal biomass would replace soybean feeds. The same scale 400-ha algal production plant was projected to produce 26,280 Mg per year of animal feed with a utilization of 45,300 Mg flue gas CO 2 taken up by the algal biomass. However, the process would result in a projected reduction of 112,500 Mg CO 2eq emissions per year, or roughly 1.9% of OUC-SEC emissions, mainly due to the large CO 2eq emissions from conventional soybean production. A major factor in this analysis were greenhouse gas emissions from land use changes. The cost of CO 2 utilization was projected at $116/Mg if the biomass sold for the same price as soybean meal, but if sold as a premium feed (e.g., based on high omega-3 fatty acid and carotenoid content), the power plant could actually charge for the CO 2 utilized. These economic projections are sensitive to assumptions underlying the TEA and LCA models, including biomass composition and the financial models used to project CAPEX and OPEX. Further development of an algal animal feed production using coal-fired power plant flue gas CO 2 is recommended based on the TEA and LCA, as well as experimental results. The required research and development is detailed in a technology gap analysis (Section 11), which focuses on the demonstrations of the cultivation of higher value filamentous algal biomass at OUC-SEC.

01 COAL, LIGNITE, AND PEAT↗

Gas-Liquid Flow Modeling for Renewable Fuels Production

Aerobic/anaerobic and gas fermentation pathways have emerged as promising new technologies for the generation of renewable fuels/chemicals from biomass derived sugars, and mixtures of greenhouse/energy rich gas streams (CO2/CH4/H2/CO) via microbial action. Example pathways include sugars-to-ethanol conversion, biomethanation (CO2/H2 to CH4), biogas upgrading, CO fermentation and wet-waste conversion. Gas and liquid phase transport, mass-transfer, and mixing physics at large length scales can significantly affect microbial conversion rates, particularly when the microbial reaction requires a narrow set of conditions. These phenomena are difficult to study in small-scale bench-top reactors that are typically well-mixed. Predictive computational fluid dynamics (CFD) based simulations can therefore aid in the scale-up, design and optimization of these reactors. This work presents multiphase Euler-Euler CFD simulations of at-scale (~500 m3) bioreactors. Our mathematical model treats the gas and liquid as interpenetrating phases. This approach reduces the computational complexity of tracking individual gas bubbles that are several orders of magnitude smaller than reactor dimensions. We solve the Reynolds averaged Navier-Stokes (RANS) multiphase equations that account for phase and chemical species transport, interphase mass and momentum transfer and uses a phenomenological model for gas uptake by microbes. We use a customized solver derived from open-source CFD toolbox, OpenFOAM [1], to perform these simulations, which has been validated against small-scale reactors in our previous work [2]. There is currently a knowledge-gap regarding bubble-size distributions when using gas mixtures with vastly different properties, which can have a significant impact overall mass-transfer. For example, hydrogen bubbles are more buoyant compared to other relatively heavier gases (CO2/CH4/CO), resulting in a large distribution of residence times and bubble sizes. This work therefore develops a deeper understanding of bubble dynamics and interphase mass transfer in such heterogenous gas mixtures through well-resolved computational models. We use a population balance model (PBM) for bubble-size-distribution modeling that is validated against small-scale experiments in our solver with an uncertainty quantification study for bubble coalescence and break-up model parameters. Results pertaining to multiple simulations of gas-fermentation reactors are presented where gas mixtures with varying compositions of CO2/CH4/CO/H2 are imposed at the sparger boundaries. The spatio-temporal variations in bubble-size distribution and mass transfer coefficient are analyzed for varying superficial velocities and gas-compositions for varying sizes of bubble-column and airlift reactors. This work will also examine the performance of different reactor designs, viz. bubble column reactor, airlift reactor with an internal draft tube, and a stirred-tank reactor with Rushton impellers. Reactor mass-transfer coefficient, gas hold-up, and dissolved gas distribution are critically analyzed among reactors, and sensitivity studies pertaining to gas flow rates and reactor geometry will be presented. [1] Weller, H., Tabor, G., Jasak, H. and Fureby, C., A tensorial approach to computational continuum mechanics using object-oriented techniques, Computers in physics, 12, 6, 620--631, 1998. [2] Rahimi, M., Sitaraman, H., Humbird, D. and Stickel, J., Computational fluid dynamics study of full-scale aerobic bioreactors: Evaluation of gas-liquid mass transfer, oxygen uptake, and dynamic oxygen distribution, Chemical Engineering Research and Design, 139: 283-295.

BIOMASS FUELS↗

Overview of Dragonfly Entry Aerosciences Measurements (DrEAM)

NASA Ames Research Center (ARC) leads the Dragonfly Entry Aerosciences Measurements (DrEAM) project, which is an aeroshell instrumentation suite on the Dragonfly mission that fulfills the Engineering Science Investigation requirement for the New Frontiers mission. NASA ARC is partnering with NASA Langley Research Center (LaRC) and the German Aerospace Center (DLR) to provide a comprehensive sensor suite, including a DLR-provided Data Acquisition System (DAS). DrEAM will provide key aerothermodynamic data and performance analysis for Dragonfly’s forebody and backshell Thermal Protection System (TPS). Titan’s atmosphere predominantly consists of ni-trogen (~98% by mole) with small amounts of me-thane (~2% by mole) and other trace gases. CN is a strong radiator, and is found in nonequilibrium con-centrations for Titan entry. The accurate modeling of nonequilibrium CN radiation has proven to be a diffi-cult task. Prompted by the Huygens mission, many experimental campaigns and analyses were performed to better understand the aerothermal environments experienced by the probe during Titan entry [1]. How-ever, the Huygens probe carried no heatshield instru-mentation. Therefore, the DrEAM sensor suite will sig-nificantly advance the state-of-the-art not only by documenting the environment and performance of Dragonfly’s entry system but also by making key in situ measurements in Titan’s atmosphere for the first time. Aerothermal environments and TPS response will be measured using sensors whose flight heritage is tak-en from the Mars Entry, Descent, and Landing In-strumentation 2 (MEDLI2) thermocouple plugs and the COMbined Aerothermal and Radiometer Sensor (COMARS) suite [2], with the latter supplied by DLR. The MEDLI2 project used embedded thermocouples to directly measure the in-depth TPS temperature-time history at several locations on the heat shield and backshell of the Mars 2020 entry vehicle. These tem-perature measurements, in turn, can be used to infer surface environments via an inverse analysis proce-dure analogous to that used for MEDLI. For DrEAM, the thermocouple plug subsystem will be known as Dragonfly Sensors for Aero-Thermal Reconstruction (DragSTR). On Schiaparelli, the COMARS suite in-cluded three total surface-mounted heat flux sensors, three pressure sensors, and one radiometer. For DrEAM, the COMARS package will be known as the COmbined Sensor System for Titan Atmosphere (COSSTA). Since the methane concentration in the Titan atmos-phere is directly proportional to the radiative heat flux, the COSSTA measurements will be used to reduce the current uncertainty in the methane volume fraction. Atmospheric density measurements and capsule aero-dynamic data will be obtained through the onboard Inertial Measurement Unit (IMU), supplemented by pressure transducers similar to those used by the MEDLI and MEDLI2 projects. The DrEAM pressure sensors will be known as the Dragonfly Atmospheric Flight Transducers. (DrAFT). The pressure measure-ments, when combined with data from the on-board IMU, will allow for reconstruction of such quantities as vehicle Mach number, freestream density, and atmos-pheric winds. DrAFT measurements will enhance Dragonfly trajectory reconstruction and enable a sepa-ration of the aerodynamics from the atmosphere, as was done for MEDLI [3] and is currently in process for the MEDLI2 flight data set.

EDL↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New York Marcellus Shale: Industry boom put on hold

Key catalysts for Marcellus Shale drilling in New York were identified. New York remains the only state in the nation with a legislative moratorium on high-volume hydraulic fracturing, as regulators and state lawmakers work to balance the advantages of potential economic benefits while protecting public drinking water resources and the environment. New York is being particularly careful to work on implementing sufficiently strict regulations to mitigate the environmental impacts Pennsylvania has already seen, such as methane gas releases, fracturing fluid releases, flowback water and brine controls, and total dissolved solids discharges. In addition to economic and environmental lessons learned, the New York Department of Environmental Conservation (DEC) also acknowledges impacts to housing markets, security, and other local issues, and may impose stringent measures to mitigate potential risks to local communities. Despite the moratorium, New York has the opportunity to take advantage of increased capital investment, tax revenue generation, and job creation opportunities by increasing shale gas activity. The combination of economic benefits, industry pressure, and recent technological advances will drive the pursuit of natural gas drilling in New York. We identify four principal catalysts as follows: Catalyst 1: Pressure from Within the State. Although high-volume hydraulic fracturing has become a nationally controversial technology, shale fracturing activity is common in every U.S. state except New York. The regulatory process has delayed potential economic opportunities for state and local economies, as well as many industry stakeholders. In 2010, shale gas production accounted for $18.6 billion in federal royalty and local, state, and federal tax revenues. (1) This is expected to continue to grow substantially. The DEC is under increased pressure to open the state to the same opportunities that Alabama, Arkansas, California, Colorado, Kansas, Louisiana, Montana, New Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Texas, Utah, West Virginia, and Wyoming are pursuing. Positive labor market impacts are another major economic draw. According to the Revised Draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program (September 2011), hydraulic fracturing would create between 4,408 and 17,634 full-time equivalent (FTE) direct construction jobs in New York State. Indirect employment in other sectors would add an additional 29,174 FTE jobs. Furthermore, the SGEIS analysis suggests that drilling activities could add an estimated $621.9 million to $2.5 billion in employee earnings (direct and indirect) per year, depending upon how much of the shale is developed. The state would also receive direct tax receipts from leasing land, and has the potential to see an increase in generated indirect revenue. Estimates range from $31 million to $125 million per year in personal income tax receipts, and local governments would benefit from revenue sharing. Some landowner groups say the continued delay in drilling is costing tens of thousands of jobs and millions of dollars in growth for New York, especially in the economically stunted upstate. A number of New York counties near Pennsylvania, such as Chemung, NY, have experienced economic uptick from Pennsylvania drilling activity just across the border. Chemung officials reported that approximately 1,300 county residents are currently employed by the drilling industry in Pennsylvania. The Marcellus shale boom is expected to continue over the next decade and beyond. By 2015, gas drilling activity could bring 20,000 jobs to New York State alone. Other states, such as Pennsylvania and West Virginia, are also expected to see a significant increase in the number of jobs. Catalyst 2: Political Reality of the Moratorium. Oil and gas drilling has taken place in New York since the 19th century, and it remains an important industry with more than 13,000 currently active wells. The use of hydraulic fracturing in particular has been employed for decades. Yet, as technological advancements have enabled access to gas in areas where drilling is not common practice, public concern has ballooned. Opponents argue that more oversight is necessary to protect the environment and public health, while supporters believe the industry is already adequately regulated. Although it is important for New York to complete a thorough environmental and regulatory review, an extended ban could lead to litigation by property owners who have been stripped of the ability to lease their mineral rights. Other states are moving forward by implementing legislative guidelines or rules created by commissions to ensure that resources are developed safely. One of the most controversial issues in other states to date has revolved around the public disclosure of chemical additives in drilling fluid. While the industry is hesitant to reveal trade secrets, the public and many officials want the security of knowing what chemicals are pumped into the ground. Industry transparency could help mitigate the public concern and controversy that is delaying a lift of the moratorium. Currently, at least five other states have set chemical disclosure rules. Arkansas, Michigan, Montana, Texas, and Wyoming require disclosure of the chemical components of drilling fluid. Colorado has the most stringent rules, requiring not just the disclosure of the additives but of their concentrations as well. As more states continue to allow hydraulic fracturing, New York will likely lift the moratorium and instead implement more stringent regulations that help to alleviate public concern surrounding hydraulic fracturing. This will allow the state to safely pursue the expansive opportunities offered by the Marcellus shale without falling behind economically. Catalyst 3: Energy and Infrastructure Benefits. Natural gas provides a key source of energy in the Northeast. The DEC estimates the Marcellus shale gas resource potential to be between 168-516 Tcf. Even at the low end of this range, Marcellus alone could supply seven years of total U.S. energy consumption, and it would provide a local resource for New York. One report suggests that savings from lower natural gas costs would result in an average annual savings of $926 per household. (4) Industry growth is leading to lower natural gas and electric power prices, while decreasing reliance on Liquid Natural Gas (LNG) imports and enhancing domestic energy security. This makes development of the resources an even more attractive commitment to New York. In addition, the natural gas business is predominantly regional in scope. Drilling companies would be required to build new pipelines for gas development in New York, therefore State regulators face valuable ancillary benefits of natural gas development such as infrastructure improvements. Catalyst 4: Technology Improvements. Lastly, the moratorium itself does not prevent the use of alternative drilling technologies, such as non-hydraulic fracturing, for shale gas production. Developers are already using new systems in Texas and Canada, as well as in France where hydraulic fracturing is banned country-wide. Commercial viability of these new technologies could ultimately provide an alternative to jumpstart shale drilling in New York if necessary. The potential benefits from development of the Marcellus shale in New York are undeniable, though regulators are still working to balance the need to stimulate the economy with environmental protection and public health. Since closing the public comment period in January, the DEC has signaled that much more work is needed, making no promises to near-term completion. While, neighboring states are feeling the economic benefits of drilling, the political environment and the recession continues adding pressure to the process in New York state.

03 NATURAL GAS↗

Validation Data Acquisition in HTTF during PCC Events

A validation experimental campaign was conducted in an Integral Effect Test (IET) facility of High Temperature Gas Reactors (HTGR), the High-Temperature Test Facility (HTTF) at Oregon State University (OSU). The HTTF simulates Depressurized and Pressurized Conduction Cooldowns (DCC and PCC). This campaign required the development of a new laser spectroscopic diagnostic to measure velocity in the challenging conditions of the HTTF: low speed (~1 m/s) gas flows at HTGR prototypical temperature and 1/10th pressure. This was a collaborative effort between co-PIs at The George Washington University (GW), Oregon State University (OSU), and NASA Langley Research Center. The main accomplishments of this project include the record for dynamic range for velocimetry, highest accuracy obtained with this technique, successful deployment in an IET leading to new validation matrix for CFD. These are detailed below and in manuscript appended to this executive summary. For this project, we introduced a new class of laser spectroscopic diagnostics to Thermal-Hydraulics to measure velocity of gases; furthermore, the diagnostic was demonstrated in-situ in an IET during DCC events. In such scenarios, particles used in mainstream techniques, like Particle Image Velocimetry (PIV) are not appropriate as they settle down too rapidly and also contaminate the experimental facility. Molecular tracers stay mixed within the working gas and can seed the flow in a technique called Molecular Tagging Velocimetry (MTV). In MTV a molecular tracer is photo-dissociated by a first (write) laser into radicals or molecules. The pattern created by the write laser is then interrogated with planar laser-induced fluorescence (PLIF), the read pulse(s), which are recorded with a camera. The pattern is probed and matched at two times (interval or probe time, dt), resulting in a time-of-flight velocimetry technique. This project demonstrated a new application range for MTV in gases. MTV has been extensively used for high-speed gas dynamics: molecules do not suffer from inertia associated with particles in regions of high accelerations (such as shock waves). For high-speed flows, the probe time is on the order of 0.1-10 µs. In time-of-flight techniques, the velocity is reconstructed from the recorded displacement, dx, between time interval dt: U = dx/dt. To first order, the resolution of the pattern matching is typically a (fixed) fraction of a pixel; therefore the resolution of the velocity measurement increases with dx and, for a given flow velocity, dt. For the low-speed flows of interest here, this requires long probe time, and therefore finding tracers that are stable for a long time. After an extensive literature survey we identified 6 tracers that would be suitable. We also worked with Spectra Physics to design a custom laser system that is flexible enough to probe these various tracers. The final instrument is made of 4 lasers that are integrated into a compact and movable cart to facilitate the deployment of the instrument off-site. One unique aspect of the laser system is the tunable dye laser (needed to do PLIF of the radicals). By being pumped by two Nd:YAG lasers, this laser is able to provide two pulses with any probe time (dt) for wavelengths between 200 and 900 nm with a linewidth of 3 pm. Accommodating the dual-pulse capability required customizing the pump lasers and the dye laser, making this system unique. Additionally, a custom UV-intensified CCD camera capable of frame-straddling and exposure time as short as 10 ns was acquired. More than two-third of the instrument cost (~$200k) was covered by a cost sharing from the PI’s startup funds. Of the 6 potential tracers identified, two were tested extensively (H2O and N2O) at high-temperature and elevated pressure at GW prior to conducting the tests at OSU. For both tracers, an Ar-F laser (193 nm, 10 ns, 10 mJ/pulse) photo-dissociates trace amounts (0.1 – 5% molar fraction) of the gases into OH and NO. OH is probed at 281.905 nm and NO at 226.186 nm (4-30mJ, 10 ns pulse). NO is very stable in inert environment and we could reconstruct velocities precisely with probe delay times as long at 40 ms, compared to 2 ms for OH, resulting in increased precision. Therefore, for the tests in the HTTF, N2O was selected as the final tracer and its optimal concentration was determined to be 0.5% molar. In the GW laboratory, we obtained a velocity measurement precision of 4 mm/s at conditions mimicking the HTTF tests. We also demonstrated the benefit of molecular tracers over particles and the flexibility of our instrument by continuously measuring velocity from 1000 to 0.1 m/s in a blow down test. This represents a dynamic range on velocity of 80 dB, which is unprecedented for velocimetry! Once the diagnostic was optimized, two two-week campaigns were conducted in the HTTF. This experimental campaign required numerous practical solutions to successfully and rapidly deploy this very sensitive table-top diagnostic in-situ. This was accomplished thanks to very extensive planning from all parties involved in the project. Due to constraints on availability of the HTTF, only adiabatic DCC tests were conducted. Specifically, the velocity was measured at the exit of the hot leg into the Reactor Cavity Simulation Tank (RCST). We were able to record the gas velocity associated with the air ingress for long times (up to one hour). Depending on the initial conditions (density of the gases in the Reactor Pressure Vessel and the RCST) the lock exchange lasted 30-60 s past the valve openings. Large vortices were identified within the shear layer at the interface of the cross flow. These vortices are an indication of shear-driven instability between the counter streams of different density. After the lock-exchange, a small residual flow was still present and its strength decayed exponentially. It finds its source in a buoyancy difference between the gases in both vessels due to the mixing and diffusion of the gases in the cross-over duct and the RPV lower plenum. We did not expect to capture this part of the transient, which would have been less significant (if not negligible) in the presence of a heated core; the precision of our measurement in the HTTF was 6 mm/s, which exceeded our expectations for such a complex test! Using commercial software (Fluent) we simulated the experiment with Computational Fluid Dynamic (CFD) using Reynolds Averaged Navier-Stokes (RANS) turbulence models. We were not able to accurately reproduce the shear layer instability, mixing, and diffusion captured in our experimental data, even with large 3D meshes (>10 M points). We attributed this to the inadequacy of the RANS models for the flow of interest: our experimental Reynolds number was too low and was outside the applicability range of the RANS models. Instead, we should have employed CFD with less modeling, such as Large Eddy (LES) or even Direct Numerical (DNS) simulations. Unfortunately, we did not have the computational resources to do so. Finally, it should be noted that this experimental technique holds great promises for measuring velocity in thermalhydraulics. MTV has an application domain (highlighted in the narrative) that is complimentary to more established (and simpler) techniques, such as PIV. It has attracted the attention of several thermalhydraulics researchers and sponsors to measure velocity in harsh environments. The spectroscopic nature of this technique also enables to expand it to measure temperature and concentration simultaneously to velocity. In lieu of a narrative, 4 detailed journal publications are appended to this executive summary to describe the various development and accomplishments during this project. They include 2 published manuscripts (Experiments in Fluids and Measurement Science and Technology), and two invited contributions following the NURETH-17 conference (Nuclear Science and Technology). Our current Nuclear Engineering and Design draft is not included at this time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗